Top 10 Most Frequently Cited Standards
for Fiscal 2013 (Oct. 1, 2012 to Sept. 30, 2013)
● The following is a list of the top 10 most
frequently cited standards* following inspections
of worksites by federal OSHA. OSHApublishes
this list to alert employers about these commonly
cited standards so they can take steps to find and
fix recognized hazards addressed in these and
other standards before OSHA shows up. Far too
many preventable injuries and illnesses occur in
the workplace.
Lockout Tagout
OSHA's 2013 TOP TEN
Most Frequently Cited Violations
● 1926.501 - Fall Protection
● 1910.1200 - Hazard Communication
● 1926.451 - Scaffolding
● 1910.134 - Respiratory Protection
● 1910.305 - Electrical, Wiring Methods
● 1910.178 - Powered Industrial Trucks
● 1926.1053 - Ladders
● 1910.147 - Lockout/Tagout
● 1910.303 - Electrical, General Requirements
● 1910.212 - Machine Guarding
Lockout Tagout
Lockout/Tagout
Training
Lockout Tagout
Purpose
Lockout Tagout
The purpose of this overview is to
increase understanding of how the
Lockout /Tagout program works to
reduce the risk of injury during
servicing and maintenance
operations.
Key Definitions
Lockout Tagout
Key Definitions
Affected employee: An employee who operates or
uses a machine or equipment on which servicing or
maintenance is being performed under lockout or
Lockout Tagout
tagout,or who works in an area where lockout tagout
is used.
Authorized employee: A person who locks out or
tags out machines or equipment to do serve or
maintenance work on them. An affected employee
becomes an authorized employee when his or her
duties include performing covered service or
maintenance work.
Other Employee: An employee whose work
operations are or may be in an area where energy
control procedures may be utilized.
Key Definitions cont.
Energy isolating device:
A mechanical device that physically
prevents the transmission or release of
Lockout Tagout
energy, including but not limited to the
following:
● A manually operated electrical circuit
breaker.
● A disconnect switch.
● A line valve.
● A block and any similar device used to block
or isolate energy.
● Push buttons, selector switches, and other
control circuit type devices are not energy
isolation devices.
Key Definitions cont.
Energy source:
Lockout Tagout
Any source of electrical, mechanical,
hydraulic, pneumatic, chemical, thermal, gravity, or
other energy.
Energized: Connected to an energy source or
containing residual or stored energy.
Tagout: The placement of a tagout device on an energy
isolation device, in accordance with an established
procedure, to indicate that the energy isolating device and
the equipment being controlled may not be operated until
the tagout device is removed.
Tagout device:
A prominent warning device, such as a tag and a means of
attachment, that can be securely fastened to an energy
isolation device
When does the standard apply?
The standard applies to repair work (servicing
and or maintenance) to powered machines or
equipment.
The standard must be followed during work that
is done during normal production operations if :
– “An employee is required to remove or bypass a guard or
other safety device.”
– “An employee is required to place any part of his or her
body into a machine’s point of operation or a danger zone
associated with a machine’s operating cycle.”
The standard does not apply to cord and plug connected
electric equipment when unplugging the equipment controls
the hazards and the plug is under the exclusive control of the
employee who is doing the service or maintenance work.
Lockout Tagout
Energy control program
Lockout Tagout
The standard requires employers to have and energy
control program that include:
● Energy control procedures.
● Employee training.
● Periodic inspections.
Energy control procedures
Documented energy control (lockout/tagout) procedures
must clearly:
● Outline the intended use of the procedure.
● Indicate specific steps to lock out or tag out the machine or
equipment.
● Include rules and authorizations for using the procedure.
● Have an explanation of how compliance will be enforced.
Energy control procedures cont.
The employer must have multiple
procedures when various types of
machines or equipment in the
facility would need different
