Company Profile
BUILDING THE FUTURE.
Headquater
10, Jalan Setia Prima G, U13/G,
Setia Alam, Seksyen U13,
40170 Shah Alam,
Selangor.
DK Construction Sdn. Bhd.
Company No. : 215203A
CIDB Registration : Grade 4 B04
Registration No : 0120160303-WP171579
Authorized Capital RM1,000,000
dkconstruction@gmail.com
www.dkconstruction.com.my
+6 033291 0503
+6 033291 0706
About Us
BUILDING THE FUTURE.
Teamwork
Integrity
Commitment
COREVALUES
Founder : Tee Dee Kei
Our Vision
BUILDING THE FUTURE.
01
02
03
Build partnerships
in the community.
Provide valuable
services to clients.
Deliver important
resources.
Why Choose DK
BUILDING THE FUTURE.
01
We reduce wastage.
DK finds ways to minimize waste
and maximize use of time, labor,
and materials.
02
Professional in BIM.
DK has become the leading
industry exponent of the
transformational construction tool
and process Building Information
Modeling (BIM), with more than
$50 billion in BIM project
experience.
DK Today
BUILDING THE FUTURE.
DK Construction Sdn. Bhd. is a fully integrated civil engineering and building construction
firm based in the Penisular Malaysia state of Selangor. DK has transformed vast acres of
uninhabitable swampland into modern housing and industrial estates, tourist resorts, commercial
centres, airports and highways.
DK Today
BUILDING THE FUTURE.
We offer:
01 02 03 04
General contracting Construction
management
Design-build Preconstruction
planning services
DK Today
BUILDING THE FUTURE.
Our people bring their technical knowledge, experience, and resourcefulness to the
delivery of our construction services.
Driven by a commitment to continuous improvement, DK embraces Building Information
Modeling to improve efficiency and enhance client's value.
Project Team
BUILDING THE FUTURE.
Agenda
BUILDING THE FUTURE.
01 02 03 04
Company Profile &
Project Team
Strengths of the
company tender
Weaknesses of the
company tender
Errors in the tender
1) Registered Contractor Company
BUILDING THE FUTURE.
01
02
Registered contractor company under CIDB.
Grade 4 with RM1000,000 capacity.
2) Expertise
BUILDING THE FUTURE.
• We’ve spent decades constructing impressive
buildings of every shape, size and purpose, from
bridge to modern housing, road to industrial
estates, airport to highways.
• Hence, we’ve developed a highly efficient
approach to construction: a powerful combination
of people, process, and technology.
2) Expertise
BUILDING THE FUTURE.
People
We retain our employees significantly
longer than the industry average.
Process
Project managers handle estimating,
procurement, operations and client
relations. For you, as an owner, this
means flexibility, consistency across
multiple projects and a single point of
contact who’s empowered to do whatever
is needed to ensure you’re satisfied.
Technology
That ensures efficient, cost-effective
construction and better quality of work
01
02
03
3) Good Reputation
BUILDING THE FUTURE.
TROPICANA KL
DEVELOPMENT SDN.
BHD.
SP SETIA BERHAD
GROUP
IJM LAND BERHAD
GSD LAND
SDN. BHD.
SELANGOR
PROPERTIES BHD.
WCT CONSTRUCTION
“Good quality of
workmanship.”
“Experienced and
well-known
company.”
“Great working
performance.
Satisfaction met.”
“No delay of
work, on-time
completion.”
“Excellent
management on
site.”
“Good
implemention of
BIM in achieving
efficiency.”
4) Good Management Skill
BUILDING THE FUTURE.
PROJECT MANAGEMENT
BIM provides a visible view of constructability,
interconnectivity of building systems and aesthetic
elements during preconstruction stage.
LABOURS & MACHINERIES MANAGEMENT
Ensure maximise the use of resources
Reason: Reduce waste of resources, time and cost.
5) Experienced on Relevant Project
BUILDING THE FUTURE.
6) Risk Management
BUILDING THE FUTURE.
- DK Construction takes a multi-faceted approach to risk management: examining potential risks to
ensure clients are satisfied with their project and our partnership.
- Safety and quality are at the top of our list, and we can handle all matters related to insurance
coverage, claims and loss control, with competence born of experience. We are prepared for the risks
associated with delivering the highest quality building.
- We believe it’s nothing more than you should expect from a professional construction firm.
Agenda
BUILDING THE FUTURE.
01 02 03 04
Company Profile &
Project Team
Strengths of the
company tender
Weaknesses of the
company tender
Errors in the tender
1) Newly hired unskilled labour
BUILDING THE FUTURE.
We value our worker’s learning
experience.
We are hiring a gang of new workers
and plan to give them hands on
experience in this project.
We are charging low prices, but hoping
of giving them another learning
opportunity in this project
2) Restricted design variations
BUILDING THE FUTURE.
1. We are imposing a very slim profit
margin.
2. Therefore, we don't encourage too
much variations and changes occur in
the design.
3. Otherwise, cost plus situation may
happen.
4. Cost plus will increase the overall
cost of the project.
Agenda
BUILDING THE FUTURE.
01 02 03 04
Company Profile &
Project Team
Strengths of the
company tender
Weaknesses of the
company tender
Errors in the tender
Error made by Client in the Tender Document
Error 1
Error 2
Error 1
The client does not specify the amount
of the Tender Deposit.
Error 2
The form of tender bond should be
shown in Appendix “D” as stated in the
content.
BUILDING THE FUTURE.
Error 3
Error 3
The client does not provide the Letter of Tender Invitation which must be included the date of collecting tender document
and the date of closing tender.
Error made by Client in the Tender Document
BUILDING THE FUTURE.
Error 4 Error 5
Error 6
Error 4, 5 and 6
The unit should be in M3 for the concrete binding screed according to SMM clause F3.1
Error made by Client in the Tender Document
BUILDING THE FUTURE.
Error 7
The submission date of tender
document should be not later than
10am on 7th June 2016.
Error made by Client in the Tender Document
BUILDING THE FUTURE.
Error of company tender
BUILDING THE FUTURE.
General Scaffolding including Staging
Wall height below 3.5 meter can reach by ladder.
RM800.00 for scaffolding will be used to replace
taxation.
PRELIMINARIE
S
THANKS !
dkconstruction@gmail.com
www.dkconstruction.com.my
+6 033291 0503
+6 033291 0706

