SlideShare a Scribd company logo
OCB/KPCIP/CW-03: CONSTRUCTION OF SEWERAGE
SYSTEM INCLUDING NEW SEWERAGE TREATMENT
PLANT (STP) AT:
LOT-2: CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW
SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA SYSTEM,
MARDAN
PROGRESS REVIEW MEETING
WSSC Mardan
Khyber Pakhtunkhwa Cities Improvement Project
Local Government Elections & Rural Development
Department
Khyber Pakhtunkhwa
16 April 2024
Progress Review Under KPCIP
S.No Name of the Project KPCIP/CW-03: “Construction of Sewerage System including New Sewage
Treatment Plant (STP) AT: Lot 2: Catchment Area of Rorya STP Mardan
including New Sewage Treatment Plant (STP) and required SCADA system"
1 Location MARDAN
2 Name of the Contractor M/s MATRACON-JTE (JV)
3 Name of the Consultant MinConsult & Creative Engineering Consultant (JV)
4 Total Contract Cost 8313.864 Million
5 Cost of Consultancy
6 Date of Commencement 20th
December, 2022
7 Time for Completion 1095 Days
8 Date of Completion 20th
December, 2025
9
Total Work Progress (as per Work
Schedule)
21.02% achieved VS Planned 26.91% till 31st
March, 2024
CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW
SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA
SYSTEM"
Friday, May 10, 2024
WSSC-KOHAT
Proposed
Sewage
Treatment Plant
Inlet
Outlet
KPCIP: Proposed Sewage Treatment Plant - Mardan
Salient Features:
Treatment Capacity: 5.8 MGD
Required Area for STP: 17 Acres
Available Area for STP: 30 Acre
Treatment Technology:
Activated Sludge Process
3D Design
CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW
SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA
SYSTEM
Scope
• New sewerage system for six (6) urban UCs of Mardan (Bicket Gunj, Bari Cham,
Muslim Abad, Guli Bagh, Rorya, Hoti)
• Provision of house connections with the newly proposed sewerage network
• Construction of STP for the total generated sewage flow at the existing location
Cost (in Millions)
• PKR: 8,313.86
PROJECT
SUMMARY
Layout of Sewage Treatment Plant Mardan
Proposed
Design
Friday, May 10, 2024
STP Mardan
Total Sewerage Network Length (Km) = 82.5
Total No Of Manholes = 4309
Total No Of House Connection = 13030
Treatment Capacity (MGD) = 5.8
Required Area For STP (Acres) = 17
Available Area For STP (Acre) = 30
Treatment Technology: Activated Sludge Process
Power Requirement (KW) = 1002
SALIENT FEATURES
Friday, May 10, 2024
STP Mardan
Friday, May 10, 2024
PACKAGE NO. KPCIP-CW-03:- CONSTRUCTION OF SEWERAGE SYSTEM INCLUDING NEW SEWAGE TREATMENT PLANT
LOT 2: CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA
FINANCIAL PROGRESS
IPC No.
Value Claimed
(in Million)
Submitted Date
Consultant E
Approval Date
Net Payable
(Millions)
Payment Status Percentage%
Cum
Percentage%
Remarks
1 304.049670 30 Sep,2023 16-Oct-23 234.042609 Received 2.815% 2.815%
2 438,620,175 27-Nov-2023 08-Dec-23 301.107489 Received 3.622% 6.437%
3 276,562,402 29-Jan-2024 06-Feb-24 203.779706
Received
2.45% 8.89%
4 207,241,167 28-Feb-2024 12-Mar-2024 176.272419
Received
2.12% 11.01%
5
6
7
8
Friday, May 10, 2024
PHYSICAL WORK PROGRESS
(STP)
• Joint survey of STP area is Completed 82km.
• Lean Concrete of Pumping Station Completed
• Excavation of Air Blower Room No. 02 Completed.
• Electrical Control Room Layout Completed and Excavation is in Progress.
• Generator Room Excavation completed and Lean Poured.
• Admin Building Ground Floor Slab formwork is in Progress.
• Sub Station Building Layout Completed.
• Work Shop Layout Completed and Excavation is in Progress.
• Roads No. 01, 02, 03, 08, 09 & 10 Embankment Material Filling is in Progress.
• HDPE Pipe Laying 1000mm is in Progress
• HDPE Pipe Laying 900mm Completed
• HDPE Pipe Laying 710mm Completed.
• HDPE Pipe Laying 560mm Completed.
• HDPE Pipe laying 315mm is in Progress.
