1. Muhammad Jahangir
Mobile No: +92 300 6895546
+92 321 3520142
E-mail: jahangirbhatti12@gmail.com
PERSONAL INFORMATION
Father’s Name: Muhammad Ramzan
Date of Birth: May 05, 1988
C.N.I.C No: 42203-7887684-3
Nationality: Pakistani
PROFESSIONAL EXPERTIES
Fabrication and Erection of Piping& Pipe Supports.
Preparation of Piping& Structure BOQ.
Handling and interpretationsDrawings (Process,P & ID, PipingPlan and Isometric).
Coordinate with Designdepartmentto resolve and or Drawing’s modificationmatters.
Preparingthe As Built of Pipingas per Site.
Conduct frequentmeetingswiththe Clientto ensure smooth executionofall construction
activitiesaccording to IFC Drawings.
Provide daily progressreport for incorporation into projectreports.
Hydro testingof Piping.
In ConstructionactivitiesIam involve inall Mechanical
Timelyprovidesresourcesto the staff to complete work with in time and budget.
Wellheadsite executionandcommissioningPhase.
Reviewthe MTO and BOQ & manage the resource accordingly.
Inspectof Instrumentmaterial withdata sheets.
Efficient& Energeticleaderwithcommunication,presentation& teambuildingskills.
Adapt at applyinglogical but creative approachesto problems.
ProjectMonitoring& CoordinationwithClient.
Follow- upand maintainCompany’sand OR Client’sstandardsofHSE & Quality.
Witnessingandsentencingofall site inspectionswithintheirdisciplines
Reviewingof the weldingsummeryreports
Reviewall inspectionreportsforcompliance
Conductedprojectprogress,QualityControl and HSE meetings.
Follow- upand MaintainCompany’sand OR Client’sstandardsofHSE & Quality.
Coordinate with the planningand schedulingdepartmentto ensure milestone datesare
understoodfor each turn overarea.
2. TECHNICAL QUALIFICATION
DAE (Mechanical),ALI INSTITUTE DG KHAN 2005
Matriculation(Science),2002 HighSchool Kotla Haji Shah (Layyah)
COMPUTER LITERACY
INTERNET USER
MS OFFICE
WINDOWINSTALATION
AUTOCAD
PROFESSIONAL EXPERIENCE
CLIENT: OMV (PAKISTAN)
EMPLAYER: GASCO ENGINEERING PAKISTAN
DESIGNATION: MECHANICAL SUPERINTENDENT
DURATION: 12 JAN 2012 TO TILL DATE
PRJECT: SAWAN&KADAN WARI GAS FIELD
Sawan -03 Flow line DBN Project (10” Dia x 10.75 KM)
Tajal-4Well Head Development Project.
Tajal-4Well Head Compressor Project(10 MMSCFD Compressor)
Sawan-03 Well Head Development Project.
Sawan Produced Water Disposal System Enhancement Project.
Sawan Gas Plant Turn Around 2012.
Sawan-12 Flow line Project. (6” Dia x 4 KM)
Sawan-12 Well Head Development Project.
Miano-15 Flow line project (6” Dia x 6 KM).
Miano-15 Well Head Development Project.
Miano-12 Flow line project (6” Dia x 5.9 KM).
Miano-12 Well Head Development Project.
MIANO-16 Wellhead Development Project.
3. Latif Block Development Projects Phase (I)
Latif North -01 Well Head Development (Up-gradation) Project
Latif -05 Well Head Development Project.
Latif-05 Flow Line (6” Dia x 4.740 KM).
Latif -06 Well Head Development Project.
Latif -06 Flow Line (6” Dia x 4.174 KM).
Latif -07 Well Head Development Project.
Latif -07 Flow Line (6” Dia x 3.39 KM). & Latif -07 Flow (Loop Line) (6” Dia x 3.43 KM).
Latif -09 Well Head Development Project.
Latif -09 Flow Line (8” Dia x 4.947 KM).
Latif North -01 Manifold Area Project.
Central Valve Station (CVS)
Latif Block Compression Projects Phase (II)
Latif -05 well Head Compression Project (10 MMSCFD Compressor)
Latif -06 well Head Compression Project (20 MMSCFD & 10 MMSCFD Compressors)
Latif -07 well Head Compression Project (20 MMSCFD & 10 MMSCFD Compressors)
Latif -09 well Head Compression Project (20 MMSCFD & 10 MMSCFD Compressors)
Latif -10 well Head Compression Project (20 MMSCFD & 10 MMSCFD Compressors)
Latif North -01 well Head Compression Project (20 MMSCFD Compressor)
Latif -01 well Head Compression Project (20 MMSCFD Compressor)
PROFESSIONAL EXPERIENCE
CLIENT: ENI ( PAKISTAN)
EMPLAYER: GASCO ENGINEERING PAKISTAN
DESIGNATION: SENIOR SUPERVISOR
DURATION: 5 JANUARY 2013 TO 25 AUG 2013
PROJECTS: KADAN WARI GAS FIELD
West Valve Station Compression Project (10 MMSCFD Compressor)
South Valve Station Compression Project (20 MMSCFD Compressor)
K-38 Well Head Development Project.
K-23 Well Head Development Project.
K-29 Well Head Development Project.
4. PROFESSIONAL EXPERIENCE
CLIENT: OMV ( PAKISTAN)
EMPLAYER: HARIS &CO PAKISTAN
DESIGNATION: SUPERVISOR
DURATION: 25 NOV 2010 TO 28 NOV 2011
PROJECTS: KADANWARI &SAWANGAS FIELD
Fabrication and installation of Fuel Gas Line at Sawan Gas Field.
Fabrication and installation of Fuel Gas Line at Kadanwari Gas Field.
Fabrication and installation of Nitrogen line From Train-1 to SCP Area.
Fabrication and installation of Dry Instrument Air Line at Sawan Gas Field.
Fabrication and installation of Fire Water line at Sawan Gas Field.
Up gradation of Wartsila Cooling Tower at Sawan Gas Field.
Installation of Potable Water line and Pumps at Kadanwari.
PROFESSIONAL EXPERIENCE
CLIENT: OMV ( PAKISTAN)
EMPLAYER: PIPELINKCONSTRUCTION Pvt LIMITED
DESIGNATION: SUPERVISOR
DURATION: 10 AUG 2009 TO 25 OCT 2010
PROJECTS: KADANWARI &SAWANGAS FIELD
Sawan-10 WellheadDevelopmentProject
Sawan-11 WellheadDevelopmentProject
Sawan-13 WellheadDevelopmentProject
Sawan-14 WellheadDevelopmentProject
Sawan-15 WellheadDevelopmentProject
5. Sawan-10 WellheadCompressorProject
Taja-1 WellheadDevelopmentProject.
ABB CompressionProject.
Latif North-1Well headDevelopmentProject.
Miano-11 Well headDevelopmentProject.
Miano-14 Well headDevelopmentProject.
Latif-1wellheadDevelopmentProject.
PROFESSIONAL EXPERIENCE
CLIENT: ENAR( PAKISTAN)
EPLAYER: SIEMENS PAKISTAN
DESIGNATION: Asst. SUPERVISOR
DURATION: 05 AUG 2008 TO 27 JUNE 2009
PROJECT: CHANDA OIL AND GASS FIELD(OGDCL)
ChandaGas PlantDevelopmentProject.