SlideShare a Scribd company logo
1 of 14
Er. B.D.KANAWADE
B.E. Civil, M.E. Structure
 Overview of Green Building
 Green Building Standards
 Green Building Incentives
 Green Building Issues – Leasing
 Green Building Issues – Design and
Construction
“Green” Buildings are high performance
structures that also meet certain standards
for reducing natural resource consumption .
 Going “Green” is the “right thing”
◦ reduce carbon consumption,
◦ energy independence,
◦ encourage community,
◦ preserve natural systems
 Because of various standards and outcomes,
it is important to work with client to
understand just what client wants to achieve
in undertaking a “green building” project
 Green Building Standards
 Green Building Incentives
 Green Building Leasing
 Green Building Design and Construction
 LEED – Leadership in Energy and
Environmental Design
◦ Administered by the U. S. Green Building Council
◦ Voluntary, consensus-based system
 Environmental impacts assessed on a 1,000
point scale in multiple categories:
◦ Energy
◦ Indoor Environment
◦ Site
◦ Water
◦ Resources
◦ Emissions
◦ Project/Environmental Management
 After achieving a threshold of at least 35% of the
total number of 1,000 points, new and existing
commercial buildings can be certified for their
environmental achievements and sustainability by
pursuing Green Globes certification that assigns a
rating of one to four globes
 A program of the US Environmental Protection
Agency
 Focuses on energy consumption
 Different tools for residential and commercial
buildings
 Federal
◦ tax incentives to the private sector
◦ require federal agencies to adopt green building
principles
 Landlords and Tenants may have competing
economic interests in “Green Building”
◦ Landlords want to recover higher costs of Green
Building
◦ Tenants want to benefit from lower operating costs
 Key is to align respective control with
responsibility and costs with benefits
◦ E.g. – Landlord responsible for maintaining “green”
performance of Shell and Core; Tenant responsible
for “green” performance of TIs and equipment
 Identifying client goals
 Contracting to achieve those goals
 Liability when goals are not met
 Insuring against failure
 Commissioning/ongoing maintenance and
operations
 Green Building is the nowadays need.
 It reduces the consumption of energy
resources and avoids pollution.
 It reduces worst effects of global warming
by avoiding regular materials.
 The design of building is design as per
owners choice with natural and renewable
resources.
 Building houses by means of natural stuff
its best for individual’s health.

More Related Content

What's hot

ICC - Commitment to Sustainability -- “Go Green”
ICC - Commitment to Sustainability --“Go Green”ICC - Commitment to Sustainability --“Go Green”
ICC - Commitment to Sustainability -- “Go Green”michelle523
 
General Electri Cpptpresent.
General Electri Cpptpresent.General Electri Cpptpresent.
General Electri Cpptpresent.fjmurphy
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building MaterialsAkash Hirpara
 
LEED and Estidama Consultancy Services in Dubai, UAE
LEED and Estidama Consultancy  Services in Dubai, UAELEED and Estidama Consultancy  Services in Dubai, UAE
LEED and Estidama Consultancy Services in Dubai, UAEConservesolution1
 
business outline pdf
business outline pdfbusiness outline pdf
business outline pdfjack moran
 
#SciChallenge2017Green buildings
#SciChallenge2017Green buildings #SciChallenge2017Green buildings
#SciChallenge2017Green buildings Ioanna05
 
Green Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureGreen Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureOSAEDA
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable futureAlexander Decker
 
Sustainability in Affordable Housing
Sustainability in Affordable HousingSustainability in Affordable Housing
Sustainability in Affordable HousingHilt Tatum IV
 
Topic 3 Green Design
Topic 3 Green DesignTopic 3 Green Design
Topic 3 Green Designguest5dc00b
 
Greenbuilding with examples
Greenbuilding with examplesGreenbuilding with examples
Greenbuilding with examplesVikrant Sanke
 

What's hot (20)

