# Estimate Cost : Rs. 900.00 Lakhs
# Admn. Sanction : GO Rt. No. 344 dt. 15.02.2014 of
the PR & RD (RWS-II) Dept,
Govt., of Andhra Pradesh.
Hyderabad.
of PR&RD (RWS-II)
Department
# Source of water : Gargeya project
# Habitations to be covered :
# Name of Contractor: M/s VSA infra projects pvt.Ltd,Hyd.
CPWS Scheme to Piler & 8other Habitations
Mandal : Piler Total
Habitations: 9 9
Salient features of the Project
Description
No. Amount
(Rs. in Lakhs)
Drilling of Bore wells 1 7.20
Pump sets (In the Bore wells) 1 16.20
Construction of 5m dia Intake well cum Pump
House at Gargeya Project
1 15.00
Construction of foot bridge at Intake well 1 35.00
Constuction of 150KL GLBR near Kuravapalle 1 10.80
Contd….
Description No. Amount
(Rs. in Lakhs)
Construction 0f 9x6mts Watchman quarters at Piler and
head works
1 7.00
Construction of Slow sand filters of size 22x11 at
kothapalle
1 10.00
Providing Pumping & Transmission lines 1 615.00
From intake well to 150KL GLBR (50HP VT pumpsets 2
No)
1 10.00
From existing 250 KL sumpwell to 250kl OHBR at R&B
guest house (Suitable horizontal submersible pumpsets
12 HP 2 Nos)
1 22.80
Power supply 1 27.00
Construction 0f 6x4mts Watchman quarters at Piler and
head works
Constuction of 150KL GLBR near Kuravapalle
1 6.60
Present stage of work
Description of Item Stage
a. Off-take point The Proposed source Grageya project was
located near village Balamvaripalle which is at
a distance of 10KM from the Piler town. The
Gargeya project is an irrigation project which
is having 98 mcft of storage capacity and
having dead storage of 16 mcft and capacity
of the reservoir above sluice is 82mcft.The
total water requirement t for Piler and 8 other
habitations is 4275 LPM (43mcft).
b. Bore well and SP Sets completed
c. GLBR completed
D Power supply Progress
>
>
>
Description of Item Stage
e. Head works:
(i) In take well Earth work completed
(ii) Foot bridge Earth work completed
f. Pipes(Pumping Main):
(i) 400mm K7- DI pipes 400m Procured
(ii) 150mm K9- DI pipes 3800m Procured
(iii) 350mm K7-DI Pipes 11000m Procured
>
>
>
>
Contd…. Present stage of work
>
THANK YOU
SUPERINTENDING
ENGINEER
RWS&S CIRCLE, CHITTOOR
SUPERINTENDING
ENGINEER
RWS&S CIRCLE, CHITTOOR
END
BACK
GLBR 150 KL @ BALAMVARIPALLE
BACK
Watchman quarters
BACK
BORE WELL - I
BACK
BORE WELL - II
BACK
BORE WELL - III
BACK
BORE WELL - IV
BACK
BORE WELL - V

More Related Content

What's hot

Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
Infographic Line 10 WSRP SEPT 2015
Infographic Line 10 WSRP SEPT 2015Infographic Line 10 WSRP SEPT 2015
Infographic Line 10 WSRP SEPT 2015David Coll
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Crosstown TO
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportHonolulu Civil Beat
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Crosstown TO
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Crosstown TO
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E HeilandErik Heiland
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Crosstown TO
 

What's hot (20)

SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLEDSOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
 
MANIMARAN
MANIMARANMANIMARAN
MANIMARAN
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
Client Presentation
Client PresentationClient Presentation
Client Presentation
 
