Agenda
1.   Progress & Schedule Update:
     a.   Transmission Main
     b.   Booster Pump Station & Well Field
     c.   Treatment
     d.   New Groundwater Wells
2.   Questions & Discussion



                                              2
Transmission Main

 NTP January 23, 2012
 Substantial Completion: July 16, 2013
 Final Completion: September 14, 2013
 Current status: Dig-Lay-Bury is approximately
  80% complete




                                                  3
Progress As of March 4, 2013




                               4
Progress Summary

 3rd dig-lay-bury crew added through March 14,
  2013 to expedite production in BCV areas before
  nesting season.
 Work progressing in both directions
 Valves and appurtenance work ongoing with dig-
  lay-bury
 Pressure testing starting soon


                                                    5
Laying Pipe in Rock




                      6
Gate Valve Installation




                          7
Booster Pump Station & Well Field

 NTP: June 18, 2012
 Substantial Completion: June 18, 2013
 Final Completion: July 17, 2013
 Current Status: Approximately 50% complete




                                               8
Progress Summary
 Booster pump cans set, backfill underway
 Foundations for all well buildings underway, most
  complete
 High point and well 6 tank foundations underway.
 Well cleaning underway
 Potential delay to current schedule mainly due to
  longer than expected time needed to clean and
  retrofit existing wells

                                                      9
Hickory Wells 1-9 Background

 Wells drilled in the 70s
 Potential obstructions or items identified by the
  initial video survey at some wells
 TCEQ required cleaning of the well casing at
  each well along with the removal of debris or
  obstructions noted in the initial video survey
  followed by a new video survey to confirm
  conditions of wells

                                                      10
Conditions of Well
   Obstruction in Well 4 has been identified as a
    packing plug. Contractor trying drill and air purge it
    out of the well.
   Obstruction removal and repairs to 3 wells
   5 holes in well 7 casing: 1 at 64 feet, 3 at 1,128 feet,
    and 1 at 2,062 feet. A sleeve can be swaged in at 64
    feet and possibly at 1128 feet, but not at 2062 due to
    the pressure at that depth. Hole at 2062 is
    completely sealed with grout.
   Well 1 liner casing slipped. Attempt will be made to
    remove the slipped casing.
                                                               11
Setting block for booster pump station
electrical building




                                         12
Booster Pump Cans




                    13
Looking East PS & Electrical Building




                                        14
Underground electrical at Well 1




                                   15
Groundwater Treatment Plant

 Groundwater Treatment Facility
 Disinfection Facility
 Associated civil work and piping
 Project Status:
    • RRSS Selection and Design NTP: February 6, 2013
    • Overall final design: Anticipated completion
      completion April 30, 2013


                                                        16
Site Layout




Disinfection Facility   Groundwater
                        Treatment Facility
                                             17
Disinfection Facility




                        18
Groundwater Treatment Facility




                                 19
Groundwater Treatment Facility




  Building Dimensions: 208’ – 0” x 133’ – 4”
                                               20
Groundwater Treatment Facility




                                 21
Disinfection Facility




Building Dimensions:
  105’ – 4” x 64’ – 44”
                          22
Disinfection Facility




                        23
Post Design Key Milestones
                                   Anticipated Dates or
                                   Schedule

TWDB/TCEQ Review                   May 1, 2013 through June 30,
                                   2013
Advertise Project                  May 16, 2013
Bid Project                        July 9, 2013
Recommendation of Award &          July 9 through July 16, 2013
Council Approval
TWDB Release of Funds and NTP      August 1, 2013
Substantial Construction           July 31, 2014
Completion for GWTF
Final Construction Completion of   October 30, 2014
Project

                                                                  24
New Wells

 Regulatory hurdle cleared and clearing, grubbing
  and grinding of cleared material of new wells and
  ROW complete.
 Phase 1: Engineering for “Drilling New Wells”
  underway. Expected design completion and
  submittal to TCEQ April 30, 2013
 Phase 2: Engineering for “Site Civil, Piping and
  Equipping New Wells” will start in May 2013

                                                      25
City Council March 19, 2013 Hickory update

More Related Content

What's hot

Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
Vedam design & Techincal Consultancy Pvt Ltd.
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Thorne & Derrick International
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
Vedam design & Techincal Consultancy Pvt Ltd.
 
