DESIGN WORKSHOP FOR PACKAGE 5A
MAY 2012
LOCATION PLAN OF PACKAGE 5
2
KUALA KRAI
GUA
MUSANG
KG RELONG
KARAK
SIMPANG PELANGAI
JALAN PERSEKUTUAN
“CENTRAL SPINE”
Jarak: 60 km
RAUB
BENTONG
PAKEJ 5 – RAUB KE BENTONG
N
LAYOUT OF PACKAGE 5
3
SECTION 5A
4
BANDAR
RAUB
LIMITOF
PACKAGE5
SECTION 5A
CH.0000 TO CH.9600
IMPORTANT FEATURES
• Length: 9.60km.
• No. of interchanges: 2
i. Raub Interchange (Ch.1500 – Ch.3300)
ii. Krau Interchange (Ch.7600 – Ch.9600)
iii. Signalized Junctions: 2
• Structures
i. No. of bridges: 5
ii. No. of VBC: 2
iii. No. of Underpass: 1
iv. Cast in situ Box Culvert greater than 3m: 3
v. Pre-cast Box Culvert less than 3m: 10
vi. Retaining Earth Wall: 5,200m²
5
GEOMETRICAL DESIGN
• Design Standard: R5
• Design Speed: 50 - 90 Kmph
• Maximum Superelevation: 6%
• Maximum Gradient: 5%
• All comments by JKR and value management matters
have been included (Meetings with JKR dated 23/11/11
and 13/01/12).
• Status of Road Safety Audit (RSA)
i. Mainline Stage 1, 2 and 3 completed.
ii. Krau Interchange in progress. Exit speed at Krau
Interchange to be discussed.
6
IMPORTANT FEATURES (cont’d)
•Standardized Pavement thickness: 740mm
7
EARTHWORKS
8
Earthworks
i. Volume of Cut: 2,907,442m³
ii. Volume of Fill: 2,785,388m³
iii. Volume of Unsuitable Material:
678,900m³
iv. Volume of Imported Fill: 556,846m³
(Contractor’s own source)
v. Volume of Hard Material: 279,200m³
vi. Volume of Rock: 839,200m³
STRUCTURES
Bridges
• Designed to HA+45 HB loading.
• Two meetings held with JKR 26/06/11 and 29/07/11. All
comments replied and incorporated in the design. JKR has no
further comments.
9
Name Chainage Location Span
Configuration
Depth
(mm)
Top Flange
(mm)
Beam
Type
Dia. of
Bored
Pile
(mm)
5A - B1 2567.469-
2722-469
Sg.
Sempalit
25-35-35-35-25 1800 1650 T-
Beam
750
5A -
B1A
129.392-
129.242
Sg.
Sempalit
30 1800 2000 T-
Beam
750
5A -
B1B
129.939
-129.706
Sg.
Sempalit
30 1800 2000 T-
Beam
750
5A - B2 8703-8948 Sg. Bilut 33-40-27-40-35-
35-35-35
2260 1650 T-
Beam
750
5A - B3 720-805 Sg. Bilut 25-35-25 1800 1650 T- 750
STRUCTURES (Cont’d)
Vehicular Box Culverts & Underpass
• JKR has agreed on the location and the types of the
VBC and Underpass
10
Name Chainage Width of
Structure
(m)
Height of
Structure
(m)
Length of
Structure
(m)
Structural
System
Foundation
5A /VBC1 CH. 510 4.5 5.0 48 RC Box Soil
Replace-
ment
5A /VBC2 CH. 3341 4.5 5.0 43 RC Box Nil
5A /UP1
(Kg.
Melayu
Sempalit)
CH. 6618 11.0 (T)
13.0 (B)
5.5 55 RC Portal
Frame
Bored Pile
Drainage Culverts
11
Culvert
No.
Chainage Length
(m)
Skew
(⁰)
Culvert Size Type
C1 550 80.70 25 1.80Ø Precast
C2 694 57.00 28 1.50Ø Precast
C3 1160 46.40 15 2.8m x 2.8m Cast in situ
C4 1548 86.60 42 1.50Ø Precast
C5 1850 109.42 25 1.5m x 1.5m Cast in situ
C6 FR8 217 41.00 0 2.40Ø Precast
C7 3130 66.00 29 1.50Ø Precast
C8 3370 88.58 19 1.5m x 1.5m Cast in situ
C9 3730 111.44 23 2.0m x 1.5m Cast in situ
C10 4120 124.38 29 1.5m x 1.5m Cast in situ
STRUCTURES (Cont’d)
Drainage Culverts
12
Culvert
No.
Chainage Length
(m)
Skew
(⁰)
Culvert Size Type
C11 4706 136.50 24 1.5m x 1.5m Cast in situ
C11a 4970 66.00 16 1.50Ø Precast
C12 5350 95.71 35 1.5m x 1.5m Cast in situ
C13 5760 65.30 0 3.0m x 3.0m Cast in situ
C14 6380 100.60 15 3.7m x 3.5m Cast in situ
C14a 6830 68.50 4 1.50Ø Precast
C15 7560 38.80 23 3.0m x 2.7m Cast in situ
C16 8225 134.00 11 1.5m x 1.5m Cast in situ
C16a 8533 123.00 32 1.5m x 1.5m Cast in situ
C16b 9184 56.00 9 1.65Ø Precast
STRUCTURES (Cont’d)
Drainage Culverts
13
Culvert
No.
Chainage Length
