Skip to main content
Engineering,
Procurement & Construction
Operation &
Management
Concession
Development
IVRCL: CORPORATE PROFILE
Pan- India presence
Premier EPC & LSTK Service Provider with front-end engineering capabilities
Brief OverviewBrief Overview
GROWTH HISTORY
 Strong presence in Water, Transportation, Buildings & Industrial
Structures and Power sector; Order book of INR 271.44 Billion
(USD 5.12 Billion) as on 31st
March 2013
 Significant EPC, LSTK & FEED capabilities
 Proven Project Execution Skills and presence across 25 states in
India and Overseas viz. Nepal, Abu Dabhi, Sri Lanka and Africa
 Undertaking BOT/ BOOT / DBFOT Type PPP contracts
 Highly qualified and well trained human resource base
 INR 800 Crores worth of sophisticated Construction Equipment
 Listed in 1995, proven dividend paying track record
 Expanding our presence in Railways, Metro Systems and Mining
Infrastructure
Acquired
Davy Markham of UK
Acquires and initiates steps
to turnaround Hindustan
Dorr Oliver
TOLL Collection
Started
Commences
commercial
operations
1990
1995
IVRCL IPO and Listing on
Indian Stock Exchanges
2001
Forays into BOT/
BOOT / DBOOT
type PPP Projects
2002
Completes
National Games
Village
2005
2006
Expansion of Realty
Business through IVR
Prime
2010
Executes
first water
project
1992
Acquired ALKOR PETROO – For
Ownership of OIL & GAS Blocks
in EGYPT & YEMEN
2007
100 MLD Desalination
plant Commissioned
2010
2010
MANAGEMENT
 MR. E. SUDHIR REDDY, CHAIRMAN & MANAGING DIRECTOR
 Founder Promoter of IVRCL.
 MR. E. SUNIL REDDY,
 VICE CHAIRMAN
 MR. R. BALARAMI REDDY,
EXECUTIVE DIRECTOR – FINANCE & GROUP CFO
 MR. K. ASHOK REDDY,
EXECUTIVE DIRECTOR
 MR. S RAMACHANDRAN,
DIRECTOR – Business Development & Corporate Strategy
 MR. D. DEVARAJA RAO
DIRECTOR- TECHNICAL
 MR. VENKATARAGHAVAN R
DEPUTY DIRECTOR - Operations & PMC
 MR. PRASAD K.H.K
COO - WATER
 MR. RAJKUMAR SINGH
COO - TRANSPORTATION
 MR. M.S.RAO
COO - MINING
 MR. VIJAY KUMAR REDDY
HEAD – BUILDINGS & INDUSTRIAL
STRUCTURES
 MR. KRISHNA REDDY
COO - IRRIGATION
 Mr. S. RAJAGOPALAN
HEAD - POWER
Current IVRCL Group manpower across all regions in the country is 5950
 Core strengths are in execution of Civil Engineering Projects in the sectors of Water & Environmental, Transportation,
Building & Industrial Structures and Power Transmission.
