       In today’s business world every organization is concerned with quality. Total Quality

Management (TQM) systems use Statistical Process Control (SPC) to insure their operations

maintain product quality.

       Shortly after World War II, a quality expert and consultant named W. E. Deming was

invited to Japan to conduct lectures on improving product reliability. Many experts believe this

to be the beginning of Japan’s commitment to TQM.

       It is very difficult to talk about TQM in production management without referring to

Statistical Process Control. SPC is a process, which uses control charts to evaluate whether any

part of the production process is out of control. The result would be a quality failure or product

defection. Its main function is to prevent quality defects before they occur. Many companies

spend huge amounts of resources to insure proper training in both TQM and SPC methods.

       Control charts are graphs that reflect a visual diagram to see if sample products remain

inside of their control limits. These control charts revolve around two main functions: the first is

to establish control limits for the process and the second is to monitor when the production

process is outside of these controls.

       P-Chart construction begins with the first step of establishing control limits. There are

some assumptions made regarding the discrete attribute measure. The main assumption is while

the sample size gets larger, the proportion of defects can be placed into a normal distribution

curve. This enables us to use the following statistical formulas to complete the first steps of
constructing a P-Chart: establishing the Upper Control Limit (UCL) and Lower Control Limit

(LCL).




                                  UCL = pbar + zσ p

                                   LCL = pbar - zσ p
         Where          z = the number of standard deviations from the process average.

                        pbar = the sample of the proportion that is defective.

                        σ p = the standard deviation of the sample proportion.




         The standard deviation is computed as




                                 σ p = √pbar (1 – pbar)/n

         Where n = sample size



         Occasionally you will see a z value of 2.00 but more often than not z is setup as 3.00.

This allows a probability of 99.74 percent under normal distribution circumstances.

         Once the Upper and Lower Control Limits are established, it becomes just a matter of

plotting the points on a graph or chart to determine the number of defects that exist. Where all

plotted points are within the control limits there is a 99.74% comfort level, which exists. If for
whatever reason points fall outside the control limits corrective action should be taken to

maintain the quality the organization is trying to achieve.

       The following is a typical problem and solution for the construction of a P-Chart:



               Twenty samples of n = 200 were taken by an operator at a workstation in a

               production process. The number of defective items in each sample were recorded

               as follows.



                NUMBER OF                                           NUMBER OF
  SAMPLE
                DEFECTIVES               p           SAMPLE        DEFECTIVES                 p

      1                12              0.060             11               16             0.080

      2                18              0.090             12               14             0.070

      3                10              0.050             13               12             0.060

      4                14              0.070             14               16             0.080

      5                16              0.080             15               18             0.090

      6                19              0.095             16               20             0.100

      7                17              0.085             17               18             0.090

      8                12              0.060             18               20             0.100

      9                11              0.055             19               21             0.105

      10               14              0.070             20               22             0.110
Management wants to develop a p-chart using 3-sigma limits. Set up the p-chart

               and plot the observations to determine if the process was out of control at any

               point.



       Solution

       Step 1. Compute pbar:

               pbar = total # of defectives/total # of observations = 320/(20)(200) = 0.08

       Step 2. Determine the control limits:

               UCL = pbar + z √ pbar (1- pbar)/n = 0.08 + (3.00)(0.019) = 0.137

               LCL = pbar – z √ pbar (1 – pbar)/n = 0.08 – (3.00)(0.019) = 0.023

       Step 3. Construct the p-chart with pbar = 0.08, UCL = 0.137, and LCL = 0.023. The

process does not appear to be out of control.
Bibliography


Amsden, Robert T., Butler, Howard E., Amsden, Davida M. SPC SIMPLIFIED: Practical Steps
     to Quality. New York: Quality Resources, 1989.

Russel, Taylor III, Operations Management: Fourth Edition. Prentice Hall, Inc., Upper Saddle
        River, New Jersey, 2003, pages 675-699.

