The document provides details on the construction methodology for expanding the infrastructure of the Ruwais Housing Complex Phase IV project. It includes scopes of work, project milestones, organization structure, phasing plans for building and villa sites, work breakdown structure, execution plans for infrastructure networks and structures, and lists of major materials. The infrastructure expansion involves networks for water, sewerage, electricity, gas, telecom, roads and landscaping across building and villa sites, as well as structures like the SNG plant, water reservoirs and pumping stations, electrical substation, and sewerage lifting stations. The project is scheduled to be completed in phases by 2022.
Zinfra Group Australia: Power BrochureZinfra Group
Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of engineering, construction and maintenance services to the utility infrastructure industry.
Zinfra knows power. We have emergedfrom an entity that managed services on more than $9 billion of Australian utility assets, including transmission, substations and distribution.Our clients include asset owners, transmission and distribution managers, mining companies and land owners.
We deliver our work, manage our projects and fulfil our contracts using the skill and commitment of over 1,500 passionate Zinfra staff, nationwide.
The city of Lima, Ohio wastewater treatment plant was running
off tribal knowledge and decades-old equipment. Facing
increased downtime, high overtime expenses for maintenance
staff, and new regulations on the horizon, the plant needed
a new control infrastructure. By upgrading to a modern,
information-enabled DCS, including PlantPAx,® FactoryTalk®
Historian and AssetCentre, the plant has cut more than 50 hours
of downtime in the first three months, saved over $2,000 on
maintenance costs with remote functionality, and is on track
to meeting future compliance goals.
Zinfra Group Australia: Power BrochureZinfra Group
Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of engineering, construction and maintenance services to the utility infrastructure industry.
Zinfra knows power. We have emergedfrom an entity that managed services on more than $9 billion of Australian utility assets, including transmission, substations and distribution.Our clients include asset owners, transmission and distribution managers, mining companies and land owners.
We deliver our work, manage our projects and fulfil our contracts using the skill and commitment of over 1,500 passionate Zinfra staff, nationwide.
The city of Lima, Ohio wastewater treatment plant was running
off tribal knowledge and decades-old equipment. Facing
increased downtime, high overtime expenses for maintenance
staff, and new regulations on the horizon, the plant needed
a new control infrastructure. By upgrading to a modern,
information-enabled DCS, including PlantPAx,® FactoryTalk®
Historian and AssetCentre, the plant has cut more than 50 hours
of downtime in the first three months, saved over $2,000 on
maintenance costs with remote functionality, and is on track
to meeting future compliance goals.
Project Execution Plan for Bridge ConstructionDavid H Moloney
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct an insitu concrete bridge.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
This Presentation is innovative and has many beneficial uses.
Ladybug is a startup that offers its customers the ideal solutions for Application Development, Brand Strategy and Digital Services, focusing on the creation, design and implementation of solutions based on the new communication channels and digital media.
Ladybug supports emerging brands, local companies and prominent medium/large enterprises at a national and international level to define and develop business models, suited to the new paradigms of Big Data, Cloud Computing, Digital Communication and the Internet of Things.
Spunti di marketing digitale per il settore moda e abbigliamento.
Presentato all'interno del seminar di Iab Italia, dedicato al performance marketing, questo lavoro vuole offrire un contributo su come i media digitali possono essere utili ai brand del fashion che vogliono comunicare con i propri pubblici specifici.
Route 2020 is a proposed extension to the existing Red Line of the Dubai Metro. The extension will be 14.5 km long, 4 km will be underground in a tunnel and the balance will be elevated on viaducts.
Project Execution Plan for Bridge ConstructionDavid H Moloney
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct an insitu concrete bridge.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
This Presentation is innovative and has many beneficial uses.
Ladybug is a startup that offers its customers the ideal solutions for Application Development, Brand Strategy and Digital Services, focusing on the creation, design and implementation of solutions based on the new communication channels and digital media.
Ladybug supports emerging brands, local companies and prominent medium/large enterprises at a national and international level to define and develop business models, suited to the new paradigms of Big Data, Cloud Computing, Digital Communication and the Internet of Things.
