1. J a m s h e e r P u l i y a t u n g a l Page 1
2. J a m s h e e r P u l i y a t u n g a l Page 2
Project Name QRail Enabling Works
Client Name QRail/ HBK – PORR – SBG JV
Description
The works involve preparation of designs to protect/ divert existing services in
preparation for the construction of the underground facilities of the Doha Metro
Stations and Tunnels
Project Name EPIC of Port Gate No. 1 and No. 2 at RasLaffan Industrial City
Client Name Qatar Petroleum – KBAS Contracting Co.
Description
Preparation of detail designs for the security building and infrastructure of Gate
Port # 1 and 2 at RasLaffan Industrial City.
Project Name
Post-Contract Professional General, Site Supervision and Quantity Surveying
Consultancy Services for Al Khor Area Sewerage for Southern Region – Package 3
CP C707/3
Client Name Public Works Authority (PWA) – Drainage Affairs
Description
The Project comprises the construction of area sewerage and trunk sewers for the
southern area of Al Khor. The works include the following:
Construction of approximately 31 km of Foul Sewer (VC pipe) network by open cut
trench with diameters varying from 200mm and 400mm.
Construction of approximately 7.5 km of Trunk Sewer (jacking pipe) by Micro tunneling
for pipe diameters varying from 400mm and 800mm.
Construction of approximately 1200 GRP lined Cast in-situ concrete manholes, 185 of
which will be located in shafts (very deep) used for Micro tunneling.
Construction of approximately 1,700 house connections (existing 130 & future
1,555Nr) including 20km of 150mm vitrified clay pipeline. Reinstatement work for
approximately 16Km of minor and major roads.
3. J a m s h e e r P u l i y a t u n g a l Page 3
Project Name
Post Contract Professional, General & Site Supervision & QS Consultancy Service for
Construction of Sewerage for Various Areas - CP 751/1
Client Name Public Works Authority – Drainage Affairs
Description
The project comprises the construction of a new sewer to extend the sewerage network
in various locations in Doha: Area 1- Al Jubailat, Area 2-West Bay Area and Area 3 -
NDOD Area. The works comprise: construction of VC sewers in trench, trunk sewers in
micro tunnel, GRP lined manholes and house connections.
Project Name
DH1411-Qatar Integrated Railway Project - Design & Build Red Line South Underground
(RTC/039/2012)
Client Name QDVC-GS-ADE JV/ QRail
Description
The scope of works include: Design verification and Electrical substation drawings for Al-
Matar/B Station, Utilities diversion/protection design for Al-Matar/D Station, Utilities
diversion/protection design and Electrical substation drawings for Al-Matar/E Station,
utilities diversion/protection design for Al-Khubaib Station, utilities diversion/protection
design for M40/M104 Switch Box. It also includes utility diversion design for Emergency
Exit Al Miqdat, Emergency Exit East, Emergency Exit West
Project Name
DH1219-C - Detailed Design of New/ Relocated Sewerage Pumping Station - MLPA
South
Client Name Qatar Rail/ HBK-SBG-PORR Joint Venture (HSP Enabling JV)
Description
Preparation of Detailed Design of Sewerage Station - MLPA South including relocation of
existing gravity 150mm diameter and pressurized 100mm diameter foul sewer pipes.
(Subproject for Qrail Enabling Works)
4. J a m s h e e r P u l i y a t u n g a l Page 4