lockout tagout procedures. Each
lock out tag out procedure needs
to identify the machines or
equipment to which it applies.
Lockout Tagout
Six steps for
applying
lockout/tagout
Lockout Tagout
Six steps for applying lockout/tagout
Lockout Tagout
1. Prepare for shutdown.
● Understand the equipment.
2. Shutdown.
● Turn off or power down according to procedures.
3. Isolating equipment.
Lockout Tagout
● Locate all disconnect switches, circuit breakers valves.
4. Applying locks and tags.
● Lockout devices must hold switches/valves in the “safe” or
“off” position.
Six steps for applying lockout/tagout
Six steps for applying lockout/tagout
Lockout Tagout
5. Releasing stored energy.
●
●
●
●
●
Bleed off pressure.
Blocking elevated parts in place.
Draining lines.
Let equipment cool.
Discharging capacitors.
Six steps for applying lockout/tagout
6. Verification.
This last, crucial step ensures that the lockout
tagout procedure has successfully isolated the
machine or equipment from its energy
sources the machine is in a “zero energy
state.”
To do this the authorized employee may
operate the machine’s controls to verify the
equipment is isolated then return the controls
to their “Off” positions. The verification
process could also include reading pressure
or temperature gauges and using test
equipment.
Lockout Tagout
Release from
lockout/tagout
Lockout Tagout
Release from lockout/tagout
Lockout Tagout
When repair or maintenance work is
completed:
1. Check the machine.
● Replace guards, remove tools, blocking devices.
2. Check for employees.
3. Remove lockout tagout devices.
● Notify all affected employees that work is
complete.
Use of tag out alone
Lockout Tagout
● In rare cases, (older machines) an energy source cannot be locked
out. In these situations a tagout procedure needs to be used.
Please be aware of the limitations of tags when a tagout system is
used.
● Tags are warning devices. They do not provide the same physical
control as a lock.
Tags must not be bypassed or ignored.
●
● Tags can only be removed by authorized employee responsible for
them.
Tags must be legible.
●
●
●
●
Tags must be understandable by all employees in the area.
Tags must hold up under the conditions of use.
Tags may evoke a false sense of security.
Additional safety measures may include: Removing a valve
handle, blocking a controlling switch, removing and isolating a
circuit element.
Maintaining lockout/tagout during shift
change or personnel changes
Lockout Tagout
If service or repair work needs to continue during the next shift.
And , there are situations where a mechanic is called away to
another job and another repairman arrives to continue the work.
In both of these cases, the lockout tagout condition needs
continue even though the people working on the project have
changed.
Remember that the employee who applied the LOTO device is the
employee who must remove it. An authorized employee is not
allowed to merely give the key to his lockout device to his
replacement.
It is also a requirement that the authorized employee who is
working on the equipment is the same person who applied the
lock and tag. The authorized employee who is leaving cannot
merely leave his or her lock in place and allow the on-coming
authorized employee to work on the equipment with out applying
his own lock and tag.
Removal of lockout/tagout when the
authorized employee is not available
Lockout Tagout
There are situations where machines or equipment have
been locked out by personnel who then become
unavailable, (Gone home for the day) or not available for
any number of reasons.
This calls for alternate procedures to safely remove the
lockout tagout devices. Your employer needs to have
specific documented procedures as part of the company’s
energy control program in order to have these devices
removed. Employees who are involved in carrying out
these procedures need to be trained to follow them carefully.
● The employer must verify that the authorized employee
who applied the device is not at the facility.
● Reasonable efforts to contact the authorized employee
must be made to let him know that his or her lock will
be removed.
● Steps must be made to contact the employee to notify
him/her of the removal before they return to the facility.