Spunti di marketing digitale per il settore moda e abbigliamento.
Presentato all'interno del seminar di Iab Italia, dedicato al performance marketing, questo lavoro vuole offrire un contributo su come i media digitali possono essere utili ai brand del fashion che vogliono comunicare con i propri pubblici specifici.
Route 2020 is a proposed extension to the existing Red Line of the Dubai Metro. The extension will be 14.5 km long, 4 km will be underground in a tunnel and the balance will be elevated on viaducts.
Design & Engineering is an integral part of the implementation of Solar Projects.
Engineering drawings & documents convey specifications, construction methodology, dimensions, tolerances etc capturing the scope of works and presenting a first-hand idea on the final by product that would be constructed.
1. Construction Methodology for the
Infrastructure Project
RUWAIS HOUSING COMPLEX EXPANSION PHASE IV
INFRASTRUCTURE WORKS PROJECT 7010C9
2. Content :
1. Scope of Work
2. Project Milestones
3. Organization Chart
4. Building Site Phases
5. Villa Site Phases
6. Project WBS
7. Execution Plan for infrastructure network
8. Execution Plan for Structure
9. Company Equipment
10.Company Manpower
4. Infrastructure Network for
Accommodation (Building
site ) and Villas site
Building site
Villas site
STP by Other
P6020
DCP by Other
P7010C12
Electrical
Substation by
Other
P7010C8
SLS 3
SLS1A
EP 1
SNG
Water
tanks
Guest House
by Other
Storm water & Drainage Network
Waste Water Network
Water Supply Network with Fire Hydrants
Irrigation Network
Telecom Network
Chilled Water Network
SNG Distribution Network
Low Voltage (LV) Network
11Kv Network (MV Cable)
Street Lighting Network
Soft and Hard Landscape
Roads
Force Main line from SLS3 to STP
Force Main line from SLS1A to STP
Discharge Line between Evaporated
Ponds
Chilled Water Line from exciting DCP to
new Gust House
Force
Main from
SLS1A to
STP
Force
Main from
SLS3 to
STP
5. Plant and Structure
SNG Plant
Sewer Pump Station SLS3
Sewer Pump Station SLS1A
Water Reservoirs and Pump Station
Electrical Substation 11/.4 kv
Evaporation Pond No. 1
Evaporation Pond No. 2
Evaporation Pond No. 3
Improve existing Evaporation Pond
Guard House 1
Guard House 2
Building site
Villas site
STP by Other
P6020
DCP by Other
P7010C12
Electrical
Substation by
Other
P7010C8
SLS 3
SLS1A
EP 1
SNG
Water
tanks
Guest
House
12. Phase 1 from building no .
20 to building no. 36 (total
no. is 17)
Finish Millstone is 78 w
Sewer Line up to from
MH 1-1 to MH1-1.12 and
from MH 1-5 to MH 1-1
including line to SLS3
Phase 1 for building site
17 Nos Building (G+5)
Water Line from
water tank up to
isolated valve in
the corner
Storm Water Line from
MH1-3 to MH1-1 and from
MH 1-1 to MH 1-1.12 and
line to EP1
13. Phase 2 - Remaining building site network
Finish Milstone is 90w
Phase 2 for building site
23 Nos Building (G+5)
15. Phase 1 for Villas site
350 villas (4 BR)+27 villas(5 BR)
To SLS A1
& EP3
To SLS 2 & EP2
27 Villas 5BR +
245 Villas 4BR
109 4BR Villas
Total =
354 villas 4BR +27 Villas 5BR
North Hill not including in Phase 1
Water Line connecting with water
tank feed phase 1 area
Sewer and
Storm lines in
this road to be
included in
phase 1
(road length ≈450m)
Sewer and Storm lines in this road
to be included in phase 1
(road length ≈475m)
16.
17.
18. Phase 2 for Villas site
214 villas (4 BR)+72 villas(5 BR)
211 4BR Villas
72 VIP Villas 5BR
North and south Hills including in
Phase 2
21. Project Wide
Package 1 Package 2 (building)Site) Package 3 (Villa Site)
UTILIY Compound
MM(EF after 58w)
(Eng. & Con & test)
Phase 1 (17 no.