(m)
Skew
(⁰)
Culvert Size Type
C17 9476 61.00 5 1.65Ø Precast
C16d KRAU
RAMP-A
(CH.687)
46.00 0 1.8m x 1.5m Cast in situ
C16c KRAU
RAMP-A
(CH.687)
55.00 5 1.65Ø Cast in situ
STRUCTURES (Cont’d)
DRAINAGE
14
Bridge Crossings
• Approved by JPS on 04/11/10.
• Designed for 100Yr Floods with minimum 1m freeboard.
• Based on JPS HP11 (Hydrological Procedure 11).
Culverts
• Approved by JPS and JKR on 08/07/11.
• Designed for 50Yr Floods.
• Based on JPS HP5 (Hydrological Procedure 5).
Roadside Drain
• Designed for 1 in 10Yr Return Period.
• Follow JKR Standardized Section dated 15/06/11.
DRAINAGE (Cont’d)
15
• We have received JKR comments dated 20/02/12.
• Our response is shown in the next slide.
 Reply to JKR for comments on 20/02/12.
GEOTECHNICAL
Embankment
• Embankment Slope design 1:2.
• Stability of embankment design to FOS >1.25.
• Excavated and replaced method are consider to apply
on possible soft ground replacement.
16
Cut slope
• Berm height: Maximum no. of berms is 6.
• Cut slope design 1:1.5, stability of cut slope designed to
FOS >1.25.
• If greater than 6 berms: Staggered (Offset 10m).
• Horizontal drains applied to reduce ground water table.
a) 2100 nos. of 12m horizontal drain
b) 250 nos. of 16m horizontal drain
• Guniting and rubber pitching are allowed at possible slope
surface area both quantity are = 38,350m³.
• Geotechnical Report to be resubmitted with minor
amendments. All comments by JKR have been included.
GEOTECHNICAL (cont’d)
ENVIRONMENTAL PROTECTION WORKS
• Preliminary Environmental Impact Assessment (PEIA)
report has been approved on 30th
March 2011.
• Total no. of Silt Trap = 26
• Total length of Silt Fence = 2000 m (the length not include
for maintenance)
• Total no. of Sand Bag = 2000 (the no. not include for
maintenance)
• Total volume of Temporary Earth Drain = 104,500 m3
• Total volume of Gabion Wall (1m×1m×1m) = 60m3
• Total volume of Gabion Wall (2m×1m×1m) = 280m3
• Total no. of Rain Gauge = 2
18
The volume
not include
for maintenance
ENVIRONMENTAL PROTECTION WORKS
(Cont’d)
• Total volume of Check Dam = 60 m3
(the volume not
include for maintenance)
• Total no. of Wash Trough = 3
• Total no. of Water Jet = 3
• Total no. of Water Bowser Truck = 3
• Total no. of Skid Tank = 3 (assume there are 3 workers’
camps along the 5A alignment)
19
 Reply to JKR on 16/12/11
 Reply to JKR for comments received on 20/02/12
20
ENVIRONMENTAL PROTECTION WORKS
(Cont’d)
Lighting Design
• Lux average requirement : more than 2.0cd/m2
• Design Lux Level : 2.1 cd/m2
(from lighting calculations
using DIALux Software).
• Design requirement are met.
Preliminary Electrical Load Calculations
• Submitted to JKR on 26 April 2012
Traffic Light System
• Submitted to JKR on 26 April 2012
21
TRAFFIC LIGHT AND STREET LIGHTINGS
Design Drawings
• Submitted to JKR on 26 April 2012
• All comments have been amended accordingly.
TNB Application
• Application to TNB for power supply will be done once
the tender drawings are approved.
22
TRAFFIC LIGHT AND STREET LIGHTINGS
(Cont’d)
ROAD FURNITURES AND SIGNAGES
• Standard F Shape NJB (TL4) with height 810mm
adopted as per agreed from JKR 16/06/11
• Signboard Size as per agreed :
i. Road Signage : Letter height -250mm
ii. Gantry Signage : Letter height -300mm
iii. Traffic Regulatory : Letter height – 900mm
• SMHB is the coordinator for overall Destination sign for
North Bound direction (Simpang Pelangai to Gua
Musang).
23
DRAWING SUBMISSION STATUS
• Drawing Transmittal
24
25
THANK YOU
26