Green building
Green building Green building
Green building
 
Green building
Green buildingGreen building
Green building
 
Gb excel
Gb excelGb excel
Gb excel
 
Green building presentation 1 24-12
Green building presentation 1 24-12Green building presentation 1 24-12
Green building presentation 1 24-12
 
ICC - Commitment to Sustainability -- “Go Green”
ICC - Commitment to Sustainability --“Go Green”ICC - Commitment to Sustainability --“Go Green”
ICC - Commitment to Sustainability -- “Go Green”
 
General Electri Cpptpresent.
General Electri Cpptpresent.General Electri Cpptpresent.
General Electri Cpptpresent.
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building Materials
 
LEED and Estidama Consultancy Services in Dubai, UAE
LEED and Estidama Consultancy  Services in Dubai, UAELEED and Estidama Consultancy  Services in Dubai, UAE
LEED and Estidama Consultancy Services in Dubai, UAE
 
green building ppt
green building pptgreen building ppt
green building ppt
 
business outline pdf
business outline pdfbusiness outline pdf
business outline pdf
 
#SciChallenge2017Green buildings
#SciChallenge2017Green buildings #SciChallenge2017Green buildings
#SciChallenge2017Green buildings
 
Green skyscraper's
Green skyscraper'sGreen skyscraper's
Green skyscraper's
 
6th semester presentation
6th semester presentation6th semester presentation
6th semester presentation
 
Green Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureGreen Buildings & Sustainable Infrastructure
Green Buildings & Sustainable Infrastructure
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable future
 
Sustainability in Affordable Housing
Sustainability in Affordable HousingSustainability in Affordable Housing
Sustainability in Affordable Housing
 
MAPD 2010 - Green affordable housing
MAPD 2010 - Green affordable housingMAPD 2010 - Green affordable housing
MAPD 2010 - Green affordable housing
 
Topic 3 Green Design
Topic 3 Green DesignTopic 3 Green Design
Topic 3 Green Design
 
Greenbuilding with examples
Greenbuilding with examplesGreenbuilding with examples
Greenbuilding with examples
 
Green building
Green buildingGreen building
Green building
 

Similar to B D kanawade

The Benefits Of Purchasing A Green-Certified House.pdf
The Benefits Of Purchasing A Green-Certified House.pdfThe Benefits Of Purchasing A Green-Certified House.pdf
The Benefits Of Purchasing A Green-Certified House.pdfyamunaNMH
 
Green-buildings for a better future.pptx
Green-buildings for a better future.pptxGreen-buildings for a better future.pptx
Green-buildings for a better future.pptxbhuvana71
 
Green Leases and Green Building
Green Leases and Green BuildingGreen Leases and Green Building
Green Leases and Green BuildingScott Wolfe
 
Green Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureGreen Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureSustainability Knowledge Group
 
Advantages of green
Advantages of greenAdvantages of green
Advantages of greenchimpy75
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptDataFile3
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.pptssuserbc5970
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptxManjeet63
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptxManjeet63
 
LEED Measurement (2).pdf
LEED Measurement (2).pdfLEED Measurement (2).pdf
LEED Measurement (2).pdfesgaugust
 

Similar to B D kanawade (20)

Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
UNIT-1 (4).pdf
UNIT-1 (4).pdfUNIT-1 (4).pdf
UNIT-1 (4).pdf
 
Leed.2018
Leed.2018Leed.2018
Leed.2018
 
The Benefits Of Purchasing A Green-Certified House.pdf
The Benefits Of Purchasing A Green-Certified House.pdfThe Benefits Of Purchasing A Green-Certified House.pdf
The Benefits Of Purchasing A Green-Certified House.pdf
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 
Green-buildings for a better future.pptx
Green-buildings for a better future.pptxGreen-buildings for a better future.pptx
Green-buildings for a better future.pptx
 
Green Leases and Green Building
Green Leases and Green BuildingGreen Leases and Green Building
Green Leases and Green Building
 
Green Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable FutureGreen Buildings – Climate Change Heroes for a Sustainable Future
Green Buildings – Climate Change Heroes for a Sustainable Future
 
