The document lists major electromechanical projects completed by the author as head of projects for various companies over their career:
1. Projects for multiple companies including coke oven batteries, calcination plants, and piping jobs.
2. More piping, tankage, and plant jobs for another company including acid and refinery projects.
3. Infrastructure projects as COO of a company including water and sewerage networks.
The document outlines the author's extensive experience leading complex industrial projects across multiple sectors over many years.
1. MAJOR EPC ELECTROMECHANICAL JOBS COMPLETED AS HEAD OF PROJECTS
1. For SIMON CARVES INDIA LIMITED ( Left as Senior Manager)
• Di Phenyle Amene Plant for ICI, Rishra ( then known as ACCI)
• Low Temperature Carbonisation Plant for Coal India, Dankuni
• No 10 Coke Oven Battery By Product Plant of IISCO, Burnpur
• No 8 Coke Oven Battery By Product Plant of DSP, Durgapur
• Aluminium Calcination Plant of NALCO, Damanjodi with Lurgi GMBH
• Supply of Mechanical Items and Fabrication for SNPE CE, France
2. FOR NICCO CORPORATION LIMITED, PROJECT DIVISION ( Left as Senior Vice President)
• Desuperheating Station for Durgapur Steel Plant
• Naphthalene Stripping Plant for DSP
• Ammonium Sulphate Plant for DSP
• Interplant Piping for DSP
• 1300 MTPD Sulphuric Acid and 335MTPD Phosphoric Acid Plant for Birla Copper, Dahej with
Otto and SNC Lavalin.
• Tankage Work and associated Piping for GSFC, Baroda
• Skid Mounted Oil Refinery for ONGC, Tatipaka with Ventech, USA
• Piping for NPCIL, Kaiga and RAPP Plant
• Gas Cleaning Plant with Swemco, UK at Hindustan Copper Ltd, Ghatsila
• Tail Gas Scrubbing Plant with Arthur D Little, USA for Hindustan Copper Ltd, Ghatsila
• Gas Cleaning Plant with Swemco, UK for Hindustan Copper Ltd, Khetri
• Gas Boosting Station for GAIL at Vizag, Vijainagram, Jamnagar- Loni with EIL
• Entire Supply of Refinery Piping for IRAQ Petroleum Refinery
2. 3. FOR RAMKY INFRASTRUCTURE LIMITED ( Left as COO)
• Started their East and North East Region single handed and rose upto 120Cr Zonal Turnover
• Building Projects of WBIDC
• Water Boosting Station of KMC
• Water and Sewerage Collection/ Distribution for KEIP under ADB Fund
• Water and Sewerage Collection/ Distribution for PHED in Rajarhat
• Water Treatment Plant for PHED at Rajarhat
4. FOR JAIN INFRAPROJECTS LIMITED ( Left as ED- Operation )
• BOF piping for DSP
• Civil Work for MSM Project, DSP
• Interplant Piping job for DSP
• Various Road Works
• Water Boosting Station
• Sewerage Collection and Treatment at Jaipur
5. FOR SUPREME INFRASTRUCTURE INDIA LIMITED ( Left as President- East)
3. • Various Road Works and Other Building Works
• Water Boosting Station of KMC
• Sewerage Collection and Distribution at Guwahati
• National Highway at Dankuni
6. FOR IOT ANWESHA ( Left as Country Head- Kuwait)
• Haldia IOC Tankage and Piping
• KOC Tankage with HEISCO, Kuwait
7. FOR TARACHANDRA ENGINEERING P LTD ( Working as CEO)
• PX 4 Train 3 Piping, Jamnagar
• C2 Complex Equipment and Piping, Jamnagar
• Dahej jobs