The presentation discuss about the operations, causes and remedies for the facing emergencies of steam Turbines. Specially for the 210MW LMW units. The emergencies can be created on simulator and studied on the simulator ACCORDINGLY.
The discussion on "Handling of Turbines During Emergencies" has been detailed in the ppt. Some case studies are also discussed in the session where the course participants express their difficulties while coming across the emergencies in handling the turbines at their locations.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
The discussion on "Handling of Turbines During Emergencies" has been detailed in the ppt. Some case studies are also discussed in the session where the course participants express their difficulties while coming across the emergencies in handling the turbines at their locations.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
The presentation details about the Boiler Operation specifically while lightup of boiler and loading of boiler. the course participants discuss in details about the operations carried in their respective power stations
Turbine Stress Control Logic, Calculation & WorkingTahoor Alam Khan
Turbine Stress Control is one of the complex logics of BHEL turbine. This presentation clearly explains the Logic, working, calculations and influence of the same on operation of steam turbine. For further details and understanding, I can be reached on tahoorkhn03@gmail.com.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
This PPT explains the logic and requirement behind Boiler Loss of Flame Protection under MFT. To know more about Boiler Loss of Flame please connect to tahoorkhn03@gmail.com
Thermal Power Plant Simulator Hands-on MalfunctionsManohar Tatwawadi
The presentation describes some of the malfunctions in a Power Plant. Many more can be simulated and operators told to handle the situations in the simulator. The trippings of Generator, turbine, boilers and all auxiliaries can be simulated to get hands on practice on the simulator before operating the actual turbogenerator and boiler associated equipment.
Power Plant Simulator, Unloading and shutting the TurbogeneratorManohar Tatwawadi
The Presentation describes the steps for gradual unloading of the machine/turbogenerator for a planned shutdown. The steps are described in the presentation.
The presentation details about the Boiler Operation specifically while lightup of boiler and loading of boiler. the course participants discuss in details about the operations carried in their respective power stations
Turbine Stress Control Logic, Calculation & WorkingTahoor Alam Khan
Turbine Stress Control is one of the complex logics of BHEL turbine. This presentation clearly explains the Logic, working, calculations and influence of the same on operation of steam turbine. For further details and understanding, I can be reached on tahoorkhn03@gmail.com.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
This PPT explains the logic and requirement behind Boiler Loss of Flame Protection under MFT. To know more about Boiler Loss of Flame please connect to tahoorkhn03@gmail.com
Thermal Power Plant Simulator Hands-on MalfunctionsManohar Tatwawadi
The presentation describes some of the malfunctions in a Power Plant. Many more can be simulated and operators told to handle the situations in the simulator. The trippings of Generator, turbine, boilers and all auxiliaries can be simulated to get hands on practice on the simulator before operating the actual turbogenerator and boiler associated equipment.
Power Plant Simulator, Unloading and shutting the TurbogeneratorManohar Tatwawadi
The Presentation describes the steps for gradual unloading of the machine/turbogenerator for a planned shutdown. The steps are described in the presentation.
The presentation is for the simulator for the operation of Thermal Power Plant from starting. It describes the Electrical Charging and Water Cycle Establishment. The simultaneous operations on Turbine sides are also described for the First Part.
The slides give a brief about the basic operations in a Thermal Power Station, The does and dont,s are discussed in the presentation. The general mistakes to be avoided while doing any operation in the Power Plant are also discussed.
MS Lines, Turbine Casings and rotors and other steam lines including Steam Stop Valves, MSV, CV, ESV heating, Turbine Rolling, Flange and Stud heating, Turbovisory and speeding the turbine to 3000 RPM.
Heavy duty gear pumps (Positive DisplacementRotary Twin gear Pumps) type AERN series pumps are useful for pumping and transfer of all kind of viscous Liquids and petroleum products.
The operations carried out to Light up the Boiler, from Air Cycle Establishment, Oil Handling Plant, Scanner air fans and Igniter Air Fans, Boiler Purging.
The presentation is based on the discussions of starting operations of a coal based thermal power plant. This presentation is based on the in-house training to the operation engineers of the thermal power plant. It describes the activity chart for the starting of boiler, Turbine and synchronising of Generator, picking up the load etc.
