The document provides details of various civil and water works projects undertaken by Advent Construction Ltd in Tanzania, Kenya, and Uganda between 2016-2022. It discusses the construction of dams, reservoirs, pumping stations, and pipelines for water supply projects. It also summarizes the construction of a sugar plantation, rice mill, gypsum plaster board plant, and aviation facility. The projects involved earthworks, concrete structures, mechanical works, and pipeline installation. Advent Construction Ltd is one of the largest construction companies in East Africa, with certifications in quality, health, safety, and environmental standards.
The document provides details about the proposed permanent restoration of the Annamayya Project in Annamayya District, Andhra Pradesh. The original earthen dam was eroded during the Jawad Cyclone in November 2021. The proposed restoration includes constructing a new 336m long non-overflow concrete dam with an additional 184.75m long spillway to increase the discharge capacity to 3,80,000 cusecs. The project is required to restore irrigation for an ayacut of 10,236 acres and drinking water supply. A line estimate of Rs. 801 crore has been submitted to the government for approval to commence the restoration work.
This document summarizes several infrastructure projects in Jordan completed by Morganti Group between 1997-2007. It provides brief descriptions of 10 water, wastewater and power generation projects ranging in value from $7.5 million to $130 million. The projects involved treatment plants, pipelines, reservoirs and pumping stations.
IVRCL Limited (www.ivrcl.com), founded over 25 years ago in India, is a leading EPC and Infrastucture public limited company listed on the Bombay and National Stock Exchanges of India.
IVRCL is the largest water company in India and we take pride in building & owning India’s 1st and largest desalination plant at Minjur (near Chennai) with capacity of 100MLD.
IVRCL is present across the length and breath of India with its major offices in metro cities such as New Delhi(NCR-National Capital Region), Mumbai, Chennai,Kolkata, Hyderbad, Pune, Bangalore, Ahmedabad and Guwahati. They have also made our global footprints with operations in Sri Lanka and Africa.
IVRCl is a diversified group and its core areas of work include Value Chain across sectors such as:
Water & Environment
Irrigation
Transportation
Power Distribution & Transmission
RSV ENCO Consulting provides engineering and project management services to mining and industrial clients. They have capabilities across the full project lifecycle for coal, mining, energy, processing and supporting infrastructure projects. The document discusses challenges with coal logistics in Mozambique, including alternative transportation solutions like rail, dredging the Zambezi river, slurry pipelines and trucking. It analyzes the Sena and Nacala rail lines, the ports of Beira and Nacala, and power and legal infrastructure needs to support coal exports from Tete Province in Mozambique.
The document outlines contracts for a water drainage scheme in Waterford, Ireland. Contract 1 involves constructing sewer systems and pumping stations north of the River Suir, including rising mains under the river. Contract 2 involves constructing an interceptor sewer system and 4 pumping stations south of the river. Contract 5 involves designing, building, and operating a wastewater treatment plant to serve 190,600 people.
The Wanlip STW Sludge Project will provide a new sludge digestion facility to replace the existing aging plant. The £32 million project is being delivered by Costain-MWH and includes importing and indigenous sludge screening, thickening, blending, acid phase and gas phase digestion, biogas handling, and dewatering. Collaboration between Severn Trent Water and the contractors standardized designs across multiple sludge projects, improving efficiency. The project utilizes existing infrastructure where possible and incorporates innovative solutions like steel digesters.
This document provides a profile and resume for Kevin Quigley, a senior project engineer with over 5 years of experience in civil engineering and construction projects. It outlines his qualifications and certifications, as well as several projects he managed, including upgrades to water treatment facilities, sewage networks, and other infrastructure projects totaling over $30 million. The resume demonstrates his skills in planning, budgeting, scheduling, supervising subcontractors, and ensuring safety on large-scale construction jobs.
The document provides details about the proposed permanent restoration of the Annamayya Project in Annamayya District, Andhra Pradesh. The original earthen dam was eroded during the Jawad Cyclone in November 2021. The proposed restoration includes constructing a new 336m long non-overflow concrete dam with an additional 184.75m long spillway to increase the discharge capacity to 3,80,000 cusecs. The project is required to restore irrigation for an ayacut of 10,236 acres and drinking water supply. A line estimate of Rs. 801 crore has been submitted to the government for approval to commence the restoration work.
This document summarizes several infrastructure projects in Jordan completed by Morganti Group between 1997-2007. It provides brief descriptions of 10 water, wastewater and power generation projects ranging in value from $7.5 million to $130 million. The projects involved treatment plants, pipelines, reservoirs and pumping stations.
IVRCL Limited (www.ivrcl.com), founded over 25 years ago in India, is a leading EPC and Infrastucture public limited company listed on the Bombay and National Stock Exchanges of India.
IVRCL is the largest water company in India and we take pride in building & owning India’s 1st and largest desalination plant at Minjur (near Chennai) with capacity of 100MLD.
IVRCL is present across the length and breath of India with its major offices in metro cities such as New Delhi(NCR-National Capital Region), Mumbai, Chennai,Kolkata, Hyderbad, Pune, Bangalore, Ahmedabad and Guwahati. They have also made our global footprints with operations in Sri Lanka and Africa.
IVRCl is a diversified group and its core areas of work include Value Chain across sectors such as:
Water & Environment
Irrigation
Transportation
Power Distribution & Transmission
RSV ENCO Consulting provides engineering and project management services to mining and industrial clients. They have capabilities across the full project lifecycle for coal, mining, energy, processing and supporting infrastructure projects. The document discusses challenges with coal logistics in Mozambique, including alternative transportation solutions like rail, dredging the Zambezi river, slurry pipelines and trucking. It analyzes the Sena and Nacala rail lines, the ports of Beira and Nacala, and power and legal infrastructure needs to support coal exports from Tete Province in Mozambique.
