FLOATING SOLAR POWER PLANT
BY
ABHAY OCEAN INDIA PVT LTD
PREPARED BY
PROF. V. BHOSALE
Why Floating PV?
Ever increasing power demand & depletion of fossil
fuels.
 Leads to shift our focus to renewable energy sources.
 Wind & Hydro RE sources are area specific.
 PV can be installed at any place.
 Major issue of Solar PV is requirement of land.
 But floating solar can be installed on any water
bodies.
 Floating solar PV results in decrease in cost and will
increase amount of generation due to cooling effect of
water.
CONCEPT
Floating Solar Power is innovative concept in energy
technology to meet the needs of our time.
Fig: PV floating plant outline
Components of Floating PV
 Floating System: A floating body (Structure +
Floater) that allows installation of PV module.
 Mooring System: This allows to adjust water level
fluctuations while maintaining its position.
 PV System: PV Generation equipment, similar to
electric junction boxes, that are installed on top of
floating system.
 Underwater Cable: To transfer generated power to
substation.
K-water 100 kW
 K- water installed 100 kW floating PV on the water
surface of Hapcheon water reservoir in 2011.
K- water 500 k W
 After successful installation of 100 kW system K-
water installed 500 kW PV system on another location
at same dam.
Performance Analysis
 100 kW PV at Hapcheon is forming 33 degree tilt &
its installed capacity is 99.36 kW, composed of 414
240W modules
Performance Analysis
 Data is collected from Jan 2012 to Dec 2012.
Monthly average generated quantity 10,852 kWh
Fig : Performance Analysis graph
Performance Analysis
 500 kW PV system forming 33 degree tilt, installed
capacity 496.8 kW composed of 2070 240 modules.
 Monthly generated Avg. quantity form Oct. 2012 to
Mar. 2013 was 55208 kWh.
Comparison Floating PV & Overland PV
 Floating solar panels( Blue) having 10.3 % more
efficient than overland system.

Fig.: Comparison Graph
Stability of floating sturcture
 Graph Floating PV stability against winds.
STATE WISE INSTALLED CAPACITY
Ever increasing power demand & depletion of fossil
fuels.
 Leads to shift our focus to renewable energy sources.
 Wind & Hydro RE sources are area specific.
 PV can be installed at any place.
 Major issue of Solar PV is requirement of land.
 But floating solar can be installed on any water
bodies.
 Floating solar PV results in decrease in cost and will
increase amount of generation due to cooling effect of
water.
GOVT. OF INDIA INITIATIVES
Policy & Regulatory framework
ELECTRICITY ACT 2003 : Most transformational & dynamic act till
date includes laid guidelines for Renewable energy.
SECTION 61(h): While specifying terms and condition for tariff
determination the commission shall consider the promotion of
generation from renewable energy sources.
SECTION 86(1) (e): State commission shall promote generation of
Electricity from renewable energy sources. It shall be done by providing
grid connectivity & sale of Electricity to anyone.
NATIONAL ELECTRICITY POLICY 2005 :
 SECTION 6.4 : This section states that in present stage non
conventional and conventional energy cannot compete at same similar
tariff and hence power shall be procured from non-conventional sources
at preferential tariff as determined by appropriate commission.
GOVT. OF INDIA INITIATIVES
Policy & Regulatory framework
 Amendment of National tariff policy for Solar
specific RPO’s.
 Solar specific RPO’s – 025 % in 2013 to 3 % by 2022.
 REC mechanism .
 Encourage state specific solar policies.
 State wise RPO orders by Regulators.
 Exemption for Environmental clearance for Solar
Power Projects.
Jawaharlal Nehru National Solar Mission (JNNSM)
Launched by Govt. of India in January 2011.
One of the major initiative at global level in
promotion of Solar energy technologies.
Mission aims to achieve grid tariff parity by 2022.
Large scale utilization, rapid diffusion and
deployment at a scale which leads to cost reduction.
R&D pilot projects and Technology Demonstration.
JNNSM Batch I Bidding Result Summary
Average tariff for selected projects was 1216
paisa/kWh which was 32% lower than CERC approved
benchmark tariff 1791 paisa/kWh.
In a Batch I a total of 204 MW capacity grid
connected solar power projects have been
commissioned.
Maharashtra Model Solar Policy
Maharashtra has reasonably high solar insolation 4-5
kWh/sq. meter with 280-300 clear sunny days.
Eastern Maharashtra considered to be most suitable
region for solar power projects
OBJECTIVE
 To generate 1000 MW of Solar energy by 2016.
To achieve grid parity by 2016 .
 Promotion of R&D and facilitation of technology
transfer.
Promotion of local manufacturing facilities.
Maharashtra Model Solar Policy
Financial outlay of Subsidy Scheme
Maharashtra Model Solar Policy
Subsidy under each project will be distributed into
three installments by state government.
Maharashtra Model Solar Policy
Criteria to avail benefits under the policy
 Project developer should not procure any
incentives/ subsidy from central government.
PPA’s should be singed with MAHADISCOM.
 Capacity Utilization Factor of Solar PV should be
more than 19% for initial two years of installation.
 An audited detailed report and energy generation
report should be submitted to MEDA.
Financial Modeling of Solar PV
 Capital Cost: Normative Capital cost INR 700 Lakhs/MW for
2014-15 as per MERC.
Annual Energy Yield: There are number of factors(e.g. Air
pollution, Shading, Soiling, Ambient temperature, Downtime
etc.) Which affect annual yield of Solar PV.
For 1 MWp Plant annual yield would averaged around 1.4
million kWh units. Yield prediction are assumed for next 25
years.
Certified Emission Reductions: As India is non Annex 1 party
under UN Clean Development Mechanism (CDM) qualifying
solar projects could generate Certified Emission
Reductions(CERs)
 Energy Price :
 Solar PV Plant under REC mechanism can earn its revenue from selling grey.
 In the financial model it is assumed that grey component of energy sold to
State discom at MSEDCL.
 Operation and Maintenance cost: One of the major benefit of Solar PV plant is
less O & M cost as compared to other renewable energy technologies.
 Financing Assumptions: General financial assumptions for a project in India
as follows
 Financial Structure: Equity 30 % and debt 70 % as assumed in MERC tariff
order.
 Debt repayment is taken over as 10 years. Interest rate on term loan and work
capital is taken as 12.87% and 13.37% respectively.
Floating solar PV Indian Context
 Great potential for floating PV.
 Availability of water bodies and land issues are main
accelerators for floating PV solar Panels.
 Increased efficiency of Floating PV over Land PV
installed will attract more investment due to better
returns.
 Availability of trained manpower and Govt. Policies
have boosts the confidence of investors.
Stable floating PV platforms results in minimum
operation & maintenance cost.
Thank You.
For Any Query Please Contact :
CAPT. JAGDISH KHOKHAR
Cell: +91 99 2030 9055
E-mail: jk@abhay-ocean.com
www.abhay-ocean.com

