29th JULY 2013 1/3
Houses to be relocated
The consultant has cooperated with
RID to relocate local houses that
affect the construction.
The...
KRA MANG SITE
4
3
1
2
3/3
KRA MANG SITE
RELOCATED HOUSE No.1 (FINISH)
4/3
KRA MANG SITE
RELOCATED HOUSE No.2 (FINISH)
5/3
KRA MANG SITE
HOUSE No.3 (NURSERY HOUSE)
6/3
KRA MANG SITE
HOUSE No.4 (SRT’S HOUSE)
7/3
HAN TRA SITE
8/3
9
6
8
7
5
HAN TRA SITE
HOUSE No.5 (FINISH)
9/3
(land owner relocated voluntarily without the
compensation)
HAN TRA SITE
RELOCATED HOUSE No.6 (FINISH)
10/
HAN TRA SITE
RELOCATED HOUSE No.7 AND 8 (FINISH)
11/
HAN TRA SITE
SMALL ARBORE No.9
12/
RELOCATION FOR WATER
SUPPLY LINE
The consultant found that the existing
water supply line was obstruction for
the constru...
KRA MANG SITE
cutting pipe line relocated pipe
line existing pipe line
14/
Tunnel
(PVC) (PVC) (PVC)
Change to HDPE pipe
HAN TRA SITE
15/
cutting pipe line relocated pipe
line existing pipe line
HDPE pipe line iron pipe line
SITE WORK
ABANDONED PIPE LINE (FINISH)
16/
SITE WORK
RELOCATED PIPE LINE (FINISH)
17/
RELOCATION FOR ELECTRIC
OVERHEAD LINE
The consultant found that the existing
electric overhead line was the
obstruction f...
KRA MANG SITE
RELOCATED FOR ELECTRIC OVERHEAD LINE
19/
HAN TRA SITE
RELOCATION FOR ELECTRIC OVERHEAD
LINE
20/
abadoned overhead line propose overhead
line existing overhead line...
DETAILS OF EXISTING ELETRIC
OVERHEAD LINE
21/
Type A Type B
SITE WORK
EXISTING ELETRIC OVERHEAD LINE
22/
TEMPORARY RELOCATION FOR
SRT’S OVERHEAD SIGNAL LINE
At Kra Mang site, the consultant
found that the existing SRT overhead...
KRA MANG SITE
TEMPORARY RELOCATION FOR SRT SIGNAL
LINE
24/
existing cable line
relocation line
existing cable line
cutting...
SIGNAL LINE SYSTEM
DETAILS OF SIGNAL LINE TO
UNDERGROUND
25/
SITE WORK
26/
SITE WORK
27/
SITE WORK
28/
SUMMARY OF RELOCATION WORKS
(UPDATE 16th JULY 2013)
29/
1 KRAMANG SITE STATUS NOTE
1.1
Houses to be
relocated
1.1
.1House ...
30/
2 Han Tra SITE STATUS NOTE
2.1
Houses to be
relocated
2.1
.1 House No.5 Finish
Owner has relocated voluntarily
without...
jica present
Upcoming SlideShare
Loading in …5
×