 Successfully executed Engineering Procurement Construction & Commissioning (EPCC); Lump Sum Turnkey (LSTK)
Projects with Front End Engineering & Design (FEED) capabilities
 Current IVRCL Group manpower across all regions in the country is 5950
IVRCL GROUP
SNAPSHOT OF INFRA VERTICALS
Water &
Transportation
Buildings &
Industrial Structures
Power
 Irrigation
 Drinking water
 Desalination
 Environmental Projects
 Industrial Water Solutions
 Highways
 Bridges
 Railways
 Tunnels
 Residential
 Commercial
 Industrial
 Institutional
 Transmission Lines
 High Voltage Direct
Current
 Distribution
 Sub Stations
 Railway Traction
Mining
 Overburden Removal
 Underground Mining
 Shaft Sinking
NTPC Vindhyachal Project
100 MLD Chennai Desalination Plant
for Chennai Metro Water Supply
 Water Projects
– Transmission Mains, Distribution Systems, Pumping & Re-
circulation Systems, O&M, Irrigation Dam and Canal Works
 Environmental Projects
– Sewage systems, Water/Sewage treatment plants, Solid waste
recycling plants
 Key Projects:
 Completed :
– Chennai Water Desalination Plant INR 550 Crore (USD 104 mn)
– Punasa Lift Irrigation Scheme INR 418 Crore (USD 79 mn)
– Chambal – Dholpur – Bharatpur Water Supply Scheme for PH,
Rajasthan INR 213 Crore (USD 40mn)
– Barsingsar Water Carrier System for Neyveli INR 80 Crore (USD
15mn)
 Ongoing :
– Bhandup Tunnel INR 1145 Crore (USD 216mn)
– Sripada Sagar Lift Irrigation Scheme INR 1737 Crore (USD 328 mn)
– Tansa Transmission Main Pipeline INR 421 Crore (USD 79 mn)
– Hogenakkal Water Supply Project INR 443 Crore (USD 83 mn)
– Jalore water supply scheme INR 320 Crore (USD 60 mn)
– SSNL – Kachchh Water Supply Scheme INR 184 Crore (USD 35 mn)
Key ProjectsKey Projects
BusinessBusiness
WATER, ENVIRONMENTAL & IRRIGATION
Purander Lift Irrigation for
Maharashtra Krishna Valley
Development Corporation
CUMULATIVE QUALIFICATIONS
IN WATER SECTOR
Laying of Pipelines undertaken : 25000 Kms.
Canals : 2300 Kms.
Largest Seawater Desalination plant catering about 2.5 Million families every day
(100 Million Litres per day)
Water Treatment Plants
• Cumulative : 1300 MLD
• Single Largest : 153 MLD
Pumping Machinery
• Discharge : 917156 Cum./Hr.
• MW : 214
• Type : VT & HSC Pumps
IVRCL’ s Projects & Programs
in Water Infrastructure
 Drinking Water Treatment including Heavy Metal Removal & Rural cum Multiple Urban
Supply Schemes
 Water Distribution Systems – Pipelines, Pumping Stations & Storage Systems
 Irrigation Projects – Major & Medium including Lift & up to Drip Irrigation
 Desalination Projects
 Industrial Water Solutions
 Water & Waste Water Treatment & Recycling Plants
 Make-up Water Systems
 Circulating water Systems
 Water Carrier Systems
 Liquid – Solid Separation
 Demineralization Plants
 Design, Engineering & Manufacture of Process Equipment
 Effluent & Common Effluent Treatment Plants
 Sewage Treatment Plants
 Chambal – Dholpur – Bharatpur Water Supply Project, Rajasthan
 Hogenakkal Water Supply and Fluorosis Mitigation Project, Tamilnadu
 Jalore Water Supply Scheme, Rajasthan
 Indore Clear Water Supply & Pumping Stations, Bhopal
 Tansa Transmission Main Pipeline Project, Maharashtra
 Sujalam Suphalam Water Supply Scheme, Gujarat
 Veeranam Water Supply Scheme, Tamil Nadu
 Vedaranyam Clear Water Supply Scheme, Tamil Nadu
 Water Supply Scheme in Gujarat (NC4, NC5, NC11 & NC22) Projects
 Water Distribution System in various districts of Gujarat – (NCD, Jalundra, Khorsam)
 Ranchi Water Supply Scheme (JNNURM) in Jharkhand
 Water Treatment Plants in Gujarat
MAJOR DRINKING WATER SUPPLY SCHEMES
Chambal - Dholpur – Bharatpur
Water Supply Project
Drinking water to the town of Bharatpur and its surroundings is being supplied through tube wells.
Supply of Drinking water to Bharatpur and its surroundings was drawn from Chambal River at a distance of 85 kms.
By implementing this scheme, water is now made available to 930 villages in Bharatpur District, 96 villages in Dholpur
District.
The scope of work involves construction of Intake structure with 21.80-m outer diameter and height of 37.15 m with wall
thickness varying from 1.4 m to 0.8 m with steel approach bridge of 261 m.
The above concept of construction of Intake, Piers and launching of truss has been a unique decision, the first of its kind
in the history of PHED and is a feather in the cap of IVRCL’s capability to handle heavy construction in water sector.
Total Length of Pipeline = 85.22 Kms.