The document outlines contracts for a water drainage scheme in Waterford, Ireland. Contract 1 involves constructing sewer systems and pumping stations north of the River Suir, including rising mains under the river. Contract 2 involves constructing an interceptor sewer system and 4 pumping stations south of the river. Contract 5 involves designing, building, and operating a wastewater treatment plant to serve 190,600 people.
The Wanlip STW Sludge Project will provide a new sludge digestion facility to replace the existing aging plant. The £32 million project is being delivered by Costain-MWH and includes importing and indigenous sludge screening, thickening, blending, acid phase and gas phase digestion, biogas handling, and dewatering. Collaboration between Severn Trent Water and the contractors standardized designs across multiple sludge projects, improving efficiency. The project utilizes existing infrastructure where possible and incorporates innovative solutions like steel digesters.
This document provides a profile and resume for Kevin Quigley, a senior project engineer with over 5 years of experience in civil engineering and construction projects. It outlines his qualifications and certifications, as well as several projects he managed, including upgrades to water treatment facilities, sewage networks, and other infrastructure projects totaling over $30 million. The resume demonstrates his skills in planning, budgeting, scheduling, supervising subcontractors, and ensuring safety on large-scale construction jobs.
The Dunmurry Wastewater Treatment Works (WwTW) located in Belfast underwent a £5.5 million upgrade to modernize its outdated systems and increase its capacity to 62,500 people equivalents. The upgrade included installing new fine bubble aeration tanks, a 31m diameter final settlement tank, increased sludge handling capacity, and automation to improve treatment and meet stricter consent standards for nutrients. The upgrade works were completed in 2012 and ensured the plant could reliably treat wastewater from growing populations in the area well into the future.
Muhammad Jahangir is a mechanical engineer with over 10 years of experience in fabrication, erection, and commissioning of piping systems and compressor projects for gas fields in Pakistan. He has worked on numerous projects for clients including OMV, ENI, and ENAR, taking on roles such as Mechanical Superintendent, Senior Supervisor, and Assistant Supervisor. His responsibilities have included piping fabrication, hydrotesting, inspection, project monitoring, and ensuring compliance with health, safety, and environmental standards.
This document provides a summary of a candidate's work experience as a Construction Maintenance Engineer and Civil Engineer. Some of their key responsibilities have included managing construction projects at various factory and storage sites, developing budgets and maintenance plans, and overseeing infrastructure projects like roads, buildings, and pipelines. They have worked on projects in Turkey, Libya, Azerbaijan, Madagascar, and other locations, managing teams and coordinating civil works.
Sunil Kumar Singh has over 22 years of experience as a Senior Manager. He is currently working at Abir Infrastructures Pvt Ltd in Kharisa, Chhattisgarh. Previously he has worked for IVRCL Infrastructures and Projects Limited, Trident Fabricators Pvt Ltd, Sunil Hi-Tech Engg Pvt Ltd, and Sheila Engineering Works on various projects. He holds a Diploma in Mining & Mine Surveying and a B.Tech in Mechanical Engineering. His responsibilities include planning, supervision, documentation, and coordination for fabrication, erection and commissioning of plant equipment and piping systems.
The presentation provided an overview of the Mohmand Dam Hydropower Project, including project details, progress, challenges, and issues delaying completion. Key points included: the project involves constructing a 213m dam, diversion tunnels, and powerhouse; major challenges include complex geology and large rockfill quantities; delays have been caused by COVID impacts, tunnel convergence, and contractor performance issues like inadequate planning and resources; critical activities requiring focus are quarry development and tunnel completion; contractual actions may be needed to improve progress.
This document provides an overview of the Neelum Jhelum Hydropower Project in Azad Kashmir, Pakistan. Some key points:
- The project will divert water from the Neelum River through a 28.5 km headrace tunnel to a power station on the Jhelum River with an installed capacity of 969 MW.
- Major components include an underground powerhouse with 4 units, a transformer hall, intake structure, spillways with 3 radial gates, stilling basin, and rockfill dam.
- The project is owned by WAPDA and the Chinese consortium CGGC-CMEC was awarded the construction contract in 2007. Construction began in 2008 and the first unit is
Jundee Mar Tejedo has over 10 years of experience as a QA/QC Engineer and Civil Engineer in Qatar and the Philippines. He has extensive experience managing construction projects, including roads, infrastructure, grading works, and more. He is proficient in quality control, project coordination, resource management, and ensuring safety and regulatory compliance. Tejedo holds a Bachelor's degree in Civil Engineering and is a licensed Civil Engineer in the Philippines.
This resume is for Jefferson T. Tulabot, a civil engineer and structural inspector with over 15 years of experience in QA/QC for various civil and structural projects. He has worked on numerous water transmission system, pipeline, plant foundation, and marine projects in Saudi Arabia and the Philippines. His experience includes inspecting rebar works, formworks, concrete works, structural erection, coating works, and more. He holds certifications from the Saudi Council of Engineers and American Society of Civil Engineers.
The document provides an introduction to the Padma Multipurpose Bridge Project (PMBP) in Bangladesh. Some key details:
- The PMBP includes a 6.15km bridge across the Padma River, approach roads, river training works, service areas, and toll plazas.
- It aims to unite two divided parts of Bangladesh and optimize use of the Mongla port.
- Construction began in 2013-2014 and is expected to be completed by 2018 at a cost of over $3 billion.
- It will include the deepest pile foundations ever built, with piles over 100m long secured by 240 steel and 24 bored piles.