More Related Content

What's hot

Tenders
TendersTenders
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
Shashi Kumara
 
Contract
Contract Contract
Contract
Simran Aggarwal
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
seenyeeyong
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
Arissa Loh
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
Shze Hwa Lee
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
Prateek Kashyap
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...Zainab Zainordin
 
Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
Delhi Technological University
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
Melvin Lim
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
Hasif Alias
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfChong Yi Hui
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
TEJAS2011
 
Contractors
ContractorsContractors
Contractors
nitinji1980
 

What's hot (20)

Tenders
TendersTenders
Tenders
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Contract
Contract Contract
Contract
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
Qs booklet
Qs bookletQs booklet
Qs booklet
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
111
111111
111
 
Quantity Surveyor
Quantity SurveyorQuantity Surveyor
Quantity Surveyor
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...
 
Nit55
Nit55Nit55
Nit55
 
Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
 
Contractors
ContractorsContractors
Contractors
 

Viewers also liked

Tender writing guide presentation
Tender writing guide presentationTender writing guide presentation
Tender writing guide presentation
Infodec Communications
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.
lucaschinsheng
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
wendyteosy
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
ZIyeeTan
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
Hasif Alias
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
Haziq1511
 
Estimating
EstimatingEstimating
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
Haziq1511
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
마 이환
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
Haziq1511
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
Melvin Lim
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
Kai Yun Pang
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
lucaschinsheng
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
Pang Khai Shuen
 
Assignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareAssignment 2 - Buildsoft Software
Assignment 2 - Buildsoft Software
Kai Yun Pang
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
kohwenqi
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
Hasif Alias
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
Pang Khai Shuen
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
Shze Hwa Lee
 

Viewers also liked (20)

Tender writing guide presentation
Tender writing guide presentationTender writing guide presentation
Tender writing guide presentation
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
 
Group Component
Group ComponentGroup Component
Group Component
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Estimating
EstimatingEstimating
Estimating
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 
Assignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareAssignment 2 - Buildsoft Software
Assignment 2 - Buildsoft Software
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 

Similar to Estimating tender presentation

Damden Infra Brochure
Damden Infra Brochure Damden Infra Brochure
Damden Infra Brochure Damla Mathew
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B Magazine
ForestedTiger
 
Ici magazine - Quantity Surveyor
Ici magazine - Quantity SurveyorIci magazine - Quantity Surveyor
Ici magazine - Quantity Surveyor
_NabilaHanim
 
Company Profile (SRB).pptx
Company Profile (SRB).pptxCompany Profile (SRB).pptx
Company Profile (SRB).pptx
ramirogmez14
 
Design tracks
Design tracksDesign tracks
Design tracks
LahoriMunda4
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Backgroundguest470ea8
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue BackgroundMansoor Chandio
 
