SlideShare a Scribd company logo
MW Scale Solar PV Power
Plant
Background
Solar energy is free source of energy
Solar radiation on earth surface per hour is equal to total
power consumption of earth for whole year.
Grid power in India is polluting, unreliable and inefficient
Solar energy is a renewable, clean alternative to fossil fuels.
solar energy is converted into electricity by using either photo-
voltaic or solar thermal
A modest 2.5kw solar power system can have over its
lifetime equivalent to
300 barrels of oil not produced
270,000 miles not driven
1,100 lbs of acid rain emissions not discharged
550 lbs of smog emissions not produced
220,000 lbs of greenhouse gases not emitted
equivalent to planting 500 trees.
Solar Energy vs Convectional Energy
•Jawaharlal Nehru National Solar Mission (MNRE, Govt of
India) launched in, 2010 by the Prime Minister, a target of
deploying 20,000 MW of grid connected solar power by
2022. It is enhanced by new government to 100,000 MW.
Target by 2022 Old
Revised
•Solar power 20,000 MW 100,000 MW
•Wind Energy 38500 MW 60,000 MW
• Others 13500 MW 15,000 MW
•Total 72,000 MW 175,000 MW
Incentives to Solar power plant
• Various incentives offered by central and state government, few
of them are
• Benefit in land registration for solar power plant
• 15-30 % subsidy for sanctioned project for equipments.
• Support in grid connectivity
• Depreciation benefits
1MW SPV Power Plant : Initial casting
Sr No Item Unit @ rate
Cost
(lac)
1Land 6 Acre 600000 36
2Modules 1100000Watt 33 363
3Civil Structure 60,500Kg 66 44
4Inverter 1100000VA 11 121
5Transformer 1 27,00,000 27
6Protective devices 1 10
7Wires, Cables 10
8SCADA/RMS 10
9Installation 10
10Legal & official work 24
11Grid Evacuation 10
12Execution & commisioning 30
Total 695
1MW SPV Power Plant : Financial
Plant Capacity 1000 KW
Plant Cost (in lacs) 0.695 lac/KW 695
Equity 30% 208.5
Debt 70% 486.5
Interst rate 12% 1.01
Payment Period (yrs) 9 108
EMI 7.3871
Maintenance & Manpower 3%
P V of Inverter Cost 132
Price reduction rate of Inverter 2%
• Area Shade free 3 Acre Only 80% of the input area is considered to adjust for potential
shaded areas
• Maintenance & Manpower 4% of project cost, with annual escalation of 5%
• Inverter lifespan is 10 years, with 2.00% annual cost reduction (110 % of capacity, @Rs 11/W)
• Accelerated depreciation is at 80.00%. It is assumed that the entire benefit of accelerated
depreciation can be claimed
• Corporate tax rate 35%
• Plant generation 4.7 kWh per KW per day, with 1% annual panel degradation and 10%
losses10%
• Debt service calculation assumes 70.00% debt; 2.00% interest rate; 9-year loan term with no
moratorium; repayable monthly through EMI
• Tariff 7.5 /KWH through PPA for 12 years
• Annual inflation 7%
1MW SPV Power Plant : Financial in lacs
Year
Plant Expenditure
Net
Yearly
Expend
Generation
return
by
power
selling
REC
Return
@
3000/
MWH
Net
Return
Present
value
of Net
return
Equity/
Inverter
replaceme
nt
Mainten
ance
Debt
Int
Debt
Prin
Power
Unit
(MWH)
Tariff
Rs per
KWH
earning
0 208.50 -208.50 -208.50 -208.50 -208.50
1 20.85 56.66 31.99 -109.50 1478 7.50 110.85 1.35 1.35 1.27
2 21.89 52.60 36.04 -110.54 1463 7.50 109.73 -0.81 44.00 43.19 37.72
3 22.99 48.03 40.61 -111.63 1449 7.50 108.68 -2.96 43.00 40.04 32.69
4 24.14 42.88 45.77 -112.78 1434 7.50 107.55 -5.23 43.00 37.77 28.81
5 25.34 37.08 51.57 -113.99 1420 7.50 106.50 -7.49 43.00 35.51 25.32
6 26.61 30.54 58.11 -115.26 1406 7.50 105.45 -9.81 42.00 32.19 21.45
7 27.94 23.17 65.48 -116.59 1392 7.50 104.40 -12.19 42.00 29.81 18.57
8 29.34 14.86 73.78 -117.98 1378 7.50 103.35 -14.63 41.00 26.37 15.35
9 30.80 5.50 83.14 -119.45 1364 7.50 102.30 -17.15 41.00 23.85 12.97
10 108.29 32.35 0.00 0.00 -140.63 1350 7.50 101.25 -39.38 41.00 1.62 0.82
11 33.96 -33.96 1337 7.50 100.28 66.31 40.00 106.31 50.51
12 35.66 -35.66 1324 7.50 99.30 63.64 40.00 103.64 46.02
1MW SPV Power Plant : Financial in lacs
Year
Plant Expenditure
Net
Yearly
Expen
Generation
return
by
power
selling
REC
Return
@
3000/
MWH
Net
Return
Present
value
of Net
return
Equity/
Inverter
replacem
ent
Mainten
ece
Debt
Int
Debt
Prin
Power
Unit
(MWH)
Tariff
Rs per
KWH
earning
13 37.44 -37.44 1310 10.00 131.00 93.56 39.00 132.56 55.01
14 39.32 -39.32 1297 10.00 129.70 90.38 39.00 129.38 50.18
15 41.28 -41.28 1284 10.00 128.40 87.12 39.00 126.12 45.71
16 43.35 -43.35 1271 10.00 127.10 83.75 38.00 121.75 41.24
17 45.51 -45.51 1259 10.00 125.90 80.39 38.00 118.39 37.48
18 47.79 -47.79 1246 10.00 124.60 76.81 37.00 113.81 33.67
19 50.18 -50.18 1234 10.00 123.40 73.22 37.00 110.22 30.48
20 88.83 52.69 -141.52 1221 10.00 122.10 -19.42 37.00 17.58 4.54
21 55.32 -55.32 1209 10.00 120.90 65.58 36.00 101.58 24.53
22 58.09 -58.09 1197 10.00 119.70 61.61 36.00 97.61 22.03
23 60.99 -60.99 1185 10.00 118.50 57.51 36.00 93.51 19.73
24 64.04 -64.04 1173 10.00 117.30 53.26 35.00 88.26 17.40
25 67.24 -67.24 1161 10.00 116.10 48.86 35.00 83.86 15.45
405.62 995.11 311.31 486.50 -2198.54 32842.00 220.00 2864.33 665.79 942.00 1607.79 480.44
1MW SPV Power Plant : Financial
• Initial Investment : 6.950 crore
Equity : 2.085 crore
Debt : 4.865 crore
• Present Value of Investment : 12.56 crore
• Present Value of earning (PPA & REC) : 17.36 crore
• Present Value of Profit before tax :4.80 crore
• Payback period : 6 years
• Levelized cost of power : Rs 3.28/unit
• After payback period capacity enhancement of another 1 MW in same land can be
done with maintenance covered by first project
(conservative estimate of earning is made. No incentive by government is considered
in investment)

