1. Implement 5S
5S is one of the most widely adopted techniques from the lean
manufacturing. 5S is a "foundational" lean management (waste
removing) concept, as it establishes the operational stability required for
making and sustaining continuous improvements.
1. Sort: Separate what is needed and what is not
needed, and keep only those things that are needed in
the workplace. Discard unnecessary items.
2. Set-In-Order: Neatly place and identify needed work
items. Designate a place for everything so that anyone
can find it. Always put things back in their designated
spots.
3. Shine: Clean up thoroughly and take measures
against the sources of dust, leakage of oil, etc.
4. Standardize: Maintain 5 Sโ€™s by indicating the rules in
visible forms.
5. Sustain: Guide the people never to allow a violation of
the rule. Maintain and practice the first four Sโ€™s.
Points of 5Sโ€™s
2. Implement Visual Control
Purpose of
Visual
Control
โ€ข Visual control
methods aim to
increase the
efficiency and
effectiveness of
a process by
making the
steps in that
process more
visible.
Requirements for Visual Control
1. Make control items and criteria clear
2. Make everyone instantly recognize the
situation. Normally called โ€œvisual
expression.โ€
Points of Visual Control
1. Abnormalities and problems to be instantly
identified with the item on the spot
โ€ข Control criteria are incorporated in the things
on the spot
โ€ข Conventional visual control
2. The status of control to be identified at a glance
with the things on the spot
โ€ข Control on 5M conditions and characteristics
visually identified
3. Observance of rules and standards visually
identified, including the checking by manager
3. Observing & Enforcement of
Standard
Points of Observance and
Enforcement of Standard
Clarificationofrolesand
responsibilities
Devicestoimprovedifficult
works
Devicestomakenormalconditions
andabnormalitiesvisuallyidentifiable
Standard
Observance and enforcement of
Observance and enforcement of
Observance and enforcement of
Securingbasicquality
100%assurance
working standard
working standard
working standard
Improvement to enable observance and
enforcement
Enhancement of quality consciousness for
observance and enforcement of standards
Three Standards at The Production
Site
Standard Operation Confirmation of Quality Remedies of Abnormalities
๏ƒ˜ Production Standard
๏ƒ˜ Operation Standard
๏ƒ˜ One Operation, One Production
๏ƒ˜ First In, First Out
๏ƒ˜ Daily Check of Facilities, Jigs
and Tools
๏ƒ˜ Control of Manufacturing
Conditions
๏ƒ˜ Safety Standard
๏ƒ˜ Recording of Production and
Material Use Histories
๏ƒ˜ Identification and Classifications
by Lots
๏ƒ˜ Working Qualification System
๏ƒ˜ Rules on Special Process
๏ƒ˜ Inspection Standard
๏ƒ˜ Rules on Self Check of The
Process
๏ƒ˜ Rules on third-party confirmation
๏ƒ˜ Rules on Daily Checking of
Measuring Instruments
๏ƒ˜ Rules on Quality Confirmation at
The Time Set-Up or Equipment
Abnormalities
๏ƒ˜ Rules on Quality Confirmation at
The Time Renewal or
Improvement of Equipment and
Tools
๏ƒ˜ Rules on Control of Measuring
Instruments
๏ƒ˜ Definition of Abnormalities
๏ƒ˜ Rules on Remedies for
Abnormalities
๏ƒ˜ โ€œGo to The Jobsite, See The
Object, and Confirm The
Phenomenon Immediatelyโ€
๏ƒ˜ Rules on Control of
Changed Points
๏ƒ˜ Judgment of The Lots and
Taking Measures Against
The Defect Product
Promotion of Observance and
Enforcement of Standards
Review and
Improvement
Set Up the
Right
Standards
Sort Out the
Work Hard To
Do or Standards
Difficult To
Observe, &
Propose
Improvements
Observe the
Standards
Securely
(Confirm
Secure
Observance of
Standards)
- Create the Climate of the Jobsite Strict on Fundamentals
๏‚งFirmly Observe What was Determined
๏‚งAlways Follow the Right Procedures When Changing Rules
Build Up
Dependable
Qualities
Points to be Noticed in Establishing
Standards
1. Focus on the necessary rules.
๏‚ง Is it really necessary? (Not influenced by nominal
principles or preoccupations)
๏‚ง Can it be done by the hardware? (By
automatization or failsafe devices)
2. Make clear the objectives, scope of work, sharing
the roles, responsibilities and authorizations.
3. Make clear the risks if the rules are not observed.
4. Reflect the opinion of the operators.
5. Avoid vague expressions
6. Make the points clear.
14
Managers and supervisors
Make standards that can be observed
Revision of the
standards
Study the improvement of standards
Sort out the points by observation of
jobsite
Operators
Observe the right methods
Implementation
Propose improvement of
the standards that are hard
to be observed
1. Is the work done according to the right procedure?
2. Are points of work observed?
3. Are there any work hard to do or standards difficult to
observe?