MS Pipeline = 37.02 Kms.
PSC Pipeline = 48.20 Kms.
Pump House – 2 Nos.
Water Treatment Plant - 112 MLD
Reservoir – 3 Nos. (220, 25 & 10 MLD)
Coffer Dam, Intake Structure, Pumping Stations,
Retaining Wall, Switchyard, VT & HSC Pumps, Railway
crossing with Jack Pushing
TUNNEL FROM GUNDOVALI TO
BHANDUP COMPLEX IN MUMBAI
 Construction of Inlet Shaft and Outlet Shaft by drilling and controlled blasting of following details
 Inlet Shaft at Kaprbawadi (K2)
 Diameter of shaft : 11.8 m
 Depth of Shaft : 108 m
 Outlet Shaft at Bhandup
 Diameter of shaft : 11.8 m
 Depth of Shaft : 125 m
 Excavation for tail tunnel and TBM assembly area, at Kapurbawdi (K2) and at tail and TBM removal
area at Bhandup by drilling and controlled blasting method and disposal of muck
 Boring of Tunnel from Kapurbawdi (K2) to Bhandup with upward gradient 4.5 : 1000 by TBM
 CONSTRUCTION OF ABOVE ROCK TUNNEL USING MODERN FULL-FACE ROCK TUNNEL
BORING MACHINE (TBM).
 Length of Tunnel : 8.30 Km (Between Kapurbawadi to Bhandup Complex)
 Bored Dia of Tunnel : 6.25 m
 RCC Lined Dia of Tunnel : 5.50 m
Hogenakkal Water Supply and Fluorosis
Mitigation Project, Tamil Nadu
 Government of India together with Tamil Nadu Water Supply and Drainage (TWAD) Board mooted this
major project to overcome water scarcity and presence of flourosis in groundwater faced by two
adjacent districts – Dharmapuri & Krishnagiri.
 Water pumped from Cauvery River 45 Kms. to the Water Treatment Plant (WTP) 127.6MLD and
distributed to 3 Municipalities, 17 Town Panchayats and 6755 Villages in 18 Panchayat Unions,
subsequently. The WTP capacity would be raised to 155.82 MLD.
 This EPC project is funded by Japan International Cooperation Agency (JICA), ensures safe drinking
water to thousands of rural households in the region. It also provides water to 5 Unions by branch
pipelines and Distribution lines of 130 Panchayats benefitting 1649 Habitations.
 Main works include construction of OHTs, Pump Houses Re-chlorlnatlon Stations and Electrical,
Mechanical & Instrumentation through various Pipelines for a total length of 2300 Kms.; 134 Nos.
Master Balancing Reservoirs, 126 Nos. Booster Pumping stations/Sumps & 137 Nos. Overhead Tanks.
Tansa Transmission Main Pipeline
Project at Maharashtra
 Name of Work: Replacement of 2 Nos of 1800mm dia existing Riveted Tansa Mains from Tans to Tarali
by 1 No 2700mm dia M.S. all welded Pipeline in H.E.’s O.C. division for Section – II – Jamboli to
Chinchavali
 Client: Municipal Corporation of Brihan Mumbai – Mumbai Water Supply Project
 The project offered by the Municipal Corporation of Brihan Mumbai (MCBM) aimed to replace the 125-
year old water supply line to Mumbai, which was damaged at various places.
 It entailed the laying of a 2750mm dia MS all-welded pipeline over 41.3 km, parallel to the existing two
lines of1800mm dia riveted mains from Tansa to Tarali.
 This is a part of the massive programme for replacement and improvement of Tansa Water mains due
to ageing and frequent leaking of the old pipelines. The Tansa pipelines would continue to bring 455
MLD of water to the western suburbs and parts of the island city.
JALORE WATER SUPPLY SCHEME
We undertook this turnkey project for Public Health Engineering Department (PHED) Rajasthan.
 Water supply from Narmada Canal to Jalore town and 281 villages through various off take viz.
Construction of Raw Water Reservoirs
 WTP of 96 MLD, 33/6.6KV Switchyard, Clear Water Transmission main and related works
between RD-44.22 of Narmada Main Canal and Ahore.