2.pdf
2.pdf2.pdf
2.pdf
 
Leed
Leed Leed
Leed
 
Advantages of green
Advantages of greenAdvantages of green
Advantages of green
 
2.pptx
2.pptx2.pptx
2.pptx
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)pptGREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
GREEN BUILDING 10-09 (Green Bldg PPT (GREEN BUILDING)ppt
 
10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt10-09_GreenBldg_PPT.ppt
10-09_GreenBldg_PPT.ppt
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptx
 
Green_House_Building[2].pptx
Green_House_Building[2].pptxGreen_House_Building[2].pptx
Green_House_Building[2].pptx
 
LEED Measurement (2).pdf
LEED Measurement (2).pdfLEED Measurement (2).pdf
LEED Measurement (2).pdf
 
Green Building Basics
Green Building BasicsGreen Building Basics
Green Building Basics
 

More from bhimaji40

Sppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuationSppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuationbhimaji40
 
Fracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregateFracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregatebhimaji40
 
Green concrete
Green concreteGreen concrete
Green concretebhimaji40
 
Influence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concreteInfluence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concretebhimaji40
 
Fracture mechanics
Fracture mechanicsFracture mechanics
Fracture mechanicsbhimaji40
 
Corrosion damaged rc columns repaired by cfrp sheets
Corrosion  damaged rc  columns repaired by cfrp  sheetsCorrosion  damaged rc  columns repaired by cfrp  sheets
Corrosion damaged rc columns repaired by cfrp sheetsbhimaji40
 
Confined masonary construction
Confined masonary constructionConfined masonary construction
Confined masonary constructionbhimaji40
 
Ex 7 b permeability by variable head
Ex 7 b permeability by variable headEx 7 b permeability by variable head
Ex 7 b permeability by variable headbhimaji40
 
Ex 7 a permeability by constant head
Ex 7 a permeability by constant headEx 7 a permeability by constant head
Ex 7 a permeability by constant headbhimaji40
 
Ex 6 c field density by clod method
Ex 6 c field density  by clod methodEx 6 c field density  by clod method
Ex 6 c field density by clod methodbhimaji40
 
Ex 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodEx 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodbhimaji40
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutterbhimaji40
 
Ex 11 vane shear test
Ex 11 vane shear testEx 11 vane shear test
Ex 11 vane shear testbhimaji40
 
Ex 10 unconfined compression test
Ex 10 unconfined compression testEx 10 unconfined compression test
Ex 10 unconfined compression testbhimaji40
 
Ex 9 differential free swell test
Ex 9 differential free swell testEx 9 differential free swell test
Ex 9 differential free swell testbhimaji40
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor testbhimaji40
 
Ex 12 direct shear test
Ex 12 direct shear testEx 12 direct shear test
Ex 12 direct shear testbhimaji40
 
Ex 5 consistency limits
Ex 5 consistency limitsEx 5 consistency limits
Ex 5 consistency limitsbhimaji40
 
Ex 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classificationEx 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classificationbhimaji40
 
Ex 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometerEx 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometerbhimaji40
 

More from bhimaji40 (20)

Sppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuationSppu be civil sem 8 qsct unit no. 04 valuation
Sppu be civil sem 8 qsct unit no. 04 valuation
 
Fracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregateFracture mechanics of CONCRETE CONTAINING recycled aggregate
Fracture mechanics of CONCRETE CONTAINING recycled aggregate
 
Green concrete
Green concreteGreen concrete
Green concrete
 
Influence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concreteInfluence of waste glass powder, ggbs, fly ash on the properties of concrete
Influence of waste glass powder, ggbs, fly ash on the properties of concrete
 
Fracture mechanics
Fracture mechanicsFracture mechanics
Fracture mechanics
 
Corrosion damaged rc columns repaired by cfrp sheets
Corrosion  damaged rc  columns repaired by cfrp  sheetsCorrosion  damaged rc  columns repaired by cfrp  sheets
Corrosion damaged rc columns repaired by cfrp sheets
 