jica present

145 views

Published on

Published in: Business, Technology
  • Be the first to comment

  • Be the first to like this

jica present

  1. 1. 29th JULY 2013 1/3
  2. 2. Houses to be relocated The consultant has cooperated with RID to relocate local houses that affect the construction. The client (RID) had already completed the compensation for the relocation to the affected people. Most of houses had already been relocated except SRT’s house (in 2/3
  3. 3. KRA MANG SITE 4 3 1 2 3/3
  4. 4. KRA MANG SITE RELOCATED HOUSE No.1 (FINISH) 4/3
  5. 5. KRA MANG SITE RELOCATED HOUSE No.2 (FINISH) 5/3
  6. 6. KRA MANG SITE HOUSE No.3 (NURSERY HOUSE) 6/3
  7. 7. KRA MANG SITE HOUSE No.4 (SRT’S HOUSE) 7/3
  8. 8. HAN TRA SITE 8/3 9 6 8 7 5
  9. 9. HAN TRA SITE HOUSE No.5 (FINISH) 9/3 (land owner relocated voluntarily without the compensation)
  10. 10. HAN TRA SITE RELOCATED HOUSE No.6 (FINISH) 10/
  11. 11. HAN TRA SITE RELOCATED HOUSE No.7 AND 8 (FINISH) 11/
  12. 12. HAN TRA SITE SMALL ARBORE No.9 12/
  13. 13. RELOCATION FOR WATER SUPPLY LINE The consultant found that the existing water supply line was obstruction for the construction. The consultant has cooperated with RID and Thetsaban Pranakorn Sri Ayutthaya Water to relocate the water supply system. The relocation for water supply is in 13/
  14. 14. KRA MANG SITE cutting pipe line relocated pipe line existing pipe line 14/ Tunnel (PVC) (PVC) (PVC)
  15. 15. Change to HDPE pipe HAN TRA SITE 15/ cutting pipe line relocated pipe line existing pipe line HDPE pipe line iron pipe line
  16. 16. SITE WORK ABANDONED PIPE LINE (FINISH) 16/
  17. 17. SITE WORK RELOCATED PIPE LINE (FINISH) 17/
  18. 18. RELOCATION FOR ELECTRIC OVERHEAD LINE The consultant found that the existing electric overhead line was the obstruction for the construction. The consultant has cooperated with RID, contractor and PEA for the relocation of electric overhead lines. PEA plans to commence the relocation work once the contractor constructs 18/
  19. 19. KRA MANG SITE RELOCATED FOR ELECTRIC OVERHEAD LINE 19/
  20. 20. HAN TRA SITE RELOCATION FOR ELECTRIC OVERHEAD LINE 20/ abadoned overhead line propose overhead line existing overhead line New Line
  21. 21. DETAILS OF EXISTING ELETRIC OVERHEAD LINE 21/ Type A Type B
  22. 22. SITE WORK EXISTING ELETRIC OVERHEAD LINE 22/
  23. 23. TEMPORARY RELOCATION FOR SRT’S OVERHEAD SIGNAL LINE At Kra Mang site, the consultant found that the existing SRT overhead line was the obstruction for the construction. The consultant has cooperated with RID and SRT for the relocation of SRT’s overhead signal line. The relocation of SRT overhead signal 23/
  24. 24. KRA MANG SITE TEMPORARY RELOCATION FOR SRT SIGNAL LINE 24/ existing cable line relocation line existing cable line cutting line
  25. 25. SIGNAL LINE SYSTEM DETAILS OF SIGNAL LINE TO UNDERGROUND 25/
  26. 26. SITE WORK 26/
  27. 27. SITE WORK 27/
  28. 28. SITE WORK 28/
  29. 29. SUMMARY OF RELOCATION WORKS (UPDATE 16th JULY 2013) 29/ 1 KRAMANG SITE STATUS NOTE 1.1 Houses to be relocated 1.1 .1House No.1 Finish Owner has received compensation and relocated 1.1 .2House No.2 Finish Owner has received compensation and relocated 1.1 .3House No.3 On Hold Owner has received compensation, but requested addition compensation 1.1 .4House No.4 In Progres s Not yet start relocation works, internal process by SRT.
  30. 30. 30/ 2 Han Tra SITE STATUS NOTE 2.1 Houses to be relocated 2.1 .1 House No.5 Finish Owner has relocated voluntarily without compensation 2.1 .2 House No.6 Finish Owner has received compensation and relocated 2.1 .3 House No.7 Finish Owner has received compensation and relocated 2.1 .4 House No.8 Finish Owner has received compensation and relocated 2.1 .5 Small Arbor No.9 Not Yet Start Owner has received compensation and plan to start relocation In SUMMARY OF RELOCATION WORKS (UPDATE 16th JULY 2013)

×