- Challenges include the
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...Rajnish Bajaj
This presentation gives an overview of planning and design aspects of sewers using advanced technique. It is based on a proposed sewage system of kanpur city district-I under NGRBA PROJECT
This report provides details on the Neelum Jhelum Hydropower Project located in Azad Kashmir, Pakistan. The project involves diverting water from the Neelum River through tunnels to a power station on the Jhelum River with an installed capacity of 969 MW. Key aspects of the project include an underground powerhouse, 48 km headrace tunnel, concrete gravity dam, and rock fill dam. The project is expected to provide clean energy, reduce load shedding, and promote economic development while some have criticized its potential environmental and social impacts.
Mabro Engineering and Technical Services is a South African company that provides specialized services to the petrochemical, oil and gas, mining, and water industries. These services include pipeline design, testing, commissioning, inspection, condition assessment, and maintenance. The company was established in 2009 and is led by Managing Director Ernest Madhlophe and Technical Director Nathan Shago. Mabro has experience working on numerous pipeline projects in South Africa, Nigeria, Tanzania, Botswana, Mozambique, and other countries.
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
The document summarizes the procedure developed by IMCO Engineering & Construction Co. to redesign underground road crossings between 33kV transmission towers in Kuwait's Wafra Oil Field using live line techniques. The original rigid underground cable connections caused failures to shut down entire lines. The new design installed temporary overhead bypasses to allow disconnecting and replacing the underground cables without power interruptions. Live line crews carefully installed and later removed the bypasses while construction crews built the new road crossing structures over 28 days per site. The procedure was successfully used to redesign 9 road crossings over 9 months, with adaptations made for special cases involving nearby power lines.
This curriculum vitae summarizes Muhammad Aslam's career objectives and experience in civil engineering and construction projects. It details his academic background graduating with degrees in civil engineering. It provides an extensive work history over 20 years with experience in oil/gas plants, power plants, buildings, canals, roads, fertilizer plants and more. It highlights several past project roles and responsibilities in Qatar and Pakistan on large industrial plants and infrastructure projects involving concrete works, earthworks, excavation, screening and crushing materials.
This document discusses the history and current state of drinking water management in Jaipur City, India. It notes that Jaipur's water supply originated over 100 years ago from local wells but has since expanded to include surface sources like the Bisalpur Dam. Presently, Jaipur faces a water deficit of 90 MLD despite supplying 374 MLD. Issues include depleting groundwater, illegal connections, and equitable distribution. Solutions proposed include artificial groundwater recharge, reducing non-revenue water, strengthening distribution networks, and managing demand.
This document provides information on Abhay Ocean India Pvt Ltd, a company that specializes in marine engineering projects such as submarine pipelines, marine intakes/outfalls, and dredging. It details the company's experience with various marine outfall projects. It also outlines the scope of work for a proposed sea water intake and reject outfall system for a desalination plant, including surveying, designing, supplying, installing, and testing the submarine pipelines and intake/diffuser structures.
Marange Resources Water Supply System Design-Odzi to Concession PipelineAugustine Marume
The document discusses the design of a water supply system from the Odzi River to the Marange Resources diamond processing plant, Concession B. It considers pump sizing and selection, pipeline sizing and material options. Key aspects include:
- Pumps were selected to pump 100,000 liters of water per hour from the river to reservoirs, taking into account total head and compatible pipe sizing. The selected pumps were KSB models.
- Three pipeline materials were considered: asbestos-cement, high-density polyethylene, and steel. Asbestos-cement was recommended due to characteristics like durability and fire resistance, though HDPE had lower maintenance and purchase costs.
- A
The document summarizes the history and development of Hong Kong's mass transit railway (MTR) system. It describes how the MTR was established in the 1970s to address Hong Kong's public transportation crisis during the Cultural Revolution. The MTR's initial system, known as the Modified Initial System (MIS), opened in sections from 1979-1980. Subsequent expansion included the Tsuen Wan Line from 1982 and the Island Line from 1985-1986. The MTR has grown to become Hong Kong's primary public transit provider on prudent commercial principles for the benefit of the public.
The Dunmurry Wastewater Treatment Works (WwTW) located in Belfast underwent a £5.5 million upgrade to modernize its outdated systems and increase its capacity to 62,500 people equivalents. The upgrade included installing new fine bubble aeration tanks, a 31m diameter final settlement tank, increased sludge handling capacity, and automation to improve treatment and meet stricter consent standards for nutrients. The upgrade works were completed in 2012 and ensured the plant could reliably treat wastewater from growing populations in the area well into the future.
Muhammad Jahangir is a mechanical engineer with over 10 years of experience in fabrication, erection, and commissioning of piping systems and compressor projects for gas fields in Pakistan. He has worked on numerous projects for clients including OMV, ENI, and ENAR, taking on roles such as Mechanical Superintendent, Senior Supervisor, and Assistant Supervisor. His responsibilities have included piping fabrication, hydrotesting, inspection, project monitoring, and ensuring compliance with health, safety, and environmental standards.
This document provides a summary of a candidate's work experience as a Construction Maintenance Engineer and Civil Engineer. Some of their key responsibilities have included managing construction projects at various factory and storage sites, developing budgets and maintenance plans, and overseeing infrastructure projects like roads, buildings, and pipelines. They have worked on projects in Turkey, Libya, Azerbaijan, Madagascar, and other locations, managing teams and coordinating civil works.
Sunil Kumar Singh has over 22 years of experience as a Senior Manager. He is currently working at Abir Infrastructures Pvt Ltd in Kharisa, Chhattisgarh. Previously he has worked for IVRCL Infrastructures and Projects Limited, Trident Fabricators Pvt Ltd, Sunil Hi-Tech Engg Pvt Ltd, and Sheila Engineering Works on various projects. He holds a Diploma in Mining & Mine Surveying and a B.Tech in Mechanical Engineering. His responsibilities include planning, supervision, documentation, and coordination for fabrication, erection and commissioning of plant equipment and piping systems.
