This document summarizes the details of a construction project to build a semi-detached two-storey house. It includes the project title, location, type of building, site conditions, key plan, floor plans, elevations, sections, form of contract, instructions to tenderers, conditions of tendering, bills of quantities, schedules, and various contract forms. The project involves building a residential semi-detached house in Klang, Selangor using a PAM Contract 2006 with Quantities, and includes details of the site, design plans, specifications of materials and works, and requirements for tender submission.
VINestate - investment opportunities in Saigon 2017VINestate
Â
Bestn properties for sale in Saigon (Ho Chi Minh) with huge investment potential. Apartments from best local, Korean and Singapurean developers. Budget from $100k to $200k.
VINestate - investment opportunities in Saigon 2017VINestate
Â
Bestn properties for sale in Saigon (Ho Chi Minh) with huge investment potential. Apartments from best local, Korean and Singapurean developers. Budget from $100k to $200k.
This presentation by Morris Kleiner (University of Minnesota), was made during the discussion âCompetition and Regulation in Professions and Occupationsâ held at the Working Party No. 2 on Competition and Regulation on 10 June 2024. More papers and presentations on the topic can be found out at oe.cd/crps.
This presentation was uploaded with the authorâs consent.
Have you ever wondered how search works while visiting an e-commerce site, internal website, or searching through other types of online resources? Look no further than this informative session on the ways that taxonomies help end-users navigate the internet! Hear from taxonomists and other information professionals who have first-hand experience creating and working with taxonomies that aid in navigation, search, and discovery across a range of disciplines.
0x01 - Newton's Third Law: Static vs. Dynamic AbusersOWASP Beja
Â
f you offer a service on the web, odds are that someone will abuse it. Be it an API, a SaaS, a PaaS, or even a static website, someone somewhere will try to figure out a way to use it to their own needs. In this talk we'll compare measures that are effective against static attackers and how to battle a dynamic attacker who adapts to your counter-measures.
About the Speaker
===============
Diogo Sousa, Engineering Manager @ Canonical
An opinionated individual with an interest in cryptography and its intersection with secure software development.
Acorn Recovery: Restore IT infra within minutesIP ServerOne
Â
Introducing Acorn Recovery as a Service, a simple, fast, and secure managed disaster recovery (DRaaS) by IP ServerOne. A DR solution that helps restore your IT infra within minutes.
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Orkestra
Â
UIIN Conference, Madrid, 27-29 May 2024
James Wilson, Orkestra and Deusto Business School
Emily Wise, Lund University
Madeline Smith, The Glasgow School of Art
This presentation, created by Syed Faiz ul Hassan, explores the profound influence of media on public perception and behavior. It delves into the evolution of media from oral traditions to modern digital and social media platforms. Key topics include the role of media in information propagation, socialization, crisis awareness, globalization, and education. The presentation also examines media influence through agenda setting, propaganda, and manipulative techniques used by advertisers and marketers. Furthermore, it highlights the impact of surveillance enabled by media technologies on personal behavior and preferences. Through this comprehensive overview, the presentation aims to shed light on how media shapes collective consciousness and public opinion.
Media as a Mind Controlling Strategy In Old and Modern Era
Â
Measurement 4 presentation slides
1. 7QS Consultant Sdn. Bhd.
Taylorâs University, Lakeside Campus.
No.1, Jalan Taylors,
47500 Subang Jaya,
Selangor Darul Ehsan
Loh Mun Tong 0323680
Loo Siah Mong 0321995
Muhammad Fareez 0322961
Michelle Tung 0324175
Ng Sheng Zhe 0323830
Nicole Thain Huey Wei 0325697
Pui Chun Shian 0323470
2. INTRODUCTION OF PROJECT
Project title: Construction and completion 1 unit semi-detached house 2
storey high Type B (Lot Lama 1774)
Address : Jalan kapar, Taman Sri Kapar (KU13), Mukim Kapar, Klang
Bandar Diraja, Selangor Darul Ehsan
Building Purposes: Residential
Type of Project: Private
3. SITE CONDITION
Generally flat. All earthwork, site clearance, external infrastructure works have
already completed by others.