This is a presentation series part 3 on Frequently Asked Questions on Steam Turbines in large steam power plants. All questions are answered properly and any doubt may be mailed to the writer.
Green building concepts and good building practicesManohar Tatwawadi
The power sector must adopt the green building concepts and go for good building practices. In fact all industries need to go for the same. The same practices can also be adopted in all commercial as well as residential buildings.
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
Discussions on Auxiliary consumption in a 4 X 210 MW TPS, the common systems and individual unitwise Auxiliary consumption has been briefed in the presentation. Also savings in various aspects due to increase in Boiler Efficiency are also discussed in the presentation.
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
The presentation gives an idea as to how the compressed air system is designed and the performance of the compressed air system. The losses, conservation of energy, the cost of leakages etc are discussed in the presentation
Questions and answers on turbines used in Power Plants. The discussion is definitely going to reduce your doubts and give you all answers on your questions. This is part 1 and the series will be continued till your doubts are cleared. you can mail me the questions and i will try to give you all answers as early as possible.
The presentation gives a basic idea of cooling towers in big industries including the Power Plants. The performance of cooling towers and the commonenly used terms with reference to the cooling towers are also discussed at length. Care to be taken while in freezing temperatures in the European countries is also discussed.
The presentation is based on the discussions about the safety in Power Plants and substations. The presentation is a part of the seminar on Electrical safety and reliability. The reporting of accidents was also discussed at length in the seminar
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
The subject matter discuss in details about the cost accounting being practiced in a thermal power station for calculating the actual cost of generation of electricity. The cost centres and the cost affecting factors alongwith steps to reduce the cost of generation are described in the presentation. The PPMS system adopted can be further be well designed by any power plant engineer.
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
The presentation gives the basic idea as to the environment, pollutions and laws, the governing bodies and the limits of the emmissions. Also specifically about the solid waste, liquid waste and the gas emmissions from the Thermal Power Plants.
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
The discussion is for the Energy Conservation drive in the thermal power plants in the Auxilliary Consumption of the Electrical Auxilliaries in the Plant and thereby identify the steps to be taken for the reduction in Auxilliary Consumption
The presentation details the process of combustion in a 500 MW Coal based Thermal Power Plant where the main fuel is Pulverised coal. It details about the combustion of coal partical in the furnace and also the combustion equations related to the process, the excess air that is supplied.
The presentation gives an idea about the primary requirements for the establishment of a coal based THERMAL POWER STATION. The estimates are quite fair.
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
The presentation discusses about the change in performance parameters of a pulveriser due to change in coal quality and the measurement of performance and troubleshooting of coal firing system as a whole.
The Presentation describes the basics about the Efficiency and performance of a steam based power plant. It also describes how the heat rate of the power plant is important from the point of view of fuel savings.
THE PRESENTATION SPEAKS ABOUT THE BASIC IDEAS ABOUT EFFICIENCIES OF BOILER AND TURBINE IN A COAL BASED THERMAL POWER PLANT WITH THE DESIGN EFFICIENCIES AND HEAT RATE. IT ALSO THROWS LIGHT ON THE VARIOUS IMPROVEMENTS IN HEAT RATE AND EFFICIENCIES.THAT CAN BE ACHIEVED.
The presentation discusses about the strengths and weaknesses of a company The swot analysis, the capabilities, strategic planning and about the resource gap analysis.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
1. HANDLING OF TURBINE DURING
EMERGENCY
Manohar Tatwawadi
Director, tops
A2-806, Palladion, Balewadi, PUNE,
411045
14-11-2019 total output power solutions 1
2. EMERGENCIES IN TURBINE AND
AUXILIARIES
• In day to day power plant operations there
can be any number of emergencies in Turbine
operation.
• Thrust is given on representative emergencies.
• Following are the representative emergency
operations and they are discussed one by one.
• Operational priorities are also to be decided
by the operating Engineer.
14-11-2019 total output power solutions 2
3. EMERGENCIES……TURBINE SIDE
1) Partial load throw off (due to high frequency).
2) Partial load throw off due to Aux. Failure.