The presentation provided an overview of the Mohmand Dam Hydropower Project, including project details, progress, challenges, and issues delaying completion. Key points included: the project involves constructing a 213m dam, diversion tunnels, and powerhouse; major challenges include complex geology and large rockfill quantities; delays have been caused by COVID impacts, tunnel convergence, and contractor performance issues like inadequate planning and resources; critical activities requiring focus are quarry development and tunnel completion; contractual actions may be needed to improve progress.
This document provides an overview of the Neelum Jhelum Hydropower Project in Azad Kashmir, Pakistan. Some key points:
- The project will divert water from the Neelum River through a 28.5 km headrace tunnel to a power station on the Jhelum River with an installed capacity of 969 MW.
- Major components include an underground powerhouse with 4 units, a transformer hall, intake structure, spillways with 3 radial gates, stilling basin, and rockfill dam.
- The project is owned by WAPDA and the Chinese consortium CGGC-CMEC was awarded the construction contract in 2007. Construction began in 2008 and the first unit is
Jundee Mar Tejedo has over 10 years of experience as a QA/QC Engineer and Civil Engineer in Qatar and the Philippines. He has extensive experience managing construction projects, including roads, infrastructure, grading works, and more. He is proficient in quality control, project coordination, resource management, and ensuring safety and regulatory compliance. Tejedo holds a Bachelor's degree in Civil Engineering and is a licensed Civil Engineer in the Philippines.
This resume is for Jefferson T. Tulabot, a civil engineer and structural inspector with over 15 years of experience in QA/QC for various civil and structural projects. He has worked on numerous water transmission system, pipeline, plant foundation, and marine projects in Saudi Arabia and the Philippines. His experience includes inspecting rebar works, formworks, concrete works, structural erection, coating works, and more. He holds certifications from the Saudi Council of Engineers and American Society of Civil Engineers.
The document provides an introduction to the Padma Multipurpose Bridge Project (PMBP) in Bangladesh. Some key details:
- The PMBP includes a 6.15km bridge across the Padma River, approach roads, river training works, service areas, and toll plazas.
- It aims to unite two divided parts of Bangladesh and optimize use of the Mongla port.
- Construction began in 2013-2014 and is expected to be completed by 2018 at a cost of over $3 billion.
- It will include the deepest pile foundations ever built, with piles over 100m long secured by 240 steel and 24 bored piles.
- Challenges include the
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...Rajnish Bajaj
This presentation gives an overview of planning and design aspects of sewers using advanced technique. It is based on a proposed sewage system of kanpur city district-I under NGRBA PROJECT
This report provides details on the Neelum Jhelum Hydropower Project located in Azad Kashmir, Pakistan. The project involves diverting water from the Neelum River through tunnels to a power station on the Jhelum River with an installed capacity of 969 MW. Key aspects of the project include an underground powerhouse, 48 km headrace tunnel, concrete gravity dam, and rock fill dam. The project is expected to provide clean energy, reduce load shedding, and promote economic development while some have criticized its potential environmental and social impacts.
Mabro Engineering and Technical Services is a South African company that provides specialized services to the petrochemical, oil and gas, mining, and water industries. These services include pipeline design, testing, commissioning, inspection, condition assessment, and maintenance. The company was established in 2009 and is led by Managing Director Ernest Madhlophe and Technical Director Nathan Shago. Mabro has experience working on numerous pipeline projects in South Africa, Nigeria, Tanzania, Botswana, Mozambique, and other countries.
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
The document summarizes the procedure developed by IMCO Engineering & Construction Co. to redesign underground road crossings between 33kV transmission towers in Kuwait's Wafra Oil Field using live line techniques. The original rigid underground cable connections caused failures to shut down entire lines. The new design installed temporary overhead bypasses to allow disconnecting and replacing the underground cables without power interruptions. Live line crews carefully installed and later removed the bypasses while construction crews built the new road crossing structures over 28 days per site. The procedure was successfully used to redesign 9 road crossings over 9 months, with adaptations made for special cases involving nearby power lines.
This curriculum vitae summarizes Muhammad Aslam's career objectives and experience in civil engineering and construction projects. It details his academic background graduating with degrees in civil engineering. It provides an extensive work history over 20 years with experience in oil/gas plants, power plants, buildings, canals, roads, fertilizer plants and more. It highlights several past project roles and responsibilities in Qatar and Pakistan on large industrial plants and infrastructure projects involving concrete works, earthworks, excavation, screening and crushing materials.
This document discusses the history and current state of drinking water management in Jaipur City, India. It notes that Jaipur's water supply originated over 100 years ago from local wells but has since expanded to include surface sources like the Bisalpur Dam. Presently, Jaipur faces a water deficit of 90 MLD despite supplying 374 MLD. Issues include depleting groundwater, illegal connections, and equitable distribution. Solutions proposed include artificial groundwater recharge, reducing non-revenue water, strengthening distribution networks, and managing demand.
This document provides information on Abhay Ocean India Pvt Ltd, a company that specializes in marine engineering projects such as submarine pipelines, marine intakes/outfalls, and dredging. It details the company's experience with various marine outfall projects. It also outlines the scope of work for a proposed sea water intake and reject outfall system for a desalination plant, including surveying, designing, supplying, installing, and testing the submarine pipelines and intake/diffuser structures.