(G+5) building )
KM(EF after
78w)
(Eng. & Con &
test)
Phase 2 (23 no.
(G+5) building )
MM(EF after 90w)
(Eng. & Con & test)
Phase 1 (377
villas)
KM(EF after 78w)
(Eng. & Con &
test)
Phase 2 (286
villas)
KM(EF after
88w)
(Eng. & Con &
test)
Project Start Earth work
Project Finish
milestones
SNG Plant Chilled water Net
Work
Chilled Water Net
Work
Mobilization Water Reservoirs and
pump station
Sewer Net work Sewer Net work Sewer Net work Sewer Net work
Material submittal &
approval
11/.4kv elec. substation
for water pump station
Storm Water Net
work
Storm Water Net work
and EP 1
Storm Water Net
work and EP 2
Storm Water Net
work & EP 3
Procurement (order &
deliver material)
Sewerage pumping
station 03
Potable Water Net
work
Potable Water Net
work
Potable Water Net
work
Potable Water
Net work
Authority NOC.s Sewerage pumping
station 1-A
Irrigation Net work Irrigation Net work Irrigation Net work Irrigation Net work
Demobilization Infrastructure within
utility yard
Telecom Network Telecom Network Telecom Network Telecom Network
Chain Link Fence
around utility
compound
Chilled water line from
exciting DCP to new
temporary Guest House
Street Lighting Net
work
Street Lighting Net
work
Street Lighting Net
work
Street Lighting
Net work
Forced sewer line from
temp. Guest House to
Sewer pump station 1A
11 KV Net Work 11 KV Net Work 11 KV Net Work 11 KV Net Work
Guard House 1 & 2 Gas Net Work Gas Net Work Gas Net Work Gas Net Work
TSE line from STP to
irrigation tie in point
Roads Roads Roads Roads
Improve the Existing
Evaporation Pond
Landscape Landscape Landscape Landscape
include hills
23. Execution of Infrastructure
network
Start
End
phase 1
on 78 W
End
phase 2
on 92 W
Order & delivery
Electrical cables and
street Lighting materials
Submit & Approval Utilities Shop
DrawingSubmit & Approval Utilities
material (pipes ,fitting ,….
Order & delivery Utilities
material (pipes ,fitting
,….
Install dewatering system
if required
Excavation ,install utilities pipes
and backfilling in sequence
according to the depth &
disposition
Excavation ,install LV
,MV & ST found.
Submit & Approval
electrical LV,MV & ST
shop Drawing
Excavation ,install
Telecom system.
Submit & Approval
prequalification of
Etisalat subcontractor
Submit & Approval
Telecom shop
Drawing
Submit & approve
Telecom Materials
Submit & approval
Electrical cables and
street Lighting materials
Order & delivery
Telecom Materials
Submit & Approval
Roads ,irrigation ,Hard
& soft landscape shop
drawing
Submit & Approval
Roads ,irrigation ,Hard
& soft landscape
material
Order & delivery Roads
,irrigation ,Hard & soft
landscape material
Install sec. Irrigation , Roads ,hard
&soft landscape and street lighting
poles.
Submit & Approval
prequalification of
Gas third party
consultant
Submit & Approval
Gas stress analysis
Report
Site survey
•Final testing ,commissioning ,snagging
and handover
24. Sewer Network Storm Network Water Network
HDPE Pipe=6920m
Upvc Pipe=15270m
GRP Pipe=18020m
Upvc Pipe=17990m
HDPE Pipe =6420m for EP
HDPE Pipe=24500m
DI Pipe=730 m
Fire Hydrant= 172 no.
Irrigation Network Gas Network Chilled Water Network
HDPE Pipe=88200m
Upvc Pipe=100m
PE Pipe =44190m HDPE Pipe=9192m
Electrical Network Street Lighting Telecom & ELV Network
MV Cable=51000m
Upvc Ducts=58332m
Light Poles=3365 no. Upvc ducts=45880 m
12 SM F.O cables=52000m
CCTV System
SMATV System
Roads Structural Works Landscape
Asphalt Roads=174174 m2
Tiles = 346416 m2
Reinforced Concrete=6926m3
Steel Reinforced = 439 ton
Trees=5288 no.
