MAT FOUNDATION FEM
DATA:
Width l : 9.50m
Length : 10.0m
(9.50m x 10.m)
STEP 1 (Creation of Geometry):
File  New Project  Select  space  File Name= mat foundation
Unit KNS Met.  Next   Add plate  Finish.
Type minimum Data on Data area.
Node X Y Z
1 0 0 0
2 0.50 0 0
3 0.0 0.0 0.50
4 0.50 0.0 0.50
Add 4 noded plates. Pick node 1,3,4,2.
1
21
43
XY
Z
(Note: Plate shall be preferably connected in anticlockwise direction.)
Select Plate 1 created. Click Translational Repeat icon.
Global direction X
Default spacing =0.50m
No. of steps =18 (9.50-0.50)/0.5 =18)
19 Plate elements created in X direction.
XY
Z
Select 19 Plates created.
Click Translational Repeat icon.
Global Direction Z
Default spacing =0.50m
No. of steps =19 (10.0-0.50)/0.5 =19)
XY
Z
STPE 2 (Member Property):
Main menu  Commands  Property  Thickness Plate 1 =0.45  Add.
Select all the plates using Plate cursor  Assign.
R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1R1
R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1R1
R1R1R1
R1
R1
R1R1R1R1
R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1R1R1R1R1
R1 R1
R1R1R1R1R1R1R1R1R1
R1R1
R1
R1R1R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1R1
R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1R1
R1R1R1
R1
R1
R1R1R1R1R1
R1R1R1R1R1R1
R1
R1R1R1R1R1R1R1R1R1R1
R1 R1
R1R1R1R1R1R1R1R1R1
R1R1
R1
R1R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1
R1R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1
R1R1R1R1
R1
R1
R1R1R1R1
R1 R1 R1 R1 R1 R1 R1
R1
R1 R1 R1 R1 R1 R1 R1 R1 R1 R1
R1 R1
R1R1R1R1R1R1R1R1
R1R1R1
R1
R1R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1
R1R1R1R1R1R1R1R1R1
R1
R1 R1R1R1R1R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1
R1R1R1R1
R1
R1
R1R1R1R1
R1R1R1R1R1R1R1
R1
R1R1R1R1R1R1R1R1R1R1
R1 R1
R1R1R1R1R1R1R1R1
R1R1R1
R1
R1R1R1R1R1R1R1R1R1
XY
Z
Step 3 (Support condition):
Calculation of Sub grade reaction
SBC =120KN/m2
Elastic mat subgrade reaction value is KN/m2
/m
As per Bowels subgrade modulus =40 x FOS x SBC
(for 25mm settlement)
FOS =2.5 to 3
Sub grade modulus =40 x (2.5 to 3) x SBC
= 100 to 120 tomes SBC = X
For 50mm settlement =X/2
For 75mm settlement = X/3 (OR)
Subgrade reaction = SBC/ settlement of 25 mm
=100KN/m2
/0.025 =4000 KN/m2
/m.
Ks =subgrade reaction = 100 to 120 times SBC say 100 x 120
=100x120 =12,000KN/m2
Ka= area x ks
= (0.25x 0.25) x 12000
=0.0625 x 12000 = 750KN/m3
Kb= area x ks
= (0.5x 0.5/2) x 12000
=0.125 x 12000 = 1500KN/m3
Kc= area x ks
= (0.50x 0.50) x 12000
=0.25 x 12000 = 3000KN/m3
General  Support  create  click Fixed but
For ka  ky =750KN/m3
For kb  ky = 1500KN/m3
For kc  ky = 3000KN/m3
Select corner node ka  Ky=750KN/m3
 Assign.
Select intermediate end plates for kb  Ky =1500KN/m3
 assign.
Select all intermediate node kc for Ky=3000KN/m3
 Assign.
Step 4 (Loading):
Main menu  Commands  Loading  Primary load  Load case 1 =Dead
Load  Add.
Load case 2=Live Load  Add  close.
Select load case 1 (Dead Load) Add.
Self weight Factor =-1. Direction  Y.
Dead Load (from column reaction) Fy=-250KN  Add.
Select Fy =-250 KN  select all column support node  Assign.
Select Load case 2 (Live load)  Add .
Fy=-150KN  Add.
Select Fy =-150KN  Select all column support nodes  Assign.
Main menu Commands  Loading  Load comb  Load comb 3
Default =1.50  Add  Close.
Main menu Commands Loading Load list (selecting design load)
Ok Close.
Step 5 (Analysis Type):
Main menu Commands Analysis Perform Analysis  No Print  Ok.
Step 6 (Post Analysis print):
Main menuCommands Post analysis print Support reactions  Ok.
Step 7 (Design):
Main menu  Commands Design  Concrete Design  Current
code=IS456  Main menu  Tools  Set current input unit= length=mm;
Force =N OK. Select all plate elements  Define Parameters
Fc=25  Assign
Fymain=415  Assign
Fysec=415 Assign
Max Main=16  Assign
Min Main=10 Assign Close.
Commands  Design slab element all.
Step 8 (Analysis):
Main menu  Analysis Run Analysis Done.
Mat foundation
Mat foundation