Farrokh, Alemi, PhD. “Assumptions of Probability Charts.” Internet:
       http://mason.gmu.edu/~falemi/cqi/p61art1.htm, November 15, 2002

“Attribute Charts in General, p Charts in Particular.” Internet:
       http://www.sytsma.com/tqmtools/pchart.html, November 15, 2002

More Related Content

What's hot

Spc training
Spc training Spc training
Spc training
VIBHASH SINGH
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
MRPeasy
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
Prashant Tomar
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentation
Suchitra Sahu
 
Pareto Diagram
Pareto DiagramPareto Diagram
Pareto Diagram
Divyansh jain
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality Control
Mahmudul Hasan
 
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
Dr.Raja R
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
Marwa Abo-Amra
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlANOOPA NARAYANAN
 
Control charts
Control chartsControl charts
Control charts
rashmi_awal
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
Babasab Patil
 
Pareto principle
Pareto principlePareto principle
Pareto principle
Madala_sarath
 
Control charts for variables
Control charts for variables Control charts for variables
Control charts for variables
Dr. Mahmoud Al-Naimi
 
5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
Hakeem-Ur- Rehman
 
Control chart for variables
Control chart for variablesControl chart for variables
Control chart for variables
Sahul Hameed
 
Time study
Time studyTime study
Time study
Lav Gupta
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
vaidehishah25
 
Statstical process control
Statstical process controlStatstical process control
Statstical process control
XenChisti
 

What's hot (20)

Spc training
Spc training Spc training
Spc training
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentation
 
Control charts
Control chartsControl charts
Control charts
 
Pareto Diagram
Pareto DiagramPareto Diagram
Pareto Diagram
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality Control
 
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
Control Charts for variables Xbar and R chart and attributes P, nP, C, and u ...
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Control charts
Control chartsControl charts
Control charts
 
Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
Pareto principle
Pareto principlePareto principle
Pareto principle
 
Control charts for variables
Control charts for variables Control charts for variables
Control charts for variables
 
5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
 
Control chart for variables
Control chart for variablesControl chart for variables
Control chart for variables
 
Time study
Time studyTime study
Time study
 
Statistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process CapabilityStatistical Process Control,Control Chart and Process Capability
Statistical Process Control,Control Chart and Process Capability
 
Spc
SpcSpc
Spc
 
Statstical process control
Statstical process controlStatstical process control
Statstical process control
 

Viewers also liked

Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
jasonhian
 
Fractional nonconforming (p – chart)
Fractional nonconforming (p – chart)Fractional nonconforming (p – chart)
Fractional nonconforming (p – chart)
Mrinmoy Bharadwaz
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributesBuddy Krishna
 
X Bar And S Charts Mini Tutorial
X Bar And S Charts Mini TutorialX Bar And S Charts Mini Tutorial
X Bar And S Charts Mini Tutorial
ahmad bassiouny
 
Attributes Control Charts
Attributes Control ChartsAttributes Control Charts
Attributes Control Charts
ahmad bassiouny
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning ProblemJoseph Konnully
 
Variable control chart
Variable control chartVariable control chart
Variable control chart
Jassfer Alina
 
quality and performance
quality and performancequality and performance
quality and performanceMEHAK GHAI
 
Statictical process Control
Statictical process ControlStatictical process Control
Statictical process Control
Prateek Nigam
 
Calculating critical values of t distributions using tables of percentage points
Calculating critical values of t distributions using tables of percentage pointsCalculating critical values of t distributions using tables of percentage points
Calculating critical values of t distributions using tables of percentage pointsmodelos-econometricos
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
ahmad bassiouny
 
control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c pblactigger401
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
ahmad bassiouny
 
Tabel t, z dan f dan chi kuadrat
Tabel t, z dan f dan chi kuadratTabel t, z dan f dan chi kuadrat
Tabel t, z dan f dan chi kuadratIr. Zakaria, M.M
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Managementajithsrc
 

Viewers also liked (19)

Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
 
Fractional nonconforming (p – chart)
Fractional nonconforming (p – chart)Fractional nonconforming (p – chart)
Fractional nonconforming (p – chart)
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributes
 
Control charts
Control charts Control charts
Control charts
 
X Bar And S Charts Mini Tutorial
X Bar And S Charts Mini TutorialX Bar And S Charts Mini Tutorial
X Bar And S Charts Mini Tutorial
 