• UPVC Pipe 75mm for Electrical Cable is in Progress
• Aeration Tank # 01,02 & 03 Walls Concrete is in Progress
• South Side Boundary Wall Brick Work is in Progress.
• Primary Settling Tank #. 01, 02 & 03 Bed Concrete Completed & Walls Reinforcement in
Progress.
• Screen Chamber Bed Completed & Wall’s Steel is in Progress.
• Sludge Thickener # 01 & 02 Sand Filling is in Progress.
• Secondary Settling Tank #. 01, 02 & 03 Bed Concrete Completed.
Friday, May 10, 2024
STP Mardan
PHYSICAL WORK PROGRESS SEWER LINE
• Joint Survey on Sewer line is completed.
• 8km Sewer Network in UC Rorya is Completed & Guli Bagh work is in Progress.
• Street Sewer Line 519 To 529&531 To 533 & 536 To 551 (Rorya) Layout Completed.
• Street Sewer Line 519 To 529&531 To533 & 536To538 & 543 To 550(Rorya) Excavation Completed.
• Street Sewer Line 519 To 529&531 To533& 536 To 538 & 543 To 550 (Rorya) Pipe Laying Completed.
• Street Sewer Line 519 To 529 & 531 To 533 & 536 To 538 & 543 To 550(Rorya) Sand Filling
Completed.
• Street Sewer Line 519 To 529&531 To 533&536 To 538&543 To 550 (Rorya) Marking Tap Completed.
• Street Sewer Line 519 To 529&531 To 533&536 To 538&543 To 550 (Rorya) Embankment Material
Completed.
• Street Sewer Line 539 To 542 & 551 (Rorya) Excavation is in Progress.
• Street Sewer Line 539 To 542 & 551 (Rorya) Pipe Laying is in Progress.
• Street Sewer Line 539 To 542 & 551 (Rorya) Sand Filling is in Progress.
• Street Sewer Line 539 To 542 & 551 (Rorya) Marking Tap is in Progress.
• Street Sewer Line 539 To 542 & 551 (Rorya) Embankment Material is in Progress.
• Street Sewer Manholes, Chambers & House Connections Activity Steel, Formwork, & Concrete etc.
is in Progress.
• Manhole No. 195 & 194 & 193 Wall’s Concrete Completed.
• Street Sewer Line 291 (Guli Bagh) Layout Completed.
• Street Sewer Line 292 (Guli Bagh) Layout Completed.
• Street Sewer Line 291 (Guli Bagh) Excavation is in Progress.
• Street Sewer Line 292 (Guli Bagh) Excavation is in Progress.
Pictorial View
Friday, May 10, 2024
WSSC-KOHAT
Meeting and Site Visit With Design, CIU,CEC & Matracon Team
Friday, May 10, 2024
STP Mardan
Gender Community Visit
17
Primary Settling Tank STP Mardan
PICTORIAL VIEW
18
Primary Settling Work Concrete Work is in Progress
PICTORIAL VIEW
19
Visit of ADB, CIU, PMU, & WSSCM, CEC Team at STP MARDAN
PICTORIAL VIEW
20
Visit of ADB, CIU, PMU, & WSSCM, CEC Team at STP MARDAN
PICTORIAL VIEW
21
PIPE INDUSTRIES HDPE PIPE & UPVC PIPE ME CEC & MATRACON DPM VISIT
PICTORIAL VIEW
22
Concrete Of PST Foundation
PICTORIAL VIEW
Concrete of Aeration Tank Wall
23
SST Work is in Progress
PICTORIAL VIEW
Mechanical Team (Matracon)
Friday, May 10, 2024
STP Mardan
Screen Chamber
25
Mechanical Team (Matracon)
PICTORIAL VIEW
Primary Settling Tank
Friday, May 10, 2024
WSSC-MARDAN
PICTORIAL VIEW
Sewerage Network Work at Rorya Union Council Sewerage Network Work at Rorya Union Council
Friday, May 10, 2024
STP Mardan
RCC Work is in Progress
Friday, May 10, 2024
STP Mardan
HDPE Pipe & Steel Yards
Friday, May 10, 2024
STP Mardan
Cement Stock
Friday, May 10, 2024
STP Mardan
Manhole Cover & Chemicals Stock Yard
Friday, May 10, 2024
Site Work Pictures
Friday, May 10, 2024
Site Work Pictures of January, 2024
STP Mardan
Site Work Pictures
Friday, May 10, 2024
STP Mardan
Site Work Pictures
Friday, May 10, 2024
STP Mardan
Site Work Pictures
Friday, May 10, 2024
STP Mardan
MEETING AND SITE VISIT WITH KPCIP, WSSCM, CEC & MATRACON TEAM
Friday, May 10, 2024
STP Mardan
Meeting and Community Visit With CIU,CEC & Matracon Team
Friday, May 10, 2024
STP Mardan
TRAINING ON FIRST AID & FIRE FIGHTING MECHANISM
THANKS
Friday, May 10, 2024
WSSC-KOHAT
The best form of charity is to give someone water” – Prophet Muhammad, on him be peace.
THANKS

