SlideShare a Scribd company logo
Project:
One unit of Double Story Semi-Detached
corner House on Seksyen 8, Kota Puteri,
Mukim Rawang, Daerah Gombak, Selangor
Darul Ehsan.
Completion period:
The completion period is 25 weeks
Parties
1.) Client (Name: Tan Sri Dato Jason Yong)
CMC INDUSTRIES SDN. BHD
Level 5A-5, Corporate Building (Block D)
Pusat Komersial Southgate
No.2, Jalan Dua, Off Jalan Chan Sow Lin
55200 Kuala Lumpur, Malaysia.
2.) Architect (Name: Mr. AR. Dennis)
WAW ALI ARCHITECT SDN. BHD
C 206 A&C 206B Jalan PJU 10/2A,
Damansara Damai, 47830 Petaling Jaya,
Selangor Darul Ehsan.
3.) Civil and Structural & Geotechnical Engineer (Name: Mr. IR. Zulhkiple A. Bakar)
PERUNDING ZNA (ASIA) SDN. BHD
Suite A-03-06, Block Allamanda,
10 Boulevard Lebuhraya Sprint PJU 6A,
47400 Petaling Jaya, Selangor Darul Ehsan.
Parties
4.) Mechanical and Electrical Engineer (Name: Mr. IR. Thum Peng Chew)
KTA Tenaga SDN. BHD.
D1-21, Jalan PJU 1/41,
Dataran Prima, Kelana Jaya,
47301 Petaling Jaya,
Selangor Darul Ehsan, Malaysia.
5.) Quantity Surveyor (Name: SR Yong Seen Yee)
SY Quantity Surveyor SDN. BHD.
No.3 Jalan Taylor’s,
47500 Subang Jaya,
Selangor Darul Ehsan, Malaysia.
6.) MINCONSULT SDN. BHD. (Name: Mr. IR. Chong Kwang Chern)
No.6 Jalan 51A/223,
46100 Petaling Jaya
Selangor Darul Ehsan Malaysia
Form of contract
Form of contract
• AGREEMENT AND CONDITIONS OF PAM Contract
2006 – (WITH QUANTITIES)
Type of contract
• This contract is based on a firm price lump sum
tender
Insurance
INTERIM VALUATION AND CERTIFICATES
• Minimum amount in interim Certificate shall be ten (10%) of the Contract Sum
INSURANCE
• cover the period from the commencement of the contract until the end of Defect
Liability Period
• The amount of cover for Contractor All Risk Insurance shall be RM1 million.
• The amount of cover for Workmen Compensation insurance shall be not less than
ten (10%) percents of the Contract Sum.
• Insurance deductible amount shall be RM 100,000.00 an occurrence.
• The amount of cover for Professional Fees for reinstatement shall be a sum
equivalent to 10% of the Contract Sum.
• The amount to cover for removal of Debris shall be a sum not less than the
equivalent of 2% of the Contract Sum.
Schedule of Programme of Work
Form of Tender
1) The tenderers shall agree to complete the
work within 25 weeks.
2) Tenderers shall not withdraw within 120
days after submission of tenders.
In the event that the tenderers
• withdraw within the Tender Validity Period,
• Imposed additional condition or stipulation
after the tender submission date, or
• refuse to execute Contract agreement or
deposit Performance Bond within 2 months
after date of possession of site,
PKNS reserves the right to nullify the contract.
Instructions to Tenderer
1) The Tenderer shall submit with his tender of
Earnest Money of RM7,000.00 in the form of
bank guarantee or bank draft in favor of SY
Quantity Surveyor Sdn. Bhd .
2) The Tenderers shall have registered with
CIDB and allow for all expenses incurred in
connections with any levels and/or fees
arising out of his compliance with CIDB.
Instructions to Tenderer
1) The Tenderer shall submit with his tender
of Earnest Money of RM7,000.00 in the
form of bank guarantee or bank draft in
favor of Total Reliability Sdn. Bhd.
2) Employer reserves the right to accept or
NOT to accept the lowest or ANY ONE of