More Related Content

Similar to loto

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
Julian Kalac P.Eng
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagoutvtsiri
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
ROHITSINGH83692
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
Nigel Brown
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
MichaelCazes1
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
Julian Kalac P.Eng
 
Lockout Tagout by SETON
Lockout Tagout by SETONLockout Tagout by SETON
Lockout Tagout by SETON
Atlantic Training, LLC.
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
SyedWasim23
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
Atlantic Training, LLC.
 
Loto basics.
Loto basics.Loto basics.
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
RajkumarArikumar
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
Bruce A. DelGrasso
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
Arkansas STEPS Network
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
JulieMaeuser
 

Similar to loto (20)

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
 
LOTO LIVE WIRE CS
LOTO LIVE WIRE CSLOTO LIVE WIRE CS
LOTO LIVE WIRE CS
 
Lockout Tagout by SETON
Lockout Tagout by SETONLockout Tagout by SETON
Lockout Tagout by SETON
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
 
Lockout &tagout
Lockout &tagoutLockout &tagout
Lockout &tagout
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
Loto basics.
Loto basics.Loto basics.
Loto basics.
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)Lock Out Tag Out (LOTO)
Lock Out Tag Out (LOTO)
 

Recently uploaded

Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
SudhanshuMandlik
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 

Recently uploaded (20)

Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 

loto

  • 1. Lockout Tagout Top 10 Most Frequently Cited Standards Lock out/Tag out Try out But first lets look at:
  • 2. Top 10 Most Frequently Cited Standards for Fiscal 2013 (Oct. 1, 2012 to Sept. 30, 2013) ● The following is a list of the top 10 most frequently cited standards* following inspections of worksites by federal OSHA. OSHApublishes this list to alert employers about these commonly cited standards so they can take steps to find and fix recognized hazards addressed in these and other standards before OSHA shows up. Far too many preventable injuries and illnesses occur in the workplace. Lockout Tagout
  • 3. OSHA's 2013 TOP TEN Most Frequently Cited Violations ● 1926.501 - Fall Protection ● 1910.1200 - Hazard Communication ● 1926.451 - Scaffolding ● 1910.134 - Respiratory Protection ● 1910.305 - Electrical, Wiring Methods ● 1910.178 - Powered Industrial Trucks ● 1926.1053 - Ladders ● 1910.147 - Lockout/Tagout ● 1910.303 - Electrical, General Requirements ● 1910.212 - Machine Guarding Lockout Tagout
  • 5. Purpose Lockout Tagout The purpose of this overview is to increase understanding of how the Lockout /Tagout program works to reduce the risk of injury during servicing and maintenance operations.
  • 7. Key Definitions Affected employee: An employee who operates or uses a machine or equipment on which servicing or maintenance is being performed under lockout or Lockout Tagout tagout,or who works in an area where lockout tagout is used. Authorized employee: A person who locks out or tags out machines or equipment to do serve or maintenance work on them. An affected employee becomes an authorized employee when his or her duties include performing covered service or maintenance work. Other Employee: An employee whose work operations are or may be in an area where energy control procedures may be utilized.
  • 8. Key Definitions cont. Energy isolating device: A mechanical device that physically prevents the transmission or release of Lockout Tagout energy, including but not limited to the following: ● A manually operated electrical circuit breaker. ● A disconnect switch. ● A line valve. ● A block and any similar device used to block or isolate energy. ● Push buttons, selector switches, and other control circuit type devices are not energy isolation devices.
  • 9. Key Definitions cont. Energy source: Lockout Tagout Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, gravity, or other energy. Energized: Connected to an energy source or containing residual or stored energy. Tagout: The placement of a tagout device on an energy isolation device, in accordance with an established procedure, to indicate that the energy isolating device and the equipment being controlled may not be operated until the tagout device is removed. Tagout device: A prominent warning device, such as a tag and a means of attachment, that can be securely fastened to an energy isolation device
  • 10. When does the standard apply? The standard applies to repair work (servicing and or maintenance) to powered machines or equipment. The standard must be followed during work that is done during normal production operations if : – “An employee is required to remove or bypass a guard or other safety device.” – “An employee is required to place any part of his or her body into a machine’s point of operation or a danger zone associated with a machine’s operating cycle.” The standard does not apply to cord and plug connected electric equipment when unplugging the equipment controls the hazards and the plug is under the exclusive control of the employee who is doing the service or maintenance work. Lockout Tagout
  • 11. Energy control program Lockout Tagout The standard requires employers to have and energy control program that include: ● Energy control procedures. ● Employee training. ● Periodic inspections. Energy control procedures Documented energy control (lockout/tagout) procedures must clearly: ● Outline the intended use of the procedure. ● Indicate specific steps to lock out or tag out the machine or equipment. ● Include rules and authorizations for using the procedure. ● Have an explanation of how compliance will be enforced.
  • 12. Energy control procedures cont. The employer must have multiple procedures when various types of machines or equipment in the facility would need different lockout tagout procedures. Each lock out tag out procedure needs to identify the machines or equipment to which it applies. Lockout Tagout
  • 14. Six steps for applying lockout/tagout Lockout Tagout 1. Prepare for shutdown. ● Understand the equipment. 2. Shutdown. ● Turn off or power down according to procedures.
  • 15. 3. Isolating equipment. Lockout Tagout ● Locate all disconnect switches, circuit breakers valves. 4. Applying locks and tags. ● Lockout devices must hold switches/valves in the “safe” or “off” position. Six steps for applying lockout/tagout
  • 16. Six steps for applying lockout/tagout Lockout Tagout 5. Releasing stored energy. ● ● ● ● ● Bleed off pressure. Blocking elevated parts in place. Draining lines. Let equipment cool. Discharging capacitors.
  • 17. Six steps for applying lockout/tagout 6. Verification. This last, crucial step ensures that the lockout tagout procedure has successfully isolated the machine or equipment from its energy sources the machine is in a “zero energy state.” To do this the authorized employee may operate the machine’s controls to verify the equipment is isolated then return the controls to their “Off” positions. The verification process could also include reading pressure or temperature gauges and using test equipment. Lockout Tagout
  • 19. Release from lockout/tagout Lockout Tagout When repair or maintenance work is completed: 1. Check the machine. ● Replace guards, remove tools, blocking devices. 2. Check for employees. 3. Remove lockout tagout devices. ● Notify all affected employees that work is complete.
  • 20. Use of tag out alone Lockout Tagout ● In rare cases, (older machines) an energy source cannot be locked out. In these situations a tagout procedure needs to be used. Please be aware of the limitations of tags when a tagout system is used. ● Tags are warning devices. They do not provide the same physical control as a lock. Tags must not be bypassed or ignored. ● ● Tags can only be removed by authorized employee responsible for them. Tags must be legible. ● ● ● ● Tags must be understandable by all employees in the area. Tags must hold up under the conditions of use. Tags may evoke a false sense of security. Additional safety measures may include: Removing a valve handle, blocking a controlling switch, removing and isolating a circuit element.
  • 21. Maintaining lockout/tagout during shift change or personnel changes Lockout Tagout If service or repair work needs to continue during the next shift. And , there are situations where a mechanic is called away to another job and another repairman arrives to continue the work. In both of these cases, the lockout tagout condition needs continue even though the people working on the project have changed. Remember that the employee who applied the LOTO device is the employee who must remove it. An authorized employee is not allowed to merely give the key to his lockout device to his replacement. It is also a requirement that the authorized employee who is working on the equipment is the same person who applied the lock and tag. The authorized employee who is leaving cannot merely leave his or her lock in place and allow the on-coming authorized employee to work on the equipment with out applying his own lock and tag.
  • 22. Removal of lockout/tagout when the authorized employee is not available Lockout Tagout There are situations where machines or equipment have been locked out by personnel who then become unavailable, (Gone home for the day) or not available for any number of reasons. This calls for alternate procedures to safely remove the lockout tagout devices. Your employer needs to have specific documented procedures as part of the company’s energy control program in order to have these devices removed. Employees who are involved in carrying out these procedures need to be trained to follow them carefully. ● The employer must verify that the authorized employee who applied the device is not at the facility. ● Reasonable efforts to contact the authorized employee must be made to let him know that his or her lock will be removed. ● Steps must be made to contact the employee to notify him/her of the removal before they return to the facility.