HANDLING OF TURBINE DURING
EMERGENCY
Manohar Tatwawadi
Director, tops
A2-806, Palladion, Balewadi, PUNE,
411045
14-11-2019 total output power solutions 1
EMERGENCIES IN TURBINE AND
AUXILIARIES
• In day to day power plant operations there
can be any number of emergencies in Turbine
operation.
• Thrust is given on representative emergencies.
• Following are the representative emergency
operations and they are discussed one by one.
• Operational priorities are also to be decided
by the operating Engineer.
14-11-2019 total output power solutions 2
EMERGENCIES……TURBINE SIDE
1) Partial load throw off (due to high frequency).
2) Partial load throw off due to Aux. Failure.
3) Sudden increase of load from full load
4) Bearing Vibrations high
5) Differential Expansion high/low
6) Axial shift high
7) Loss of vacuum
8) High level in condenser
9) Loss of Barring gear or barring gear fails to start
The description of probable causes and remedial operation
at the time of occurrence of such emergencies are
discussed in the following slides.
14-11-2019 total output power solutions 3
Partial load throw off.
(due to high frequency)
• Probable Reasons : Due to grid frequency going high OR
disconnection of Unit from grid(CPP).
S.N. Plant Disturbances Actions to be taken
1 The steam pressure at
ESV will increase
FSSS operator to control the
boiler pressure by reducing fuel.
2 Governor will control the
load.
If it fails, Throttle the control
valves suitably and maintain
pressure to normal till the
frequency comes down to
normal.
3 The turbine load will
decrease
There should be a constant
watch on the supervisory
instruments
14-11-2019 total output power solutions 4
Partial load throw off.
(due to high frequency)
S.N. Plant Disturbances Actions to be taken
4 Disturbances in differential
expansion, vibration, axial
shift & eccentricity
Check and watch.
5 Disturbance in condenser
level
Adjust and maintain the hot well
level by hotwell level control Valve.
6 Disturbance in Condenser
vacuum
Check and adjust ejector steam
pressure and gland steam pressure to
normal.
7 Turbine lubricating oil temp
will change
Adjust Oil cooler’s water flow as
necessary.
8 Disturbance in Deaerator
pressure
Deaerator pressure tends to fall,
maintain it through extraction on 16
ata / PRDS.
14-11-2019 total output power solutions 5
Partial load throw off
(due to Auxiliaries Failure)
Probable Reasons and Action to be taken:-
There is a provision for initial load throw off by help of a relay
without time delay which reduces turbine load to half (100 MW
in case of 210 MW unit) in case of tripping of following
equipment’s.
One C.W. pump in case both are running:
• If the partial load relay fails/not in circuit: Reduce the turbine
load and inform the boiler operator to control steam
parameter in case one C.W. pump or one condensate pump
trip.
• Careful watch may be kept on vacuum.
• Inform the local operator to check the cause of tripping.
• Maintain the deaerator and hotwell level.
14-11-2019 total output power solutions 6
Partial load throw off
(due to Auxiliaries Failure)
One BFP in case two are running and standby does not come
on auto remote /not available. :
• Reduce generator load to ½ of full load slowly and try to
maintain Boiler drum level
• Inform the local operator to check the cause of tripping.
One condensate pump in case two are running and standby
dose not come on auto/ remote not available:
• Careful watch may be kept on vacuum.
• Take the standby ejector in service if necessary.
And also due to tripping of any one of I.D. fan, F.D. fan P.A.fan.:
• Reduce load to ½ full load.
• Inform the local operator to check the cause of tripping
14-11-2019 total output power solutions 7
Partial load throw off
(due to Auxiliaries Failure)
In case of full load throw off (due to opening generator
breaker):
• Unit trip on protection.
The turbine may trip due to over speeding :
• Close the control gear hand wheel
If closing control valve can not control the speed :
• Check that ESV, IV and control valves are closed.
Immediately otherwise trip the Turbine by emergency
trip button.
• Close the Boiler Outlet valves in the M.S. line.
• Close the Extr. steam valves.
14-11-2019 total output power solutions 8
Sudden increase of load from full load
• Probable Reasons and Action to be taken:-
Low frequency : Since the turbine is on governor control the load
will increase due to fall in speed.
• Reduce the load by the control gear and bring the boiler
parameter and load to normal.
Due to sudden rise of boiler drum pressure:
• Bring back the load /governing wheel pressure to normal by
control gear and inform the boiler operator.
Due to HP Heaters Bypassing on protection:
• Keep a close watch on the Generator output current, Stator
winding temp, Hydrogen temp, Boiler Drum Level.
• Slowly reduce the control gear to reduce generator load to
normal value.
14-11-2019 total output power solutions 9
