MEASUREMENT IV
TENDER DOCUMENT
Group Member:
Lecturer: Sr Loo Seong King
INTRODUCTION
Proposed 3 Storey Semi Detached House on Lot 1512, Pekeliling
Sempadan, Seksyen 2, Bandar Ayer Itam, Daerah Timur Laut,
Pulau Pinang.
Key plan Location Plan
Site Plan
PEKELILING SEMPADAN, ,
SEKSYEN 2, BANDAR AYER
ITAM, DAERAH TIMUR LAUT,
PULAU PINANG.
LOCATION
PLAN
Level 1 Level 2 Level 3
FRONT ELEVATION
BACK ELEVATION
RIGHT ELEVATION
SECTION 1
SECTION 2
TENDER DOCUMENT
● This is a form for the tenderer to fill in and sign to declare that they are not
under any agreement with any other tenderers or parties to submit any
pre-determined tender amount.
DECLARATION OF NON-COLLUSION
● Tender validity period:
60 days from the date of submission of tender.
● Tender Deposit /Tender Documentation Fees:
RM500.00 non-refundable in the form of cash or Banker’s Cheque
made payable to the Quantity Surveyor
● Tender Bond / Earnest Money:
RM 10,000.00 in the form of a Bank Guarantee or Banker's Cheque
made payable to the Employer.
● Fixed completion period:
10 months
● Tendering period:
2 weeks from the date of the letter of invitation to tender.
INSTRUCTION & CONDITIONS OF TENDERING
PAM 2006 (with quantities)
FORM OF CONTRACT
Defects Liability Period: 24 months
Insurance cover of third parties and damages to property: RM 1 million
Insurance deductible amount: RM 50,000.00
Percentage to Cover Professional fees for reinstatement: 10% of Contract Sum
Amount for removal of Debris: 1% of Contract Sum
Liquidated damages: At the rate of RM 1,000.00 per day
Period of Delay: 3 months
Interim Claim Interval: 1 month
FORM OF CONTRACT
Period of Honouring of Certificates: 30 days
Percentage of the value of materials and goods included in the Certificate: 75%
Percentage of Certified Value Retained: 10%
Limit of Retention: 5% of the Contract Sum
Period to complete the Final Account: 6 months
Amount of Performance Bond: 5% of Contract Sum
FORM OF CONTRACT
BILLS OF QUANTITIES
Scope of work:
● Construction of one unit of 3 storey residential house including external
works within lot boundary.
● Cold water and Sanitary Plumbing and Electrical Installation are nominated
sub-contract works
● Supply of sanitary fittings is nominated supply sub-contract works
● Fixing of sanitary fittings, in-coming cold water supply and soil pipes and
manholes within lot boundary are included under Cold Water and Sanitary
Plumbing
PRELIMINARIES
Site:
● The site is generally flat.
● All earthwork, site clearance, external infrastructure works such as roads,
surface water drains and sumps, soil drainage pipes and manholes and
water supply mains leading to and around the site have already been
completed by others.
PRELIMINARIES
Prime Cost Sum:
Cold Water and Sanitary Plumbing Works: RM 20,000.00
Electrical Installation Works: RM 15,000.00
Supply and Delivery to Site of Sanitary Fittings: RM 10,000.00
Provisional Sum:
Contingencies: RM 100,000.00
PC AND PROVISIONAL SUM
APPENDICES
LIST OF DRAWINGS
SCHEDULE OF FINISHES
First Floor
SCHEDULE OF FINISHES
Second Floor
SCHEDULE OF FINISHES
Third Floor
SCHEDULE OF FINISHES
Floor Finishes
600mm X 600mm Niro polish
homogeneous tiles
600mm X 600mm Niro
homogeneous non-slip tiles
300mm X 600mm Niro
non-polish homogeneous tiles
SCHEDULE OF FINISHES
Wall Finishes
300mmx600mm “Niro” homogeneous estilo
ceramic tile
Location: Kitchen
300 x 600mm 'Niro' horizon stone (PONE)
LAPPATO ceramic tile
Location: Bath
SCHEDULE OF FINISHES
Ceiling Finishes
Plaster glass ceiling Moisture resistant plaster ceiling
Skim coating ceiling
SCHEDULE OF DAYWORK RATES
● For tenderer to fill in daywork rates for labour & machineries.
● Form the basis of payment for daywork ordered by the Architect.
● Avoid protracted argument on the reasonable rates to be used
PRICES OF BASIC MATERIALS
● For tenderer to fill in daywork rates for the prices of basic materials
● To be used for deriving new rates for variation ordered by the Architect.
● Avoid protracted argument on the reasonable rates to be used
● A standard form with pre-determined wordings for the tenderer’s sourcing of
a bank Guarantee for Earnest Money in the event of a successful tender.
BANK GUARANTEE FORM FOR EARNEST MONEY
● A standard form with pre-determined wordings for the tenderer’s sourcing of
a bank Guarantee for Performance Bond in the event of a successful tender.
BANK GUARANTEE FORM FOR PERFORMANCE BOND
THANK YOU !