More Related Content

What's hot

Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemShoeb Ali Khan
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
L'Obel Solar Power System
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
Gensol Engineering Limited
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging TechnologyMd Shahabuddin
 
Standalone Solar PV system design Example
Standalone Solar PV system design ExampleStandalone Solar PV system design Example
Standalone Solar PV system design Example
Dr Naim R Kidwai
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.
Urval Chotalia
 
On Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own ElectricityOn Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own Electricity
renewgreensolar
 
Solar energy by hadi @bau
Solar energy by hadi @bauSolar energy by hadi @bau
Solar energy by hadi @bau
Md Abdul Hai
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
Vignesh Sekar
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
Rajesh Pindoriya
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Private Consultants
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
Gensol Engineering Limited
 
Solarpowerplant
SolarpowerplantSolarpowerplant
Solarpowerplant
rudrik joshi
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
firstgreen
 
Solar energy
Solar energy Solar energy
Solar energy
Shoaib Madridista
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
Gensol Engineering Limited
 
Solar system design
Solar system designSolar system design
Solar system design
Ajinkya Bobade
 
Solar power plant
Solar power plantSolar power plant
Solar power plant
Anurag Singh
 
Solar PV Cells, Module and Array
Solar PV Cells, Module and ArraySolar PV Cells, Module and Array
Solar PV Cells, Module and Array
Dr Naim R Kidwai
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
Leonardo ENERGY
 

What's hot (20)

Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 
Standalone Solar PV system design Example
Standalone Solar PV system design ExampleStandalone Solar PV system design Example
Standalone Solar PV system design Example
 
Basic Introduction to solar PV System.
Basic Introduction to solar PV System.Basic Introduction to solar PV System.
Basic Introduction to solar PV System.
 
On Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own ElectricityOn Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own Electricity
 
Solar energy by hadi @bau
Solar energy by hadi @bauSolar energy by hadi @bau
Solar energy by hadi @bau
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Solarpowerplant
SolarpowerplantSolarpowerplant
Solarpowerplant
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
 
Solar energy
Solar energy Solar energy
Solar energy
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Solar system design
Solar system designSolar system design
Solar system design
 
Solar power plant
Solar power plantSolar power plant
Solar power plant
 
Solar PV Cells, Module and Array
Solar PV Cells, Module and ArraySolar PV Cells, Module and Array
Solar PV Cells, Module and Array
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 

Viewers also liked

Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
Akash Jauhari
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
Vignesh Sekar
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
CupertinoElectric
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
Shahbaz Makandar A.
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
Abhay Ocean India ltd.
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
Luis Ram Rojas-Sol
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Maxpromotion
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
Ajay Yadav
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
Avish Thakral
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
Anjali Khandelwal
 

Viewers also liked (10)

Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 

Similar to Financial analysis of 1 MW Solar PV plant

Lecture 1 piyush 21
Lecture 1 piyush 21Lecture 1 piyush 21
Lecture 1 piyush 21
Dr Piyush Charan
 
Solar rooftop market analysis
Solar rooftop market analysisSolar rooftop market analysis
Solar rooftop market analysis
Arun kumar
 
Solar PPt.pptx
Solar PPt.pptxSolar PPt.pptx
Solar PPt.pptx
MissSeptember1
 
installation of grid solar panel of electrical department
installation of grid solar panel of electrical departmentinstallation of grid solar panel of electrical department
installation of grid solar panel of electrical department
surendra gurjar
 
Welcome to the presentation
Welcome to the presentationWelcome to the presentation
Welcome to the presentation
surendra gurjar
 
A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009
Private Consultants
 
STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)sajidpk92
 
Renewable Energy::Pakistan Perspective 2013
Renewable Energy::Pakistan Perspective 2013Renewable Energy::Pakistan Perspective 2013
Renewable Energy::Pakistan Perspective 2013akhtar ali
 
Inverted Energy: Energy Storage Case Study
Inverted Energy: Energy Storage Case Study Inverted Energy: Energy Storage Case Study
Inverted Energy: Energy Storage Case Study
Inverted2019
 
Floating Solar
Floating SolarFloating Solar
Floating Solar
plzsorry
 
Financial viability of solar power plant in Tamil Nadu
Financial viability of solar power plant in Tamil NaduFinancial viability of solar power plant in Tamil Nadu
Financial viability of solar power plant in Tamil NaduIshan Rohit
 
Sopitsuda thailandssolarfit
Sopitsuda thailandssolarfitSopitsuda thailandssolarfit
Sopitsuda thailandssolarfit
Next Gen Group of Company
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
Abhishek Ashok
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
John Blue
 
solar net-metering system
solar net-metering systemsolar net-metering system
solar net-metering system
Mohd Uddin
 
Energy conservation sachivalaya part 2
Energy conservation sachivalaya part 2Energy conservation sachivalaya part 2
Energy conservation sachivalaya part 2
IEI GSC
 
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
mza.arifin
 
Project of a solar system on the roof of the house of Santa Claus
Project of a solar system on the roof of the house of Santa ClausProject of a solar system on the roof of the house of Santa Claus
Project of a solar system on the roof of the house of Santa Claus
EasySolar
 

Similar to Financial analysis of 1 MW Solar PV plant (20)

Lecture 1 piyush 21
Lecture 1 piyush 21Lecture 1 piyush 21
Lecture 1 piyush 21
 
Solar rooftop market analysis
Solar rooftop market analysisSolar rooftop market analysis
Solar rooftop market analysis
 
Solar PPt.pptx
Solar PPt.pptxSolar PPt.pptx
Solar PPt.pptx
 
installation of grid solar panel of electrical department
installation of grid solar panel of electrical departmentinstallation of grid solar panel of electrical department
installation of grid solar panel of electrical department
 