Marange Resources Water Supply System Design-Odzi to Concession PipelineAugustine Marume
The document discusses the design of a water supply system from the Odzi River to the Marange Resources diamond processing plant, Concession B. It considers pump sizing and selection, pipeline sizing and material options. Key aspects include:
- Pumps were selected to pump 100,000 liters of water per hour from the river to reservoirs, taking into account total head and compatible pipe sizing. The selected pumps were KSB models.
- Three pipeline materials were considered: asbestos-cement, high-density polyethylene, and steel. Asbestos-cement was recommended due to characteristics like durability and fire resistance, though HDPE had lower maintenance and purchase costs.
- A
The document summarizes the history and development of Hong Kong's mass transit railway (MTR) system. It describes how the MTR was established in the 1970s to address Hong Kong's public transportation crisis during the Cultural Revolution. The MTR's initial system, known as the Modified Initial System (MIS), opened in sections from 1979-1980. Subsequent expansion included the Tsuen Wan Line from 1982 and the Island Line from 1985-1986. The MTR has grown to become Hong Kong's primary public transit provider on prudent commercial principles for the benefit of the public.
Similar to Advent Portfolio - Presentation - 2022.pptx (20)
Success is often not achievable without facing and overcoming obstacles along the way. To reach our goals and achieve success, it is important to understand and resolve the obstacles that come in our way.
In this article, we will discuss the various obstacles that hinder success, strategies to overcome them, and examples of individuals who have successfully surmounted their obstacles.
In the intricate tapestry of life, connections serve as the vibrant threads that weave together opportunities, experiences, and growth. Whether in personal or professional spheres, the ability to forge meaningful connections opens doors to a multitude of possibilities, propelling individuals toward success and fulfillment.
Eirini is an HR professional with strong passion for technology and semiconductors industry in particular. She started her career as a software recruiter in 2012, and developed an interest for business development, talent enablement and innovation which later got her setting up the concept of Software Community Management in ASML, and to Developer Relations today. She holds a bachelor degree in Lifelong Learning and an MBA specialised in Strategic Human Resources Management. She is a world citizen, having grown up in Greece, she studied and kickstarted her career in The Netherlands and can currently be found in Santa Clara, CA.
Joyce M Sullivan, Founder & CEO of SocMediaFin, Inc. shares her "Five Questions - The Story of You", "Reflections - What Matters to You?" and "The Three Circle Exercise" to guide those evaluating what their next move may be in their careers.
A Guide to a Winning Interview June 2024Bruce Bennett
This webinar is an in-depth review of the interview process. Preparation is a key element to acing an interview. Learn the best approaches from the initial phone screen to the face-to-face meeting with the hiring manager. You will hear great answers to several standard questions, including the dreaded “Tell Me About Yourself”.
We recently hosted the much-anticipated Community Skill Builders Workshop during our June online meeting. This event was a culmination of six months of listening to your feedback and crafting solutions to better support your PMI journey. Here’s a look back at what happened and the exciting developments that emerged from our collaborative efforts.
A Gathering of Minds
We were thrilled to see a diverse group of attendees, including local certified PMI trainers and both new and experienced members eager to contribute their perspectives. The workshop was structured into three dynamic discussion sessions, each led by our dedicated membership advocates.
Key Takeaways and Future Directions
The insights and feedback gathered from these discussions were invaluable. Here are some of the key takeaways and the steps we are taking to address them:
• Enhanced Resource Accessibility: We are working on a new, user-friendly resource page that will make it easier for members to access training materials and real-world application guides.
• Structured Mentorship Program: Plans are underway to launch a mentorship program that will connect members with experienced professionals for guidance and support.
• Increased Networking Opportunities: Expect to see more frequent and varied networking events, both virtual and in-person, to help you build connections and foster a sense of community.
Moving Forward
We are committed to turning your feedback into actionable solutions that enhance your PMI journey. This workshop was just the beginning. By actively participating and sharing your experiences, you have helped shape the future of our Chapter’s offerings.
Thank you to everyone who attended and contributed to the success of the Community Skill Builders Workshop. Your engagement and enthusiasm are what make our Chapter strong and vibrant. Stay tuned for updates on the new initiatives and opportunities to get involved. Together, we are building a community that supports and empowers each other on our PMI journeys.
Stay connected, stay engaged, and let’s continue to grow together!
About PMI Silver Spring Chapter
We are a branch of the Project Management Institute. We offer a platform for project management professionals in Silver Spring, MD, and the DC/Baltimore metro area. Monthly meetings facilitate networking, knowledge sharing, and professional development. For more, visit pmissc.org.
Learnings from Successful Jobs SearchersBruce Bennett
Are you interested to know what actions help in a job search? This webinar is the summary of several individuals who discussed their job search journey for others to follow. You will learn there are common actions that helped them succeed in their quest for gainful employment.
1. Relevant Civil and Water Works 2016 - 2022
info@adventconstructions.com
www.adventconstructions.com
1
2. Advent Construction Ltd is one of Tanzania’s largest and most recognized Civil & Building construction companies. The
company operates its activities in all the regions of the United Republic of Tanzania and has regional offices throughout the
country. It is also active in Uganda and Kenya.
COMPANY CERTIFICATIONS, WARRANTY SYSTEMS AND QUALITY POLICIES
First construction company in Tanzania certified for ISO 9001:2015,
ISO 14001:2015 and ISO 45001:2018.
Extended warranties over all projects.
Stringent internal QC & QA policies throughout the projects.
Best HSSE policies & performance of any construction company in Tanzania.
Tanzanian owned and the largest local Construction Company.