Turbine Bearing Vibrations High
Normally the vibration in bearings should be within 40 microns.
If it exceeds the limit, turbine should be shut down:
• Check the turbine cylinder drain should not be cold (if necessary
open the drain valve for few minutes if turbine is on load).
• Check bearing oil press flow and temp. to be normal .
• Check for any rubbing sound etc.
Turbine bearing oil press low :
• Reduce the load /speed.
• Check the main Oil line pressure and maintain it.
Bearing oil inlet temp. High :
• Check the cooling water valves are open in oil coolers and vent the
coolers.
• Put the standby cooler in service, ensure C.W.P. is running normal.
• Check bearing oil outlet temp. (less then 65° c ).
14-11-2019 total output power solutions 10
Differential Expansions high/low
Probable Reasons and Action to be taken:-
• Normally the rotor gets long during running and gets short
during shut down.
• The expansion is to be controlled by admitting steam or
shutting off supply to flange and stud heating, chamber
heating accordingly.
• In case if it goes beyond control, the machine to be tripped:
• Check the steam temp. reduce load / speed.
• Check the valve for flange heating is in open condition if
rotor is long or Close if rotor is short.
• Check and adjust gland steam temp.
• Check the vacuum to be normal
14-11-2019 total output power solutions 11
Axial shift high
Probable Reasons and Action to be taken:-
• In case of excessive shift the turbine will trip through the protection
• Due to Sudden change in load : Control the load and maintain the
steam parameter.
• Abrupt change of steam parameter: Control the load and maintain
the steam parameter
• Sudden closure of FCNRV of heater (HP/LP): Control the load and
maintain the governing pressure, if heaters are healthy open
FCNRV.
• Variation in lub. Oil temp .pressure and quality : Maintain lub. Oil
pressure and temp. for quality get the oil tested from laboratory
and if necessary oil is to be changed.
• Difference of oil temp . from thrust bearing front & rear outlet
should not be more than 3°c.
14-11-2019 total output power solutions 12
Loss of vacuum
Probable Reasons and Action to be taken
• If there be any loss of vacuum, start the standby
ejector at the earliest.
• Still if it does not improve start starting ejector.
• With no further improvement of vacuum, reduce the
load as required to maintain the vacuum at 700 MM.
• Meanwhile try to detect the specific reason which may
be as follows…..
: Steam ejector not properly functioning
: Check that steam pressure in 6 kg/ cm².
14-11-2019 total output power solutions 13
High level in condenser
Probable Reasons and Action to be taken:-
• Malfunctioning of condensate pump or valve: Check the normal
running of the condensate pump, start standby.
• Check the operation of valve from UCB by taking it to manual, if not
all right control the hot well level bypass valve.
• Malfunctioning of DM make up valve : Close valve from UCB and
watch that hot well level falls.
• Condenser tube leakage : If the above operation fails to control the
hot well level, get the condensate water tested by laboratory to
confirm the leakage .if the tube leakage is very high, it may not be
possible to pump out the condensate from the condenser when the
condensate level will gradually increase. Ultimately if the water
level rises up to the air suction space of condenser , water will be
sucked in to air suction pipe line of the ejector. When the same well
be supercooled and ejector will not function. Shut down the turbine
at the earliest to get the leakage attend.
14-11-2019 total output power solutions 14
High level in condenser
Probable Reasons and Action to be taken:-
CW pump failure :
• If one pump is tripped , reduce the load. Meanwhile determine the
cause of CWP failure and rectify the defects. Of course if both the
CW pumps fails , there is no way out other than to trip the unit.
Malfunctioning of DM make up valve
Condenser tube leakage
Air leak into system :
• Check scaling water pressure to valves under vacuum is normal.
Check starting ejector air vale and vacuum break valve are tightly
closed. Measure the amount of air leakage At air removal
equipment outlet and investigate the source of leak.
Condenser tube choking : Check the CW inlet and outlet temperature.
14-11-2019 total output power solutions 15
Loss of Barring gear or barring gear
fails to start
Probable Reasons and Action to be taken:-
• For loss of electrical supply: D.G. set will start
automatically Otherwise start. : If not possible to
start the DG set, attempt to turn the Turbine
shaft by slings with the help of over head crane
by 180 Degrees at regular intervals of 15 minutes
after cutting in the D.C. emergency lub oil pump.
• Smoke from turbine seals. : Check differential
expansions are normal
• Reduce seal steam temperature, if high.
14-11-2019 total output power solutions 16
14-11-2019 total output power solutions 17