Palm Trees=219 no.
Shrubs = 60135 no.
Major Material for Infrastructure
Network
26. Utilities Compound Structure
Execution plan for
SNG Plant
•Submit subcontractor
prequalification
•ADNOC approval for subcontractor
•Submit and approve
Material (include long
lead items)
•Submit and approve
Civil and MEP shop
drawing
•Construct Civil
Structure
•Order and deliver
Civil and MEP
material
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W58
Start
•Submit Design Consultant
prequalification
•ADNOC approval for Consultant
•Verification SNG gas network
Design
27. Major Material for SNG Plant
No. Material Description Unit Qty.
1 LPG storage tanks no 3
2 LPG filter no 3
3 SNG accumulator tank no 2
4 Compressed air receiver tank no 1
5 LPG compressor no 2
6 Air compressor no 4
8 Vaporiser feed pump, rotary type no 4
9 LPG vaporiser, indirect fired no 4
10 LPG-Air blender no 1
11 Flare stack no 1
12 Methanol injection skid no 1
13 Valves ,strainer (different type)
14 5 Tons Overhead Crane, FPS-OHTC-
01
no 1
15 Steel Pipe for Fire Suppression m 1055
16 Steel Pipe schedule 80 HVAC m 413
28. Utilities Compound Structure
Execution plan for
Water Tank Reservoirs , Water Pump Station
•Order and deliver
Civil material
•Submit and
approve Civil and
MEP shop drawing
for pump station
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W58
•Submit and approve MEP
Material AND civil (include
long lead items)
•Construct Civil
Structure for pump
station
•Order and deliver
MEP material
•Construct water
tanks reservoirs
•Submit and approve
Civil shop drawing for
water tanks
•Submit subcontractor prequalification
•ADNOC approval for subcontractor
Start
29. No. Material Description Unit Qty.
1 Vertical Turbine Double Case Pump 106 L/S no 4
2 Vertical Booster Pump 2L/S no 2
3 Vertical Turbine Double Case Jockey Pump 32
L/S
no 1
4 Monorail crane - 5 Tons , WPS-MC-1 no 1
5 Pressure Tanks 20000 L no 2
6 Valves ( B.F.V,G.V, Check,etc.) no
7 D.I Pipes & Fittings m
8 Dismantling Joints no
9 Motor Control Center (MCC) no 1
10 Diesel Generator 640KVA no 1
11 Bulk Fuel Tank 9500 Liters no 1
12 Fire Fighting & Fire Alarm System no 1
13 Chlorination System no 1
14 UPS System 3KVA no 1
15 SCADA System and Instrumentation no 1
Major Material for Water pump Station
30. Utilities Compound Structure
Execution plan for
11/.4kv Electrical substation
•Order and deliver
Civil material
•Construct Civil
Structure for
electrical substation
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W58
•Submit and approve MEP
Material AND civil (include
long lead items)
•Submit and
approve Civil and
MEP shop drawing
for Electrical
substation
•Order and deliver
MEP material
•Submit subcontractor prequalification
•ADNOC approval for subcontractor
Start
31. No. Material Description Unit Qty.
1 Capacitor Bank 200KVAR no 2
2 UPS System 3KVA no 1
3 SCADA System and Instrumentation no 1
4 11kV switchgear, indoor type no 1
5 Oil immersed type distribution
transformer(s) ,three phase, 50Hz,
1500 kVA (AN) rating, 11/0.4 kV
no 1
Major Material for 11/.4kv Electrical substation
32. Execution plan for
Sewerage Lifting Station SLS 3
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W58
•Submit and approve
Material (include long
lead items)
•Submit and
approve Civil and
MEP shop drawing
for lifting station
•Construct Civil
Structure for lifting
station
•Order and deliver
Civil and MEP
material
•Submit subcontractor prequalification
•ADNOC approval for subcontractor
Start
33. Execution plan for
Sewerage Lifting Station SLS -1A & Force
main line from SLS-1A to STP &
From Guest House to STP
•Submit Design consultant prequalification for
design of force main lines
•ADNOC approval for design consultant
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W58
•Submit and approve
Material (include long
lead items)
•Submit and
approve Civil and
MEP shop drawing
for lifting station &
force main line
•Construct Civil
Structure for lifting
station
•Order and deliver
Civil and MEP
material •Execution of force
main line (including
install dewatering
system )