 Civil, Mechanical, Electrical & Instrumentation work at various Pumping Stations including O&M
for 5 years.
100 MLD DESALINATION PLANT FOR
CHENNAI METRO WATER SUPPLY &
SEWERAGE BOARD
INDUSTRIAL WATER SUPPLY
PROJECTS ESTABLISHED
 Water Carrier System Package (RA8) for Neyveli Lignite Corporation Limited
 Stand Alone Water Supply Scheme for Kochi Refineries Limited
 Circulating Water System for Maharashtra State Electricity Board and
Karnataka Power Corporation Limited
 Vindhyachal Super Thermal Power Project, Stage III (2x500 MW) Pre-Water
Treatment Package on EPC for NTPC
 Make up Water System for Sipat Thermal Power Station for NTPC
 Bailadilla Iron Ore Water Supply Project on EPC for NMDC
Neyveli Lignite Corporation Ltd,
Rajasthan – Barsingsar Thermal Project
(2X 125MW) – Water Carrier System
 The project for Indira Gandhi Nahar Pariyojana
Canal of Neyveli Lignite Corporation (NLC) Limited,
Thermal Power Project at Barsingsar, Rajasthan
(2x125 MW). Design, Civil Structures like intake
channels, settling tanks, forebay, Raw water intake
sump, Raw water pump house, Raw water
reservoirs of 1.50 Lac and 5.40 Lac cum capacity,
Hydraulics for Vertical Turbine pumps of 1850
cum/hr capacity; and Laying, Jointing, Hydro
testing and Commissioning of GRP pipeline over
60km.
 It also included designing of PLC/SCADA and
commissioning of 33 KV transmission lines
stretching approximately 60km.
IVRCL BRINGS HOPE AND LIFE
TO THE DESERT OF RAJASTHAN
Vindhyachal Super Thermal Power Project NTPC-2X500MW• Pre Water Treatment Plant
 The project comprised construction of a 160-MLD water treatment plant involving central monitoring basin, clarification
plant, chemical house and filters. This caters to the industrial water needs of the thermal power plant.
Sipat Thermal Power Project NTPC - Stagelll-3x660MW on EPC basis
 The project consists of a Make-Up Water System Package including supply and erection of 3 vertical turbine pumps
(8500 m/hr) water pump house with a depth of 30 metres, stop log gates and traveling screens. The 1400 mm twin line
26 km pipes have been internally painted with bitumen, hydro-tasted, back-filled and provided with cathodic protection.
Raw Water Supply Pipeline APGENCO – Rayalaseema Thermal Power Project
 Designed to transport 40 cusecs of water, the project Involved construction of pipe bridges across rivers and canals
from Sri Pothuluri Veerabrahmendra Swamy Reservoir to Rayalaseema Thermal Power Project (2X500MW) along with
 Construction of a storage reservoir in the plant premises in
Cuddapah District Andhra Pradesh.
 MS Pipeline of 1100 mm dia = 34 Kms.
 Sluice & Surplus weir / Spillway in Plant Premises
INDUSTRIAL WATER SUPPLY PROJECTS
Rajasthan Urban Infrastructure Development Project
 The State Government of Rajasthan awarded us the sewage schemes in cities like Kota, Jaipur,
Jodhpur, Ajmer and Udaipur. The work comprised supply, Installation, testing and commissioning of
sanitary sewers, trunk sewers, manholes etc.
Allahabad STP
 The Sewage Treatment Plant (STP) at the holy city of Allahabad under JNNURM scheme through Uttar
Pradesh Jal Nigam, Pollution Control Unit, is one of the biggest sewerage projects in India. With 143
km RCC pipeline, varying in dia from 200 mm to 1400 mm at varying depths of 1.50mto 10m.
 The project Includes 6 Intermediate pumping stations. Out of the six pumping stations, three old ones
are to be upgraded and three New ones are to be constructed with capacity of 12, 55 &25 MLD
respectively.
 The city is lacing a sewerage disposal problem and presently total city sewerage is disposed off in the
Ganga river. To keep the Ganga pollution free, one 60 MLD STP with USSBR technology is also being
designed.