Only construction company in East Africa to be recognized by the
London Stock Exchange group as a “Company to Inspire Africa 2019”
2
3. MTIBWA SUGAR PLANTATION – CONSTRUCTION
OF DAM, RESERVOIRS, RIVER PUMPING STATIONS
AND INLAND PUMP STATIONS
CLIENT : EMI GROUP 3
4. MTIBWA SUGAR PLANTATION (Cont’d)
SCOPE OF WORKS
CONSTRUCTION OF DAM
CONSTRUCTION OF RESERVOIR
CONSTRUCTION OF RIVER PUMP STATIONS
CONSTRUCTION OF INLAND PUMP STATIONS
VALVE CHAMBER PITS TYPE 1 & 2
FLOW METER VALVE CHAMBER
4
5. • Excavation below flowing river level required
close monitoring and engineering expertise
to ensure smooth progress and zero
accidents on site.
5
MTIBWA SUGAR PLANTATION (Cont’d)
7. The above show Valve Chambers. The person in the background gives an idea of the size of these chambers 7
MTIBWA SUGAR PLANTATION (Cont’d)
8. REHABILITATION OF CHALINZE WASTE WATER TREATMENT
PLANT AND WATER TREATMENT PLANT & DISTRIBUTION IN
CHALINZE
CLIENT : OVERSEAS INFRASTRUCTURE ALLIANCE (INDIA) PVT LTD 8
9. CHALINZE WATER SUPPLY (Cont’d)
9
SCOPE OF WORKS
• 9 Nos of Elevated Reservoirs
• 10 Nos of Ground Reservoirs
10. 10
CHALINZE WATER SUPPLY (Cont’d)
19 No.s of Reservoir sites over a stretch of 95 km from Chalinze to Manga
14. PROPOSED EXTENSION OF LAKE VICTORIA PIPELINE TO
TABORA, IGUNGA & NZEGA TOWNS (TANZANIA)
CLIENT : LARSEN & TOUBRO LIMITED, SHRIRAM EPC JOINT VENTURE 14
15. 15
SCOPE OF WORKS
• Ground Reservoirs total volume of
7,500 m3
• TUWASA Office Building
• Kiosks – 103 No.s
PROPOSED EXTENSION OF LAKE VICTORIA PIPELINE TO
TABORA, IGUNGA & NZEGA TOWNS (TANZANIA)
21. LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
CLIENT : DAR ES SALAAM WATER & SEWERAGE AUTHORITY 21
22. 22
SCOPE OF WORKS
• Ground Reservoir of volume of
15,000,000 litres
• Sump of 540 m3
• Pump Station
• Transmission Main Pipeline - MS Pipe
DN 700mm – 6300m
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
23. 23
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
24. 24
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
25. 25
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
26. 26
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
27. 27
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
28. 28
LOT 2 DEVELOPMENT OF KIMBIJI WATER PROJECT -
CONSTRUCTION OF SUMP, PUMPING STATION,
TRANSMISSION PIPELINE AND RESERVOIR TO SAVE 5
BOREHOLES
29. 29
• DEVELOPMENT OF KIMBIJI WATER SUPPLY PROJECT LOT 2: CONTRACT AE/033/2019-
2020/W/27-CONSTRUCTION OF RESERVOIR, TRANSMISSION PIPELINE, SUMP WELL AND
PUMPING STATION FOR KIMBIJI WATER SUPPLY PROJECT
• Contract Signing Date : 17th December 2020
• Start Date : 18th January 2021
• Completion Date : 31st September 2022
• Employer : DAWASA
Scope of Works:
• Construction of Ground Water Reservoir of 15,000,000 Litres
• Construction of Sump of 540m3 and Pump Station
• Transmission Pipeline - MS Pipe DN 700mm – 6300m
ONGOING WATER PROJECTS
30. 30
• CONSTRUCTION OF GROUND WATER RESERVOIR, RAISING MAIN BOOSTING STATION, STORAGE
SUMP AND WATER SUPPLY SCHEME AT MSHIKAMANO AREA
• Contract Signing Date : 03rd October 2021
• Start Date : 17th December 2021
• Completion Date : 17th September 2022
• Employer : DAWASA
Scope of Works:
• Construction of Ground Water Reservoir of 6,000,000 Litres
• Construction of Sump of 540m3 and Pump Station
• Transmission Pipeline - MS Pipe DN 400mm – 3150m
ONGOING WATER PROJECTS
31. 31
• CONSTRUCTION OF TRANSMISSION MAIN FROM KIVERENGE RESERVOIR (MWANGA) TO SAME
TOWN
• Contract Signing Date : 27th October 2021
• Start Date : 25th May 2022
• Completion Date : 25th May 2023
• Employer : DAWASA
Scope of Works:
• Transmission Main Pipeline DI Pipe DN 900mm – 4400m
• Transmission Main Pipeline DI Pipe DN 800mm – 17550m
• Transmission Main Pipeline DI Pipe DN 500mm – 2310m
• Transmission Main Pipeline HDPE Pipe DN 630mm – 1235m
• Transmission Main Pipeline HDPE Pipe DN 500mm – 1445m
• Horizontal Direction Drilling (HDD) for Crossing DN 900mm to 500mm – 568m
ONGOING WATER PROJECTS
32. 32
• CONSTRUCTION OF OFF-GRID WATER SUPPLY DISTRIBUTION NETWORKS IN ILALA AND PART OF
KIGAMBONI MUNICIPALITIES
• Contract Signing Date : 12th November 2021
• Start Date : 22nd February 2022