More Related Content

What's hot

Floating Solar
Floating SolarFloating Solar
Floating Solarplzsorry
 
Grid connected pv solar power plant
Grid connected pv solar power plantGrid connected pv solar power plant
Grid connected pv solar power plantAnujkumar985
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic ProjectHarry Indig
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantDr Naim R Kidwai
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemashmomio
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV systemRamesh Adhikari
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravShubham Gaurav
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV systemMalik Sameeullah
 
Solar PV Cells, Module and Array
Solar PV Cells, Module and ArraySolar PV Cells, Module and Array
Solar PV Cells, Module and ArrayDr Naim R Kidwai
 
1. Solar Power Plant Technologies
1. Solar Power Plant Technologies1. Solar Power Plant Technologies
1. Solar Power Plant TechnologiesNageswar Rao
 
Floating solar power plant converted
Floating solar power plant convertedFloating solar power plant converted
Floating solar power plant convertedroshanravi6
 
Solar canal and floating power plants.
Solar canal  and floating power plants.Solar canal  and floating power plants.
Solar canal and floating power plants.Maharishi Tiwari
 

What's hot (20)

Floating Solar
Floating SolarFloating Solar
Floating Solar
 
Grid connected pv solar power plant
Grid connected pv solar power plantGrid connected pv solar power plant
Grid connected pv solar power plant
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV system
 
Solar pv systems
Solar pv systemsSolar pv systems
Solar pv systems
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham Gaurav
 
About Solar Inverter
About Solar Inverter About Solar Inverter
About Solar Inverter
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
 
Solar PV Cells, Module and Array
Solar PV Cells, Module and ArraySolar PV Cells, Module and Array
Solar PV Cells, Module and Array
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
1. Solar Power Plant Technologies
1. Solar Power Plant Technologies1. Solar Power Plant Technologies
1. Solar Power Plant Technologies
 
Grid Integration of PV
Grid Integration of PVGrid Integration of PV
Grid Integration of PV
 
FLOATING SOLAR ppt
FLOATING SOLAR pptFLOATING SOLAR ppt
FLOATING SOLAR ppt
 
Floating solar power plant converted
Floating solar power plant convertedFloating solar power plant converted
Floating solar power plant converted
 
Solar pv connected to grid
Solar pv connected to gridSolar pv connected to grid
Solar pv connected to grid
 
Solar power plant
Solar power plantSolar power plant
Solar power plant
 
Solar pv
Solar pvSolar pv
Solar pv
 
Solar canal and floating power plants.
Solar canal  and floating power plants.Solar canal  and floating power plants.
Solar canal and floating power plants.
 