Alandur Under Ground Sewage Disposal System
 This is among the first public private participation (PPP) projects in India, benefiting 25,162 homes in
an area of 19.5 sq. km. The project entailed laying and jointing of stoneware pipes tor a length of 193
km and of RCC NP3 pipes and PSCpipesover12.67 km.
SEWAGE SCHEMES & TREATMENT PLANTS
Irrigation – Major Projects Undertaken
Andhra Pradesh
 Sripada Sagar Project –Stage II, Phase I Ramagundam in Karimnagar District
 Polavaram Project Right main canal
 Kalwakurthy Lift Irrigation Scheme
 Sriram Sagar Project – II in Karimnagar District
 Telugu Ganga Project in Cuddapah District
Gujarat
 Narmada Irrigation Pipeline
Maharashtra
 Purandar Lift Irrigation Scheme
 Muktainagar Lift Irrigation Scheme
 Dehani Lift ( Drip) Irrigation Scheme
Madhya Pradesh
 Indirasagar Lift Irrigation Scheme
 Punasa Lift Irrigation Scheme
 Lower GOI Dam Project
Above works involved detailed EPC & Commissioning of Water Intake Systems, Cross Country Pipelines, Pump Houses, Substations, E&M,
Instrumentation & SCADA in Optimizing Water Reach and Usage to the End Beneficiary
Solapur – Mohol B.G Railway Line
Srikakulam – Palasa NHAI
Tunnel Project for Konkan
Railways
 National Highways/Expressways, State Highways, Integrated Toll Collection,
Bridges, Tunnels, Railways & Metro Rail Projects
 Key Projects:
 Completed:
– Indore–Jhabua–Gujarat/MP Border NH–INR 1523 Crore (USD 338.5 mn)
– 4 Laning of Salem to Kumarapalayam & Kumarapalayam to Chengapalli
NH Project – Length: 99 Kms. Value : INR 1090 Crore (USD 218 Mn).
– 4 Laning of Jalandhar to Amritsar NH Project – Length: 49 Kms. Value :
INR 410 Crore (USD 82 Mn).
– 4 Laning of Madurai to Kanyakumari (NS40 & 41) NH Project – Length:
78 Kms. Value : INR 363 Crore (USD 73 Mn).
 Ongoing:
– 6 Laning Gundugolanu – Rajahmundry NH – INR 1617 Crore
(USD323.4mn)
– 4 laning Patiala-Sangur-Barnala-Bathinda SH–INR 1586 Crore
(USD317mn)
– 4/6 Laning of Raipur to Bilaspur NH –INR 1286 Crore (USD 257mn)
– Rai Malikpur (Rajasthan border)-Kharak– INR 1202 Crore (USD 251 mn)
– 6 Laning from Chengapalli to start of Coimbatore Bypass and 4 laning
of end of Coimbatore to TN / Kerala Border (INR 1123 Crore (USD
249mn)
Key ProjectsKey Projects
BusinessBusiness
TRANSPORTATION
TRANSPORTATION DIVISION : HIGHLIGHTS
SRIKAKULAM PROJECT FOR NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI) RAJAMUNDRY PROJECT FOR NATIONAL
HIGHWAYS AUTHORITY OF INDIA (NHAI)
VIVEKANANDA ROAD FLYOVER PROJECT - KOLKATA
RS.165 Crores
DARBHANGA – KAMTAUL – BASAITHA - MADHWAPUR
ROAD PROJECT IN BIHAR - RS.156 Crores
BHOGPUR – MUKERIAN NHAI
RS.243 Crores
ONGOING MAJOR PROJECTS
6 Laning – RAJAMUNDRY – GUNDLAGONU NH
RS.1617 Crores
4/6 LANING RAIPUR - BILASPUR NHAI
RS.1286 Crores
INDORE - JHABUA - GUJARAT / MP BORDER NHAI
RS.1523 Crores
NHAI BOT PROJECTS
CUMULATIVE CREDENTIALS IN
TRANSPORTATION SECTOR
Highways : 7500 Lane Kms.
Tunneling : 120 Kms. (Dia 4m to 18m)
Bridges : 20 Kms.
