Experiment No: 02 Date:
DETERMINATION OF WATER CONTENT BY CALCIUM CARBIDE
METHOD
Objective and Scope:
Rapid determination of water content from the gas pressure developed by the reaction of calcium
carbide with the free water of the soil.
Reference:
IS: 2720 (Part II) -1973
Soil specimen:
Sand requires no special preparation. Coarse soil may be grounded and pulverized. Cohesive and
plastic soil is tested with addition of steel balls in the pressure vessel. This test requires about 6 gm of
soil sample.
Equipments:
1) Metallic pressure vessel with clamp for scaling cup and gauge calibrated in percentage water
content.
2) Counterpoised balance for weighing sample.
3) Scoop for measuring absorbent.
4) Absorbent bottle (Calcium carbide)
5) Cleaning Brush
6) Steel balls- three balls of about 12.5 mm dia. and one steel ball of 25 mm dia.
Procedure:
1) Set up the balance. Place the sample in pan till the mark on the balance arm mass lines up with the
index mark. Unclamp the clamping screw of the instrument sufficiently to move the U-clamp off
the cup. Lift off the cup. Clean the cup and body with cleaning brush.
2) Hold the body horizontal and gently deposit one scoopful of absorbent (Calcium carbide) half way
inside the chamber. Then lay the chamber down without disturbing the absorbent charge. Transfer
the soil weighed from pan to the cup. Holding cup and chamber approximately horizontal bring
them together. Without disturbing sample, bring the U-clamp round and clamp the cup tightly in
the place.
3) With gauge downwards shake the moisture meter up and down vigorously for 5 sec, then quickly
turn it so that the gauge is upwards, give a tap to the body of the moisture meter to ensure that all
the content fall into the cup. Hold the rapid moisture meter downwards, again shake for 5 min.,
then turn gauge upwards and tap. Hold for 1 min.
4) Repeat this for three times. Water present in the soil reacts with the calcium carbide powder
releasing acetylene gas which exerts pressure on the dial from which water content on wet basis is
read. This is converted into dry basis as shown in the observation table.
5) Finally release the pressure slowly (away from the operator) by opening the clamp screw and
taking cup out, empty the contents and clean the instrument with the brush.
Observation table:
Sr.
No.
Description 1 2 3
1 Water content obtained on wet basis as the reading
on the rapid moisture meter
2 Water content on the dry basis ω = m ×
100
(100−m)
%
Average value of water content (%)
Calculation:
Water content (%) ω = m ×
100
(100−m)
%
Result:
Water content of given soil sample on dry basis =
Description
1. Scoop 2. Balance Base
3. Index mark 4. Balance arm
5. Stirrup 6. Pan
7. Gauge (0 - 50 percent) 8. Body
9. Cup 10. U-clamp
11. Clamp screw
Fig.1. Rapid Moisture Meter

More Related Content

What's hot

Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil sampling
Ana Debbarma
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavation
Yogesh Pandey
 

What's hot (20)

Determination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel AcademyDetermination of Field Density Using Sand Cone Method | Jameel Academy
Determination of Field Density Using Sand Cone Method | Jameel Academy
 
Stability of Slopes
Stability of Slopes Stability of Slopes
Stability of Slopes
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Plate load test
Plate load testPlate load test
Plate load test
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATION
 
Proctor compaction test
Proctor compaction testProctor compaction test
Proctor compaction test
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)
 
Unconfined Compression Test
Unconfined Compression TestUnconfined Compression Test
Unconfined Compression Test
 
Class 3 (a) Soil Plasticity (Atterberg Limits) ( Geotechenical Engineering )
Class 3 (a)   Soil Plasticity (Atterberg Limits) ( Geotechenical Engineering )Class 3 (a)   Soil Plasticity (Atterberg Limits) ( Geotechenical Engineering )
Class 3 (a) Soil Plasticity (Atterberg Limits) ( Geotechenical Engineering )
 
cone Penetration test
cone Penetration testcone Penetration test
cone Penetration test
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil sampling
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavation
 
Plate load test
Plate load testPlate load test
Plate load test
 
Atterberg limits
Atterberg limitsAtterberg limits
Atterberg limits
 
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 11
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 11Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 11
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 11
 

Similar to Ex 2 water content by calcium carbide method

Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docxLab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
smile790243
 
Atterberg limit test
Atterberg limit testAtterberg limit test
Atterberg limit test
Bahzad5
 

Similar to Ex 2 water content by calcium carbide method (20)

CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdf
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdf
 
DETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITSDETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITS
 
Mto lab
Mto labMto lab
Mto lab
 
capillary suction time
capillary suction timecapillary suction time
capillary suction time
 
Ex 5 consistency limits
Ex 5 consistency limitsEx 5 consistency limits
Ex 5 consistency limits
 
Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docxLab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
Lab 9 Chemical Reactions IIPre-lab Questions1. What is a limi.docx
 
Index properties
Index propertiesIndex properties
Index properties
 
Atterberg limit test
Atterberg limit testAtterberg limit test
Atterberg limit test
 
DocScanner Nov 3, 2022 1-55 PM.docx
DocScanner Nov 3, 2022 1-55 PM.docxDocScanner Nov 3, 2022 1-55 PM.docx
DocScanner Nov 3, 2022 1-55 PM.docx
 
Oedometer test
Oedometer testOedometer test
Oedometer test
 
Drilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal AwlDrilling engineering laboratory manual by Muhammed Jamal Awl
Drilling engineering laboratory manual by Muhammed Jamal Awl
 
Multi desaturator cell
Multi desaturator cellMulti desaturator cell
Multi desaturator cell
 
Marsh funnel viscosity2
Marsh funnel viscosity2Marsh funnel viscosity2
Marsh funnel viscosity2
 
Relationship of Soil Physical & Chemical Properties with Aggregate Stability ...
Relationship of Soil Physical & Chemical Properties with Aggregate Stability ...Relationship of Soil Physical & Chemical Properties with Aggregate Stability ...
Relationship of Soil Physical & Chemical Properties with Aggregate Stability ...
 