the Tenders or any other Tender.
3) The Tenderer is to agree that this
TENDER is to remain valid and open for
consideration for a period of Sixty (60)
days from the final closing date for the
submission of Tenders.
Prime Cost
and
Provisional Sum
PRIME COST SUM
MEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A,
SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8,
KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Mechanical and
Electrical (M&E) Works
-RM15,000.00
Sanitary ware fittings
and plumbing services
-RM6,375.00
Windows and
Ironmongeries
-RM3,000.00
External Works and
Landscaping
-RM6,600.00
PROVISIONAL SUM
MEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A,
SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8,
KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Contingency Sum
-RM7,500.00
INTERNAL CEILING FINISHES
LOCATION TYPES OF FINISHES
ENTRANCE FOYER, LIVING AND
DINING AREA, KITCHEN, WASH
AREA, BEDROOM 3
Skim Coat painted with ‘Jotun’
paint system
BATHROOM 1, BATHROOM 2,
BATHROOM 3, MASTER
BEDROOM, BEDROOM 1,
BEDROOM 2, FAMILY AREA,
Suspended Fibrous plaster ceiling
board panel
INTRNAL FLOOR FINISHES
LOCATION TYPES OF FINISHES
LIVING AND DINING AREA ‘Kimgres’ Ceramic non-slips Tiles
‘Binco Series (White-gloss/matt)’
floor tiles
KITCHEN, WASH AREA ‘Kimgres’ Ceramic non-slips Tiles
‘Binco Series’ - Plain Yulara Grey
floor tile
INTERNAL FLOOR FINISHES
LOCATION TYPES OF FINISHES
BEDROOM 3 ‘Kimgres’ Ceramic non-slips Tiles
‘Concept Series’ - ‘Concept Plain
Latte’ floor tiles
BATHROOM 2, BATHROOM 3 ‘Kimgres’ Ceramic non-slip Tiles –
‘Lifestyle Ice Grey’ floor tiles
INTERNAL FLOOR FINISHES
LOCATION TYPES OF FINISHES
MASTER BEDROOM, BEDROOM 1,
BEDROOM 2, FAMILY AREA,
STAIRCASE
Timber laminated flooring
BATHROOM 1 ‘Kimgres’ Ceramic non-slip Tiles –
‘Lifestyle River Saltbush’ floor
tiles
EXTERNAL FLOOR FINISHES
LOCATION TYPES OF FINISHES
FOYER ‘Kimgres’ Ceramic non-slip tiles-
‘Bino Series(White-gloss/matt)
floor tiles.
TERRACE, BALCONY ‘Kimgres’ Ceramic non-slip Tiles
CAR PORCH Decoractive Concrete Imprint
Bino Series
Concrete Imprint
EXTERNAL CEILING FINISHES
LOCATION TYPES OF FINISHES
GROUND FLOOR, BALCONY Skim Coating
FIRST FLOOR Eave Ceiling – UAC Duravent Ceiling
Skim Coating
Eave Ceiling
F I T T I N G S
WATER CLOSETS WASH HAND BASINS
BATHROOM 1, 2 & 3
F I T T I N G S
KITCHEN SINK
T A P
SHOWER FITTINGS
T A P
HAND BIDETS
BATHROOM 1, 2 & 3
TAP WASH BASIN
BATHROOM 1, 2 & 3
T A P
KITCHEN SINK TAP
HOSE BIB TAP
WASH AREA & GARDEN TOP
A C C E S O R I E S
SOAP HOLDER BATHROOM 1, 2 & 3
Claytan TA723 Semi
Recessed Soap Holder
WHITE COLOUR or other
equivalent
MIRROR BATHROOM 1
MSG size 450mm x 600mm
x 5mm thk.
Dulux Interior
Basecoat Sealer
+
Dulux ICI Maxilite
Trade Emulsion Paint
To plastered surface of :
• Horizontal soffit of landing slab
• Sloping soffit of staircase
• Open string of staircase
+
Dulux Trade Metalshield
Zinc Phosphate
Dulux Trade
Bituminous Paint
To surface of :
• Mild Steel balustrade
• Mild steel handrails
INOVAR FLOOR
Smartfloor Interlocking
Timber Laminated
Flooring
To :
• Landing Slab
• Threads
• Face of receeding riser
STAIRCASE
FINISHES
SEWER DRAINAGE
MH B1
MH B2
MH B3
MH B4MH B5
MH B6
MH B7
MH M3
225mm
sewer pipe
WATER RETICULATION
90 BAND
3 TEES
250mm DIA.
PIPE
1 END CAP
22 ½ BEND
SURFACE WATER DRAIN
12 DRAINS
13 SEWERS
300mm DIA.
PIPE
CULVERT

