SlideShare a Scribd company logo
Page 1 of 3
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
GENERAL SAFETY
1.PERSONAL PROTECTIVE EQUIPMENT
CSA or ANSI equivalent personal protective equipment must be worn
2 EMERGENCY
In case of an emergency, stop the equipment by pressing the red emergency stop button.
All employees should be familiar with the location of the emergency stop buttons on the equipment they operate, as their
exact location can differ from location to location (branch to branch)
LOTO (Lock Out Tag Out) Reference LOTO STD
If any of these DISCONNECTS are in the “ON” position notify your supervisor.
ONLY THOSE WHO ARE TRAINED CAN LOCK OUT/TAG OUT
TRAINING:
Only those who have been trained on Lock Out/Tag out (LOTO) should perform LOTO.
Inform Supervisor and/or Safety Manager if any locks are missing or out of place
Please read the Corrosion Service Lock Out Tag Out Policy for more details, including disciplinary process
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Implem Date N/A Date Created: JUNE 14 2013 Document # SWP-1XX-001
Dept. MFG Version 2013-0 Page 1 of 4
OFF POSITION
DIFFERENT POWER RATING DISCONNECTS
ON POSITION
Page 2 of 3
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
Lock Out Tag Out Procedure
1. Prepare For Shutdown
Everyone in the area must be informed that Lockout/Tagout will be performed and on which machines.
2. Identify Sources of Hazardous Energy on the machine/equipment
Assess equipment and identify the hazardous energy sources (figure 1.0), either potential or kinetic and
determine the most effective method to achieve a “ZERO ENERGY STATE”. Contact Manufacturing
Engineer (Julian Kalac) to help identify system shutdown procedures.
3. Shutdown
Follow proprietary equipment and system shutdown procedures normally used to stopping the
equipment and return equipment to a “ZERO ENERGY STATE” by methods described under “General
Lockout Guidelines” in Figure 1.0. This will likely mean turning or pressing the “stop” button
4. Apply Lock and Tag Information.
Locks
— Each worker will shall obtain his/her own individually keyed lock. This is the workers own safety
equipment is not to be loaned. (No duplicate or master keys).
— When more than one person use a multi-hinged hasp lockout device.
Tags
Lockout tags should include the following information:
— Date, Time. Workers Name(s), Department(s).
— Reason why equipment has been disconnected
5. Verify Effectiveness of Lockout
Ensure that all equipment energy sources are re-tested and a “ZERO ENERGY STATE” has ben achieved.
Use equipment specified testing devices for system shutdown confirmation such as Volt Meters, pressure
gauges, blocks, bleeding devices or cycling systems procedures.
6. Release From Lockout/Tagout
Before locks/tags are removed and energy is restored to the machine/equipment, inspect the work area
to ensure components are operationally intact. Each lock and tag should be removed from each energy-
isolating device by the worker who applied the lock and tag.
Page 3 of 3
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
FIGURE 1
ENERGY FORM ENERGY SOURCE GENERAL LOCKOUT GUIDELINE
Electricity
power transmission lines;
machine power cords;
motors;
solenoids;
capacitors (stored
electrical energy)
Turn off power at machine first (i.e., at point of operation
switch), and then at the main disconnect switch for the
machine; lock and tag main disconnect switch (or remove
fuses from box, and then lock and tag box).
Fully discharge all capacitive systems (e.g., cycle machine to
drain power from capacitors) according to manufacturer’s
instructions.
Fluid pressure
hydraulic systems (e.g.,
hydraulic presses, rams,
cylinders, hammers)
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off and blank
lines as necessary.
Air pressure
pneumatic systems (e.g.,
lines, pressure reservoirs,
accumulators, air surge
tanks, rams, cylinders)
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off excess air;
if pressure cannot be relieved, block any possible
movement of machinery.
Kinetic energy
blades;
flywheels;
materials in supply lines of
bins or silos
Stop and block machine parts (e.g., stop flywheels and
ensure that they do not recycle); review entire cycle of
mechanical motion, ensure that all motions are stopped.
Block material from moving into area of work;
Potential energy
springs (e.g., in air brake cylinders);
actuators; counter weights;
raised loads;
top or movable part of a
press or lifting device
If possible, lower all suspended parts and loads to the
lowers (rest) position, block parts that might be moved
by gravity; release or block spring energy.
Pressurized liquids
and gases
supply lines;
storage tanks and vessels
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off excess
liquids or gases; blank lines as necessary.