More Related Content

What's hot

Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
Ashish Kumar Jain
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
Manohar Tatwawadi
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentationSteve Ford
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
Nitin Patel
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
Billa ParameswaraRao
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
Nitin Patel
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
Boben Anto Chemmannoor
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
Tahoor Alam Khan
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
Jigyasa Singh
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
Sachin Pyasi
 
turbine governing oil system
turbine governing oil systemturbine governing oil system
turbine governing oil system
pradeep chotia
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
Tahoor Alam Khan
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
VEERABHADRA SWAMY
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
Manohar Tatwawadi
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plantsSHIVAJI CHOUDHURY
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
Tahoor Alam Khan
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Manohar Tatwawadi
 
Thermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on MalfunctionsThermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on Malfunctions
Manohar Tatwawadi
 

What's hot (20)

Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
example hydrogen seal oil presentation
example hydrogen seal oil presentationexample hydrogen seal oil presentation
example hydrogen seal oil presentation
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 
turbine governing oil system
turbine governing oil systemturbine governing oil system
turbine governing oil system
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plants
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Thermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on MalfunctionsThermal Power Plant Simulator Hands-on Malfunctions
Thermal Power Plant Simulator Hands-on Malfunctions
 

Similar to Handling of turbine side emergencies

POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
Manohar Tatwawadi
 
Power Plant Simulator, Unloading and shutting the Turbogenerator
Power Plant Simulator, Unloading and shutting the TurbogeneratorPower Plant Simulator, Unloading and shutting the Turbogenerator
Power Plant Simulator, Unloading and shutting the Turbogenerator
Manohar Tatwawadi
 
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdfEC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
suryanshsingh836763
 
A330 FuelDefuel.pptx
A330 FuelDefuel.pptxA330 FuelDefuel.pptx
A330 FuelDefuel.pptx
KumaresonKobarajah
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
BhimarajuKanireddy
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
Manohar Tatwawadi
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
ssuser8006c7
 
Principals of operation of a thermal power station
Principals of operation of a thermal power stationPrincipals of operation of a thermal power station
Principals of operation of a thermal power station
Manohar Tatwawadi
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
Manohar Tatwawadi
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC
 
Heavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series PumpsHeavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series Pumps
Anivarya pumps
 
Submersible Pumps Trouble Shooting
Submersible Pumps Trouble ShootingSubmersible Pumps Trouble Shooting
Submersible Pumps Trouble Shooting
controlspecialties1
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
Madan Karki
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
 