More Related Content

What's hot

Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a Building
ARAVINDBORRA1
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
Jayson Ang
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
Jannah Jailani
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
ashleyyeap
 
Casa Grande Masseys Brochure - Zricks.com
Casa Grande Masseys Brochure - Zricks.comCasa Grande Masseys Brochure - Zricks.com
Casa Grande Masseys Brochure - Zricks.com
Zricks.com
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
Ali Belal
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 
CV 2017# harendra sharma
CV 2017# harendra sharmaCV 2017# harendra sharma
CV 2017# harendra sharmaHarendra Sharma
 
Casa Grande Marina Bay Brochure - Zricks.com
Casa Grande Marina Bay Brochure - Zricks.comCasa Grande Marina Bay Brochure - Zricks.com
Casa Grande Marina Bay Brochure - Zricks.com
Zricks.com
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
Est
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Alec Rendell [NBPR-2]
 
Wellington residences in Tanza Cavite
Wellington residences in Tanza CaviteWellington residences in Tanza Cavite
Wellington residences in Tanza Cavite
Jr Rob
 
Ajnara Homes in Sector-121 Noida - 2,3 BHK Booking @ 9910061017
Ajnara Homes in Sector-121 Noida -  2,3 BHK Booking @ 9910061017Ajnara Homes in Sector-121 Noida -  2,3 BHK Booking @ 9910061017
Ajnara Homes in Sector-121 Noida - 2,3 BHK Booking @ 9910061017
Webedge Info Pvt. Ltd.
 
Bq floor
Bq floorBq floor
Bq floor
Jennifer Chong
 
Building permit 2
Building permit 2Building permit 2
Building permit 2
Lumbad 1989
 

What's hot (20)

Car park bq
Car park bqCar park bq
Car park bq
 
Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a Building
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 
PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Casa Grande Masseys Brochure - Zricks.com
Casa Grande Masseys Brochure - Zricks.comCasa Grande Masseys Brochure - Zricks.com
Casa Grande Masseys Brochure - Zricks.com
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
CV 2017# harendra sharma
CV 2017# harendra sharmaCV 2017# harendra sharma
CV 2017# harendra sharma
 
Greenbanks
GreenbanksGreenbanks
Greenbanks
 
Casa Grande Marina Bay Brochure - Zricks.com
Casa Grande Marina Bay Brochure - Zricks.comCasa Grande Marina Bay Brochure - Zricks.com
Casa Grande Marina Bay Brochure - Zricks.com
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
 
Wellington residences in Tanza Cavite
Wellington residences in Tanza CaviteWellington residences in Tanza Cavite
Wellington residences in Tanza Cavite
 
Ajnara Homes in Sector-121 Noida - 2,3 BHK Booking @ 9910061017
Ajnara Homes in Sector-121 Noida -  2,3 BHK Booking @ 9910061017Ajnara Homes in Sector-121 Noida -  2,3 BHK Booking @ 9910061017
Ajnara Homes in Sector-121 Noida - 2,3 BHK Booking @ 9910061017
 