BBR Design
BBR DesignBBR Design
BBR Design
mikY9451
 
businesszone profile
businesszone profilebusinesszone profile
businesszone profileSanthan Reddy
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Benjamin Leavy
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers ProfileMansoor Chandio
 
Agile on the beach 2014: Contracted to deliver outcomes
Agile on the beach 2014: Contracted to deliver outcomesAgile on the beach 2014: Contracted to deliver outcomes
Agile on the beach 2014: Contracted to deliver outcomes
krislander
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
Kailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
Shze Hwa Lee
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
tfkc1212
 

Similar to Estimating tender presentation (20)

Damden Infra Brochure
Damden Infra Brochure Damden Infra Brochure
Damden Infra Brochure
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B Magazine
 
Ici magazine - Quantity Surveyor
Ici magazine - Quantity SurveyorIci magazine - Quantity Surveyor
Ici magazine - Quantity Surveyor
 
Company Profile (SRB).pptx
Company Profile (SRB).pptxCompany Profile (SRB).pptx
Company Profile (SRB).pptx
 
Design tracks
Design tracksDesign tracks
Design tracks
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 
BBR Design
BBR DesignBBR Design
BBR Design
 
businesszone profile
businesszone profilebusinesszone profile
businesszone profile
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
 
Rainbow Developers
Rainbow  DevelopersRainbow  Developers
Rainbow Developers
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers Profile
 
Agile on the beach 2014: Contracted to deliver outcomes
Agile on the beach 2014: Contracted to deliver outcomesAgile on the beach 2014: Contracted to deliver outcomes
Agile on the beach 2014: Contracted to deliver outcomes
 
biju DGM
biju DGMbiju DGM
biju DGM
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 

More from seenyeeyong

Community service 2017 (1)
Community service 2017 (1)Community service 2017 (1)
Community service 2017 (1)
seenyeeyong
 
Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-by
seenyeeyong
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
seenyeeyong
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
seenyeeyong
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
seenyeeyong
 
software assignment
software assignmentsoftware assignment
software assignment
seenyeeyong
 
ECA Presentation slide
ECA Presentation slideECA Presentation slide
ECA Presentation slide
seenyeeyong
 
Estimating seminar presentation
Estimating seminar presentationEstimating seminar presentation
Estimating seminar presentation
seenyeeyong
 

More from seenyeeyong (8)

Community service 2017 (1)
Community service 2017 (1)Community service 2017 (1)
Community service 2017 (1)
 
Lecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-byLecture 8-determination-of-own-employment-by
Lecture 8-determination-of-own-employment-by
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
 
software assignment
software assignmentsoftware assignment
software assignment
 
ECA Presentation slide
ECA Presentation slideECA Presentation slide
ECA Presentation slide
 
Estimating seminar presentation
Estimating seminar presentationEstimating seminar presentation
Estimating seminar presentation
 

Recently uploaded

2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 

Recently uploaded (20)