13. FORM OF CONTRACT
PAM Contract 2006 with Quantities
Under the terms and conditions of the PAM Standard Form contract 2006,
both the employer and contractor form the contractual parties to the
contract.
To ensure that the Contract is administered fairly between both
Contractual Parties, PAM Contract 2006 places the administration under
third party, namely the Architect.
14. Reasons of using PAM contract 2006 with Quantities
Quality and Quantity of works
Under clause 12, where PAM with quantities mentions that Contract Bills
form the basis for quantity of the works while PAM without quantities
mentions that the Contract Sum is derived from the contractor's own
estimate of the quantity based on Drawings and Specifications.
To ensure the performance on the quantities of works, BOQ is therefore
crucial to provide accurate and sufficient information of the project.
FORM OF CONTRACT (contâd)
15. Completion of work on time
Under clause 22.1, liquidated damages and certificate of non-completion,
if the contractor fails to complete the works by the completion date and it
shall be ought to be completed in the opinion of the Architect, the architect
shall issue the certificate of non-completion.
The contractor will compensate the employer from the damages or
referred to as Liquidated Damages from the sum as a debt or from the
performance bond.
FORM OF CONTRACT (contâd)
16. FORM OF TENDER
Form where the tenderer insert his
âtender amountâ and agreement to
other specified tender conditions by
attesting its signature or company seal
and making this form to be his legal
âofferâ to the Employer
17. INSTRUCTIONS TO TENDERER
Served to inform the tenderer on the
general rules & procedures that they need
to comply within the entire tendering
process
18. CONDITIONS OF TENDERING
Conditions of tendering is a rules and terms specific to a tender, submission,
evaluation and awarding of the contract.
â Basis of Tender
Firm price tender and no claim is allowed for variation
â Tender Deposit
Fee for the tender documents, RM500.00 shall pay in cash to
â7QS CONSULTANT SDN BHDâ
19. CONDITIONS OF TENDERING (contâd)
â Tender Bond
- Shall made in the form of Bankerâs Draft or unconditional Bankerâs Guarantee
- Shall be retained and remain valid until the expiration of 90 days after the
closing of tender
â Tender Validity Period
Remain valid open for consideration for a period of 90 days from the final
closing date for the submission of Tenders
20. FINAL SUMMARY OF TENDER
â Summary of total amount of
every bill in bills of quantity
â Total bill will be tender sum
21. PREAMBLE
Contain clauses that serve to introduce
and explain the provisions in the
âSpecificationâ and âBills of Quantitiesâ
sections and the scope of coverage of
the rates in the BQ
22. SPECIFICATIONS
Contain extensive clauses on detail
procedures to be followed in executing
the works; requirements & description
of the works to be performed
Eg: Quality & performance of materials
24. BILL NO. 1 - PRELIMINARIES
The purpose of Preliminaries is to
provide information, general
obligations and liabilities of the
project.
INSURANCE
Insurance of New Building/Works -
By The Employer
25. BILL NO. 1 - PRELIMINARIES
PROTECTION, PRECAUTION
& PREVENTION
Safety Precaution
Maintenance & protection of
Public Property
Mosquito Prevention
Watching and Security
Fencing and Hoarding
26. BILL NO 2 - MAIN BUILDING WORKS
PILLING
WORK BELOW LOWEST FLOOR FINISH
FRAME
UPPER FLOORS
ROOF
STAIR AND STAIRCASE FINISHES
EXTERNAL WALLS
27. BILL NO 2 - MAIN BUILDING WORKS
INTERNAL WALL AND PARTITIONS
WINDOWS & DOORS
INTERNAL WALL FINISHES
INTERNAL FLOOR FINISHES
INTERNAL CEILING FINISHES
EXTERNAL FINISHES
EXTERNAL WORK WITHIN BOUNDARY
28. BILL NO. 3 - PC AND PROVISIONAL SUMS
Prime Cost (PC) sums
Sums included in the contract to cover specialist works and the supply of
specific materials, which entail the employment of nominated
sub-contractor or nominated supplier.
Provisional sums
Sums included in the contract for works which the full extent and character