Viewers also liked

Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantAvish Thakral
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdAjay Yadav
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataCupertinoElectric
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...Luis Ram Rojas-Sol
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Maxpromotion
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaAkash Jauhari
 

Viewers also liked (7)

Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 

Similar to Aoil floating solar power plant ppt 2015

Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyMalik Sameeullah
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging TechnologyMd Shahabuddin
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Techno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMERTechno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMERIRJET Journal
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Private Consultants
 
pptajay-180629114156.pptx
pptajay-180629114156.pptxpptajay-180629114156.pptx
pptajay-180629114156.pptx20269vinay
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison Nilesh Dayalapwar
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsEklavya Sharma
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisissolarindia
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationBiswajit Bhuyan
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in IndiaRBSA Advisors
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship reportDharmveer kumar
 

Similar to Aoil floating solar power plant ppt 2015 (20)

Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
I010326469
I010326469I010326469
I010326469
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Techno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMERTechno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMER
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
pptajay-180629114156.pptx
pptajay-180629114156.pptxpptajay-180629114156.pptx
pptajay-180629114156.pptx
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
Cashing on the sun
Cashing on the sunCashing on the sun
Cashing on the sun
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Country report
Country reportCountry report
Country report
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity Generation
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship report
 

More from Abhay Ocean India ltd. (13)

Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
 
Proposed subsea power grid AOIL
Proposed subsea power grid AOILProposed subsea power grid AOIL
Proposed subsea power grid AOIL
 
Aoil Tidal energy ppt
Aoil Tidal energy pptAoil Tidal energy ppt
Aoil Tidal energy ppt
 
Aoil wind power ppt 2015
Aoil wind power ppt 2015Aoil wind power ppt 2015
Aoil wind power ppt 2015
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Technical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipesTechnical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipes
 
Aoil diving code,& standards 2016
Aoil diving code,& standards 2016 Aoil diving code,& standards 2016
Aoil diving code,& standards 2016
 
Floating resorts Project in India
Floating resorts Project in  IndiaFloating resorts Project in  India
Floating resorts Project in India
 
Funicular railways Proposal ppt
Funicular railways Proposal pptFunicular railways Proposal ppt
Funicular railways Proposal ppt
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Aoil survey presentation
Aoil survey presentation Aoil survey presentation
Aoil survey presentation
 
Aoil dredging ppt
Aoil dredging ppt Aoil dredging ppt
Aoil dredging ppt
 
Aoil diving
Aoil diving Aoil diving
Aoil diving
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Recently uploaded (20)