• Completion Date : 24th February 2023
• Employer : DAWASA
Scope of Works:
• Construction of Ground Water Reservoir at Nzasa of 2,000,000 Litres
• Construction of Elevated Water Reservoir (18m Staging) at Mgeule of 1,000,000 Litres
• Construction of Laboratory, Chlorination and associated Buildings
• Transmission Main Pipeline MS Pipe DN 800mm – 2850m
• Transmission Main Pipeline HDPE Pipe DN 315mm & DN 250mm – 1800m
• Internal Distribution Pipeline HDPE & uPVC Pipe DN 315mm to DN 75mm – 59,871m
• Road Crossing using non-disruptive method (Thrust Boring) – 490m
ONGOING WATER PROJECTS
33. V.S.K PLANT FOR SUNGURA CEMENT COMPANY
LIMITED, TANGA
CLIENT : SUNGURA CEMENT COMPANY LIMITED 33
34. SUNGURA CEMENT Cont’d
SCOPE OF WORKS
CEMENT MILL
CEMENT SILO
BLENDING SILO
RAW MILL
VSK SECTION
BLOWERS (CEMENT
SILO)
BLOWERS (VSK
SECTION)
CLINKER STOCK PILE
CLINKER CRUSHER
SECTION
RAW MIX STOCK PILE
LIME CRUSHER SECTION
FEEDING TO RAW MILL
WATER TANKS FOR VSK
GRAVEL ROADS
34
35. The entire structure was fabricated on site by Advent Mechanical works team. The RCC silos were cast using SlipForm
technology and moulds fabricated and owned by Advent 35
SUNGURA CEMENT Cont’d
36. 36
CONSTRUCTION OF RICE MILL AND ALL
ASSOCIATED WORKS. MOROGORO, TANZANIA
CLIENT : MURZAH WILMAR RICE MILLERS LTD
37. MW RICE MILLS (Cont’d)
SCOPE OF WORKS
EARTHWORKS – 46,800 CUM
PADDY SAMPLER MILL,
RICE MILL,
MACHINERY TOWER,
DRYING TOWER,
SILO TOWER,
SILOS - 100 TON (3 NOS),
SILOS - 500 TON (3 NOS),
SILOS - 3000 TON (3 NOS),
MECHANICAL WORKSHOP,
WEIGH BRIDGE,
ANCILLARY SPACE AND OUTDOOR ENGINEERING,
REINFORCED CONCRETE ROAD WORKS – 18,000 M2,
OFFICE BUILDING AND CANTEEN BLOCK,
STORM WATER DRAIN
37
47. 47
DESIGN AND BUILD GYPSUM PLASTER BOARD
PLANT IN
MKURANGA, COAST REGION.
CLIENT : KNAUF GYPSUM (TANZANIA) LTD
48. SCOPE OF WORKS
EARTH WORKS – 49,400 CUM
CONSTRUCTION OF WAREHOUSE, PROFILE PLANT,
CALCINATION AND PREPARING STATIONS –
TOTALING 14,000 SQM.
COMPRESSOR STATION, PRODUCTION LINE, HOT
GAS GENERATOR, AUXILIARY BUILDINGS
CONCRETE ROAD WORKS, GRAVEL ROAD WORKS –
15,000 SQM
WEIGH BRIDGE- 80 TON
FIRE DETECTION AND FIRE FIGHTING SYSTEM,
ELECTRICAL INSTALLATION WORKS
LANDSCAPING WORKS
THIS PROJECT IS BEING EXECUTED ON A SITE WHICH HAS A FULLY OPERATIONAL PLASTER BOARD PLANT.
THE BLUE ROOFS ARE THE EXSTING PLANT
48
KNAUF GYPSUM PLANT (Cont’d)
51. 51
We used a ride on trowel for finishing the road
KNAUF GYPSUM PLANT (Cont’d)
52. 52
You can see the precise alignment of the structure. The bolts were cast using templates and no welding
or modification was permitted on site. Covered warehouse area is over 3 acres
KNAUF GYPSUM PLANT (Cont’d)
53. 53
Piling works for the main machine and mill foundations
subcontracted to Franki Pile
KNAUF GYPSUM PLANT (Cont’d)
54. 54
High gloss finish floor with hardener. A laser screeder machine and ride on trowel were key to
achieving this finish
KNAUF GYPSUM PLANT (Cont’d)
57. EVERETT AVIATION (Cont’d)
Located at Tanzania’s largest international airport, JNIA, The taxiway and airside facilities were built without
hindrance to normal flight schedules.
57
58. SCOPE OF WORK
HANGAR FACLITY
TERMINAL BUILDING
OFFICE BUILDING
TAXIWAY
RUNWAY
LANDING PADS
HARD APRON
SOFT APRON
EXTERNAL PAVING AND PARKING WORKS
OTHER ASSOCIATED BUILDING WORKS
TOTAL BUILT UP AREA 24,280 SQM
58
EVERETT AVIATION (Cont’d)
59. Unstable ground surface, a very high water table and an unexpected sub strata of clay soil made foundation work more
challenging than expected.
59
EVERETT AVIATION (Cont’d)
60. PEB structure erected with zero margin of error and no modifications carried out on site, entire
structure bolted on with no welding.
60
EVERETT AVIATION (Cont’d)
61. DESIGN AND BUILD OF OIL AND GAS SUPPLY BASE
MDENGA AND PLOT 12 MTWARA
CLIENT : SCHLUMBERGER SEACO INC 61
62. MDENGA SUPPLY BASE (Cont’d)
SCOPE OF WORK
CIVIL WORKS
MECHANICAL WORKS
ERECTION OF PREFABRICATED WAREHOUSES
TESTING FACILITIES
PRESSURE TEST BASE
CEMENT LABORATORY BLOCK
CIVIL WORKS & ERECTION OF PREFABRICATED
OFFICES
WASH BAYS
SOIL IMPROVEMENT & EXTERNAL SURFACE
PREPARATION
62
63. 63
KEY PROJECT FACTS
100% Completion and handover within 180
days.