More Related Content

What's hot

Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
Dr.Abdulmannan Orabi
 
Modulus of subgrade reaction
Modulus of subgrade reaction Modulus of subgrade reaction
Modulus of subgrade reaction
Abdelrahman Esam
 
How to model and analyse structures using etabs
How to model and analyse structures using etabsHow to model and analyse structures using etabs
How to model and analyse structures using etabs
Wilson vils
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Muhammad Irfan
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
Bhaskar Alapati
 
Lecture 1 design loads
Lecture 1   design loadsLecture 1   design loads
Lecture 1 design loads
Morsaleen Chowdhury
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
Natalie Ulza
 
4.0 bearing capacity shallow foundations
4.0 bearing capacity shallow foundations4.0 bearing capacity shallow foundations
4.0 bearing capacity shallow foundations
Rakesh Reddy
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
SantistebanCampos
 
Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)
Md. Shahadat Hossain
 
Skempton's analysis for cohesive soils
Skempton's analysis for cohesive soilsSkempton's analysis for cohesive soils
Skempton's analysis for cohesive soils
SANJEEV Wazir
 
Etabs concrete-design
Etabs concrete-designEtabs concrete-design
Etabs concrete-designmamilli
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs
Godfrey James
 
Matching base shear in Etabs 2016
Matching base shear in Etabs 2016Matching base shear in Etabs 2016
Matching base shear in Etabs 2016
Vamsi krishna reddy
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Muhammad Irfan
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
SantistebanCampos
 
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Make Mannan
 
Basement wall design
Basement wall designBasement wall design
Basement wall design
CETCBIM
 
Design of shallow foundation slide share
Design of shallow foundation   slide shareDesign of shallow foundation   slide share
Design of shallow foundation slide share
zameer1979
 

What's hot (20)

Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
 
Modulus of subgrade reaction
Modulus of subgrade reaction Modulus of subgrade reaction
Modulus of subgrade reaction
 
How to model and analyse structures using etabs
How to model and analyse structures using etabsHow to model and analyse structures using etabs
How to model and analyse structures using etabs
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
 
Lecture 1 design loads
Lecture 1   design loadsLecture 1   design loads
Lecture 1 design loads
 
Unconfined compression test
Unconfined compression testUnconfined compression test
Unconfined compression test
 
4.0 bearing capacity shallow foundations
4.0 bearing capacity shallow foundations4.0 bearing capacity shallow foundations
4.0 bearing capacity shallow foundations
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)
 
Skempton's analysis for cohesive soils
Skempton's analysis for cohesive soilsSkempton's analysis for cohesive soils
Skempton's analysis for cohesive soils
 
Wind_Load
Wind_LoadWind_Load
Wind_Load
 
Etabs concrete-design
Etabs concrete-designEtabs concrete-design
Etabs concrete-design
 
Design and detailing of flat slabs
Design and detailing of flat slabs Design and detailing of flat slabs
Design and detailing of flat slabs
 
Matching base shear in Etabs 2016
Matching base shear in Etabs 2016Matching base shear in Etabs 2016
Matching base shear in Etabs 2016
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
 
Chapter 11
Chapter 11Chapter 11
Chapter 11
 
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)Best numerical problem group pile capacity (usefulsearch.org) (useful search)
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
 
Basement wall design
Basement wall designBasement wall design
Basement wall design
 
Design of shallow foundation slide share
Design of shallow foundation   slide shareDesign of shallow foundation   slide share
Design of shallow foundation slide share
 