3D
3D3D
3D
 
Bq floor
Bq floorBq floor
Bq floor
 
Building permit 2
Building permit 2Building permit 2
Building permit 2
 

Viewers also liked

Assignment - Measurement
Assignment - MeasurementAssignment - Measurement
Assignment - Measurement
Kai Yun Pang
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishes
Doreen Yeo
 
Sem 2 measurement 2 (qsb 60204) module outline
Sem 2 measurement 2 (qsb 60204)   module outlineSem 2 measurement 2 (qsb 60204)   module outline
Sem 2 measurement 2 (qsb 60204) module outline
Est
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
hlksd
 
Wall finishes and wall patterns
Wall finishes and wall patternsWall finishes and wall patterns
Wall finishes and wall patterns
ELFIndia
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
Chiety Lasim
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)Zairul Zaiky
 

Viewers also liked (8)

Assignment - Measurement
Assignment - MeasurementAssignment - Measurement
Assignment - Measurement
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishes
 
Sem 2 measurement 2 (qsb 60204) module outline
Sem 2 measurement 2 (qsb 60204)   module outlineSem 2 measurement 2 (qsb 60204)   module outline
Sem 2 measurement 2 (qsb 60204) module outline
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Wall finishes and wall patterns
Wall finishes and wall patternsWall finishes and wall patterns
Wall finishes and wall patterns
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 
ACH 121 Lecture 14 (Finishes)
ACH 121 Lecture 14 (Finishes)ACH 121 Lecture 14 (Finishes)
ACH 121 Lecture 14 (Finishes)
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 

Similar to MEASUREMENT 4 PRESENTATION

Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Shze Hwa Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Kailyn Lee
 
M4ppt
M4pptM4ppt
M4ppt
Timun Loh
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
shensin1015
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
Lin Hui
 
An industrial training report
An industrial training reportAn industrial training report
An industrial training reportborokinni
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
Hasif Alias
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptx
Ziyad Zaidi
 
Drawing_ R0.pdf
Drawing_ R0.pdfDrawing_ R0.pdf
Drawing_ R0.pdf
SzeMianKueh
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
Alok Mishra
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
amity university
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
ashleyyeap
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileZairi Zainudin
 
Vatika lifestyle home
Vatika lifestyle homeVatika lifestyle home
Vatika lifestyle home
Invest Gurgaon Properties
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
Rakshita Raghunath
 
Ansal Amantre Sector-88A - Gurgaon
Ansal Amantre Sector-88A - GurgaonAnsal Amantre Sector-88A - Gurgaon
Ansal Amantre Sector-88A - Gurgaon
Property Point Gurgaon
 
Ansal Amantre
Ansal AmantreAnsal Amantre
Ansal Amantre
Property Point Gurgaon
 
IRJET- Glass Facade Water Cooling System
IRJET- Glass Facade Water Cooling SystemIRJET- Glass Facade Water Cooling System
IRJET- Glass Facade Water Cooling System
IRJET Journal
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
Melvin Lim
 

Similar to MEASUREMENT 4 PRESENTATION (20)

Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
M4ppt
M4pptM4ppt
M4ppt
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
An industrial training report
An industrial training reportAn industrial training report
An industrial training report
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptx
 
Drawing_ R0.pdf
Drawing_ R0.pdfDrawing_ R0.pdf
Drawing_ R0.pdf
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd Profile
 
Vatika lifestyle home
Vatika lifestyle homeVatika lifestyle home
Vatika lifestyle home
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
Ansal Amantre Sector-88A - Gurgaon
Ansal Amantre Sector-88A - GurgaonAnsal Amantre Sector-88A - Gurgaon
Ansal Amantre Sector-88A - Gurgaon
 