PUMPS.ppt
PUMPS.pptPUMPS.ppt
PUMPS.ppt
ArmaanKhan92
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
DhananjayaTripathy1
 
Variable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcastVariable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcast
Schneider Electric
 
Lessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanksLessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanks
PROTEGO® | Braunschweiger Flammenfilter GmbH
 
Compressor operation.pdf
Compressor operation.pdfCompressor operation.pdf
Compressor operation.pdf
MBouderbala
 
compressor Operation pdf.pdf
compressor Operation pdf.pdfcompressor Operation pdf.pdf
compressor Operation pdf.pdf
yusuf699644
 

Similar to Handling of turbine side emergencies (20)

POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Power Plant Simulator, Unloading and shutting the Turbogenerator
Power Plant Simulator, Unloading and shutting the TurbogeneratorPower Plant Simulator, Unloading and shutting the Turbogenerator
Power Plant Simulator, Unloading and shutting the Turbogenerator
 
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdfEC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
EC8DE5D2-3B41-4599-8A5D-AB833F9397F5.pdf
 
A330 FuelDefuel.pptx
A330 FuelDefuel.pptxA330 FuelDefuel.pptx
A330 FuelDefuel.pptx
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
 
Principals of operation of a thermal power station
Principals of operation of a thermal power stationPrincipals of operation of a thermal power station
Principals of operation of a thermal power station
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
 
Heavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series PumpsHeavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series Pumps
 
Submersible Pumps Trouble Shooting
Submersible Pumps Trouble ShootingSubmersible Pumps Trouble Shooting
Submersible Pumps Trouble Shooting
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
PUMPS.ppt
PUMPS.pptPUMPS.ppt
PUMPS.ppt
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 
Variable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcastVariable frequency drives rod pump control podcast
Variable frequency drives rod pump control podcast
 
Lessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanksLessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanks
 
Compressor operation.pdf
Compressor operation.pdfCompressor operation.pdf
Compressor operation.pdf
 
compressor Operation pdf.pdf
compressor Operation pdf.pdfcompressor Operation pdf.pdf
compressor Operation pdf.pdf
 

More from Manohar Tatwawadi

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
Manohar Tatwawadi
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
Manohar Tatwawadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Manohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
Manohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
Manohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
Manohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
Manohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
Manohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
Manohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
Manohar Tatwawadi
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Manohar Tatwawadi
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
Manohar Tatwawadi
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
Manohar Tatwawadi
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
Manohar Tatwawadi
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
Manohar Tatwawadi
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
Manohar Tatwawadi
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
Manohar Tatwawadi
 

More from Manohar Tatwawadi (20)