More Related Content

Viewers also liked

Costin
CostinCostin
Horizon hills Semi D - The Gateway
Horizon hills Semi D - The Gateway Horizon hills Semi D - The Gateway
Horizon hills Semi D - The Gateway
Tophills Realty
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
Ajay Prasad
 
Lecture10 Three-Span Girder-Part II ( Highway Engineering )
Lecture10   Three-Span Girder-Part II ( Highway Engineering )Lecture10   Three-Span Girder-Part II ( Highway Engineering )
Lecture10 Three-Span Girder-Part II ( Highway Engineering )
Hossam Shafiq I
 
Lecture03 composite beam with plate ( Highway Engineering )
Lecture03   composite beam with plate ( Highway Engineering )Lecture03   composite beam with plate ( Highway Engineering )
Lecture03 composite beam with plate ( Highway Engineering )
Hossam Shafiq I
 
Lecture06 Influence Lines ( Highway Engineering )
Lecture06   Influence Lines ( Highway Engineering )Lecture06   Influence Lines ( Highway Engineering )
Lecture06 Influence Lines ( Highway Engineering )
Hossam Shafiq I
 
Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural road
Pawan Kumar
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
South Fraser Blog
 
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
My own
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
YAU MEE LIM
 
2009 AASHTO Audit Guide
2009 AASHTO Audit Guide2009 AASHTO Audit Guide
2009 AASHTO Audit Guide
Stambaugh Ness, PC
 
Method to identify Building Energy Index BEI
Method to identify Building Energy Index BEIMethod to identify Building Energy Index BEI
Method to identify Building Energy Index BEI
Steve Lojuntin
 
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Nurhasanah Shafei
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Steve Lojuntin
 
Intelligent Traffic System for kajang city, Malaysia.
Intelligent Traffic System for kajang city, Malaysia.Intelligent Traffic System for kajang city, Malaysia.
Intelligent Traffic System for kajang city, Malaysia.
Yousef Abujubba
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forward
ZAINI ABDUL WAHAB
 
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 20102nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
deaarchitect
 
Lecture12 Abutments ( Highway Engineering )
Lecture12   Abutments ( Highway Engineering )Lecture12   Abutments ( Highway Engineering )
Lecture12 Abutments ( Highway Engineering )
Hossam Shafiq I
 
Holcim technical manual_english
Holcim technical manual_englishHolcim technical manual_english
Holcim technical manual_english
abbdou001
 
CHAPTER 1: INTRO TO HIGHWAY
CHAPTER 1: INTRO TO HIGHWAYCHAPTER 1: INTRO TO HIGHWAY
CHAPTER 1: INTRO TO HIGHWAY
azak80
 

Viewers also liked (20)