Welcome to the presentation
Welcome to the presentationWelcome to the presentation
Welcome to the presentation
 
Solarexppt
SolarexpptSolarexppt
Solarexppt
 
A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009
 
STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)
 
Renewable Energy::Pakistan Perspective 2013
Renewable Energy::Pakistan Perspective 2013Renewable Energy::Pakistan Perspective 2013
Renewable Energy::Pakistan Perspective 2013
 
Inverted Energy: Energy Storage Case Study
Inverted Energy: Energy Storage Case Study Inverted Energy: Energy Storage Case Study
Inverted Energy: Energy Storage Case Study
 
A n srivastava
A n srivastavaA n srivastava
A n srivastava
 
Floating Solar
Floating SolarFloating Solar
Floating Solar
 
Financial viability of solar power plant in Tamil Nadu
Financial viability of solar power plant in Tamil NaduFinancial viability of solar power plant in Tamil Nadu
Financial viability of solar power plant in Tamil Nadu
 
Sopitsuda thailandssolarfit
Sopitsuda thailandssolarfitSopitsuda thailandssolarfit
Sopitsuda thailandssolarfit
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
 
solar net-metering system
solar net-metering systemsolar net-metering system
solar net-metering system
 
Energy conservation sachivalaya part 2
Energy conservation sachivalaya part 2Energy conservation sachivalaya part 2
Energy conservation sachivalaya part 2
 
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
 
Project of a solar system on the roof of the house of Santa Claus
Project of a solar system on the roof of the house of Santa ClausProject of a solar system on the roof of the house of Santa Claus
Project of a solar system on the roof of the house of Santa Claus
 

More from Dr Naim R Kidwai

Asynchronous sequential circuit analysis
Asynchronous sequential circuit analysisAsynchronous sequential circuit analysis
Asynchronous sequential circuit analysis
Dr Naim R Kidwai
 
synchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registerssynchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registers
Dr Naim R Kidwai
 
Clocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and designClocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and design
Dr Naim R Kidwai
 
Sequential circuit-flip flops
Sequential circuit-flip flopsSequential circuit-flip flops
Sequential circuit-flip flops
Dr Naim R Kidwai
 
Sampling Theorem
Sampling TheoremSampling Theorem
Sampling Theorem
Dr Naim R Kidwai
 
Moodle introduction
Moodle introductionMoodle introduction
Moodle introduction
Dr Naim R Kidwai
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibility
Dr Naim R Kidwai
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projects
Dr Naim R Kidwai
 
financing projects
financing projectsfinancing projects
financing projects
Dr Naim R Kidwai
 
multiple projects and constraints
multiple projects and constraintsmultiple projects and constraints
multiple projects and constraints
Dr Naim R Kidwai
 
project risk analysis
project risk analysisproject risk analysis
project risk analysis
Dr Naim R Kidwai
 
Nec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random processNec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random process
Dr Naim R Kidwai
 
spread spectrum communication
spread spectrum communicationspread spectrum communication
spread spectrum communication
Dr Naim R Kidwai
 
Error Control coding
Error Control codingError Control coding
Error Control coding
Dr Naim R Kidwai
 
information theory
information theoryinformation theory
information theory
Dr Naim R Kidwai
 
Rec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re modelRec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re model
Dr Naim R Kidwai
 
Rec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistorRec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistor
Dr Naim R Kidwai
 
Rec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristicsRec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristics
Dr Naim R Kidwai
 
Rec101 unit v communication engg
Rec101 unit v communication enggRec101 unit v communication engg
Rec101 unit v communication engg
Dr Naim R Kidwai
 
Rec101 unit iv emi
Rec101 unit iv emiRec101 unit iv emi
Rec101 unit iv emi
Dr Naim R Kidwai
 

More from Dr Naim R Kidwai (20)

Asynchronous sequential circuit analysis
Asynchronous sequential circuit analysisAsynchronous sequential circuit analysis
Asynchronous sequential circuit analysis
 
synchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registerssynchronous Sequential circuit counters and registers
synchronous Sequential circuit counters and registers
 
Clocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and designClocked Sequential circuit analysis and design
Clocked Sequential circuit analysis and design
 
Sequential circuit-flip flops
Sequential circuit-flip flopsSequential circuit-flip flops
Sequential circuit-flip flops
 