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 

Handling of turbine side emergencies

  • 1. HANDLING OF TURBINE DURING EMERGENCY Manohar Tatwawadi Director, tops A2-806, Palladion, Balewadi, PUNE, 411045 14-11-2019 total output power solutions 1
  • 2. EMERGENCIES IN TURBINE AND AUXILIARIES • In day to day power plant operations there can be any number of emergencies in Turbine operation. • Thrust is given on representative emergencies. • Following are the representative emergency operations and they are discussed one by one. • Operational priorities are also to be decided by the operating Engineer. 14-11-2019 total output power solutions 2
  • 3. EMERGENCIES……TURBINE SIDE 1) Partial load throw off (due to high frequency). 2) Partial load throw off due to Aux. Failure. 3) Sudden increase of load from full load 4) Bearing Vibrations high 5) Differential Expansion high/low 6) Axial shift high 7) Loss of vacuum 8) High level in condenser 9) Loss of Barring gear or barring gear fails to start The description of probable causes and remedial operation at the time of occurrence of such emergencies are discussed in the following slides. 14-11-2019 total output power solutions 3
  • 4. Partial load throw off. (due to high frequency) • Probable Reasons : Due to grid frequency going high OR disconnection of Unit from grid(CPP). S.N. Plant Disturbances Actions to be taken 1 The steam pressure at ESV will increase FSSS operator to control the boiler pressure by reducing fuel. 2 Governor will control the load. If it fails, Throttle the control valves suitably and maintain pressure to normal till the frequency comes down to normal. 3 The turbine load will decrease There should be a constant watch on the supervisory instruments 14-11-2019 total output power solutions 4
  • 5. Partial load throw off. (due to high frequency) S.N. Plant Disturbances Actions to be taken 4 Disturbances in differential expansion, vibration, axial shift & eccentricity Check and watch. 5 Disturbance in condenser level Adjust and maintain the hot well level by hotwell level control Valve. 6 Disturbance in Condenser vacuum Check and adjust ejector steam pressure and gland steam pressure to normal. 7 Turbine lubricating oil temp will change Adjust Oil cooler’s water flow as necessary. 8 Disturbance in Deaerator pressure Deaerator pressure tends to fall, maintain it through extraction on 16 ata / PRDS. 14-11-2019 total output power solutions 5
  • 6. Partial load throw off (due to Auxiliaries Failure) Probable Reasons and Action to be taken:- There is a provision for initial load throw off by help of a relay without time delay which reduces turbine load to half (100 MW in case of 210 MW unit) in case of tripping of following equipment’s. One C.W. pump in case both are running: • If the partial load relay fails/not in circuit: Reduce the turbine load and inform the boiler operator to control steam parameter in case one C.W. pump or one condensate pump trip. • Careful watch may be kept on vacuum. • Inform the local operator to check the cause of tripping. • Maintain the deaerator and hotwell level. 14-11-2019 total output power solutions 6
  • 7. Partial load throw off (due to Auxiliaries Failure) One BFP in case two are running and standby does not come on auto remote /not available. : • Reduce generator load to ½ of full load slowly and try to maintain Boiler drum level • Inform the local operator to check the cause of tripping. One condensate pump in case two are running and standby dose not come on auto/ remote not available: • Careful watch may be kept on vacuum. • Take the standby ejector in service if necessary. And also due to tripping of any one of I.D. fan, F.D. fan P.A.fan.: • Reduce load to ½ full load. • Inform the local operator to check the cause of tripping 14-11-2019 total output power solutions 7
  • 8. Partial load throw off (due to Auxiliaries Failure) In case of full load throw off (due to opening generator breaker): • Unit trip on protection. The turbine may trip due to over speeding : • Close the control gear hand wheel If closing control valve can not control the speed : • Check that ESV, IV and control valves are closed. Immediately otherwise trip the Turbine by emergency trip button. • Close the Boiler Outlet valves in the M.S. line. • Close the Extr. steam valves. 14-11-2019 total output power solutions 8
  • 9. Sudden increase of load from full load • Probable Reasons and Action to be taken:- Low frequency : Since the turbine is on governor control the load will increase due to fall in speed. • Reduce the load by the control gear and bring the boiler parameter and load to normal. Due to sudden rise of boiler drum pressure: • Bring back the load /governing wheel pressure to normal by control gear and inform the boiler operator. Due to HP Heaters Bypassing on protection: • Keep a close watch on the Generator output current, Stator winding temp, Hydrogen temp, Boiler Drum Level. • Slowly reduce the control gear to reduce generator load to normal value. 14-11-2019 total output power solutions 9
