This document outlines the logic and conditions for a pulverized coal fired boiler. It describes 17 conditions that can trigger a manual fire trip (MFT), including issues with fans, pumps, pressures, and flame detection. It also explains the requirements and process for furnace purging after an MFT occurs. This includes conditions that must be met and interlocks in place. Additionally, it provides the process and permissives for testing for oil leaks in the heavy and light fuel oil supply pipes.
The discussion on "Handling of Turbines During Emergencies" has been detailed in the ppt. Some case studies are also discussed in the session where the course participants express their difficulties while coming across the emergencies in handling the turbines at their locations.
This PPT explains the logic and requirement behind Boiler Loss of Flame Protection under MFT. To know more about Boiler Loss of Flame please connect to tahoorkhn03@gmail.com
The presentation discuss about the operations, causes and remedies for the facing emergencies of steam Turbines. Specially for the 210MW LMW units. The emergencies can be created on simulator and studied on the simulator ACCORDINGLY.
The discussion on "Handling of Turbines During Emergencies" has been detailed in the ppt. Some case studies are also discussed in the session where the course participants express their difficulties while coming across the emergencies in handling the turbines at their locations.
This PPT explains the logic and requirement behind Boiler Loss of Flame Protection under MFT. To know more about Boiler Loss of Flame please connect to tahoorkhn03@gmail.com
The presentation discuss about the operations, causes and remedies for the facing emergencies of steam Turbines. Specially for the 210MW LMW units. The emergencies can be created on simulator and studied on the simulator ACCORDINGLY.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
This is a presentation series part 3 on Frequently Asked Questions on Steam Turbines in large steam power plants. All questions are answered properly and any doubt may be mailed to the writer.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
This is a presentation series part 3 on Frequently Asked Questions on Steam Turbines in large steam power plants. All questions are answered properly and any doubt may be mailed to the writer.
A Limited Duty Officer (LDO) is an officer who was selected for commissioning based on his/her skill and expertise, and is not required to have a bachelor’s degree.
The term "Limited Duty" refers not to an LDO's authority, but rather the LDO's career progression and restrictions.
This week our students have had the opportunity to be part of real-time current events. With the media circus buzzing around Kony2012, Invisible Children, and the LRA – I created a (fairly) student-friendly powerpoint that objectively explains the background of Kony and the LRA. I am not getting into the hype surrounding supporters and opponents of Invisible Children, but have included them as well as other organizations at the end of the presentation to give students options regarding how to get involved.
No matter what people feel about Invisible Children, it’s obvious that they have created a successful awareness raising campaign. My students have had a lot of questions about the whole situation, so I created this powerpoint that I am now sharing with you.
On February 4, 2013, CMS announced the new Comprehensive ESRD Care Initiative. During this Open Door FOrum, CMS staff provided an overview of the initiative and answered questions from interested stakeholders.
MS Lines, Turbine Casings and rotors and other steam lines including Steam Stop Valves, MSV, CV, ESV heating, Turbine Rolling, Flange and Stud heating, Turbovisory and speeding the turbine to 3000 RPM.
The operations carried out to Light up the Boiler, from Air Cycle Establishment, Oil Handling Plant, Scanner air fans and Igniter Air Fans, Boiler Purging.
What Is A Control Valve
Process Control Terminology
Sliding-Stem Control Valve Terminology
Rotary-Shaft Control Valve Terminology
Control Valve Functions and Characteristics Terminology
Other Process Control Terminology
sliding stem control valve
introduction to thermal powerplant,type of thermal powerplant,captive powerplant,rankin cycle,co-generation powerplant,subcritical powerplant,supercritical powerplant,theory of operation,working principle,parts of powerplant,boiler,turbine,etc
introduction to flow,flow type,laminar,turbulent,one dimensional flow,two dimensional flow,type of flow measurement,flow measuring elements,orifices,nozzles,venturi,pitot tubes,limitations,advantages of the elements,application of elements
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
3. Any following condition generate, touch off
MFT or generate the pulse or PF contact.
1. Manual MFT
Both MFT pushbuttons are depressed at the
same time.
Two signals are to trip MFT cabinet. Two
signals (AND) are to DCS system to trip.
2. Both FDFs tripped
FD Fan 1 trip
FD Fan 2 trip
4. 3.Both ID Fans tripped.
1.ID Fan 1 tripped.
2.ID Fan 2 tripped.
4. Both APHs tripped.
1.APH A pass should be tripped
2.APH b pass should be tripped.
5. All BFP tripped.
1.BFWP 1 tripped.(TD)
2.BFWP 2 tripped.(TD)
3.BFWP 3 tripped.(MD)
6. Lost primary air : Both PAFs tripped when
any mill in service.
1.PA Fan 1 tripped.
2.PA Fan 2 tripped.
5. 7.Lost Flame Scanner cooling air.
Both cooling air fans tripped
or outlet main pipe press LL 2/3, with delay
of 10s.