Assignment - Tender Documentation (Presentation Slide)

  • 1.
    1. Pang KaiYun 2. Sam Wei Yin 3. Sandrabrooke 4. Tan Hwee Min 5. Tan Ming Howe 6. Tan You Liang 7. Sim Chia Ting MEASUREMENT IV TENDER DOCUMENT Group Member: Lecturer: Sr Loo Seong King
  • 2.
    INTRODUCTION Proposed 3 StoreySemi Detached House on Lot 1512, Pekeliling Sempadan, Seksyen 2, Bandar Ayer Itam, Daerah Timur Laut, Pulau Pinang.
  • 3.
    Key plan LocationPlan Site Plan PEKELILING SEMPADAN, , SEKSYEN 2, BANDAR AYER ITAM, DAERAH TIMUR LAUT, PULAU PINANG. LOCATION
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
    ● This isa form for the tenderer to fill in and sign to declare that they are not under any agreement with any other tenderers or parties to submit any pre-determined tender amount. DECLARATION OF NON-COLLUSION
  • 12.
    ● Tender validityperiod: 60 days from the date of submission of tender. ● Tender Deposit /Tender Documentation Fees: RM500.00 non-refundable in the form of cash or Banker’s Cheque made payable to the Quantity Surveyor ● Tender Bond / Earnest Money: RM 10,000.00 in the form of a Bank Guarantee or Banker's Cheque made payable to the Employer. ● Fixed completion period: 10 months ● Tendering period: 2 weeks from the date of the letter of invitation to tender. INSTRUCTION & CONDITIONS OF TENDERING
  • 13.
    PAM 2006 (withquantities) FORM OF CONTRACT
  • 14.
    Defects Liability Period:24 months Insurance cover of third parties and damages to property: RM 1 million Insurance deductible amount: RM 50,000.00 Percentage to Cover Professional fees for reinstatement: 10% of Contract Sum Amount for removal of Debris: 1% of Contract Sum Liquidated damages: At the rate of RM 1,000.00 per day Period of Delay: 3 months Interim Claim Interval: 1 month FORM OF CONTRACT
  • 15.
    Period of Honouringof Certificates: 30 days Percentage of the value of materials and goods included in the Certificate: 75% Percentage of Certified Value Retained: 10% Limit of Retention: 5% of the Contract Sum Period to complete the Final Account: 6 months Amount of Performance Bond: 5% of Contract Sum FORM OF CONTRACT
  • 16.
  • 17.
    Scope of work: ●Construction of one unit of 3 storey residential house including external works within lot boundary. ● Cold water and Sanitary Plumbing and Electrical Installation are nominated sub-contract works ● Supply of sanitary fittings is nominated supply sub-contract works ● Fixing of sanitary fittings, in-coming cold water supply and soil pipes and manholes within lot boundary are included under Cold Water and Sanitary Plumbing PRELIMINARIES
  • 18.
    Site: ● The siteis generally flat. ● All earthwork, site clearance, external infrastructure works such as roads, surface water drains and sumps, soil drainage pipes and manholes and water supply mains leading to and around the site have already been completed by others. PRELIMINARIES
  • 19.
    Prime Cost Sum: ColdWater and Sanitary Plumbing Works: RM 20,000.00 Electrical Installation Works: RM 15,000.00 Supply and Delivery to Site of Sanitary Fittings: RM 10,000.00 Provisional Sum: Contingencies: RM 100,000.00 PC AND PROVISIONAL SUM
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
    SCHEDULE OF FINISHES FloorFinishes 600mm X 600mm Niro polish homogeneous tiles 600mm X 600mm Niro homogeneous non-slip tiles 300mm X 600mm Niro non-polish homogeneous tiles
  • 26.
    SCHEDULE OF FINISHES WallFinishes 300mmx600mm “Niro” homogeneous estilo ceramic tile Location: Kitchen 300 x 600mm 'Niro' horizon stone (PONE) LAPPATO ceramic tile Location: Bath
  • 27.
    SCHEDULE OF FINISHES CeilingFinishes Plaster glass ceiling Moisture resistant plaster ceiling Skim coating ceiling
  • 28.
    SCHEDULE OF DAYWORKRATES ● For tenderer to fill in daywork rates for labour & machineries. ● Form the basis of payment for daywork ordered by the Architect. ● Avoid protracted argument on the reasonable rates to be used
  • 29.
    PRICES OF BASICMATERIALS ● For tenderer to fill in daywork rates for the prices of basic materials ● To be used for deriving new rates for variation ordered by the Architect. ● Avoid protracted argument on the reasonable rates to be used
  • 30.
    ● A standardform with pre-determined wordings for the tenderer’s sourcing of a bank Guarantee for Earnest Money in the event of a successful tender. BANK GUARANTEE FORM FOR EARNEST MONEY
  • 31.
    ● A standardform with pre-determined wordings for the tenderer’s sourcing of a bank Guarantee for Performance Bond in the event of a successful tender. BANK GUARANTEE FORM FOR PERFORMANCE BOND
  • 32.