Attributes Control Charts
Attributes Control ChartsAttributes Control Charts
Attributes Control Charts
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning Problem
 
NG BB 26 Control Charts
NG BB 26 Control ChartsNG BB 26 Control Charts
NG BB 26 Control Charts
 
Variable control chart
Variable control chartVariable control chart
Variable control chart
 
quality and performance
quality and performancequality and performance
quality and performance
 
Statictical process Control
Statictical process ControlStatictical process Control
Statictical process Control
 
Calculating critical values of t distributions using tables of percentage points
Calculating critical values of t distributions using tables of percentage pointsCalculating critical values of t distributions using tables of percentage points
Calculating critical values of t distributions using tables of percentage points
 
Qa.spc
Qa.spcQa.spc
Qa.spc
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
 
control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c p
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Tabel t, z dan f dan chi kuadrat
Tabel t, z dan f dan chi kuadratTabel t, z dan f dan chi kuadrat
Tabel t, z dan f dan chi kuadrat
 
Why TQM fails?
Why TQM fails?Why TQM fails?
Why TQM fails?
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Management
 

Similar to P Charts

Control charts tool
Control charts toolControl charts tool
Control charts toolMohit Singla
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
Hariharan Ponnusamy
 
JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4
Asraf Malik
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
KanriConsulting
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.dvietians
 
TQM
TQMTQM
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
NAVEENBANSHIWAL
 
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
aurkoiitk
 
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
GMSL S.r.l.
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
Sai Datri Arige
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
Vicky Raj
 
Example -BB Powertrain
Example -BB PowertrainExample -BB Powertrain
Example -BB PowertrainPeter Zhou
 
Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)
Matt Hansen
 
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docxPA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
gerardkortney
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
Ijan Rahman Ode
 
Control chart qm
Control chart qmControl chart qm
Control chart qmAshu0711
 
Six sigma using minitab
Six sigma using minitabSix sigma using minitab
Six sigma using minitab
Vimal sam singh
 
Gestión de la calidad sem 2
Gestión de la calidad sem 2Gestión de la calidad sem 2
Gestión de la calidad sem 2
youffre
 

Similar to P Charts (20)

Control charts tool
Control charts toolControl charts tool
Control charts tool
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
 
Chapter9[1]
Chapter9[1]Chapter9[1]
Chapter9[1]
 
JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
TQM
TQMTQM
TQM
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
A Study on the Short Run Relationship b/w Major Economic Indicators of US Eco...
 
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
Vitaletti Leonardo, Elica Motors - Design for Six Sigma ed applicazioni minit...
 
ch06.ppt
ch06.pptch06.ppt
ch06.ppt
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
 
Example -BB Powertrain
Example -BB PowertrainExample -BB Powertrain
Example -BB Powertrain
 
Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)
 
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docxPA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
PA 1c. Decision VariablesabcdCalculated values0.21110.531110.09760.docx
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
 
Six sigma using minitab
Six sigma using minitabSix sigma using minitab
Six sigma using minitab
 
Gestión de la calidad sem 2
Gestión de la calidad sem 2Gestión de la calidad sem 2
Gestión de la calidad sem 2
 

More from ahmad bassiouny

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
ahmad bassiouny
 
Work Study
Work StudyWork Study
Work Study
ahmad bassiouny
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
ahmad bassiouny
 
Motion Study
Motion StudyMotion Study
Motion Study
ahmad bassiouny
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
ahmad bassiouny
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
ahmad bassiouny
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
ahmad bassiouny
 
Miramar
MiramarMiramar
Linearization
LinearizationLinearization
Linearization
ahmad bassiouny
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
ahmad bassiouny
 
How To Survive
How To SurviveHow To Survive
How To Survive
ahmad bassiouny
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
ahmad bassiouny
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
ahmad bassiouny
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
ahmad bassiouny
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
ahmad bassiouny
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
ahmad bassiouny
 
Workstudy
WorkstudyWorkstudy
Workstudy
ahmad bassiouny
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
ahmad bassiouny
 

More from ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Recently uploaded

678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 

Recently uploaded (20)