Sampling Theorem
Sampling TheoremSampling Theorem
Sampling Theorem
 
Moodle introduction
Moodle introductionMoodle introduction
Moodle introduction
 
Project financial feasibility
Project financial feasibilityProject financial feasibility
Project financial feasibility
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projects
 
financing projects
financing projectsfinancing projects
financing projects
 
multiple projects and constraints
multiple projects and constraintsmultiple projects and constraints
multiple projects and constraints
 
project risk analysis
project risk analysisproject risk analysis
project risk analysis
 
Nec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random processNec 602 unit ii Random Variables and Random process
Nec 602 unit ii Random Variables and Random process
 
spread spectrum communication
spread spectrum communicationspread spectrum communication
spread spectrum communication
 
Error Control coding
Error Control codingError Control coding
Error Control coding
 
information theory
information theoryinformation theory
information theory
 
Rec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re modelRec101 unit ii (part 2) bjt biasing and re model
Rec101 unit ii (part 2) bjt biasing and re model
 
Rec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistorRec101 unit ii (part 3) field effect transistor
Rec101 unit ii (part 3) field effect transistor
 
Rec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristicsRec101 unit ii (part 1) bjt characteristics
Rec101 unit ii (part 1) bjt characteristics
 
Rec101 unit v communication engg
Rec101 unit v communication enggRec101 unit v communication engg
Rec101 unit v communication engg
 
Rec101 unit iv emi
Rec101 unit iv emiRec101 unit iv emi
Rec101 unit iv emi
 

Recently uploaded

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Financial analysis of 1 MW Solar PV plant