Single largest bridge : 2.62 Kms.
Railways Track Works : 150 Kms.
Highway Concession Projects under Operation and Development
Cumulative Lane Kms. : 3294.27 Kms.
Cumulative project cost : Rs.115.92 billion / USD 2.32 billion
Total Value of Transportation Projects Pre-qualified is Rs.408.53 billion/USD 8.2 billion
CLIENT
National Highways Authority of India
PROJECT
Design, Construction, Development, Finance,
Operation and Maintenance of Km 9.500 (Indore)
to Km 171.100 (Gujarat Border) on NH-59,
in the state of MP on DBFOT Basis
FEATURES
Length = 155 Kms.
Major Bridges - 10 Nos. (4 Lane
Flyovers - 02 Nos.
Minor Bridges - 23 Nos.
VALUE
Rs.1175 Crores
4 Laning of Indore-Jhabua-Gujarat/MP Border
National Highway Project for NHAI
CLIENT
National Highways Authority of India
PROJECT
Four lanning and Strengthening of existing two
lanes of NH-7 form Madurai to Kanyakumari
from Km 42.00 to Km 120.00 Contract
Packages NS-40 & NS-41 (TN)
FEATURES
78 Kms. 4 Lane National Highway Road Project
VALUE
Rs.365 Crores
Madurai to Kanniyakumari NS – 40 & 41
National Highway Project for NHAI
MAJOR INTERCHANGE AT CHENNAI
Major Interchange (Trumpet Type) at Kondalampatti as part of 4-Laning of
Salem to Kumarapalayam of NH-47
Total Length of Interchange – 2619 Mtrs
No. of Spans - 93
Construction of Main tunnel : 8600 m long - Modified horseshoe Shaped 7m Dia.
Construction of Escape tunnel : 7430 m long - Modified horseshoe Shaped 5m Dia.
Construction of Adit- 585 m long : Modified horseshoe Shaped 7m Dia.
Vehicular Cross Passage : 7 Nos
Pedestrain Cross Passage : 12Nos
Trolley Refuge Niche : 76 Nos
Escape Tunnel Lay Bye : 18 Nos
This project of Northern Railway is a part of Udhampur - Srinagar - Baramulla New BG Rly line Project
to connect Jammu and Kasmir with main land through Rali link.
Our project is the first package in the new alignment fixed deeper inside mountain giving a rock over
burden of more than one km above the tunnel. Clients have adopted NATM (New Astrian Tunnelling
Method) for this package.
DHARAMPUR – SRINAGAR – BARAMULA
NEW BG RAILWAY LINE – Contd..,
BMRCL Metro Station
Guru Gobind Singh Refinery
Project
Hill Ridge- Games Village
Gachibowli, Hyderabad –1.5mn sft
Key Ongoing
Projects
Key Ongoing
Projects
BusinessBusiness
BUILDINGS AND INDUSTRIAL STRUCTURES
 Building Projects including Integrated Townships, Composite Housing Projects,
Commercial Buildings, Institutional & Technical Buildings, SEZ’s / IT Parks and
Industrial Construction
 Other Infrastructure projects include Storm water drains, underground drains, layout
formation and overburden removal, Project Site Developments
 Key Projects:
 Completed:
– Seawoods Estate at Navi Mumbai for CIDCO – INR 215 Crores (USD 40 mn)
– Naya Raipur state Secretariat Bldg – INR 189 Croes (USD 35 mn)
– Civil & Structural works at Bathinda for HMEIL– INR196 Crores (USD 37 mn)
– IGCARL Research Bldg – INR 168 Crores (USD 31 mn)
– Bangalore Metro Stations 6 Stns for BMRCL – INR 254 Crores (USD 48 mn)
 Ongoing
– Civil & Structural works of Main Plant NTPC- INR1189 Crores – (USD224 mn)
– DSIISD Bawana – EWS Housing – INR 298 Crores (USD 56 mn)
– General Hospital Campus, Valsad - INR 167 Crores (USD 31 mn)
– Old MLA Quarters, Hyderabad, Govt. AP R&B – INR 126 Crores ( USD 24 mn)
– CIDCO Exhibition Centre Building – INR 152 Crores (USD 28 mn)
– Institute Campus for NIT, Patna INR 105 – (USD 20 mn)
CUMULATIVE QUALIFICATIONS IN
BUILDINGS & INDUSTRIAL SECTOR
Total Building area undertaken : 51.60 Million Sft.