Costin
CostinCostin
Costin
 
Horizon hills Semi D - The Gateway
Horizon hills Semi D - The Gateway Horizon hills Semi D - The Gateway
Horizon hills Semi D - The Gateway
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
 
Lecture10 Three-Span Girder-Part II ( Highway Engineering )
Lecture10   Three-Span Girder-Part II ( Highway Engineering )Lecture10   Three-Span Girder-Part II ( Highway Engineering )
Lecture10 Three-Span Girder-Part II ( Highway Engineering )
 
Lecture03 composite beam with plate ( Highway Engineering )
Lecture03   composite beam with plate ( Highway Engineering )Lecture03   composite beam with plate ( Highway Engineering )
Lecture03 composite beam with plate ( Highway Engineering )
 
Lecture06 Influence Lines ( Highway Engineering )
Lecture06   Influence Lines ( Highway Engineering )Lecture06   Influence Lines ( Highway Engineering )
Lecture06 Influence Lines ( Highway Engineering )
 
Report on rsa for rural road
Report on rsa for rural roadReport on rsa for rural road
Report on rsa for rural road
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
 
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
 
Malaysia Logistics
Malaysia LogisticsMalaysia Logistics
Malaysia Logistics
 
2009 AASHTO Audit Guide
2009 AASHTO Audit Guide2009 AASHTO Audit Guide
2009 AASHTO Audit Guide
 
Method to identify Building Energy Index BEI
Method to identify Building Energy Index BEIMethod to identify Building Energy Index BEI
Method to identify Building Energy Index BEI
 
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
 
Intelligent Traffic System for kajang city, Malaysia.
Intelligent Traffic System for kajang city, Malaysia.Intelligent Traffic System for kajang city, Malaysia.
Intelligent Traffic System for kajang city, Malaysia.
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forward
 
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 20102nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
2nd Malaysia Pavilion Proposal for The Shanghai World Expo 2010
 
Lecture12 Abutments ( Highway Engineering )
Lecture12   Abutments ( Highway Engineering )Lecture12   Abutments ( Highway Engineering )
Lecture12 Abutments ( Highway Engineering )
 
Holcim technical manual_english
Holcim technical manual_englishHolcim technical manual_english
Holcim technical manual_english
 
CHAPTER 1: INTRO TO HIGHWAY
CHAPTER 1: INTRO TO HIGHWAYCHAPTER 1: INTRO TO HIGHWAY
CHAPTER 1: INTRO TO HIGHWAY
 

Similar to SMHB

Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptx
ssuserde6364
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
Egyptian Engineers Association
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
Path Marketing Inc.
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
Jill Reeves
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
Jill Reeves
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
MUHAMMAD NOMAN KHAN
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
Ziad el-Balbisi
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Rajesh Prasad
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
Rajesh Prasad
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
Aamir Patni
 
Success story fischer fze
Success story  fischer fzeSuccess story  fischer fze
Success story fischer fze
fischer_ae
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Rajesh Prasad
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
Shashank Gaurav
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Rajesh Prasad
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
Gihan Anuradha Bombuwala
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
Rajesh Prasad
 

Similar to SMHB (20)

Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptx
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Success story fischer fze
Success story  fischer fzeSuccess story  fischer fze
Success story fischer fze
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 