  • 10. Turbine Bearing Vibrations High Normally the vibration in bearings should be within 40 microns. If it exceeds the limit, turbine should be shut down: • Check the turbine cylinder drain should not be cold (if necessary open the drain valve for few minutes if turbine is on load). • Check bearing oil press flow and temp. to be normal . • Check for any rubbing sound etc. Turbine bearing oil press low : • Reduce the load /speed. • Check the main Oil line pressure and maintain it. Bearing oil inlet temp. High : • Check the cooling water valves are open in oil coolers and vent the coolers. • Put the standby cooler in service, ensure C.W.P. is running normal. • Check bearing oil outlet temp. (less then 65° c ). 14-11-2019 total output power solutions 10
  • 11. Differential Expansions high/low Probable Reasons and Action to be taken:- • Normally the rotor gets long during running and gets short during shut down. • The expansion is to be controlled by admitting steam or shutting off supply to flange and stud heating, chamber heating accordingly. • In case if it goes beyond control, the machine to be tripped: • Check the steam temp. reduce load / speed. • Check the valve for flange heating is in open condition if rotor is long or Close if rotor is short. • Check and adjust gland steam temp. • Check the vacuum to be normal 14-11-2019 total output power solutions 11
  • 12. Axial shift high Probable Reasons and Action to be taken:- • In case of excessive shift the turbine will trip through the protection • Due to Sudden change in load : Control the load and maintain the steam parameter. • Abrupt change of steam parameter: Control the load and maintain the steam parameter • Sudden closure of FCNRV of heater (HP/LP): Control the load and maintain the governing pressure, if heaters are healthy open FCNRV. • Variation in lub. Oil temp .pressure and quality : Maintain lub. Oil pressure and temp. for quality get the oil tested from laboratory and if necessary oil is to be changed. • Difference of oil temp . from thrust bearing front & rear outlet should not be more than 3°c. 14-11-2019 total output power solutions 12
  • 13. Loss of vacuum Probable Reasons and Action to be taken • If there be any loss of vacuum, start the standby ejector at the earliest. • Still if it does not improve start starting ejector. • With no further improvement of vacuum, reduce the load as required to maintain the vacuum at 700 MM. • Meanwhile try to detect the specific reason which may be as follows….. : Steam ejector not properly functioning : Check that steam pressure in 6 kg/ cm². 14-11-2019 total output power solutions 13
  • 14. High level in condenser Probable Reasons and Action to be taken:- • Malfunctioning of condensate pump or valve: Check the normal running of the condensate pump, start standby. • Check the operation of valve from UCB by taking it to manual, if not all right control the hot well level bypass valve. • Malfunctioning of DM make up valve : Close valve from UCB and watch that hot well level falls. • Condenser tube leakage : If the above operation fails to control the hot well level, get the condensate water tested by laboratory to confirm the leakage .if the tube leakage is very high, it may not be possible to pump out the condensate from the condenser when the condensate level will gradually increase. Ultimately if the water level rises up to the air suction space of condenser , water will be sucked in to air suction pipe line of the ejector. When the same well be supercooled and ejector will not function. Shut down the turbine at the earliest to get the leakage attend. 14-11-2019 total output power solutions 14
  • 15. High level in condenser Probable Reasons and Action to be taken:- CW pump failure : • If one pump is tripped , reduce the load. Meanwhile determine the cause of CWP failure and rectify the defects. Of course if both the CW pumps fails , there is no way out other than to trip the unit. Malfunctioning of DM make up valve Condenser tube leakage Air leak into system : • Check scaling water pressure to valves under vacuum is normal. Check starting ejector air vale and vacuum break valve are tightly closed. Measure the amount of air leakage At air removal equipment outlet and investigate the source of leak. Condenser tube choking : Check the CW inlet and outlet temperature. 14-11-2019 total output power solutions 15
  • 16. Loss of Barring gear or barring gear fails to start Probable Reasons and Action to be taken:- • For loss of electrical supply: D.G. set will start automatically Otherwise start. : If not possible to start the DG set, attempt to turn the Turbine shaft by slings with the help of over head crane by 180 Degrees at regular intervals of 15 minutes after cutting in the D.C. emergency lub oil pump. • Smoke from turbine seals. : Check differential expansions are normal • Reduce seal steam temperature, if high. 14-11-2019 total output power solutions 16
  • 17. 14-11-2019 total output power solutions 17