  • 1. MW Scale Solar PV Power Plant
  • 2. Background Solar energy is free source of energy Solar radiation on earth surface per hour is equal to total power consumption of earth for whole year. Grid power in India is polluting, unreliable and inefficient Solar energy is a renewable, clean alternative to fossil fuels. solar energy is converted into electricity by using either photo- voltaic or solar thermal
  • 3. A modest 2.5kw solar power system can have over its lifetime equivalent to 300 barrels of oil not produced 270,000 miles not driven 1,100 lbs of acid rain emissions not discharged 550 lbs of smog emissions not produced 220,000 lbs of greenhouse gases not emitted equivalent to planting 500 trees. Solar Energy vs Convectional Energy
  • 4. •Jawaharlal Nehru National Solar Mission (MNRE, Govt of India) launched in, 2010 by the Prime Minister, a target of deploying 20,000 MW of grid connected solar power by 2022. It is enhanced by new government to 100,000 MW. Target by 2022 Old Revised •Solar power 20,000 MW 100,000 MW •Wind Energy 38500 MW 60,000 MW • Others 13500 MW 15,000 MW •Total 72,000 MW 175,000 MW
  • 5. Incentives to Solar power plant • Various incentives offered by central and state government, few of them are • Benefit in land registration for solar power plant • 15-30 % subsidy for sanctioned project for equipments. • Support in grid connectivity • Depreciation benefits
  • 6. 1MW SPV Power Plant : Initial casting Sr No Item Unit @ rate Cost (lac) 1Land 6 Acre 600000 36 2Modules 1100000Watt 33 363 3Civil Structure 60,500Kg 66 44 4Inverter 1100000VA 11 121 5Transformer 1 27,00,000 27 6Protective devices 1 10 7Wires, Cables 10 8SCADA/RMS 10 9Installation 10 10Legal & official work 24 11Grid Evacuation 10 12Execution & commisioning 30 Total 695
  • 7. 1MW SPV Power Plant : Financial Plant Capacity 1000 KW Plant Cost (in lacs) 0.695 lac/KW 695 Equity 30% 208.5 Debt 70% 486.5 Interst rate 12% 1.01 Payment Period (yrs) 9 108 EMI 7.3871 Maintenance & Manpower 3% P V of Inverter Cost 132 Price reduction rate of Inverter 2% • Area Shade free 3 Acre Only 80% of the input area is considered to adjust for potential shaded areas • Maintenance & Manpower 4% of project cost, with annual escalation of 5% • Inverter lifespan is 10 years, with 2.00% annual cost reduction (110 % of capacity, @Rs 11/W) • Accelerated depreciation is at 80.00%. It is assumed that the entire benefit of accelerated depreciation can be claimed • Corporate tax rate 35% • Plant generation 4.7 kWh per KW per day, with 1% annual panel degradation and 10% losses10% • Debt service calculation assumes 70.00% debt; 2.00% interest rate; 9-year loan term with no moratorium; repayable monthly through EMI • Tariff 7.5 /KWH through PPA for 12 years • Annual inflation 7%
  • 8. 1MW SPV Power Plant : Financial in lacs Year Plant Expenditure Net Yearly Expend Generation return by power selling REC Return @ 3000/ MWH Net Return Present value of Net return Equity/ Inverter replaceme nt Mainten ance Debt Int Debt Prin Power Unit (MWH) Tariff Rs per KWH earning 0 208.50 -208.50 -208.50 -208.50 -208.50 1 20.85 56.66 31.99 -109.50 1478 7.50 110.85 1.35 1.35 1.27 2 21.89 52.60 36.04 -110.54 1463 7.50 109.73 -0.81 44.00 43.19 37.72 3 22.99 48.03 40.61 -111.63 1449 7.50 108.68 -2.96 43.00 40.04 32.69 4 24.14 42.88 45.77 -112.78 1434 7.50 107.55 -5.23 43.00 37.77 28.81 5 25.34 37.08 51.57 -113.99 1420 7.50 106.50 -7.49 43.00 35.51 25.32 6 26.61 30.54 58.11 -115.26 1406 7.50 105.45 -9.81 42.00 32.19 21.45 7 27.94 23.17 65.48 -116.59 1392 7.50 104.40 -12.19 42.00 29.81 18.57 8 29.34 14.86 73.78 -117.98 1378 7.50 103.35 -14.63 41.00 26.37 15.35 9 30.80 5.50 83.14 -119.45 1364 7.50 102.30 -17.15 41.00 23.85 12.97 10 108.29 32.35 0.00 0.00 -140.63 1350 7.50 101.25 -39.38 41.00 1.62 0.82 11 33.96 -33.96 1337 7.50 100.28 66.31 40.00 106.31 50.51 12 35.66 -35.66 1324 7.50 99.30 63.64 40.00 103.64 46.02
  • 9. 1MW SPV Power Plant : Financial in lacs Year Plant Expenditure Net Yearly Expen Generation return by power selling REC Return @ 3000/ MWH Net Return Present value of Net return Equity/ Inverter replacem ent Mainten ece Debt Int Debt Prin Power Unit (MWH) Tariff Rs per KWH earning 13 37.44 -37.44 1310 10.00 131.00 93.56 39.00 132.56 55.01 14 39.32 -39.32 1297 10.00 129.70 90.38 39.00 129.38 50.18 15 41.28 -41.28 1284 10.00 128.40 87.12 39.00 126.12 45.71 16 43.35 -43.35 1271 10.00 127.10 83.75 38.00 121.75 41.24 17 45.51 -45.51 1259 10.00 125.90 80.39 38.00 118.39 37.48 18 47.79 -47.79 1246 10.00 124.60 76.81 37.00 113.81 33.67 19 50.18 -50.18 1234 10.00 123.40 73.22 37.00 110.22 30.48 20 88.83 52.69 -141.52 1221 10.00 122.10 -19.42 37.00 17.58 4.54 21 55.32 -55.32 1209 10.00 120.90 65.58 36.00 101.58 24.53 22 58.09 -58.09 1197 10.00 119.70 61.61 36.00 97.61 22.03 23 60.99 -60.99 1185 10.00 118.50 57.51 36.00 93.51 19.73 24 64.04 -64.04 1173 10.00 117.30 53.26 35.00 88.26 17.40 25 67.24 -67.24 1161 10.00 116.10 48.86 35.00 83.86 15.45 405.62 995.11 311.31 486.50 -2198.54 32842.00 220.00 2864.33 665.79 942.00 1607.79 480.44
  • 10. 1MW SPV Power Plant : Financial • Initial Investment : 6.950 crore Equity : 2.085 crore Debt : 4.865 crore • Present Value of Investment : 12.56 crore • Present Value of earning (PPA & REC) : 17.36 crore • Present Value of Profit before tax :4.80 crore • Payback period : 6 years • Levelized cost of power : Rs 3.28/unit • After payback period capacity enhancement of another 1 MW in same land can be done with maintenance covered by first project (conservative estimate of earning is made. No incentive by government is considered in investment)