SMHB

  • 1. 1 DESIGN WORKSHOP FOR PACKAGE 5A MAY 2012
  • 2. LOCATION PLAN OF PACKAGE 5 2 KUALA KRAI GUA MUSANG KG RELONG KARAK SIMPANG PELANGAI JALAN PERSEKUTUAN “CENTRAL SPINE” Jarak: 60 km RAUB BENTONG PAKEJ 5 – RAUB KE BENTONG N
  • 5. IMPORTANT FEATURES • Length: 9.60km. • No. of interchanges: 2 i. Raub Interchange (Ch.1500 – Ch.3300) ii. Krau Interchange (Ch.7600 – Ch.9600) iii. Signalized Junctions: 2 • Structures i. No. of bridges: 5 ii. No. of VBC: 2 iii. No. of Underpass: 1 iv. Cast in situ Box Culvert greater than 3m: 3 v. Pre-cast Box Culvert less than 3m: 10 vi. Retaining Earth Wall: 5,200m² 5
  • 6. GEOMETRICAL DESIGN • Design Standard: R5 • Design Speed: 50 - 90 Kmph • Maximum Superelevation: 6% • Maximum Gradient: 5% • All comments by JKR and value management matters have been included (Meetings with JKR dated 23/11/11 and 13/01/12). • Status of Road Safety Audit (RSA) i. Mainline Stage 1, 2 and 3 completed. ii. Krau Interchange in progress. Exit speed at Krau Interchange to be discussed. 6
  • 7. IMPORTANT FEATURES (cont’d) •Standardized Pavement thickness: 740mm 7
  • 8. EARTHWORKS 8 Earthworks i. Volume of Cut: 2,907,442m³ ii. Volume of Fill: 2,785,388m³ iii. Volume of Unsuitable Material: 678,900m³ iv. Volume of Imported Fill: 556,846m³ (Contractor’s own source) v. Volume of Hard Material: 279,200m³ vi. Volume of Rock: 839,200m³
  • 9. STRUCTURES Bridges • Designed to HA+45 HB loading. • Two meetings held with JKR 26/06/11 and 29/07/11. All comments replied and incorporated in the design. JKR has no further comments. 9 Name Chainage Location Span Configuration Depth (mm) Top Flange (mm) Beam Type Dia. of Bored Pile (mm) 5A - B1 2567.469- 2722-469 Sg. Sempalit 25-35-35-35-25 1800 1650 T- Beam 750 5A - B1A 129.392- 129.242 Sg. Sempalit 30 1800 2000 T- Beam 750 5A - B1B 129.939 -129.706 Sg. Sempalit 30 1800 2000 T- Beam 750 5A - B2 8703-8948 Sg. Bilut 33-40-27-40-35- 35-35-35 2260 1650 T- Beam 750 5A - B3 720-805 Sg. Bilut 25-35-25 1800 1650 T- 750
  • 10. STRUCTURES (Cont’d) Vehicular Box Culverts & Underpass • JKR has agreed on the location and the types of the VBC and Underpass 10 Name Chainage Width of Structure (m) Height of Structure (m) Length of Structure (m) Structural System Foundation 5A /VBC1 CH. 510 4.5 5.0 48 RC Box Soil Replace- ment 5A /VBC2 CH. 3341 4.5 5.0 43 RC Box Nil 5A /UP1 (Kg. Melayu Sempalit) CH. 6618 11.0 (T) 13.0 (B) 5.5 55 RC Portal Frame Bored Pile
  • 11. Drainage Culverts 11 Culvert No. Chainage Length (m) Skew (⁰) Culvert Size Type C1 550 80.70 25 1.80Ø Precast C2 694 57.00 28 1.50Ø Precast C3 1160 46.40 15 2.8m x 2.8m Cast in situ C4 1548 86.60 42 1.50Ø Precast C5 1850 109.42 25 1.5m x 1.5m Cast in situ C6 FR8 217 41.00 0 2.40Ø Precast C7 3130 66.00 29 1.50Ø Precast C8 3370 88.58 19 1.5m x 1.5m Cast in situ C9 3730 111.44 23 2.0m x 1.5m Cast in situ C10 4120 124.38 29 1.5m x 1.5m Cast in situ STRUCTURES (Cont’d)
  • 12. Drainage Culverts 12 Culvert No. Chainage Length (m) Skew (⁰) Culvert Size Type C11 4706 136.50 24 1.5m x 1.5m Cast in situ C11a 4970 66.00 16 1.50Ø Precast C12 5350 95.71 35 1.5m x 1.5m Cast in situ C13 5760 65.30 0 3.0m x 3.0m Cast in situ C14 6380 100.60 15 3.7m x 3.5m Cast in situ C14a 6830 68.50 4 1.50Ø Precast C15 7560 38.80 23 3.0m x 2.7m Cast in situ C16 8225 134.00 11 1.5m x 1.5m Cast in situ C16a 8533 123.00 32 1.5m x 1.5m Cast in situ C16b 9184 56.00 9 1.65Ø Precast STRUCTURES (Cont’d)