Ansal Amantre
Ansal AmantreAnsal Amantre
Ansal Amantre
 
IRJET- Glass Facade Water Cooling System
IRJET- Glass Facade Water Cooling SystemIRJET- Glass Facade Water Cooling System
IRJET- Glass Facade Water Cooling System
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 

More from XinYee Khoo

Software Applications
Software ApplicationsSoftware Applications
Software Applications
XinYee Khoo
 
Building Service II Group Assignment
Building Service II Group AssignmentBuilding Service II Group Assignment
Building Service II Group Assignment
XinYee Khoo
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
XinYee Khoo
 
Management Science Report
Management Science ReportManagement Science Report
Management Science Report
XinYee Khoo
 
Management Science Presendation
Management Science PresendationManagement Science Presendation
Management Science Presendation
XinYee Khoo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment
XinYee Khoo
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
XinYee Khoo
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
XinYee Khoo
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
XinYee Khoo
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
XinYee Khoo
 
Presentation on Concrete
Presentation on ConcretePresentation on Concrete
Presentation on Concrete
XinYee Khoo
 
Compacting Factor Test
Compacting Factor TestCompacting Factor Test
Compacting Factor Test
XinYee Khoo
 
Presentation on concrete
Presentation on concretePresentation on concrete
Presentation on concrete
XinYee Khoo
 
Final CT Assignment
Final CT AssignmentFinal CT Assignment
Final CT Assignment
XinYee Khoo
 
Business Charity Drive Report
Business Charity Drive ReportBusiness Charity Drive Report
Business Charity Drive ReportXinYee Khoo
 
Mathematics Statistic Gym Infographic Poster
 Mathematics Statistic Gym Infographic Poster Mathematics Statistic Gym Infographic Poster
Mathematics Statistic Gym Infographic PosterXinYee Khoo
 
Mathematics Statistic Report
Mathematics Statistic ReportMathematics Statistic Report
Mathematics Statistic ReportXinYee Khoo
 

More from XinYee Khoo (20)

Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Building Service II Group Assignment
Building Service II Group AssignmentBuilding Service II Group Assignment
Building Service II Group Assignment
 
BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
Management Science Report
Management Science ReportManagement Science Report
Management Science Report
 
Management Science Presendation
Management Science PresendationManagement Science Presendation
Management Science Presendation
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
 
Building Materials Assignment
Building Materials AssignmentBuilding Materials Assignment
Building Materials Assignment
 
Presentation on Concrete
Presentation on ConcretePresentation on Concrete
Presentation on Concrete
 
Compacting Factor Test
Compacting Factor TestCompacting Factor Test
Compacting Factor Test
 
Presentation on concrete
Presentation on concretePresentation on concrete
Presentation on concrete
 
Final CT Assignment
Final CT AssignmentFinal CT Assignment
Final CT Assignment
 
Business Charity Drive Report
Business Charity Drive ReportBusiness Charity Drive Report
Business Charity Drive Report
 
Mathematics Statistic Gym Infographic Poster
 Mathematics Statistic Gym Infographic Poster Mathematics Statistic Gym Infographic Poster
Mathematics Statistic Gym Infographic Poster
 
Mathematics Statistic Report
Mathematics Statistic ReportMathematics Statistic Report
Mathematics Statistic Report
 

Recently uploaded

Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 

Recently uploaded (20)

Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 

MEASUREMENT 4 PRESENTATION

  • 1. Project: One unit of Double Story Semi-Detached corner House on Seksyen 8, Kota Puteri, Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan. Completion period: The completion period is 25 weeks
  • 2. Parties 1.) Client (Name: Tan Sri Dato Jason Yong) CMC INDUSTRIES SDN. BHD Level 5A-5, Corporate Building (Block D) Pusat Komersial Southgate No.2, Jalan Dua, Off Jalan Chan Sow Lin 55200 Kuala Lumpur, Malaysia. 2.) Architect (Name: Mr. AR. Dennis) WAW ALI ARCHITECT SDN. BHD C 206 A&C 206B Jalan PJU 10/2A, Damansara Damai, 47830 Petaling Jaya, Selangor Darul Ehsan. 3.) Civil and Structural & Geotechnical Engineer (Name: Mr. IR. Zulhkiple A. Bakar) PERUNDING ZNA (ASIA) SDN. BHD Suite A-03-06, Block Allamanda, 10 Boulevard Lebuhraya Sprint PJU 6A, 47400 Petaling Jaya, Selangor Darul Ehsan.
  • 3. Parties 4.) Mechanical and Electrical Engineer (Name: Mr. IR. Thum Peng Chew) KTA Tenaga SDN. BHD. D1-21, Jalan PJU 1/41, Dataran Prima, Kelana Jaya, 47301 Petaling Jaya, Selangor Darul Ehsan, Malaysia. 5.) Quantity Surveyor (Name: SR Yong Seen Yee) SY Quantity Surveyor SDN. BHD. No.3 Jalan Taylor’s, 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia. 6.) MINCONSULT SDN. BHD. (Name: Mr. IR. Chong Kwang Chern) No.6 Jalan 51A/223, 46100 Petaling Jaya Selangor Darul Ehsan Malaysia
  • 4. Form of contract Form of contract • AGREEMENT AND CONDITIONS OF PAM Contract 2006 – (WITH QUANTITIES) Type of contract • This contract is based on a firm price lump sum tender
  • 5. Insurance INTERIM VALUATION AND CERTIFICATES • Minimum amount in interim Certificate shall be ten (10%) of the Contract Sum INSURANCE • cover the period from the commencement of the contract until the end of Defect Liability Period • The amount of cover for Contractor All Risk Insurance shall be RM1 million. • The amount of cover for Workmen Compensation insurance shall be not less than ten (10%) percents of the Contract Sum. • Insurance deductible amount shall be RM 100,000.00 an occurrence. • The amount of cover for Professional Fees for reinstatement shall be a sum equivalent to 10% of the Contract Sum. • The amount to cover for removal of Debris shall be a sum not less than the equivalent of 2% of the Contract Sum.
  • 8. 1) The tenderers shall agree to complete the work within 25 weeks. 2) Tenderers shall not withdraw within 120 days after submission of tenders. In the event that the tenderers • withdraw within the Tender Validity Period, • Imposed additional condition or stipulation after the tender submission date, or • refuse to execute Contract agreement or deposit Performance Bond within 2 months after date of possession of site, PKNS reserves the right to nullify the contract.
  • 10. 1) The Tenderer shall submit with his tender of Earnest Money of RM7,000.00 in the form of bank guarantee or bank draft in favor of SY Quantity Surveyor Sdn. Bhd . 2) The Tenderers shall have registered with CIDB and allow for all expenses incurred in connections with any levels and/or fees arising out of his compliance with CIDB.
  • 12. 1) The Tenderer shall submit with his tender of Earnest Money of RM7,000.00 in the form of bank guarantee or bank draft in favor of Total Reliability Sdn. Bhd. 2) Employer reserves the right to accept or NOT to accept the lowest or ANY ONE of the Tenders or any other Tender. 3) The Tenderer is to agree that this TENDER is to remain valid and open for consideration for a period of Sixty (60) days from the final closing date for the submission of Tenders.