Ce305c127&128
Ce305c127&128Ce305c127&128
Ce305c127&128
 
Subgrade soil test, by Micotol
Subgrade soil test, by MicotolSubgrade soil test, by Micotol
Subgrade soil test, by Micotol
 
Rate of Reaction
Rate of ReactionRate of Reaction
Rate of Reaction
 
Exp01.pptx
Exp01.pptxExp01.pptx
Exp01.pptx
 

More from bhimaji40

More from bhimaji40 (20)

Sppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuationSppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuation
 
Fracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregateFracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregate
 
Green concrete
Green concreteGreen concrete
Green concrete
 
Influence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concreteInfluence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concrete
 
Fracture mechanics
Fracture mechanicsFracture mechanics
Fracture mechanics
 
Corrosion damaged rc columns repaired by cfrp sheets
Corrosion  damaged rc  columns repaired by cfrp  sheetsCorrosion  damaged rc  columns repaired by cfrp  sheets
Corrosion damaged rc columns repaired by cfrp sheets
 
Confined masonary construction
Confined masonary constructionConfined masonary construction
Confined masonary construction
 
B D kanawade
B D kanawadeB D kanawade
B D kanawade
 
Ex 7 b permeability by variable head
Ex 7 b permeability by variable headEx 7 b permeability by variable head
Ex 7 b permeability by variable head
 
Ex 7 a permeability by constant head
Ex 7 a permeability by constant headEx 7 a permeability by constant head
Ex 7 a permeability by constant head
 
Ex 6 c field density by clod method
Ex 6 c field density  by clod methodEx 6 c field density  by clod method
Ex 6 c field density by clod method
 
Ex 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodEx 6 b field density by sand replacement method
Ex 6 b field density by sand replacement method
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutter
 
Ex 11 vane shear test
Ex 11 vane shear testEx 11 vane shear test
Ex 11 vane shear test
 
Ex 10 unconfined compression test
Ex 10 unconfined compression testEx 10 unconfined compression test
Ex 10 unconfined compression test
 
Ex 9 differential free swell test
Ex 9 differential free swell testEx 9 differential free swell test
Ex 9 differential free swell test
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor test
 
Ex 12 direct shear test
Ex 12 direct shear testEx 12 direct shear test
Ex 12 direct shear test
 
Ex 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classificationEx 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classification
 
Ex 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometerEx 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometer
 

Recently uploaded

Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Ex 2 water content by calcium carbide method

  • 1. Experiment No: 02 Date: DETERMINATION OF WATER CONTENT BY CALCIUM CARBIDE METHOD Objective and Scope: Rapid determination of water content from the gas pressure developed by the reaction of calcium carbide with the free water of the soil. Reference: IS: 2720 (Part II) -1973 Soil specimen: Sand requires no special preparation. Coarse soil may be grounded and pulverized. Cohesive and plastic soil is tested with addition of steel balls in the pressure vessel. This test requires about 6 gm of soil sample. Equipments: 1) Metallic pressure vessel with clamp for scaling cup and gauge calibrated in percentage water content. 2) Counterpoised balance for weighing sample. 3) Scoop for measuring absorbent. 4) Absorbent bottle (Calcium carbide) 5) Cleaning Brush 6) Steel balls- three balls of about 12.5 mm dia. and one steel ball of 25 mm dia. Procedure: 1) Set up the balance. Place the sample in pan till the mark on the balance arm mass lines up with the index mark. Unclamp the clamping screw of the instrument sufficiently to move the U-clamp off the cup. Lift off the cup. Clean the cup and body with cleaning brush. 2) Hold the body horizontal and gently deposit one scoopful of absorbent (Calcium carbide) half way inside the chamber. Then lay the chamber down without disturbing the absorbent charge. Transfer the soil weighed from pan to the cup. Holding cup and chamber approximately horizontal bring them together. Without disturbing sample, bring the U-clamp round and clamp the cup tightly in the place. 3) With gauge downwards shake the moisture meter up and down vigorously for 5 sec, then quickly turn it so that the gauge is upwards, give a tap to the body of the moisture meter to ensure that all the content fall into the cup. Hold the rapid moisture meter downwards, again shake for 5 min., then turn gauge upwards and tap. Hold for 1 min. 4) Repeat this for three times. Water present in the soil reacts with the calcium carbide powder releasing acetylene gas which exerts pressure on the dial from which water content on wet basis is read. This is converted into dry basis as shown in the observation table. 5) Finally release the pressure slowly (away from the operator) by opening the clamp screw and taking cup out, empty the contents and clean the instrument with the brush.
  • 2. Observation table: Sr. No. Description 1 2 3 1 Water content obtained on wet basis as the reading on the rapid moisture meter 2 Water content on the dry basis ω = m × 100 (100−m) % Average value of water content (%) Calculation: Water content (%) ω = m × 100 (100−m) % Result: Water content of given soil sample on dry basis =
  • 3. Description 1. Scoop 2. Balance Base 3. Index mark 4. Balance arm 5. Stirrup 6. Pan 7. Gauge (0 - 50 percent) 8. Body 9. Cup 10. U-clamp 11. Clamp screw Fig.1. Rapid Moisture Meter