Awwa Presentation 2011
Awwa Presentation 2011Awwa Presentation 2011
Awwa Presentation 2011
klthompson13
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
Paolo Aguzzi
 
Work Experience large
Work Experience largeWork Experience large
Work Experience large
Travis Costello P.Tech
 
FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015
Raja Muazzam
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Daniel Matranga
 
Cingsa commonwealth north energy action coalition 11012012
Cingsa   commonwealth north energy action coalition 11012012Cingsa   commonwealth north energy action coalition 11012012
Cingsa commonwealth north energy action coalition 11012012
Alaska Energy Dudes and Divas
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
Doug Mast
 
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
San Diego County Water Authority
 
10 year testing of lpg terminal
10 year testing of lpg terminal 10 year testing of lpg terminal
10 year testing of lpg terminal
lpgbnhgastank
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...
Benoit Latapie
 
CV-2
CV-2CV-2
BPClairRidge
BPClairRidgeBPClairRidge
BPClairRidge
Scott Miller
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
Subhash Dhiman
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
Sunday Kanshio, PhD
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
Jonathan Hemming
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
Yaser Hatem
 

What's hot (20)

Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Awwa Presentation 2011
Awwa Presentation 2011Awwa Presentation 2011
Awwa Presentation 2011
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 
Work Experience large
Work Experience largeWork Experience large
Work Experience large
 
FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015FEA and Deepwater Project Summary 2007-2015
FEA and Deepwater Project Summary 2007-2015
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
 
Cingsa commonwealth north energy action coalition 11012012
Cingsa   commonwealth north energy action coalition 11012012Cingsa   commonwealth north energy action coalition 11012012
Cingsa commonwealth north energy action coalition 11012012
 
CV_Doug_Mast
CV_Doug_MastCV_Doug_Mast
CV_Doug_Mast
 
San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013San Vicente Dam Raise Update - May 2013
San Vicente Dam Raise Update - May 2013
 
10 year testing of lpg terminal
10 year testing of lpg terminal 10 year testing of lpg terminal
10 year testing of lpg terminal
 
151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...151111 Exploring the challenges of underground construction in urban areas_Be...
151111 Exploring the challenges of underground construction in urban areas_Be...
 
CV-2
CV-2CV-2
CV-2
 
BPClairRidge
BPClairRidgeBPClairRidge
BPClairRidge
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 

Viewers also liked

B&V EMEIA Brains & Brawn
B&V EMEIA Brains & BrawnB&V EMEIA Brains & Brawn
B&V EMEIA Brains & Brawn
Paul Hart
 
Cleantech Group 2011 Global conference - Grundfos presentation
Cleantech Group 2011 Global conference - Grundfos presentationCleantech Group 2011 Global conference - Grundfos presentation
Cleantech Group 2011 Global conference - Grundfos presentation
Henrik Skov Laursen
 
LLC Presentation
LLC PresentationLLC Presentation
LLC Presentation
Peter Bates
 
T s2 gh3_nigel murphy
T s2 gh3_nigel murphyT s2 gh3_nigel murphy
T s2 gh3_nigel murphy
International WaterCentre
 
2. Parsons Brinckerhoff
2. Parsons Brinckerhoff2. Parsons Brinckerhoff
2. Parsons Brinckerhoff
NEXTDC
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
Dave Machin
 
USE THIS Industrial Stream Presentations
USE THIS Industrial Stream PresentationsUSE THIS Industrial Stream Presentations
USE THIS Industrial Stream Presentations
NEXTDC
 
Slides throughout the day (2016 EWMF)
Slides throughout the day (2016 EWMF)Slides throughout the day (2016 EWMF)
Slides throughout the day (2016 EWMF)
Victorian Environmental Water Holder
 
BlueTechValley conference 2011 - Grundfos presentation
BlueTechValley conference 2011 - Grundfos presentationBlueTechValley conference 2011 - Grundfos presentation
BlueTechValley conference 2011 - Grundfos presentation
Henrik Skov Laursen
 
Pro Bid Brochure
Pro Bid BrochurePro Bid Brochure
Pro Bid Brochure
Tara Quin
 
CFSGAM Presentation - Yarra Valley Water Breakfast series
CFSGAM Presentation - Yarra Valley Water Breakfast seriesCFSGAM Presentation - Yarra Valley Water Breakfast series
CFSGAM Presentation - Yarra Valley Water Breakfast series
NEXTDC
 
Yarra Valley Water and Box Hill Institute Initiative - Diploma of Sustainabl...
Yarra Valley Water and  Box Hill Institute Initiative - Diploma of Sustainabl...Yarra Valley Water and  Box Hill Institute Initiative - Diploma of Sustainabl...
Yarra Valley Water and Box Hill Institute Initiative - Diploma of Sustainabl...
NEXTDC
 
RELIABILITY infographic
RELIABILITY infographicRELIABILITY infographic
RELIABILITY infographic
Leif Ericson
 
SWM_PrivateInspectionsMobile
SWM_PrivateInspectionsMobileSWM_PrivateInspectionsMobile
SWM_PrivateInspectionsMobile
Renee Opatz, GISP
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Association for Project Management
 