  • 14. PRIME COST SUM MEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN Mechanical and Electrical (M&E) Works -RM15,000.00 Sanitary ware fittings and plumbing services -RM6,375.00 Windows and Ironmongeries -RM3,000.00 External Works and Landscaping -RM6,600.00
  • 15. PROVISIONAL SUM MEMBINA DAN MENYIAPKAN 1 UNIT RUMAH LINK 2 TINGKAT (20’ X 70’) FASA 3A, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 8, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN Contingency Sum -RM7,500.00
  • 16. INTERNAL CEILING FINISHES LOCATION TYPES OF FINISHES ENTRANCE FOYER, LIVING AND DINING AREA, KITCHEN, WASH AREA, BEDROOM 3 Skim Coat painted with ‘Jotun’ paint system BATHROOM 1, BATHROOM 2, BATHROOM 3, MASTER BEDROOM, BEDROOM 1, BEDROOM 2, FAMILY AREA, Suspended Fibrous plaster ceiling board panel
  • 17. INTRNAL FLOOR FINISHES LOCATION TYPES OF FINISHES LIVING AND DINING AREA ‘Kimgres’ Ceramic non-slips Tiles ‘Binco Series (White-gloss/matt)’ floor tiles KITCHEN, WASH AREA ‘Kimgres’ Ceramic non-slips Tiles ‘Binco Series’ - Plain Yulara Grey floor tile
  • 18. INTERNAL FLOOR FINISHES LOCATION TYPES OF FINISHES BEDROOM 3 ‘Kimgres’ Ceramic non-slips Tiles ‘Concept Series’ - ‘Concept Plain Latte’ floor tiles BATHROOM 2, BATHROOM 3 ‘Kimgres’ Ceramic non-slip Tiles – ‘Lifestyle Ice Grey’ floor tiles
  • 19. INTERNAL FLOOR FINISHES LOCATION TYPES OF FINISHES MASTER BEDROOM, BEDROOM 1, BEDROOM 2, FAMILY AREA, STAIRCASE Timber laminated flooring BATHROOM 1 ‘Kimgres’ Ceramic non-slip Tiles – ‘Lifestyle River Saltbush’ floor tiles
  • 20. EXTERNAL FLOOR FINISHES LOCATION TYPES OF FINISHES FOYER ‘Kimgres’ Ceramic non-slip tiles- ‘Bino Series(White-gloss/matt) floor tiles. TERRACE, BALCONY ‘Kimgres’ Ceramic non-slip Tiles CAR PORCH Decoractive Concrete Imprint Bino Series Concrete Imprint
  • 21. EXTERNAL CEILING FINISHES LOCATION TYPES OF FINISHES GROUND FLOOR, BALCONY Skim Coating FIRST FLOOR Eave Ceiling – UAC Duravent Ceiling Skim Coating Eave Ceiling
  • 22. F I T T I N G S WATER CLOSETS WASH HAND BASINS BATHROOM 1, 2 & 3
  • 23. F I T T I N G S KITCHEN SINK
  • 24. T A P SHOWER FITTINGS
  • 25. T A P HAND BIDETS BATHROOM 1, 2 & 3 TAP WASH BASIN BATHROOM 1, 2 & 3
  • 26. T A P KITCHEN SINK TAP HOSE BIB TAP WASH AREA & GARDEN TOP
  • 27. A C C E S O R I E S SOAP HOLDER BATHROOM 1, 2 & 3 Claytan TA723 Semi Recessed Soap Holder WHITE COLOUR or other equivalent MIRROR BATHROOM 1 MSG size 450mm x 600mm x 5mm thk.
  • 28. Dulux Interior Basecoat Sealer + Dulux ICI Maxilite Trade Emulsion Paint To plastered surface of : • Horizontal soffit of landing slab • Sloping soffit of staircase • Open string of staircase + Dulux Trade Metalshield Zinc Phosphate Dulux Trade Bituminous Paint To surface of : • Mild Steel balustrade • Mild steel handrails INOVAR FLOOR Smartfloor Interlocking Timber Laminated Flooring To : • Landing Slab • Threads • Face of receeding riser STAIRCASE FINISHES
  • 29. SEWER DRAINAGE MH B1 MH B2 MH B3 MH B4MH B5 MH B6 MH B7 MH M3 225mm sewer pipe
  • 30. WATER RETICULATION 90 BAND 3 TEES 250mm DIA. PIPE 1 END CAP 22 ½ BEND
  • 31. SURFACE WATER DRAIN 12 DRAINS 13 SEWERS 300mm DIA. PIPE CULVERT