Confined masonary construction
Confined masonary constructionConfined masonary construction
Confined masonary construction
 
Ex 7 b permeability by variable head
Ex 7 b permeability by variable headEx 7 b permeability by variable head
Ex 7 b permeability by variable head
 
Ex 7 a permeability by constant head
Ex 7 a permeability by constant headEx 7 a permeability by constant head
Ex 7 a permeability by constant head
 
Ex 6 c field density by clod method
Ex 6 c field density  by clod methodEx 6 c field density  by clod method
Ex 6 c field density by clod method
 
Ex 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodEx 6 b field density by sand replacement method
Ex 6 b field density by sand replacement method
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutter
 
Ex 11 vane shear test
Ex 11 vane shear testEx 11 vane shear test
Ex 11 vane shear test
 
Ex 10 unconfined compression test
Ex 10 unconfined compression testEx 10 unconfined compression test
Ex 10 unconfined compression test
 
Ex 9 differential free swell test
Ex 9 differential free swell testEx 9 differential free swell test
Ex 9 differential free swell test
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor test
 
Ex 12 direct shear test
Ex 12 direct shear testEx 12 direct shear test
Ex 12 direct shear test
 
Ex 5 consistency limits
Ex 5 consistency limitsEx 5 consistency limits
Ex 5 consistency limits
 
Ex 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classificationEx 4 sieve analysis and soil classification
Ex 4 sieve analysis and soil classification
 
Ex 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometerEx 3 specific gravity by pycnometer
Ex 3 specific gravity by pycnometer
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

B D kanawade

  • 2.  Overview of Green Building  Green Building Standards  Green Building Incentives  Green Building Issues – Leasing  Green Building Issues – Design and Construction
  • 3. “Green” Buildings are high performance structures that also meet certain standards for reducing natural resource consumption .
  • 4.  Going “Green” is the “right thing” ◦ reduce carbon consumption, ◦ energy independence, ◦ encourage community, ◦ preserve natural systems
  • 5.  Because of various standards and outcomes, it is important to work with client to understand just what client wants to achieve in undertaking a “green building” project
  • 6.  Green Building Standards  Green Building Incentives  Green Building Leasing  Green Building Design and Construction
  • 7.  LEED – Leadership in Energy and Environmental Design ◦ Administered by the U. S. Green Building Council ◦ Voluntary, consensus-based system
  • 8.  Environmental impacts assessed on a 1,000 point scale in multiple categories: ◦ Energy ◦ Indoor Environment ◦ Site ◦ Water ◦ Resources ◦ Emissions ◦ Project/Environmental Management
  • 9.  After achieving a threshold of at least 35% of the total number of 1,000 points, new and existing commercial buildings can be certified for their environmental achievements and sustainability by pursuing Green Globes certification that assigns a rating of one to four globes
  • 10.  A program of the US Environmental Protection Agency  Focuses on energy consumption  Different tools for residential and commercial buildings
  • 11.  Federal ◦ tax incentives to the private sector ◦ require federal agencies to adopt green building principles
  • 12.  Landlords and Tenants may have competing economic interests in “Green Building” ◦ Landlords want to recover higher costs of Green Building ◦ Tenants want to benefit from lower operating costs  Key is to align respective control with responsibility and costs with benefits ◦ E.g. – Landlord responsible for maintaining “green” performance of Shell and Core; Tenant responsible for “green” performance of TIs and equipment
  • 13.  Identifying client goals  Contracting to achieve those goals  Liability when goals are not met  Insuring against failure  Commissioning/ongoing maintenance and operations
  • 14.  Green Building is the nowadays need.  It reduces the consumption of energy resources and avoids pollution.  It reduces worst effects of global warming by avoiding regular materials.  The design of building is design as per owners choice with natural and renewable resources.  Building houses by means of natural stuff its best for individual’s health.