Zero accidents and zero near misses on site
during construction.
Letter of recommendation and bonus
received from client due to early delivery,
excellent HSSE policy and performance and
outstanding quality of construction.
MDENGA SUPPLY BASE (Cont’d)
70. CONSTRUCTION OF KILIMANJARO COMMERCIAL COMPLEX, MOSHI
SCOPE OF WORKS
CONSTRUCTION OF COMMERCIAL COMPLEX
TOTAL BUILT UP AREA: 48000 SQ.M
ONE OF THE LARGEST FLOOR SPACES OF ANY
COMMERCIAL COMPLEX IN TANZANIA.
70
72. 72
MLIMANI PLAZA - PROPOSED SHOPPING MALL &
COMMERCIAL BUILDING IN DAR ES SALAAM
CLIENT : SKYLINE PROPERTIES LTD
73. MLIMANI PLAZA (Cont’d)
SCOPE OF WORKS
CONSTRUCTION OF SHOPPING MALL AND
COMMERCIAL COMPLEX
TOTAL BUILT UP AREA: 18570 SQ.M
ENTIRE PROJECT WAS EXECUTED WITH PERI
FRAME FLEX AND LIWA FORMWORK SYSTEM.
73
79. 79
CLIENT : HERITAGE HEIGHT LIMITED
BELLA VISTA - RESIDENTIAL BUILDINGS ON PLOT No.
2017 AT MSASANI PENINSULAR DAR ES SALAAM
80. SCOPE OF WORKS
CONSTRUCTION OF 14 UNITS LUXUARY VILLAS
AND CLUB HOUSE
SWIMMING POOL
TOTAL BUILT UP AREA: 6,038 SQ.M
80
BELLA VISTA - RESIDENTIAL BUILDINGS ON PLOT
No. 2017 AT MSASANI PENINSULAR DAR ES
SALAAM
81. 81
BELLA VISTA - RESIDENTIAL BUILDINGS ON PLOT
No. 2017 AT MSASANI PENINSULAR DAR ES
SALAAM
82. 82
BELLA VISTA - RESIDENTIAL BUILDINGS ON PLOT
No. 2017 AT MSASANI PENINSULAR DAR ES
SALAAM
89. 89
CONSTRUCTION OF THE RESIDENCY, MASAKI, DAR ES SALAAM
CLIENT : CORTZEN INVESTMENT LIMITED
90. CONSTRUCTION OF THE RESIDENCY, MASAKI, DAR ES SALAAM
SCOPE OF WORKS
CONSTRUCTION OF 7 STOREYED BUILDING WITH
42 UNITS LUXUARY APARTMENTS
SWIMMING POOL
TOTAL BUILT UP AREA: 9600 SQ.M
90
94. CONSTRUCTION OF FAYKAT TOWER. DAR ES SALAAM
SCOPE OF WORKS
CONSTRUCTION OF RESIDENTIAL+ COMMERCIAL
BUILDING WITH 10 OFFICES, 4 RESIDENTIAL
APARTMENTS
TOTAL BUILT UP AREA: 15600 SQ.M
94
99. 99
PROPOSED DESIGN AND BUILD OF RESIDENTIAL APARTMENT BLOCK ON PLOT NO
274 AT CHATO STREET – DAR ES SALAAM, TANZANIA
CLIENT : NATIONAL HOUSING CORPORATION
100. SCOPE OF WORKS
CONSTRUCTION OF 8 STOREYED BUILDING WITH
22 UNITS LUXUARY APARTMENTS AND 4 PENT
HOUSES
SWIMMING POOLS
TOTAL BUILT UP AREA: 6,038 SQ.M
100
DESIGN AND BUILD OF RESIDENTIAL APARTMENT BLOCK ON PLOT NO 274 AT CHATO
STREET – DAR ES SALAAM, TANZANIA
101. 101
DESIGN AND BUILD OF RESIDENTIAL APARTMENT BLOCK ON PLOT NO 274 AT CHATO
STREET – DAR ES SALAAM, TANZANIA
102. 102
DESIGN AND BUILD OF RESIDENTIAL APARTMENT BLOCK ON PLOT NO 274 AT CHATO
STREET – DAR ES SALAAM, TANZANIA
103. 103
PROPOSED CONSTRUCTION OF OFFICE COMPLEX AT PLOT NO.1403/1 MSASANI
PENINSULA, OYSTERBAY, MASAKI, DAR ES SALAAM
CLIENT : NS BAINS LIMITED
104. SCOPE OF WORKS
CONSTRUCTION OF 7 STOREYED COMMERCIAL
BUILDING
TOTAL BUILT UP AREA: 12,800 SQ.M
104
PROPOSED CONSTRUCTION OF OFFICE COMPLEX AT PLOT NO.1403/1 MSASANI
PENINSULA, OYSTERBAY, MASAKI, DAR ES SALAAM
105. 105
PROPOSED CONSTRUCTION OF OFFICE COMPLEX AT PLOT NO.1403/1 MSASANI
PENINSULA, OYSTERBAY, MASAKI, DAR ES SALAAM
106. 106
PROPOSED CONSTRUCTION OF OFFICE COMPLEX AT PLOT NO.1403/1 MSASANI
PENINSULA, OYSTERBAY, MASAKI, DAR ES SALAAM
108. CONSTRUCTION OF SATELLITE VILLAGE AT DUNGU FARM, KIGAMBONI, TEMEKE
SCOPE OF WORKS
CONSTRUCTION OF 11 TOWER BUILDINGS
INCLUDES 116 FLATS (2 & 3 BHK)
1 COMMERCIAL BUILDING
TOTAL BUILT UP AREA: 26000 SQ.M
108