8. Total airflow is <25%BMCR (2 out of 3)
total airflow is <25%(PA +SA air flow)
9. 1.Drum level HH (2 out of 3, delayed
20s)
2. Drum level LL (2 out of 3, delayed
20s)
10. 1.Furnace negative pressure HH (2 out
of 3)
2. Furnace negative pressure LL (2 out
of 3)
6. 11.Fire failure
Any oil burner ignite fail up to 3 times
12. Loss of fuel trip
1.When any oil burner ever set in service.
2.all oil valve closed(HFO and LDO) or
OFT.
3.all PULV stopped.
13. Unit flames failure (AND)
Any coal feeder has run 120 second
No oil elevations is in service
A coal elevations no flame(3 out of 4)
B coal elevations no flame(3 out of 4)
C coal elevations no flame(3 out of 4)
D coal elevations no flame(3 out of 4)
E coal elevations no flame(3 out of 4)
F coal elevations no flame(3 out of 4)
7. 14.Repurge requirement
MFT is reset but no firing up to 30
minutes.
15. Turbine tripped.
16. MFT trip relay cabinet power off
or Both power off.
17. FSSS cabinet power off
When FSSS common logic cabinet
power off.
8. When MFT generate, system will generate alarm,
display first reason for generating the MFT signal.
Please execute furnace purging after MFT.
MFT will cause the following action
Close HFO and LDO oil supply main pipe valve.
Close HFO and LDO oil return main pipe valve.
Close all corner oil valves. HFO and LDO.
Retract all oil gun and ignition gun.
Trip all PAFs.
Trip all mills.
Trip all coal feeders.
Close all mill inlet valve.
Close all mill outlet valves.
9. Close SH spray water valve.
Close RH spray water valve.
MFT to local ignite control box.
MFT to ETS.
Stop electrostatic precipitator.
Stop soot blowers.
MFT to MCS.
MFT to SCS.
Reset MFT: Furnace purging command
initiated and wait till completion of purge.
10. Furnace purging is required to clean all the
obstacle in the air and coal path of boiler.
Furnace purging have many
conditions/Interlocks to execute are given
below.
1. No MFT conditions exist.
2. Any one FDF is running.
3. Any one IDF is running.
4. Both APH are running.
11. 5. Both PAFs stopped
6. The boiler total airflow > 30% and <40%.
7. Furnace press should be normal.
8. Drum level should be normal.
9. HFO and LDO oil supply main pipe valve
closed.
10. all corner oil valves closed HFO and
LDO.
11. All mills should be stopped.
12. All mill inlet(cold/hot) valve closed.
13. All mill outlet valve closed.
14. All coal feeders stopped.
12. 15. No flames are detected in the furnace.
The furnace purging condition-2
1. Furnace purge condition -1 should be
healthy.
2. All auxiliary air dampers in purge position
(feedback >80%).
The purging process is:
When the purging condition-1 is met, push the
“start purge button”, purge command
executed.
After the purging condition-2 is met, start the
purging process that will keep on for 5 minutes.
When the purging process is completed after 5
minutes, reset MFT memory.
13. Furnace purging interrupt:
During this five minutes period, if any
condition happens to not exist, the furnace
purging process has to
be interrupted.
14. Permissive conditions:
1. No MFT conditions exist.
2.HFO Oil supply press normal.
3.All HFO oil valve closed.
4. HFO oil supply main pipe valve closed.
Test process:
Step-1: Open HFO oil supply main
pipe valve, close oil return main pipe valve,
charge oil into the pipe for 60
second.
15. Monitor until HFO Oil supply press reach
the set point.
If the HFO oil supply press does not reach
the set point, charging oil fails and the
testing process has to be interrupted.
Step2:
Close HFO oil supply main pipe valve, start
to monitor oil pressure for 3 minutes.
HFO Oil supply press is not low.
If the HFO oil supply press is low, that
means the oil pipe leaks and the testing
process has to be interrupted.
16. Step3: Open HFO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Step3: Open HFO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Bypass test:
if necessary, operators can ignore this
testing process through pushing “bypass
button” on the console and force the oil
leak test to be success.
17. Permissive conditions:
1. No MFT conditions exist.
2.LDO Oil supply press normal.
3.All LDOO oil valve closed.
4. LDO oil supply main pipe valve closed.
Test process:
Step-1: Open LDO oil supply main
pipe valve, close oil return main pipe valve,
charge oil into the pipe for 60
second.
18. Monitor until LDO Oil supply press reach
the set point.
If the LDO oil supply press does not reach
the set point, charging oil fails and the
testing process has to be interrupted.
Step2:
Close LDO oil supply main pipe valve, start
to monitor oil pressure for 3 minutes.
LDO Oil supply press is not low.
If the LDO oil supply press is low, that
means the oil pipe leaks and the testing
process has to be interrupted.
19. Step3: Open LDO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Step3: Open LDO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Bypass test:
if necessary, operators can ignore this
testing process through pushing “bypass
button” on the console and force the oil
leak test to be success.
20. Next logic in next PPT of FSSS-2