•Submit subcontractor prequalification for SLS -1A
•ADNOC approval for subcontractor
•Submit &approval design drawing FORCE MAIN
LINES
Start
34. No. Material Description Unit Qty.
1 Submersible Sewage Pump 46 L/S no 3
2 Odor Control Unit 620 L/s no 1
3
Macerator 94 L/S
no
2
4 Motorized Penstock no 1
5 Overhead Travelling Crane 1.5 T no 1
6 Valves ( G.V, Check,etc.) no
7 D.I Pipes & Fittings m
8 Dismantling & Flexible Coupling no
9 Motor Control Center (MCC) no 1
10 SCADA System & Instrumintations no 1
11 HVAC no 1
12 Diesel Generator 315 KVA no 1
13 Fire Fighting And Fire Alarm System no 1
14 UPS System no 1
15 Power & Control Cable M
16 Surge Vessel 3000L no 2
17 Sump Pumps 5 L/S no 2
Major Material for
SLS3
No. Material Description Unit Qty.
1 Submersible Sewage Pump 160 L/S no 4
2 Odor Control Unit no 1
3
Macerator 210 L/S no 2
4 Motorized Penstock no 1
5 Overhead Travelling Crane 5 T no 1
6 Valves ( G.V, Check,etc.) no
7 D.I Pipes & Fittings m
8 Dismantling & Flexible Coupling no
9 Motor Control Center (MCC) no 1
10 SCADA System & Instrumentations no 1
11 HVAC no 1
12 Diesel Generator 315 KVA no 1
13 UPS System no 1
14 Surge Vessel no 2
SLS-1A
35. Execution plan for
New Evaporation Pond 1 ,2 & 3
•Install MEP material
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
•Submit and approve
Material (include long
lead items)
•Submit and approve
Civil and MEP shop
drawing for new
Evaporation Pond 1,2,3
•Construct Civil
Structure for
Evaporation Pond
•Order and deliver
Civil and MEP
material
Improve of Existing Evaporation Pond
•Submit Design consultant prequalification
•ADNOC approval for design consultant
•Submit &approval design drawing for sump pit ,
pump station & overflow line from exiting EP to
EP2 and overflow line from EP 1 to EP2 and overflow
line from EP2 to EP3 and overflow line from exiting EP3
to Sabkha area
•Submit and approve
Civil and MEP shop
drawing for EP &
overflow lines
•Submit and approve
Material (include long
lead items)
•Order and deliver
Civil and MEP
material
Lining of existing EP
construction of a sump pit &
pump station for existing EP
Construct overflow line from
EP1 to EP2
Construct overflow line from
EP2 to EP3
Construct overflow line from
EP3 to Sabkha Area
Construct overflow line from
existing EP to EP2
Start
36. No. Material Description Unit Qty.
1 Submersible Pump 75 L/s no 2
2 Swing Check Valve no 2
3 Gate Valves no 2
4 Dismantling Coupling no 2
5 Di Pipes & Fittings no
6 ARV & Vacuum Breaker Valve no 1
EP1
No. Material Description Unit Qty.
1 Submersible Pump 83 L/s no 2
2 Swing Check Valve no 2
3 Gate Valves no
2
4 Dismantling Coupling no 2
5 Di Pipes & Fittings no
6 ARV & Vacuum Breaker Valve no 1
EP2
No. Material Description Unit Qty.