Concrete : 1.80 Million Cum.
Structural Steel : 30600 MT
Tallest Building : 20 Floors
Piling : 3.43 Lac Mtrs. (500mm to 1600mm dia)
CIDCO TOWNSHIP
CIDCO-SEAWOODS ESTATES ,
NAVI MUMBAI,
Multistoried Housing Project
Built up area – 1.06 Million Sft
Value Rs. 215 Crores
STATE SECRETARIAT
BUILDING AT NAYA RAIPUR
State Secretariat Building
Built up area – 0.58 Million Sft
Value Rs. 179 Crores
Naya Raipur Development
Authority
BITS PILANI CAMPUS AT HYDERABAD
Birla Institute of
Technology & Science
BITS Pilani Campus
Built up area – 1.6 Million Sft
Value Rs. 110 Crores
IVRCL: METRO STATIONS & INDUSTRIAL CONSTRUCTION
BMRCL ELEVATED METRO STATIONS
Name of work:-
Constrution of two elevated metro stations CMH road station and Byappanahalli Stations
Value of work: - 92 Crores
Constrution of two elevated metro stations R V Road station and Jayanagar Stations
Value of work: - 71.52 Crores
Construction of two elevated metro stations Old Madras road station and Ulsoor Stations
Value of work :- 90 Crores
ONGC Petrochemical Complex,
Dahej – Infrastructure Development
Scope: Design, Engineering, Procurement, Earthwork, Construction,
Commissioning of utilities and handover of ready for use Infrastructure
Development
Contract Value: INR 10 Billion / USD 210 million
S.No Description Unit Quantity
1 Earth Work Cum 1,23,75,392
2 Concrete Work Cum 35,000
3 Reinforcement Steel Work MT 3000
4 Steel Work MT 250
5 Plant Road works Km 35
6 Plant Drain works Km 30
7 Utility Services Pipeline Km 12
8 Construction of
Buildings/Structures (Major)
No. 9
9 Filling Soil Cum 90,00,000
10 Reinforcement Steel work MT 3000
11 Steel Work MT 250
12 Supply of Pipe of various
material & class
Km 12
Major Quantities:
Project Description : Indian Oil Corporation Limited (IOCL) is setting
up a 15 MMTPA grass root refinery at Paradip in the state of Orissa
near Paradip Port, IOCL for meeting storage and handling
requirements, proposed to install crude oil and finished product
storage and handling facilities in the refinery complex on Built-Own-
Operate and Transfer (BOOT) basis.
Client : Indian Oil Corporation (IOCL)
Consortium : IOT Infrastructure & Energy Services Limited, Oil tanking
GmbH (“OT”), Germany & IVRCL Infrastructures & Projects Limited
SPV: IOT Utkal Energy Services Ltd.(IOTUL)
EPC: ITOUL will be entering into fixed-cost EPC contracts with IVRCL
for civil related portion of the project. The EPC portion of the Total
Project Cost awarded to IVRCL is INR 671.74 Crores.
Construction Period: 24 months
Operation Period: 15 Years from the beginning of Commercial
Operations Date (COD).
CRUDE OIL AND FINISHED PRODUCT STORAGE AND
HANDLING FACILITIES AT PARADIP
 Power Projects include Transmission Lines, High Voltage Direct
Current, Distribution and Substations
 Key Ongoing Projects:
– 400 KV / 220 KV / 132 KV Transmission lines INR 674 Crores (USD
127 mn)
– 765KV Transmission Line Tower Package INR 227.60 Crores
(USD 43 mn)
– 220/120 KV Substation Projects INR 167 Crores (USD 31 mn)
– Rural Electrification Projects INR 1712 Crores (USD 323 mn)
Key Ongoing
Projects
Key Ongoing
Projects
BusinessBusiness
POWER TRANSMISSION & DISTRIBUTION
CUMULATIVE QUALIFICATIONS IN POWER SECTOR
220/120 K.V. SUBSTATION AT
JIND FOR HARAYANA VIDYUT
400 KV DC TRANSMISSION LINE
PROJECT FOR AP TRANSCO
2x500 MW HVDC PROJECT AT
BHADRAWATI,
MAHARASHTRA
Villages Electrified : 9947 Nos.