Viewers also liked

Mat foundation
Mat foundationMat foundation
Mat foundation
Khushnuma Wasim
 
Mat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-CMat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-C
MD. Ashif Rayhan Shuvo
 
Mat Foundation Presentation Abhijatrik-28C
Mat Foundation Presentation Abhijatrik-28C Mat Foundation Presentation Abhijatrik-28C
Mat Foundation Presentation Abhijatrik-28C
Team-AbacuS
 
Presentation on Mat Foundation
Presentation on Mat FoundationPresentation on Mat Foundation
Presentation on Mat FoundationTanvir Alam Khan
 
10. design of mat foundation
10. design of mat foundation10. design of mat foundation
10. design of mat foundation
Konstantinos Kalemis
 
design of piled raft foundations. مشاركة لبشة الأوتاد الخوازيق و التربة في ...
design of piled raft foundations. مشاركة لبشة  الأوتاد  الخوازيق و التربة في ...design of piled raft foundations. مشاركة لبشة  الأوتاد  الخوازيق و التربة في ...
design of piled raft foundations. مشاركة لبشة الأوتاد الخوازيق و التربة في ...
Dr.youssef hamida
 
Seminar piled raft_foundation
Seminar piled raft_foundationSeminar piled raft_foundation
Seminar piled raft_foundation
Almotasem Darawish
 
Uniaxial Column Design
Uniaxial Column DesignUniaxial Column Design
Uniaxial Column DesignIkhtiar Khan
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
Fawad Najam
 
Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differences
scaffolddesign
 
Mat or raft foundation
Mat or raft foundationMat or raft foundation
Mat or raft foundation
Noroz Malghani
 
Raft foundations _design_and_analysis_with_a_practical_approach
Raft foundations _design_and_analysis_with_a_practical_approachRaft foundations _design_and_analysis_with_a_practical_approach
Raft foundations _design_and_analysis_with_a_practical_approach
Almotasem Darawish
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
Zawad khalil
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
Mohamed Azeem Nijamdeen
 

Viewers also liked (15)

Mat foundation
Mat foundationMat foundation
Mat foundation
 
Mat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-CMat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-C
 
Mat Foundation Presentation Abhijatrik-28C
Mat Foundation Presentation Abhijatrik-28C Mat Foundation Presentation Abhijatrik-28C
Mat Foundation Presentation Abhijatrik-28C
 
Presentation on Mat Foundation
Presentation on Mat FoundationPresentation on Mat Foundation
Presentation on Mat Foundation
 
10. design of mat foundation
10. design of mat foundation10. design of mat foundation
10. design of mat foundation
 
design of piled raft foundations. مشاركة لبشة الأوتاد الخوازيق و التربة في ...
design of piled raft foundations. مشاركة لبشة  الأوتاد  الخوازيق و التربة في ...design of piled raft foundations. مشاركة لبشة  الأوتاد  الخوازيق و التربة في ...
design of piled raft foundations. مشاركة لبشة الأوتاد الخوازيق و التربة في ...
 
Seminar piled raft_foundation
Seminar piled raft_foundationSeminar piled raft_foundation
Seminar piled raft_foundation
 
Footing a
Footing aFooting a
Footing a
 
Uniaxial Column Design
Uniaxial Column DesignUniaxial Column Design
Uniaxial Column Design
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
 
Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differences
 
Mat or raft foundation
Mat or raft foundationMat or raft foundation
Mat or raft foundation
 
Raft foundations _design_and_analysis_with_a_practical_approach
Raft foundations _design_and_analysis_with_a_practical_approachRaft foundations _design_and_analysis_with_a_practical_approach
Raft foundations _design_and_analysis_with_a_practical_approach
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 

Similar to Mat foundation

CAD Lab Manual 2021-22 pdf-30-51.pdf
CAD Lab Manual  2021-22 pdf-30-51.pdfCAD Lab Manual  2021-22 pdf-30-51.pdf
CAD Lab Manual 2021-22 pdf-30-51.pdf
Sunil Jp
 
Design steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girderDesign steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girder
Gaurav Ghai
 
Rigid-jointed_frame_analysis_1458662758
Rigid-jointed_frame_analysis_1458662758Rigid-jointed_frame_analysis_1458662758
Rigid-jointed_frame_analysis_1458662758
GURUPRASADSHIKHARE2
 