2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 

Estimating tender presentation

  • 2. Agenda BUILDING THE FUTURE. 01 02 03 04 Company Profile & Project Team Strengths of the company tender Weaknesses of the company tender Errors in the tender
  • 3. Company Profile BUILDING THE FUTURE. Headquater 10, Jalan Setia Prima G, U13/G, Setia Alam, Seksyen U13, 40170 Shah Alam, Selangor. DK Construction Sdn. Bhd. Company No. : 215203A CIDB Registration : Grade 4 B04 Registration No : 0120160303-WP171579 Authorized Capital RM1,000,000 dkconstruction@gmail.com www.dkconstruction.com.my +6 033291 0503 +6 033291 0706
  • 4. About Us BUILDING THE FUTURE. Teamwork Integrity Commitment COREVALUES Founder : Tee Dee Kei
  • 5. Our Vision BUILDING THE FUTURE. 01 02 03 Build partnerships in the community. Provide valuable services to clients. Deliver important resources.
  • 6. Why Choose DK BUILDING THE FUTURE. 01 We reduce wastage. DK finds ways to minimize waste and maximize use of time, labor, and materials. 02 Professional in BIM. DK has become the leading industry exponent of the transformational construction tool and process Building Information Modeling (BIM), with more than $50 billion in BIM project experience.
  • 7. DK Today BUILDING THE FUTURE. DK Construction Sdn. Bhd. is a fully integrated civil engineering and building construction firm based in the Penisular Malaysia state of Selangor. DK has transformed vast acres of uninhabitable swampland into modern housing and industrial estates, tourist resorts, commercial centres, airports and highways.
  • 8. DK Today BUILDING THE FUTURE. We offer: 01 02 03 04 General contracting Construction management Design-build Preconstruction planning services
  • 9. DK Today BUILDING THE FUTURE. Our people bring their technical knowledge, experience, and resourcefulness to the delivery of our construction services. Driven by a commitment to continuous improvement, DK embraces Building Information Modeling to improve efficiency and enhance client's value.
  • 11. Agenda BUILDING THE FUTURE. 01 02 03 04 Company Profile & Project Team Strengths of the company tender Weaknesses of the company tender Errors in the tender
  • 12. 1) Registered Contractor Company BUILDING THE FUTURE. 01 02 Registered contractor company under CIDB. Grade 4 with RM1000,000 capacity.
  • 13. 2) Expertise BUILDING THE FUTURE. • We’ve spent decades constructing impressive buildings of every shape, size and purpose, from bridge to modern housing, road to industrial estates, airport to highways. • Hence, we’ve developed a highly efficient approach to construction: a powerful combination of people, process, and technology.
  • 14. 2) Expertise BUILDING THE FUTURE. People We retain our employees significantly longer than the industry average. Process Project managers handle estimating, procurement, operations and client relations. For you, as an owner, this means flexibility, consistency across multiple projects and a single point of contact who’s empowered to do whatever is needed to ensure you’re satisfied. Technology That ensures efficient, cost-effective construction and better quality of work 01 02 03
  • 15. 3) Good Reputation BUILDING THE FUTURE. TROPICANA KL DEVELOPMENT SDN. BHD. SP SETIA BERHAD GROUP IJM LAND BERHAD GSD LAND SDN. BHD. SELANGOR PROPERTIES BHD. WCT CONSTRUCTION “Good quality of workmanship.” “Experienced and well-known company.” “Great working performance. Satisfaction met.” “No delay of work, on-time completion.” “Excellent management on site.” “Good implemention of BIM in achieving efficiency.”
  • 16. 4) Good Management Skill BUILDING THE FUTURE. PROJECT MANAGEMENT BIM provides a visible view of constructability, interconnectivity of building systems and aesthetic elements during preconstruction stage. LABOURS & MACHINERIES MANAGEMENT Ensure maximise the use of resources Reason: Reduce waste of resources, time and cost.
  • 17. 5) Experienced on Relevant Project BUILDING THE FUTURE.
  • 18. 6) Risk Management BUILDING THE FUTURE. - DK Construction takes a multi-faceted approach to risk management: examining potential risks to ensure clients are satisfied with their project and our partnership. - Safety and quality are at the top of our list, and we can handle all matters related to insurance coverage, claims and loss control, with competence born of experience. We are prepared for the risks associated with delivering the highest quality building. - We believe it’s nothing more than you should expect from a professional construction firm.
  • 19. Agenda BUILDING THE FUTURE. 01 02 03 04 Company Profile & Project Team Strengths of the company tender Weaknesses of the company tender Errors in the tender
  • 20. 1) Newly hired unskilled labour BUILDING THE FUTURE. We value our worker’s learning experience. We are hiring a gang of new workers and plan to give them hands on experience in this project. We are charging low prices, but hoping of giving them another learning opportunity in this project
  • 21. 2) Restricted design variations BUILDING THE FUTURE. 1. We are imposing a very slim profit margin. 2. Therefore, we don't encourage too much variations and changes occur in the design. 3. Otherwise, cost plus situation may happen. 4. Cost plus will increase the overall cost of the project.
  • 22. Agenda BUILDING THE FUTURE. 01 02 03 04 Company Profile & Project Team Strengths of the company tender Weaknesses of the company tender Errors in the tender
  • 23. Error made by Client in the Tender Document Error 1 Error 2 Error 1 The client does not specify the amount of the Tender Deposit. Error 2 The form of tender bond should be shown in Appendix “D” as stated in the content. BUILDING THE FUTURE.
  • 24. Error 3 Error 3 The client does not provide the Letter of Tender Invitation which must be included the date of collecting tender document and the date of closing tender. Error made by Client in the Tender Document BUILDING THE FUTURE.
  • 25. Error 4 Error 5 Error 6 Error 4, 5 and 6 The unit should be in M3 for the concrete binding screed according to SMM clause F3.1 Error made by Client in the Tender Document BUILDING THE FUTURE.
  • 26. Error 7 The submission date of tender document should be not later than 10am on 7th June 2016. Error made by Client in the Tender Document BUILDING THE FUTURE.
  • 27. Error of company tender BUILDING THE FUTURE. General Scaffolding including Staging Wall height below 3.5 meter can reach by ladder. RM800.00 for scaffolding will be used to replace taxation. PRELIMINARIE S