678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 

P Charts

  • 1. Donald Davis OPERMGMT 345 November 18, 2002 P-CHARTS In today’s business world every organization is concerned with quality. Total Quality Management (TQM) systems use Statistical Process Control (SPC) to insure their operations maintain product quality. Shortly after World War II, a quality expert and consultant named W. E. Deming was invited to Japan to conduct lectures on improving product reliability. Many experts believe this to be the beginning of Japan’s commitment to TQM. It is very difficult to talk about TQM in production management without referring to Statistical Process Control. SPC is a process, which uses control charts to evaluate whether any part of the production process is out of control. The result would be a quality failure or product defection. Its main function is to prevent quality defects before they occur. Many companies spend huge amounts of resources to insure proper training in both TQM and SPC methods. Control charts are graphs that reflect a visual diagram to see if sample products remain inside of their control limits. These control charts revolve around two main functions: the first is to establish control limits for the process and the second is to monitor when the production process is outside of these controls. P-Chart construction begins with the first step of establishing control limits. There are some assumptions made regarding the discrete attribute measure. The main assumption is while the sample size gets larger, the proportion of defects can be placed into a normal distribution curve. This enables us to use the following statistical formulas to complete the first steps of
  • 2. constructing a P-Chart: establishing the Upper Control Limit (UCL) and Lower Control Limit (LCL). UCL = pbar + zσ p LCL = pbar - zσ p Where z = the number of standard deviations from the process average. pbar = the sample of the proportion that is defective. σ p = the standard deviation of the sample proportion. The standard deviation is computed as σ p = √pbar (1 – pbar)/n Where n = sample size Occasionally you will see a z value of 2.00 but more often than not z is setup as 3.00. This allows a probability of 99.74 percent under normal distribution circumstances. Once the Upper and Lower Control Limits are established, it becomes just a matter of plotting the points on a graph or chart to determine the number of defects that exist. Where all plotted points are within the control limits there is a 99.74% comfort level, which exists. If for
  • 3. whatever reason points fall outside the control limits corrective action should be taken to maintain the quality the organization is trying to achieve. The following is a typical problem and solution for the construction of a P-Chart: Twenty samples of n = 200 were taken by an operator at a workstation in a production process. The number of defective items in each sample were recorded as follows. NUMBER OF NUMBER OF SAMPLE DEFECTIVES p SAMPLE DEFECTIVES p 1 12 0.060 11 16 0.080 2 18 0.090 12 14 0.070 3 10 0.050 13 12 0.060 4 14 0.070 14 16 0.080 5 16 0.080 15 18 0.090 6 19 0.095 16 20 0.100 7 17 0.085 17 18 0.090 8 12 0.060 18 20 0.100 9 11 0.055 19 21 0.105 10 14 0.070 20 22 0.110
  • 4. Management wants to develop a p-chart using 3-sigma limits. Set up the p-chart and plot the observations to determine if the process was out of control at any point. Solution Step 1. Compute pbar: pbar = total # of defectives/total # of observations = 320/(20)(200) = 0.08 Step 2. Determine the control limits: UCL = pbar + z √ pbar (1- pbar)/n = 0.08 + (3.00)(0.019) = 0.137 LCL = pbar – z √ pbar (1 – pbar)/n = 0.08 – (3.00)(0.019) = 0.023 Step 3. Construct the p-chart with pbar = 0.08, UCL = 0.137, and LCL = 0.023. The process does not appear to be out of control.
  • 5. Bibliography Amsden, Robert T., Butler, Howard E., Amsden, Davida M. SPC SIMPLIFIED: Practical Steps to Quality. New York: Quality Resources, 1989. Russel, Taylor III, Operations Management: Fourth Edition. Prentice Hall, Inc., Upper Saddle River, New Jersey, 2003, pages 675-699. Farrokh, Alemi, PhD. “Assumptions of Probability Charts.” Internet: http://mason.gmu.edu/~falemi/cqi/p61art1.htm, November 15, 2002 “Attribute Charts in General, p Charts in Particular.” Internet: http://www.sytsma.com/tqmtools/pchart.html, November 15, 2002