More Related Content

Similar to Presentation regarding the city development and hygienic environment.pptx

Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
San Diego County Water Authority
 
FQUP PPT.pptx
FQUP PPT.pptxFQUP PPT.pptx
FQUP PPT.pptx
SudiptaKolay2
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Venkatesh Dontha
 
TU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptxTU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptx
subhashkumar394373
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptx
SaketChandra4
 
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
santosobudipray
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
ShyamPrasadThiraviam
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
Pradeep Yadav
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
UrbanSystemsCanada
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt
NMnam
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
PRABHASH GOKARN
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
Rajabdeen Amjath
 
Design Status.pptx
Design Status.pptxDesign Status.pptx
Design Status.pptx
ssuser73884b
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
PPT_14.03.2022.pptx
PPT_14.03.2022.pptxPPT_14.03.2022.pptx
PPT_14.03.2022.pptx
ssuser3ca391
 

Similar to Presentation regarding the city development and hygienic environment.pptx (20)

Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
FQUP PPT.pptx
FQUP PPT.pptxFQUP PPT.pptx
FQUP PPT.pptx
 
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptxPkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
Pkg-1&2-Project Status on 31.01.2022 (To HO) (1).pptx
 
TU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptxTU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptx
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
PPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptxPPT seri Nallah 19.10.2023.pptx
PPT seri Nallah 19.10.2023.pptx
 
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
2024.03.07 PICA Armor Rock_Rev. 05 (Live Doc.)_CPY.pdf
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
Sadab
SadabSadab
Sadab
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
Design Status.pptx
Design Status.pptxDesign Status.pptx
Design Status.pptx
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
PPT_14.03.2022.pptx
PPT_14.03.2022.pptxPPT_14.03.2022.pptx
PPT_14.03.2022.pptx
 
Training PPT
Training PPTTraining PPT
Training PPT
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 