MSC NASTRAN
MSC NASTRANMSC NASTRAN
MSC NASTRAN
deily99
 
Preliminary design of slab
Preliminary design of slabPreliminary design of slab
Preliminary design of slab
ila vamsi krishna
 
Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYS
Maha Hassan
 
Cantilever Beam modal analysis using 1D elements in Nastran
Cantilever Beam modal analysis using 1D elements in NastranCantilever Beam modal analysis using 1D elements in Nastran
Cantilever Beam modal analysis using 1D elements in Nastran
shailesh patil
 
Steel warehouse design report
Steel warehouse design reportSteel warehouse design report
Steel warehouse design report
Havit Steel Structure Co.,ltd
 
Frequency response analysis of plate using Nastran Sol108
Frequency response analysis of plate using Nastran Sol108Frequency response analysis of plate using Nastran Sol108
Frequency response analysis of plate using Nastran Sol108
shailesh patil
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
Hamza Waheed
 
Analysis of a building with XC
Analysis of a building with XCAnalysis of a building with XC
Analysis of a building with XC
Luis Claudio Pérez Tato
 
B structure power point
B structure power pointB structure power point
B structure power point
Anderson Wong
 
presentation_41.pptx
presentation_41.pptxpresentation_41.pptx
presentation_41.pptx
ShathaTaha2
 
Group8 presentation
Group8 presentationGroup8 presentation
Group8 presentation
Nilesh Raj
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
Jing Fan Koh
 
Guided Wave Propagation Simulation by ANSYS
Guided Wave Propagation Simulation by ANSYS Guided Wave Propagation Simulation by ANSYS
Guided Wave Propagation Simulation by ANSYS
Ping Hung Lee
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_story
AliAlmayalee
 
Visual Basic(Vb) practical
Visual Basic(Vb) practicalVisual Basic(Vb) practical
Visual Basic(Vb) practical
Rahul juneja
 

Similar to Mat foundation (20)

CAD Lab Manual 2021-22 pdf-30-51.pdf
CAD Lab Manual  2021-22 pdf-30-51.pdfCAD Lab Manual  2021-22 pdf-30-51.pdf
CAD Lab Manual 2021-22 pdf-30-51.pdf
 
Design steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girderDesign steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girder
 
Rigid-jointed_frame_analysis_1458662758
Rigid-jointed_frame_analysis_1458662758Rigid-jointed_frame_analysis_1458662758
Rigid-jointed_frame_analysis_1458662758
 
MSC NASTRAN
MSC NASTRANMSC NASTRAN
MSC NASTRAN
 
Preliminary design of slab
Preliminary design of slabPreliminary design of slab
Preliminary design of slab
 
Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYS
 
Cantilever Beam modal analysis using 1D elements in Nastran
Cantilever Beam modal analysis using 1D elements in NastranCantilever Beam modal analysis using 1D elements in Nastran
Cantilever Beam modal analysis using 1D elements in Nastran
 
Steel warehouse design report
Steel warehouse design reportSteel warehouse design report
Steel warehouse design report
 
Frequency response analysis of plate using Nastran Sol108
Frequency response analysis of plate using Nastran Sol108Frequency response analysis of plate using Nastran Sol108
Frequency response analysis of plate using Nastran Sol108
 
Project in Excel 1
Project in Excel 1 Project in Excel 1
Project in Excel 1
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
G.p presentation
G.p presentationG.p presentation
G.p presentation
 
Analysis of a building with XC
Analysis of a building with XCAnalysis of a building with XC
Analysis of a building with XC
 
B structure power point
B structure power pointB structure power point
B structure power point
 
presentation_41.pptx
presentation_41.pptxpresentation_41.pptx
presentation_41.pptx
 
Group8 presentation
Group8 presentationGroup8 presentation
Group8 presentation
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Guided Wave Propagation Simulation by ANSYS
Guided Wave Propagation Simulation by ANSYS Guided Wave Propagation Simulation by ANSYS
Guided Wave Propagation Simulation by ANSYS
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_story
 
Visual Basic(Vb) practical
Visual Basic(Vb) practicalVisual Basic(Vb) practical
Visual Basic(Vb) practical
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