Produced Water Handling System Upgrade
Produced Water Handling System UpgradeProduced Water Handling System Upgrade
Produced Water Handling System Upgrade
Brian Thomas
 
Media presentation feb 2011
Media presentation feb 2011Media presentation feb 2011
Media presentation feb 2011
NEXTDC
 
Water Infrastructure Group Advertisement
Water Infrastructure Group AdvertisementWater Infrastructure Group Advertisement
Water Infrastructure Group Advertisement
Leif Ericson
 
Michael Skelton – Facility Management in a changing climate
Michael Skelton – Facility Management in a changing climate Michael Skelton – Facility Management in a changing climate
Michael Skelton – Facility Management in a changing climate
NEXTDC
 
Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment
OCESAdmin
 

Viewers also liked (20)

B&V EMEIA Brains & Brawn
B&V EMEIA Brains & BrawnB&V EMEIA Brains & Brawn
B&V EMEIA Brains & Brawn
 
Cleantech Group 2011 Global conference - Grundfos presentation
Cleantech Group 2011 Global conference - Grundfos presentationCleantech Group 2011 Global conference - Grundfos presentation
Cleantech Group 2011 Global conference - Grundfos presentation
 
LLC Presentation
LLC PresentationLLC Presentation
LLC Presentation
 
T s2 gh3_nigel murphy
T s2 gh3_nigel murphyT s2 gh3_nigel murphy
T s2 gh3_nigel murphy
 
2. Parsons Brinckerhoff
2. Parsons Brinckerhoff2. Parsons Brinckerhoff
2. Parsons Brinckerhoff
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
 
USE THIS Industrial Stream Presentations
USE THIS Industrial Stream PresentationsUSE THIS Industrial Stream Presentations
USE THIS Industrial Stream Presentations
 
Slides throughout the day (2016 EWMF)
Slides throughout the day (2016 EWMF)Slides throughout the day (2016 EWMF)
Slides throughout the day (2016 EWMF)
 
BlueTechValley conference 2011 - Grundfos presentation
BlueTechValley conference 2011 - Grundfos presentationBlueTechValley conference 2011 - Grundfos presentation
BlueTechValley conference 2011 - Grundfos presentation
 
Pro Bid Brochure
Pro Bid BrochurePro Bid Brochure
Pro Bid Brochure
 
CFSGAM Presentation - Yarra Valley Water Breakfast series
CFSGAM Presentation - Yarra Valley Water Breakfast seriesCFSGAM Presentation - Yarra Valley Water Breakfast series
CFSGAM Presentation - Yarra Valley Water Breakfast series
 
Yarra Valley Water and Box Hill Institute Initiative - Diploma of Sustainabl...
Yarra Valley Water and  Box Hill Institute Initiative - Diploma of Sustainabl...Yarra Valley Water and  Box Hill Institute Initiative - Diploma of Sustainabl...
Yarra Valley Water and Box Hill Institute Initiative - Diploma of Sustainabl...
 
RELIABILITY infographic
RELIABILITY infographicRELIABILITY infographic
RELIABILITY infographic
 
SWM_PrivateInspectionsMobile
SWM_PrivateInspectionsMobileSWM_PrivateInspectionsMobile
SWM_PrivateInspectionsMobile
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
 
Produced Water Handling System Upgrade
Produced Water Handling System UpgradeProduced Water Handling System Upgrade
Produced Water Handling System Upgrade
 
Media presentation feb 2011
Media presentation feb 2011Media presentation feb 2011
Media presentation feb 2011
 
Water Infrastructure Group Advertisement
Water Infrastructure Group AdvertisementWater Infrastructure Group Advertisement
Water Infrastructure Group Advertisement
 
Michael Skelton – Facility Management in a changing climate
Michael Skelton – Facility Management in a changing climate Michael Skelton – Facility Management in a changing climate
Michael Skelton – Facility Management in a changing climate
 
Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment Charlie Littlefair on digital disruption and the environment
Charlie Littlefair on digital disruption and the environment
 

Similar to City Council March 19, 2013 Hickory update

20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
Wael Nafad
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
Kook Dean
 
M station Additional HCl Storage TanKs
 M station Additional HCl Storage TanKs M station Additional HCl Storage TanKs
M station Additional HCl Storage TanKs
Ahmad Moharram
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory update
City of San Angelo Texas
 
Presentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptxPresentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptx
NaziaBashar
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 
Summer training
Summer trainingSummer training
Summer training
Ana Debbarma
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
PRABHASH GOKARN
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Marcellus Drilling News
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
City of College Station
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
City of College Station
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Fairfax County
 
IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1
Jim Manson
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
Fairfax County
 
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
James Zhang (Chi, Zhang)
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Fairfax County
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
Ahmad Hazwan
 