3) Sudden increase of load from full load
4) Bearing Vibrations high
5) Differential Expansion high/low
6) Axial shift high
7) Loss of vacuum
8) High level in condenser
9) Loss of Barring gear or barring gear fails to start
The description of probable causes and remedial operation
at the time of occurrence of such emergencies are
discussed in the following slides.
14-11-2019 total output power solutions 3
4. Partial load throw off.
(due to high frequency)
• Probable Reasons : Due to grid frequency going high OR
disconnection of Unit from grid(CPP).
S.N. Plant Disturbances Actions to be taken
1 The steam pressure at
ESV will increase
FSSS operator to control the
boiler pressure by reducing fuel.
2 Governor will control the
load.
If it fails, Throttle the control
valves suitably and maintain
pressure to normal till the
frequency comes down to
normal.
3 The turbine load will
decrease
There should be a constant
watch on the supervisory
instruments
14-11-2019 total output power solutions 4
5. Partial load throw off.
(due to high frequency)
S.N. Plant Disturbances Actions to be taken
4 Disturbances in differential
expansion, vibration, axial
shift & eccentricity
Check and watch.
5 Disturbance in condenser
level
Adjust and maintain the hot well
level by hotwell level control Valve.
6 Disturbance in Condenser
vacuum
Check and adjust ejector steam
pressure and gland steam pressure to
normal.
7 Turbine lubricating oil temp
will change
Adjust Oil cooler’s water flow as
necessary.
8 Disturbance in Deaerator
pressure
Deaerator pressure tends to fall,
maintain it through extraction on 16
ata / PRDS.
14-11-2019 total output power solutions 5
6. Partial load throw off
(due to Auxiliaries Failure)
Probable Reasons and Action to be taken:-
There is a provision for initial load throw off by help of a relay
without time delay which reduces turbine load to half (100 MW
in case of 210 MW unit) in case of tripping of following
equipment’s.
One C.W. pump in case both are running:
• If the partial load relay fails/not in circuit: Reduce the turbine
load and inform the boiler operator to control steam
parameter in case one C.W. pump or one condensate pump
trip.
• Careful watch may be kept on vacuum.
• Inform the local operator to check the cause of tripping.
• Maintain the deaerator and hotwell level.
14-11-2019 total output power solutions 6
7. Partial load throw off
(due to Auxiliaries Failure)
One BFP in case two are running and standby does not come
on auto remote /not available. :
• Reduce generator load to ½ of full load slowly and try to
maintain Boiler drum level
• Inform the local operator to check the cause of tripping.
One condensate pump in case two are running and standby
dose not come on auto/ remote not available:
• Careful watch may be kept on vacuum.
• Take the standby ejector in service if necessary.
And also due to tripping of any one of I.D. fan, F.D. fan P.A.fan.:
• Reduce load to ½ full load.
• Inform the local operator to check the cause of tripping
14-11-2019 total output power solutions 7
8. Partial load throw off
(due to Auxiliaries Failure)
In case of full load throw off (due to opening generator
breaker):
• Unit trip on protection.
The turbine may trip due to over speeding :
• Close the control gear hand wheel
If closing control valve can not control the speed :
• Check that ESV, IV and control valves are closed.
Immediately otherwise trip the Turbine by emergency
trip button.
• Close the Boiler Outlet valves in the M.S. line.
• Close the Extr. steam valves.
14-11-2019 total output power solutions 8
9. Sudden increase of load from full load
• Probable Reasons and Action to be taken:-
Low frequency : Since the turbine is on governor control the load
will increase due to fall in speed.
• Reduce the load by the control gear and bring the boiler
parameter and load to normal.
Due to sudden rise of boiler drum pressure:
• Bring back the load /governing wheel pressure to normal by
control gear and inform the boiler operator.
Due to HP Heaters Bypassing on protection:
• Keep a close watch on the Generator output current, Stator
winding temp, Hydrogen temp, Boiler Drum Level.
• Slowly reduce the control gear to reduce generator load to
normal value.
14-11-2019 total output power solutions 9
10. Turbine Bearing Vibrations High
Normally the vibration in bearings should be within 40 microns.
If it exceeds the limit, turbine should be shut down:
• Check the turbine cylinder drain should not be cold (if necessary
open the drain valve for few minutes if turbine is on load).
• Check bearing oil press flow and temp. to be normal .