BPL Connections : 5.61 Lakh Nos.
Transmission Line Undertaken (132/220/400/765 KV) : 1460 Kms.
Traction (25KV AC) OHE works : 60 Track Kms.
 Client: Power Grid Corporation of India Limited
 765 KV S/C Transmission line from Seoni to Nandanwadi in Madya Pradesh
 Length = 126 Kms.
 Project cost = Rs.108 Crores
 Total Towers = 342 Nos.
765 KV S/C SEONI-NANDANWADI
765 KV TRASMISSION LINE
400 KV D/C MANESAR-NEEMRANA
 Client: Power Grid Corporation of India Limited
 400 KV D/C Transmission line from Manesar To Neemrana in Haryana & Rajasthan.
 Length = 67 Kms.
 Project cost = Rs.31.93 Crores
 Total Towers = 197 Nos.
400 KV TRASMISSION LINE
220/132KV Substations at Bahadurgarh & MIE Bahadurgarh (Haryana)
 Client: Haryana Vidyut Prasaran Nigam Limited
 Supply of Equipment, erection, civil works, testing and commissioning of 220 KV Substation at
Bahadurgarh and 132 KV Substation MIE-Bahadurgarh on turnkey basis.
 Project cost = Rs. 25.16 Crores
220/132 KV SUBSTATION
♦ Area: 23 acres ( 93281 Sq.m )
♦ Installed capacity : 36000 MT / per annum
♦ Salient features:
♦ With State-of-art infrastructure.
♦ Mix & match type having CNC & manual
machines.
♦ Galvanising Bath (75m x 1m x 2m)
♦ Combines highly skilled manpower
deployment with modern manufacturing
infrastructure to ensure products of
highest quality.
♦ An environment / pollution free plant
♦ Production planned for current fiscal : 24000 MT
Our Product Range :
♦ Transmission line towers (66kV to 765 kV)
♦ Substation Structures (Lattice & Pipe)
♦ Structural steel for Rural electrification
♦ Micro wave towers
♦ Structural steel for AC Traction (OHE)
TRANSMISSION LINE TOWER FACTORY, NAGPUR
INTERNATIONAL OPERATIONS
DUBAI:
IVRCL Limited
# P.O.Box 186848, FLAT No-610
AL Barsha Business Centre
Near Mall of Emirates, Dubai
Tel : +971-4-399 0416
Fax: +971-4-3990417
E: ivrcldubai@ivrinfra.com
ABU DHABI:
IVRCL International Infrastructures & Projects
LLC
Villa No. 1, Opp: Khaleed Al Walid Mosque,
Khaleej Al Arabi Street, Near The Cultural Media
Center of Shaikh Sultan, P.O.Box 105357,
Abu Dhabi, U.A.E.
Tel: +97-2-639 0300, Fax : +97-2-639 0303
E: ivrclabudhabi@ivrinfra.com
KENYA:
2nd Floor Kiganjo House
Rose Avenue, Off Lenana Road
Kilimani, P.O.Box No. 6624400800
Nairobi, Kenya
Telefax : +254 20 2713951
SRI LANKA:
IVRCL LANKA (Private) Limited
No. 216, De Saram Place
Colombo -10
Srilanka
NEPAL:
C/O Sudhanshu Raj Satyal
Ward No. 1, 327 Gairidhara
Opp. Sunrise Bank
Kathmandu,Nepal
Phone no : +97 7014435928
Mobile : +97 98085434443
IVRCL: FINANCIAL SNAPSHOT
FINANCIALS (STANDALONE)
(INR Crores)
Financial Year Turnover Net Worth
2010-2011 5659 1987
2011-2012
(15 Months)
6178 2270
2012-2013
( 9 Months)
3759 2169
IVRCL - Company Profile.