Presentation regarding the city development and hygienic environment.pptx

  • 1.
  • 2. OCB/KPCIP/CW-03: CONSTRUCTION OF SEWERAGE SYSTEM INCLUDING NEW SEWERAGE TREATMENT PLANT (STP) AT: LOT-2: CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA SYSTEM, MARDAN PROGRESS REVIEW MEETING WSSC Mardan Khyber Pakhtunkhwa Cities Improvement Project Local Government Elections & Rural Development Department Khyber Pakhtunkhwa 16 April 2024
  • 3. Progress Review Under KPCIP S.No Name of the Project KPCIP/CW-03: “Construction of Sewerage System including New Sewage Treatment Plant (STP) AT: Lot 2: Catchment Area of Rorya STP Mardan including New Sewage Treatment Plant (STP) and required SCADA system" 1 Location MARDAN 2 Name of the Contractor M/s MATRACON-JTE (JV) 3 Name of the Consultant MinConsult & Creative Engineering Consultant (JV) 4 Total Contract Cost 8313.864 Million 5 Cost of Consultancy 6 Date of Commencement 20th December, 2022 7 Time for Completion 1095 Days 8 Date of Completion 20th December, 2025 9 Total Work Progress (as per Work Schedule) 21.02% achieved VS Planned 26.91% till 31st March, 2024
  • 4. CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA SYSTEM"
  • 5. Friday, May 10, 2024 WSSC-KOHAT Proposed Sewage Treatment Plant Inlet Outlet KPCIP: Proposed Sewage Treatment Plant - Mardan Salient Features: Treatment Capacity: 5.8 MGD Required Area for STP: 17 Acres Available Area for STP: 30 Acre Treatment Technology: Activated Sludge Process 3D Design
  • 6.
  • 7. CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA SYSTEM Scope • New sewerage system for six (6) urban UCs of Mardan (Bicket Gunj, Bari Cham, Muslim Abad, Guli Bagh, Rorya, Hoti) • Provision of house connections with the newly proposed sewerage network • Construction of STP for the total generated sewage flow at the existing location Cost (in Millions) • PKR: 8,313.86 PROJECT SUMMARY
  • 8. Layout of Sewage Treatment Plant Mardan Proposed Design
  • 9. Friday, May 10, 2024 STP Mardan Total Sewerage Network Length (Km) = 82.5 Total No Of Manholes = 4309 Total No Of House Connection = 13030 Treatment Capacity (MGD) = 5.8 Required Area For STP (Acres) = 17 Available Area For STP (Acre) = 30 Treatment Technology: Activated Sludge Process Power Requirement (KW) = 1002 SALIENT FEATURES
  • 10. Friday, May 10, 2024 STP Mardan
  • 11. Friday, May 10, 2024 PACKAGE NO. KPCIP-CW-03:- CONSTRUCTION OF SEWERAGE SYSTEM INCLUDING NEW SEWAGE TREATMENT PLANT LOT 2: CATCHMENT AREA OF RORYA STP MARDAN INCLUDING NEW SEWAGE TREATMENT PLANT (STP) AND REQUIRED SCADA FINANCIAL PROGRESS IPC No. Value Claimed (in Million) Submitted Date Consultant E Approval Date Net Payable (Millions) Payment Status Percentage% Cum Percentage% Remarks 1 304.049670 30 Sep,2023 16-Oct-23 234.042609 Received 2.815% 2.815% 2 438,620,175 27-Nov-2023 08-Dec-23 301.107489 Received 3.622% 6.437% 3 276,562,402 29-Jan-2024 06-Feb-24 203.779706 Received 2.45% 8.89% 4 207,241,167 28-Feb-2024 12-Mar-2024 176.272419 Received 2.12% 11.01% 5 6 7 8
  • 12. Friday, May 10, 2024 PHYSICAL WORK PROGRESS (STP) • Joint survey of STP area is Completed 82km. • Lean Concrete of Pumping Station Completed • Excavation of Air Blower Room No. 02 Completed. • Electrical Control Room Layout Completed and Excavation is in Progress. • Generator Room Excavation completed and Lean Poured. • Admin Building Ground Floor Slab formwork is in Progress. • Sub Station Building Layout Completed. • Work Shop Layout Completed and Excavation is in Progress. • Roads No. 01, 02, 03, 08, 09 & 10 Embankment Material Filling is in Progress. • HDPE Pipe Laying 1000mm is in Progress • HDPE Pipe Laying 900mm Completed • HDPE Pipe Laying 710mm Completed. • HDPE Pipe Laying 560mm Completed. • HDPE Pipe laying 315mm is in Progress. • UPVC Pipe 75mm for Electrical Cable is in Progress • Aeration Tank # 01,02 & 03 Walls Concrete is in Progress • South Side Boundary Wall Brick Work is in Progress. • Primary Settling Tank #. 01, 02 & 03 Bed Concrete Completed & Walls Reinforcement in Progress. • Screen Chamber Bed Completed & Wall’s Steel is in Progress. • Sludge Thickener # 01 & 02 Sand Filling is in Progress. • Secondary Settling Tank #. 01, 02 & 03 Bed Concrete Completed.