DURBAN PORT COMMITTEE - 20 April
 DURBAN PORT COMMITTEE - 20 April DURBAN PORT COMMITTEE - 20 April
DURBAN PORT COMMITTEE - 20 April
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Dec 22 2014 CSLL
Dec 22 2014 CSLLDec 22 2014 CSLL
Dec 22 2014 CSLL
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
Infographic Line 10 WSRP SEPT 2015
Infographic Line 10 WSRP SEPT 2015Infographic Line 10 WSRP SEPT 2015
Infographic Line 10 WSRP SEPT 2015
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
 
injo slip update
injo slip updateinjo slip update
injo slip update
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland
 
jica present
jica presentjica present
jica present
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
 

Similar to cpwss to piler and 8other habitations

Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxmuk7971
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.Gitanjali Singh
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 
Presentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptxPresentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptxNaziaBashar
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL MUDASSAR AFZAL
 
City Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity of San Angelo Texas
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxIESGATEWiz
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port LandsideAnthony Jones
 
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaRubnawaz Bhatti
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreADDA
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 

Similar to cpwss to piler and 8other habitations (20)

Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Presentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptxPresentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptx
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
SLHEP ppt_general
SLHEP ppt_generalSLHEP ppt_general
SLHEP ppt_general
 
City Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory update
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
 
CV William 2016
CV William 2016CV William 2016
CV William 2016
 
New Persentation
New PersentationNew Persentation
New Persentation
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
 
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road GujranwalaPresentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
IFCDongoing
IFCDongoingIFCDongoing
IFCDongoing
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 

Recently uploaded

Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUankushspencer015
 

Recently uploaded (20)

Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 

cpwss to piler and 8other habitations

  • 1. # Estimate Cost : Rs. 900.00 Lakhs # Admn. Sanction : GO Rt. No. 344 dt. 15.02.2014 of the PR & RD (RWS-II) Dept, Govt., of Andhra Pradesh. Hyderabad. of PR&RD (RWS-II) Department # Source of water : Gargeya project # Habitations to be covered : # Name of Contractor: M/s VSA infra projects pvt.Ltd,Hyd. CPWS Scheme to Piler & 8other Habitations Mandal : Piler Total Habitations: 9 9
  • 2. Salient features of the Project Description No. Amount (Rs. in Lakhs) Drilling of Bore wells 1 7.20 Pump sets (In the Bore wells) 1 16.20 Construction of 5m dia Intake well cum Pump House at Gargeya Project 1 15.00 Construction of foot bridge at Intake well 1 35.00 Constuction of 150KL GLBR near Kuravapalle 1 10.80 Contd….
  • 3. Description No. Amount (Rs. in Lakhs) Construction 0f 9x6mts Watchman quarters at Piler and head works 1 7.00 Construction of Slow sand filters of size 22x11 at kothapalle 1 10.00 Providing Pumping & Transmission lines 1 615.00 From intake well to 150KL GLBR (50HP VT pumpsets 2 No) 1 10.00 From existing 250 KL sumpwell to 250kl OHBR at R&B guest house (Suitable horizontal submersible pumpsets 12 HP 2 Nos) 1 22.80 Power supply 1 27.00 Construction 0f 6x4mts Watchman quarters at Piler and head works Constuction of 150KL GLBR near Kuravapalle 1 6.60
  • 4. Present stage of work Description of Item Stage a. Off-take point The Proposed source Grageya project was located near village Balamvaripalle which is at a distance of 10KM from the Piler town. The Gargeya project is an irrigation project which is having 98 mcft of storage capacity and having dead storage of 16 mcft and capacity of the reservoir above sluice is 82mcft.The total water requirement t for Piler and 8 other habitations is 4275 LPM (43mcft). b. Bore well and SP Sets completed c. GLBR completed D Power supply Progress > > >
  • 5. Description of Item Stage e. Head works: (i) In take well Earth work completed (ii) Foot bridge Earth work completed f. Pipes(Pumping Main): (i) 400mm K7- DI pipes 400m Procured (ii) 150mm K9- DI pipes 3800m Procured (iii) 350mm K7-DI Pipes 11000m Procured > > > > Contd…. Present stage of work >