Similar to City Council March 19, 2013 Hickory update (20)

20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
 
M station Additional HCl Storage TanKs
 M station Additional HCl Storage TanKs M station Additional HCl Storage TanKs
M station Additional HCl Storage TanKs
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory update
 
Presentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptxPresentation regarding the city development and hygienic environment.pptx
Presentation regarding the city development and hygienic environment.pptx
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Summer training
Summer trainingSummer training
Summer training
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
 
IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 

More from City of San Angelo Texas

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
City of San Angelo Texas
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
City of San Angelo Texas
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
City of San Angelo Texas
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
City of San Angelo Texas
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
City of San Angelo Texas
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
City of San Angelo Texas
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
City of San Angelo Texas
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
City of San Angelo Texas
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
City of San Angelo Texas
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
City of San Angelo Texas
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
City of San Angelo Texas
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
City of San Angelo Texas
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City of San Angelo Texas
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
City of San Angelo Texas
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
City of San Angelo Texas
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
City of San Angelo Texas
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
City of San Angelo Texas
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
City of San Angelo Texas
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
City of San Angelo Texas
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
City of San Angelo Texas
 

More from City of San Angelo Texas (20)

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
 

City Council March 19, 2013 Hickory update

  • 1.
  • 2. Agenda 1. Progress & Schedule Update: a. Transmission Main b. Booster Pump Station & Well Field c. Treatment d. New Groundwater Wells 2. Questions & Discussion 2
  • 3. Transmission Main  NTP January 23, 2012  Substantial Completion: July 16, 2013  Final Completion: September 14, 2013  Current status: Dig-Lay-Bury is approximately 80% complete 3
  • 4. Progress As of March 4, 2013 4
  • 5. Progress Summary  3rd dig-lay-bury crew added through March 14, 2013 to expedite production in BCV areas before nesting season.  Work progressing in both directions  Valves and appurtenance work ongoing with dig- lay-bury  Pressure testing starting soon 5
  • 6. Laying Pipe in Rock 6
  • 8. Booster Pump Station & Well Field  NTP: June 18, 2012  Substantial Completion: June 18, 2013  Final Completion: July 17, 2013  Current Status: Approximately 50% complete 8
  • 9. Progress Summary  Booster pump cans set, backfill underway  Foundations for all well buildings underway, most complete  High point and well 6 tank foundations underway.  Well cleaning underway  Potential delay to current schedule mainly due to longer than expected time needed to clean and retrofit existing wells 9
  • 10. Hickory Wells 1-9 Background  Wells drilled in the 70s  Potential obstructions or items identified by the initial video survey at some wells  TCEQ required cleaning of the well casing at each well along with the removal of debris or obstructions noted in the initial video survey followed by a new video survey to confirm conditions of wells 10
  • 11. Conditions of Well  Obstruction in Well 4 has been identified as a packing plug. Contractor trying drill and air purge it out of the well.  Obstruction removal and repairs to 3 wells  5 holes in well 7 casing: 1 at 64 feet, 3 at 1,128 feet, and 1 at 2,062 feet. A sleeve can be swaged in at 64 feet and possibly at 1128 feet, but not at 2062 due to the pressure at that depth. Hole at 2062 is completely sealed with grout.  Well 1 liner casing slipped. Attempt will be made to remove the slipped casing. 11
  • 12. Setting block for booster pump station electrical building 12
  • 14. Looking East PS & Electrical Building 14
  • 16. Groundwater Treatment Plant  Groundwater Treatment Facility  Disinfection Facility  Associated civil work and piping  Project Status: • RRSS Selection and Design NTP: February 6, 2013 • Overall final design: Anticipated completion completion April 30, 2013 16
  • 17. Site Layout Disinfection Facility Groundwater Treatment Facility 17
  • 20. Groundwater Treatment Facility Building Dimensions: 208’ – 0” x 133’ – 4” 20
  • 22. Disinfection Facility Building Dimensions: 105’ – 4” x 64’ – 44” 22
  • 24. Post Design Key Milestones Anticipated Dates or Schedule TWDB/TCEQ Review May 1, 2013 through June 30, 2013 Advertise Project May 16, 2013 Bid Project July 9, 2013 Recommendation of Award & July 9 through July 16, 2013 Council Approval TWDB Release of Funds and NTP August 1, 2013 Substantial Construction July 31, 2014 Completion for GWTF Final Construction Completion of October 30, 2014 Project 24
  • 25. New Wells  Regulatory hurdle cleared and clearing, grubbing and grinding of cleared material of new wells and ROW complete.  Phase 1: Engineering for “Drilling New Wells” underway. Expected design completion and submittal to TCEQ April 30, 2013  Phase 2: Engineering for “Site Civil, Piping and Equipping New Wells” will start in May 2013 25