1 Submersible Pump 85 L/s no 2
2 Swing Check Valve no 2
3 Gate Valves no
2
4 Dismantling Coupling no 2
5 Di Pipes & Fittings no
6 ARV & Vacuum Breaker Valve no 1
EP3
Major Material for
37. Execution plan for
Chilled water Line from DCP to new Guest house and Additional Forced Sewer
Lines from New Guest House to STP and TSE line from STP to irrigation tie in
point
•Submit Design consultant prequalification
•ADNOC approval for design consultant
•Submit &approval design drawing for chilled water
line and additional forced sewer lines & TSE line
•Submit and approve
shop drawing for
chilled water line
&Force main & TSE line
•Submit and approve
Material (include long
lead items)
•Order and deliver
Civil and MEP
material
Install dewatering if required ,
excavation , laying pipe line
,…., testing and backfilling
•Testing and Pre-commissioning
•Final testing ,commissioning ,snagging
and handover
W52
W56
Start
38. DESCRIPTION, CAPACITY, MAKE & MODEL
NUMBER OF
ITEMS
YEAR OF
MANUFACTURE
PRESENT
LOCATION
Excavator 320 D/PC-300 30 2008 - 2012 Abu Dhabi
Excavator/ Road Breaker JCBJW17 45 2009 - 2013 Abu Dhabi
Crane 20 Tons LW250-2 15 2008 - 2010 Abu Dhabi
Crane 50 Tons QY50B 16 2008 - 2011 Abu Dhabi
Crane 70 Tons GR-700EX 9 2009 - 2010 Abu Dhabi
Concrete Batching Plant 100 C.M./Hr 2 2010 Abu Dhabi
Grader GD 705A-4, 18 2009 - 2013 Abu Dhabi
Backhoe Loader OPERATING WEIGHT: 9800 kg; ZAV
90, OPERATING WEIGHT: 20000 kg
28 2007 - 2012 Abu Dhabi
Wheel Loader CAT 966D, OPERATING WEIGHT: 22010
kg
20 2007 - 2011 Abu Dhabi
Small Wheel Loader 906H, OPERATING WEIGHT: 5.630
ton
10 2008 - 2012 Abu Dhabi
Trailor 38m³ 135 2006 - 2013 Abu Dhabi
Tipper Trucks 18m³ 104 2006 - 2013 Abu Dhabi
Double Drum Roller HD75, OPERATING WEIGHT:
7680kg
14 2007 - 2011 Abu Dhabi
Single Drum Roller OPERATING WEIGHT: 4290 kg. SD
100DC
23 2008 - 2012 Abu Dhabi
Hand Roller BWR650 6 2006 - 2010 Abu Dhabi
Asphalt Baby Roller RD 16-90, OPERATING WEIGHT:
1485 kg.
6 2007 - 2011 Abu Dhabi
Generator 3 - 20 Kva 5 2008 - 2011 Abu Dhabi
Generator 101 - 1300 Kva 7 2007 - 2011 Abu Dhabi
Asphalt Paver ABG 7820 + VB88/ SUPER 1800-2 5 2007 - 2012 Abu Dhabi
Asphalt Plant 200 Ton/Hr 2 2009 Abu Dhabi
Prime Coat/Tack Coat Sprayer 4000 Ltr 3 2010 Abu Dhabi
Pneumatic Tyre Roller GRW18 9 2010 - 2012 Abu Dhabi
Milling Machine W1900, OPERATING WEIGHT: 20000kg 1 2008 Abu Dhabi
Asphalt Plate Compactor IB20-7 1 2008 Abu Dhabi
Bobcat Skid Loader 410, OPERATING WEIGHT: 2490kg 20 2007 - 2013 Abu Dhabi
Dozer D8R, OPERATING WEIGHT: 41 ton 66 2008 - 2012 Abu Dhabi
Shovel 966H 34 2009 - 2013 Abu Dhabi
Mobile Service Workshop Upto 75mm Shaft 4 2011 Abu Dhabi
Concrete Vibrator 120 Ton 14 2007 - 2013 Abu Dhabi
Weigh Bridge - Electronic 210 Ton 1 2009 Abu Dhabi
Pick Up 48 2008 - 2013 Abu Dhabi
Diesel Tanker 6000 Ltr 5 2008 - 2011 Abu Dhabi
LIST OF AVAILABLE EQUIPMENT