  • 13. Drainage Culverts 13 Culvert No. Chainage Length (m) Skew (⁰) Culvert Size Type C17 9476 61.00 5 1.65Ø Precast C16d KRAU RAMP-A (CH.687) 46.00 0 1.8m x 1.5m Cast in situ C16c KRAU RAMP-A (CH.687) 55.00 5 1.65Ø Cast in situ STRUCTURES (Cont’d)
  • 14. DRAINAGE 14 Bridge Crossings • Approved by JPS on 04/11/10. • Designed for 100Yr Floods with minimum 1m freeboard. • Based on JPS HP11 (Hydrological Procedure 11). Culverts • Approved by JPS and JKR on 08/07/11. • Designed for 50Yr Floods. • Based on JPS HP5 (Hydrological Procedure 5). Roadside Drain • Designed for 1 in 10Yr Return Period. • Follow JKR Standardized Section dated 15/06/11.
  • 15. DRAINAGE (Cont’d) 15 • We have received JKR comments dated 20/02/12. • Our response is shown in the next slide.  Reply to JKR for comments on 20/02/12.
  • 16. GEOTECHNICAL Embankment • Embankment Slope design 1:2. • Stability of embankment design to FOS >1.25. • Excavated and replaced method are consider to apply on possible soft ground replacement. 16
  • 17. Cut slope • Berm height: Maximum no. of berms is 6. • Cut slope design 1:1.5, stability of cut slope designed to FOS >1.25. • If greater than 6 berms: Staggered (Offset 10m). • Horizontal drains applied to reduce ground water table. a) 2100 nos. of 12m horizontal drain b) 250 nos. of 16m horizontal drain • Guniting and rubber pitching are allowed at possible slope surface area both quantity are = 38,350m³. • Geotechnical Report to be resubmitted with minor amendments. All comments by JKR have been included. GEOTECHNICAL (cont’d)
  • 18. ENVIRONMENTAL PROTECTION WORKS • Preliminary Environmental Impact Assessment (PEIA) report has been approved on 30th March 2011. • Total no. of Silt Trap = 26 • Total length of Silt Fence = 2000 m (the length not include for maintenance) • Total no. of Sand Bag = 2000 (the no. not include for maintenance) • Total volume of Temporary Earth Drain = 104,500 m3 • Total volume of Gabion Wall (1m×1m×1m) = 60m3 • Total volume of Gabion Wall (2m×1m×1m) = 280m3 • Total no. of Rain Gauge = 2 18 The volume not include for maintenance
  • 19. ENVIRONMENTAL PROTECTION WORKS (Cont’d) • Total volume of Check Dam = 60 m3 (the volume not include for maintenance) • Total no. of Wash Trough = 3 • Total no. of Water Jet = 3 • Total no. of Water Bowser Truck = 3 • Total no. of Skid Tank = 3 (assume there are 3 workers’ camps along the 5A alignment) 19
  • 20.  Reply to JKR on 16/12/11  Reply to JKR for comments received on 20/02/12 20 ENVIRONMENTAL PROTECTION WORKS (Cont’d)
  • 21. Lighting Design • Lux average requirement : more than 2.0cd/m2 • Design Lux Level : 2.1 cd/m2 (from lighting calculations using DIALux Software). • Design requirement are met. Preliminary Electrical Load Calculations • Submitted to JKR on 26 April 2012 Traffic Light System • Submitted to JKR on 26 April 2012 21 TRAFFIC LIGHT AND STREET LIGHTINGS
  • 22. Design Drawings • Submitted to JKR on 26 April 2012 • All comments have been amended accordingly. TNB Application • Application to TNB for power supply will be done once the tender drawings are approved. 22 TRAFFIC LIGHT AND STREET LIGHTINGS (Cont’d)
  • 23. ROAD FURNITURES AND SIGNAGES • Standard F Shape NJB (TL4) with height 810mm adopted as per agreed from JKR 16/06/11 • Signboard Size as per agreed : i. Road Signage : Letter height -250mm ii. Gantry Signage : Letter height -300mm iii. Traffic Regulatory : Letter height – 900mm • SMHB is the coordinator for overall Destination sign for North Bound direction (Simpang Pelangai to Gua Musang). 23
  • 24. DRAWING SUBMISSION STATUS • Drawing Transmittal 24
  • 25. 25