More Related Content

What's hot

Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
KJP Consulting
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Noel Regalado
 
LOTO
LOTO LOTO
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
Bruce A. DelGrasso
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014
H&K Equipment Group
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
Creative Safety Supply
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
Mary Helen
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
Panduit Safety
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
Bimal Chandra Das
 
LOTO BLOQUEO DE ENERGÍAS2023.pptx
LOTO BLOQUEO DE ENERGÍAS2023.pptxLOTO BLOQUEO DE ENERGÍAS2023.pptx
LOTO BLOQUEO DE ENERGÍAS2023.pptx
YoshRobles
 
Lockout Tagout by SETON
Lockout Tagout by SETONLockout Tagout by SETON
Lockout Tagout by SETON
Atlantic Training, LLC.
 
Loto basics.
Loto basics.Loto basics.
Bloqueo de energias 2020
Bloqueo de energias 2020Bloqueo de energias 2020
Bloqueo de energias 2020
Jose Barrueto
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding PptColleen True
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
Gaurav Singh Rajput
 
Bloqueo y Candadeo. ( LOTO)..ppt
Bloqueo y Candadeo.        ( LOTO)..pptBloqueo y Candadeo.        ( LOTO)..ppt
Bloqueo y Candadeo. ( LOTO)..ppt
ssuser7f9de11
 

What's hot (20)

Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
LOTO
LOTO LOTO
LOTO
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Loto training
Loto trainingLoto training
Loto training
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
LOTO BLOQUEO DE ENERGÍAS2023.pptx
LOTO BLOQUEO DE ENERGÍAS2023.pptxLOTO BLOQUEO DE ENERGÍAS2023.pptx
LOTO BLOQUEO DE ENERGÍAS2023.pptx
 
Lockout Tagout by SETON
Lockout Tagout by SETONLockout Tagout by SETON
Lockout Tagout by SETON
 
Loto basics.
Loto basics.Loto basics.
Loto basics.
 
Bloqueo de energias 2020
Bloqueo de energias 2020Bloqueo de energias 2020
Bloqueo de energias 2020
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Bloqueo y Candadeo. ( LOTO)..ppt
Bloqueo y Candadeo.        ( LOTO)..pptBloqueo y Candadeo.        ( LOTO)..ppt
Bloqueo y Candadeo. ( LOTO)..ppt
 

Viewers also liked

Ben Version 2-page LOTO Procedure TEMPLATE
Ben Version 2-page LOTO Procedure TEMPLATEBen Version 2-page LOTO Procedure TEMPLATE
Ben Version 2-page LOTO Procedure TEMPLATEBenjamin Canaday
 
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
Catalogue khoa LOTO (Lockout Tagout)_TIFACOCatalogue khoa LOTO (Lockout Tagout)_TIFACO
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
TIFACO VIET NAM
 
Safe System of Work (SSW)
Safe System  of Work (SSW) Safe System  of Work (SSW)
Safe System of Work (SSW)
Ammar Abdelgader, Ph.D.
 
0051 travamento seguran%e7a-92sld
0051 travamento seguran%e7a-92sld0051 travamento seguran%e7a-92sld
0051 travamento seguran%e7a-92sldSávio Gomes
 
Controle e bloqueio de energia
Controle e bloqueio de energiaControle e bloqueio de energia
Controle e bloqueio de energiaAdony Amorim
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Outsspuent
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009txn4_8
 

Viewers also liked (10)

Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Ben Version 2-page LOTO Procedure TEMPLATE
Ben Version 2-page LOTO Procedure TEMPLATEBen Version 2-page LOTO Procedure TEMPLATE
Ben Version 2-page LOTO Procedure TEMPLATE
 
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
Catalogue khoa LOTO (Lockout Tagout)_TIFACOCatalogue khoa LOTO (Lockout Tagout)_TIFACO
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
Safe System of Work (SSW)
Safe System  of Work (SSW) Safe System  of Work (SSW)
Safe System of Work (SSW)
 
Curso loto
Curso lotoCurso loto
Curso loto
 
0051 travamento seguran%e7a-92sld
0051 travamento seguran%e7a-92sld0051 travamento seguran%e7a-92sld
0051 travamento seguran%e7a-92sld
 
Controle e bloqueio de energia
Controle e bloqueio de energiaControle e bloqueio de energia
Controle e bloqueio de energia
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 

Similar to Lock Out Tag Out Safe Work Procedure

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
Julian Kalac P.Eng
 
loto
lotoloto
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
Julian Kalac P.Eng
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
Atlantic Training, LLC.
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
RajkumarArikumar
 
Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)
ComplianceSigns, LLC
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
Atlantic Training, LLC.
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
Syed Neyaz Ahmad
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
Nigel Brown
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
MichaelCazes1
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
Muhammed Fuad Al-Barznji
 
Legacy pwr war1
Legacy pwr war1Legacy pwr war1
Legacy pwr war1
Giovanni Trinidad
 

Similar to Lock Out Tag Out Safe Work Procedure (20)

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
loto
lotoloto
loto
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
 
Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
 
Lockout &tagout
Lockout &tagoutLockout &tagout
Lockout &tagout
 
Legacy pwr war1
Legacy pwr war1Legacy pwr war1
Legacy pwr war1
 

More from Julian Kalac P.Eng

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
Julian Kalac P.Eng
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
Julian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
Julian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
Julian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
Julian Kalac P.Eng
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
Julian Kalac P.Eng
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
Julian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
Julian Kalac P.Eng
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
Julian Kalac P.Eng
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
Julian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
Julian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
Julian Kalac P.Eng
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
Julian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

Recently uploaded

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

Lock Out Tag Out Safe Work Procedure

  • 1. Page 1 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 GENERAL SAFETY 1.PERSONAL PROTECTIVE EQUIPMENT CSA or ANSI equivalent personal protective equipment must be worn 2 EMERGENCY In case of an emergency, stop the equipment by pressing the red emergency stop button. All employees should be familiar with the location of the emergency stop buttons on the equipment they operate, as their exact location can differ from location to location (branch to branch) LOTO (Lock Out Tag Out) Reference LOTO STD If any of these DISCONNECTS are in the “ON” position notify your supervisor. ONLY THOSE WHO ARE TRAINED CAN LOCK OUT/TAG OUT TRAINING: Only those who have been trained on Lock Out/Tag out (LOTO) should perform LOTO. Inform Supervisor and/or Safety Manager if any locks are missing or out of place Please read the Corrosion Service Lock Out Tag Out Policy for more details, including disciplinary process SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Implem Date N/A Date Created: JUNE 14 2013 Document # SWP-1XX-001 Dept. MFG Version 2013-0 Page 1 of 4 OFF POSITION DIFFERENT POWER RATING DISCONNECTS ON POSITION
  • 2. Page 2 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 Lock Out Tag Out Procedure 1. Prepare For Shutdown Everyone in the area must be informed that Lockout/Tagout will be performed and on which machines. 2. Identify Sources of Hazardous Energy on the machine/equipment Assess equipment and identify the hazardous energy sources (figure 1.0), either potential or kinetic and determine the most effective method to achieve a “ZERO ENERGY STATE”. Contact Manufacturing Engineer (Julian Kalac) to help identify system shutdown procedures. 3. Shutdown Follow proprietary equipment and system shutdown procedures normally used to stopping the equipment and return equipment to a “ZERO ENERGY STATE” by methods described under “General Lockout Guidelines” in Figure 1.0. This will likely mean turning or pressing the “stop” button 4. Apply Lock and Tag Information. Locks — Each worker will shall obtain his/her own individually keyed lock. This is the workers own safety equipment is not to be loaned. (No duplicate or master keys). — When more than one person use a multi-hinged hasp lockout device. Tags Lockout tags should include the following information: — Date, Time. Workers Name(s), Department(s). — Reason why equipment has been disconnected 5. Verify Effectiveness of Lockout Ensure that all equipment energy sources are re-tested and a “ZERO ENERGY STATE” has ben achieved. Use equipment specified testing devices for system shutdown confirmation such as Volt Meters, pressure gauges, blocks, bleeding devices or cycling systems procedures. 6. Release From Lockout/Tagout Before locks/tags are removed and energy is restored to the machine/equipment, inspect the work area to ensure components are operationally intact. Each lock and tag should be removed from each energy- isolating device by the worker who applied the lock and tag.
  • 3. Page 3 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 FIGURE 1 ENERGY FORM ENERGY SOURCE GENERAL LOCKOUT GUIDELINE Electricity power transmission lines; machine power cords; motors; solenoids; capacitors (stored electrical energy) Turn off power at machine first (i.e., at point of operation switch), and then at the main disconnect switch for the machine; lock and tag main disconnect switch (or remove fuses from box, and then lock and tag box). Fully discharge all capacitive systems (e.g., cycle machine to drain power from capacitors) according to manufacturer’s instructions. Fluid pressure hydraulic systems (e.g., hydraulic presses, rams, cylinders, hammers) Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off and blank lines as necessary. Air pressure pneumatic systems (e.g., lines, pressure reservoirs, accumulators, air surge tanks, rams, cylinders) Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off excess air; if pressure cannot be relieved, block any possible movement of machinery. Kinetic energy blades; flywheels; materials in supply lines of bins or silos Stop and block machine parts (e.g., stop flywheels and ensure that they do not recycle); review entire cycle of mechanical motion, ensure that all motions are stopped. Block material from moving into area of work; Potential energy springs (e.g., in air brake cylinders); actuators; counter weights; raised loads; top or movable part of a press or lifting device If possible, lower all suspended parts and loads to the lowers (rest) position, block parts that might be moved by gravity; release or block spring energy. Pressurized liquids and gases supply lines; storage tanks and vessels Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off excess liquids or gases; blank lines as necessary.