• Check for any rubbing sound etc.
Turbine bearing oil press low :
• Reduce the load /speed.
• Check the main Oil line pressure and maintain it.
Bearing oil inlet temp. High :
• Check the cooling water valves are open in oil coolers and vent the
coolers.
• Put the standby cooler in service, ensure C.W.P. is running normal.
• Check bearing oil outlet temp. (less then 65° c ).
14-11-2019 total output power solutions 10
11. Differential Expansions high/low
Probable Reasons and Action to be taken:-
• Normally the rotor gets long during running and gets short
during shut down.
• The expansion is to be controlled by admitting steam or
shutting off supply to flange and stud heating, chamber
heating accordingly.
• In case if it goes beyond control, the machine to be tripped:
• Check the steam temp. reduce load / speed.
• Check the valve for flange heating is in open condition if
rotor is long or Close if rotor is short.
• Check and adjust gland steam temp.
• Check the vacuum to be normal
14-11-2019 total output power solutions 11
12. Axial shift high
Probable Reasons and Action to be taken:-
• In case of excessive shift the turbine will trip through the protection
• Due to Sudden change in load : Control the load and maintain the
steam parameter.
• Abrupt change of steam parameter: Control the load and maintain
the steam parameter
• Sudden closure of FCNRV of heater (HP/LP): Control the load and
maintain the governing pressure, if heaters are healthy open
FCNRV.
• Variation in lub. Oil temp .pressure and quality : Maintain lub. Oil
pressure and temp. for quality get the oil tested from laboratory
and if necessary oil is to be changed.
• Difference of oil temp . from thrust bearing front & rear outlet
should not be more than 3°c.
14-11-2019 total output power solutions 12
13. Loss of vacuum
Probable Reasons and Action to be taken
• If there be any loss of vacuum, start the standby
ejector at the earliest.
• Still if it does not improve start starting ejector.
• With no further improvement of vacuum, reduce the
load as required to maintain the vacuum at 700 MM.
• Meanwhile try to detect the specific reason which may
be as follows…..
: Steam ejector not properly functioning
: Check that steam pressure in 6 kg/ cm².
14-11-2019 total output power solutions 13
14. High level in condenser
Probable Reasons and Action to be taken:-
• Malfunctioning of condensate pump or valve: Check the normal
running of the condensate pump, start standby.
• Check the operation of valve from UCB by taking it to manual, if not
all right control the hot well level bypass valve.
• Malfunctioning of DM make up valve : Close valve from UCB and
watch that hot well level falls.
• Condenser tube leakage : If the above operation fails to control the
hot well level, get the condensate water tested by laboratory to
confirm the leakage .if the tube leakage is very high, it may not be
possible to pump out the condensate from the condenser when the
condensate level will gradually increase. Ultimately if the water
level rises up to the air suction space of condenser , water will be
sucked in to air suction pipe line of the ejector. When the same well
be supercooled and ejector will not function. Shut down the turbine
at the earliest to get the leakage attend.
14-11-2019 total output power solutions 14
15. High level in condenser
Probable Reasons and Action to be taken:-
CW pump failure :
• If one pump is tripped , reduce the load. Meanwhile determine the
cause of CWP failure and rectify the defects. Of course if both the
CW pumps fails , there is no way out other than to trip the unit.
Malfunctioning of DM make up valve
Condenser tube leakage
Air leak into system :
• Check scaling water pressure to valves under vacuum is normal.
Check starting ejector air vale and vacuum break valve are tightly
closed. Measure the amount of air leakage At air removal
equipment outlet and investigate the source of leak.
Condenser tube choking : Check the CW inlet and outlet temperature.
14-11-2019 total output power solutions 15
16. Loss of Barring gear or barring gear
fails to start
Probable Reasons and Action to be taken:-
• For loss of electrical supply: D.G. set will start
automatically Otherwise start. : If not possible to
start the DG set, attempt to turn the Turbine
shaft by slings with the help of over head crane
by 180 Degrees at regular intervals of 15 minutes
after cutting in the D.C. emergency lub oil pump.
• Smoke from turbine seals. : Check differential
expansions are normal
• Reduce seal steam temperature, if high.
14-11-2019 total output power solutions 16