  • 13. Friday, May 10, 2024 STP Mardan PHYSICAL WORK PROGRESS SEWER LINE • Joint Survey on Sewer line is completed. • 8km Sewer Network in UC Rorya is Completed & Guli Bagh work is in Progress. • Street Sewer Line 519 To 529&531 To 533 & 536 To 551 (Rorya) Layout Completed. • Street Sewer Line 519 To 529&531 To533 & 536To538 & 543 To 550(Rorya) Excavation Completed. • Street Sewer Line 519 To 529&531 To533& 536 To 538 & 543 To 550 (Rorya) Pipe Laying Completed. • Street Sewer Line 519 To 529 & 531 To 533 & 536 To 538 & 543 To 550(Rorya) Sand Filling Completed. • Street Sewer Line 519 To 529&531 To 533&536 To 538&543 To 550 (Rorya) Marking Tap Completed. • Street Sewer Line 519 To 529&531 To 533&536 To 538&543 To 550 (Rorya) Embankment Material Completed. • Street Sewer Line 539 To 542 & 551 (Rorya) Excavation is in Progress. • Street Sewer Line 539 To 542 & 551 (Rorya) Pipe Laying is in Progress. • Street Sewer Line 539 To 542 & 551 (Rorya) Sand Filling is in Progress. • Street Sewer Line 539 To 542 & 551 (Rorya) Marking Tap is in Progress. • Street Sewer Line 539 To 542 & 551 (Rorya) Embankment Material is in Progress. • Street Sewer Manholes, Chambers & House Connections Activity Steel, Formwork, & Concrete etc. is in Progress. • Manhole No. 195 & 194 & 193 Wall’s Concrete Completed. • Street Sewer Line 291 (Guli Bagh) Layout Completed. • Street Sewer Line 292 (Guli Bagh) Layout Completed. • Street Sewer Line 291 (Guli Bagh) Excavation is in Progress. • Street Sewer Line 292 (Guli Bagh) Excavation is in Progress.
  • 15. Friday, May 10, 2024 WSSC-KOHAT Meeting and Site Visit With Design, CIU,CEC & Matracon Team
  • 16. Friday, May 10, 2024 STP Mardan Gender Community Visit
  • 17. 17 Primary Settling Tank STP Mardan PICTORIAL VIEW
  • 18. 18 Primary Settling Work Concrete Work is in Progress PICTORIAL VIEW
  • 19. 19 Visit of ADB, CIU, PMU, & WSSCM, CEC Team at STP MARDAN PICTORIAL VIEW
  • 20. 20 Visit of ADB, CIU, PMU, & WSSCM, CEC Team at STP MARDAN PICTORIAL VIEW
  • 21. 21 PIPE INDUSTRIES HDPE PIPE & UPVC PIPE ME CEC & MATRACON DPM VISIT PICTORIAL VIEW
  • 22. 22 Concrete Of PST Foundation PICTORIAL VIEW Concrete of Aeration Tank Wall
  • 23. 23 SST Work is in Progress PICTORIAL VIEW Mechanical Team (Matracon)
  • 24. Friday, May 10, 2024 STP Mardan Screen Chamber
  • 25. 25 Mechanical Team (Matracon) PICTORIAL VIEW Primary Settling Tank
  • 26. Friday, May 10, 2024 WSSC-MARDAN PICTORIAL VIEW Sewerage Network Work at Rorya Union Council Sewerage Network Work at Rorya Union Council
  • 27. Friday, May 10, 2024 STP Mardan RCC Work is in Progress
  • 28. Friday, May 10, 2024 STP Mardan HDPE Pipe & Steel Yards
  • 29. Friday, May 10, 2024 STP Mardan Cement Stock
  • 30. Friday, May 10, 2024 STP Mardan Manhole Cover & Chemicals Stock Yard
  • 31. Friday, May 10, 2024 Site Work Pictures
  • 32. Friday, May 10, 2024 Site Work Pictures of January, 2024 STP Mardan Site Work Pictures
  • 33. Friday, May 10, 2024 STP Mardan Site Work Pictures
  • 34. Friday, May 10, 2024 STP Mardan Site Work Pictures
  • 35. Friday, May 10, 2024 STP Mardan MEETING AND SITE VISIT WITH KPCIP, WSSCM, CEC & MATRACON TEAM
  • 36. Friday, May 10, 2024 STP Mardan Meeting and Community Visit With CIU,CEC & Matracon Team
  • 37. Friday, May 10, 2024 STP Mardan TRAINING ON FIRST AID & FIRE FIGHTING MECHANISM
  • 38. THANKS Friday, May 10, 2024 WSSC-KOHAT The best form of charity is to give someone water” – Prophet Muhammad, on him be peace. THANKS