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

Aoil floating solar power plant ppt 2015

  • 1. FLOATING SOLAR POWER PLANT BY ABHAY OCEAN INDIA PVT LTD PREPARED BY PROF. V. BHOSALE
  • 2. Why Floating PV? Ever increasing power demand & depletion of fossil fuels.  Leads to shift our focus to renewable energy sources.  Wind & Hydro RE sources are area specific.  PV can be installed at any place.  Major issue of Solar PV is requirement of land.  But floating solar can be installed on any water bodies.  Floating solar PV results in decrease in cost and will increase amount of generation due to cooling effect of water.
  • 3. CONCEPT Floating Solar Power is innovative concept in energy technology to meet the needs of our time. Fig: PV floating plant outline
  • 4. Components of Floating PV  Floating System: A floating body (Structure + Floater) that allows installation of PV module.  Mooring System: This allows to adjust water level fluctuations while maintaining its position.  PV System: PV Generation equipment, similar to electric junction boxes, that are installed on top of floating system.  Underwater Cable: To transfer generated power to substation.
  • 5. K-water 100 kW  K- water installed 100 kW floating PV on the water surface of Hapcheon water reservoir in 2011.
  • 6. K- water 500 k W  After successful installation of 100 kW system K- water installed 500 kW PV system on another location at same dam.
  • 7. Performance Analysis  100 kW PV at Hapcheon is forming 33 degree tilt & its installed capacity is 99.36 kW, composed of 414 240W modules
  • 8. Performance Analysis  Data is collected from Jan 2012 to Dec 2012. Monthly average generated quantity 10,852 kWh Fig : Performance Analysis graph
  • 9. Performance Analysis  500 kW PV system forming 33 degree tilt, installed capacity 496.8 kW composed of 2070 240 modules.  Monthly generated Avg. quantity form Oct. 2012 to Mar. 2013 was 55208 kWh.
  • 10. Comparison Floating PV & Overland PV  Floating solar panels( Blue) having 10.3 % more efficient than overland system.  Fig.: Comparison Graph
  • 11. Stability of floating sturcture  Graph Floating PV stability against winds.
  • 12. STATE WISE INSTALLED CAPACITY Ever increasing power demand & depletion of fossil fuels.  Leads to shift our focus to renewable energy sources.  Wind & Hydro RE sources are area specific.  PV can be installed at any place.  Major issue of Solar PV is requirement of land.  But floating solar can be installed on any water bodies.  Floating solar PV results in decrease in cost and will increase amount of generation due to cooling effect of water.
  • 13. GOVT. OF INDIA INITIATIVES Policy & Regulatory framework ELECTRICITY ACT 2003 : Most transformational & dynamic act till date includes laid guidelines for Renewable energy. SECTION 61(h): While specifying terms and condition for tariff determination the commission shall consider the promotion of generation from renewable energy sources. SECTION 86(1) (e): State commission shall promote generation of Electricity from renewable energy sources. It shall be done by providing grid connectivity & sale of Electricity to anyone. NATIONAL ELECTRICITY POLICY 2005 :  SECTION 6.4 : This section states that in present stage non conventional and conventional energy cannot compete at same similar tariff and hence power shall be procured from non-conventional sources at preferential tariff as determined by appropriate commission.
  • 14. GOVT. OF INDIA INITIATIVES Policy & Regulatory framework  Amendment of National tariff policy for Solar specific RPO’s.  Solar specific RPO’s – 025 % in 2013 to 3 % by 2022.  REC mechanism .  Encourage state specific solar policies.  State wise RPO orders by Regulators.  Exemption for Environmental clearance for Solar Power Projects.
  • 15. Jawaharlal Nehru National Solar Mission (JNNSM) Launched by Govt. of India in January 2011. One of the major initiative at global level in promotion of Solar energy technologies. Mission aims to achieve grid tariff parity by 2022. Large scale utilization, rapid diffusion and deployment at a scale which leads to cost reduction. R&D pilot projects and Technology Demonstration.
  • 16. JNNSM Batch I Bidding Result Summary Average tariff for selected projects was 1216 paisa/kWh which was 32% lower than CERC approved benchmark tariff 1791 paisa/kWh. In a Batch I a total of 204 MW capacity grid connected solar power projects have been commissioned.
  • 17. Maharashtra Model Solar Policy Maharashtra has reasonably high solar insolation 4-5 kWh/sq. meter with 280-300 clear sunny days. Eastern Maharashtra considered to be most suitable region for solar power projects OBJECTIVE  To generate 1000 MW of Solar energy by 2016. To achieve grid parity by 2016 .  Promotion of R&D and facilitation of technology transfer. Promotion of local manufacturing facilities.
  • 18. Maharashtra Model Solar Policy Financial outlay of Subsidy Scheme
  • 19. Maharashtra Model Solar Policy Subsidy under each project will be distributed into three installments by state government.
  • 20. Maharashtra Model Solar Policy Criteria to avail benefits under the policy  Project developer should not procure any incentives/ subsidy from central government. PPA’s should be singed with MAHADISCOM.  Capacity Utilization Factor of Solar PV should be more than 19% for initial two years of installation.  An audited detailed report and energy generation report should be submitted to MEDA.
  • 21. Financial Modeling of Solar PV  Capital Cost: Normative Capital cost INR 700 Lakhs/MW for 2014-15 as per MERC. Annual Energy Yield: There are number of factors(e.g. Air pollution, Shading, Soiling, Ambient temperature, Downtime etc.) Which affect annual yield of Solar PV. For 1 MWp Plant annual yield would averaged around 1.4 million kWh units. Yield prediction are assumed for next 25 years. Certified Emission Reductions: As India is non Annex 1 party under UN Clean Development Mechanism (CDM) qualifying solar projects could generate Certified Emission Reductions(CERs)
  • 22.  Energy Price :  Solar PV Plant under REC mechanism can earn its revenue from selling grey.  In the financial model it is assumed that grey component of energy sold to State discom at MSEDCL.  Operation and Maintenance cost: One of the major benefit of Solar PV plant is less O & M cost as compared to other renewable energy technologies.  Financing Assumptions: General financial assumptions for a project in India as follows  Financial Structure: Equity 30 % and debt 70 % as assumed in MERC tariff order.  Debt repayment is taken over as 10 years. Interest rate on term loan and work capital is taken as 12.87% and 13.37% respectively.
  • 23. Floating solar PV Indian Context  Great potential for floating PV.  Availability of water bodies and land issues are main accelerators for floating PV solar Panels.  Increased efficiency of Floating PV over Land PV installed will attract more investment due to better returns.  Availability of trained manpower and Govt. Policies have boosts the confidence of investors. Stable floating PV platforms results in minimum operation & maintenance cost.
  • 24. Thank You. For Any Query Please Contact : CAPT. JAGDISH KHOKHAR Cell: +91 99 2030 9055 E-mail: jk@abhay-ocean.com www.abhay-ocean.com