Mat foundation

  • 1. MAT FOUNDATION FEM DATA: Width l : 9.50m Length : 10.0m (9.50m x 10.m)
  • 2. STEP 1 (Creation of Geometry): File  New Project  Select  space  File Name= mat foundation Unit KNS Met.  Next   Add plate  Finish. Type minimum Data on Data area. Node X Y Z 1 0 0 0 2 0.50 0 0 3 0.0 0.0 0.50 4 0.50 0.0 0.50 Add 4 noded plates. Pick node 1,3,4,2. 1 21 43 XY Z (Note: Plate shall be preferably connected in anticlockwise direction.) Select Plate 1 created. Click Translational Repeat icon. Global direction X Default spacing =0.50m No. of steps =18 (9.50-0.50)/0.5 =18) 19 Plate elements created in X direction.
  • 3. XY Z Select 19 Plates created. Click Translational Repeat icon. Global Direction Z Default spacing =0.50m No. of steps =19 (10.0-0.50)/0.5 =19) XY Z STPE 2 (Member Property): Main menu  Commands  Property  Thickness Plate 1 =0.45  Add. Select all the plates using Plate cursor  Assign.
  • 4. R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1R1 R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1R1 R1R1R1 R1 R1 R1R1R1R1 R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1 R1R1 R1 R1R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1R1 R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1R1 R1R1R1 R1 R1 R1R1R1R1R1 R1R1R1R1R1R1 R1 R1R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1 R1R1 R1 R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1 R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1 R1R1R1R1 R1 R1 R1R1R1R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1R1R1R1R1R1R1R1 R1R1R1 R1 R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1R1 R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1 R1R1R1R1 R1 R1 R1R1R1R1 R1R1R1R1R1R1R1 R1 R1R1R1R1R1R1R1R1R1R1 R1 R1 R1R1R1R1R1R1R1R1 R1R1R1 R1 R1R1R1R1R1R1R1R1R1 XY Z Step 3 (Support condition): Calculation of Sub grade reaction SBC =120KN/m2 Elastic mat subgrade reaction value is KN/m2 /m As per Bowels subgrade modulus =40 x FOS x SBC (for 25mm settlement) FOS =2.5 to 3 Sub grade modulus =40 x (2.5 to 3) x SBC = 100 to 120 tomes SBC = X For 50mm settlement =X/2 For 75mm settlement = X/3 (OR) Subgrade reaction = SBC/ settlement of 25 mm =100KN/m2 /0.025 =4000 KN/m2 /m. Ks =subgrade reaction = 100 to 120 times SBC say 100 x 120 =100x120 =12,000KN/m2 Ka= area x ks = (0.25x 0.25) x 12000 =0.0625 x 12000 = 750KN/m3 Kb= area x ks = (0.5x 0.5/2) x 12000 =0.125 x 12000 = 1500KN/m3 Kc= area x ks = (0.50x 0.50) x 12000 =0.25 x 12000 = 3000KN/m3
  • 5. General  Support  create  click Fixed but For ka  ky =750KN/m3 For kb  ky = 1500KN/m3 For kc  ky = 3000KN/m3 Select corner node ka  Ky=750KN/m3  Assign. Select intermediate end plates for kb  Ky =1500KN/m3  assign. Select all intermediate node kc for Ky=3000KN/m3  Assign. Step 4 (Loading): Main menu  Commands  Loading  Primary load  Load case 1 =Dead Load  Add. Load case 2=Live Load  Add  close. Select load case 1 (Dead Load) Add. Self weight Factor =-1. Direction  Y. Dead Load (from column reaction) Fy=-250KN  Add. Select Fy =-250 KN  select all column support node  Assign. Select Load case 2 (Live load)  Add . Fy=-150KN  Add. Select Fy =-150KN  Select all column support nodes  Assign. Main menu Commands  Loading  Load comb  Load comb 3 Default =1.50  Add  Close. Main menu Commands Loading Load list (selecting design load) Ok Close. Step 5 (Analysis Type): Main menu Commands Analysis Perform Analysis  No Print  Ok. Step 6 (Post Analysis print): Main menuCommands Post analysis print Support reactions  Ok. Step 7 (Design): Main menu  Commands Design  Concrete Design  Current code=IS456  Main menu  Tools  Set current input unit= length=mm; Force =N OK. Select all plate elements  Define Parameters Fc=25  Assign Fymain=415  Assign Fysec=415 Assign Max Main=16  Assign Min Main=10 Assign Close. Commands  Design slab element all. Step 8 (Analysis): Main menu  Analysis Run Analysis Done.