The Roles of the Operators and
Supervisors in Rotating the PDCA Cycle
Devices to make off-standards
apparent
Third-party confirmation
(Confirmation of the state of
confirmation)
Building up the
quality
(Causes)
๏‚ท Failsafe devices
๏‚ท Alarm devices work when condition not fulfilled
๏‚ท Automatic shutdown of equipment
๏‚ท Standardization of the place and manner of
storage
๏‚ท Effective use of computers
๏‚ท Checking of production records
๏‚ท Checking by patrol
๏‚ท Indication of standard passage
๏‚ท Simplification and standardization of work
๏‚ท Shortening the cycle by โ€œone-piece-at-a-
time system
Confirmation
of quality
(Results)
๏‚ท Equipment for 100% inspection
๏‚ท Failsafe devices
๏‚ท Computer checking
๏‚ท Comparison with actual checking
๏‚ท Graphic management
๏‚ท Automatic shutdown of equipment
๏‚ท Retaining of actual product
๏‚ท Inspection records
๏‚ท Checking by patrol
๏‚ท Audit (Not double-checks)
Framework to Identify Off-Standards
4. Implement Failsafe Devices
Fact: People Make Mistakes.
A good failsafe device makes it impossible to make a
mistake.
Points to be Noticed on Failsafe
Devices
โ€ข Checking of the functions of failsafe devices is
necessary (at regular intervals)
โ€ข Design the process upon full understanding of
actual situation of the jobsite (work)
โ€ข Reflect the opinions from the jobsite to avoid
unnecessary difficulties of work
โ€ข Let the operators well understand the significance
of failsafe devices
Abnormality is the condition different from
normal, but not necessarily troubles or
defects.
Select and put out acceptable products
only
Right treatment for finished products.
Preventive measures against possible
claims.
The group is
in trouble!
Combine all the
technologies and
skills
5. Abnormality Control
Heavy injury Claim
<Latent>
Slight injury
Near miss or
near accident
Defects
Quality
abnormalities
๏‚ง Insufficient enforcement of standards
๏‚ง Insufficient establishment of rules
๏‚ง Insufficient horizontal deployment of know-how
๏‚ง Insufficient succession of technologies
Identification of
potential defects is
the points (just as
with safety)
<Apparent> (Safety) (Quality)
<Latent>
Causes of Quality & Safety Defect
Detection of abnormalities and remedies
Early detection of
abnormalities
Quick judgment and
countermeasures
Rules of remedies for abnormalities
Atmosphere of jobsite to make reporting
customary
Enhancement of abilities to detect
abnormalities
Abnormalities are: conditions different from
normal
๏‚ง Work cannot be done in accordance with
standards.
๏‚ง Inexperienced defects occurred
๏‚ง Conditions of materials or equipment differ
from normal
๏‚ง Continuous defects occurred
๏‚ง The results went off the control limit.
(Control chart, etc.)
Points of Abnormality Control
- Off-specification products - Out of controlled conditions
- Off-company-rule products* but within - Quality different from normal
official specifications - Quality abnormalities
- Off-specification products but accepted - Abnormalities in 5 Mโ€™s with
by the customer equipment, materials, etc
Defects are
Waiver concessions
are
Manners of occurrence,
Characteristics and appearance,
Beyond control limits
Manners of occurrence
Beyond control limits
*Company rules: Established on the basis of
process
Abnormalities are
Defects and Abnormalities
Abnormality control by control chart
A control chart is a time series linear graph representing data with
specific control lines, in order to see if the processes are in stable
condition (whether there are abnormalities) or to maintain the processes
in stable condition.
Upper control limit (UCL)
Center line (CL)
Lower control limit (LCL)
Early Detection of Abnormalities
Qualitative characteristics cannot be
controlled by control charts.
Enhancement of the abilities to detect
abnormalities of the forefront
operators
Detecting
Abnormalities
๏ฑ Abnormalities are the differences in sound, colour, touch,
smell, temperature, etc. from normal.
๏ฑ Repeated education on abnormalities.
๏ฑ Example of identifying a problem by detection of abnormalities
A part-timer identified the change in material quality of piston
sealing by a slight difference of touch
Education on Abnormalities
1. Definition of abnormalities and education on them
o Clarification of rules of measures and easy-to-see
indication
o Enhancement of abilities to detect abnormalities
o Simulated training on measure for abnormalities
2. Enforcement of rules on irregularity measures for
abnormalities
o Report: Quick report to the superiors
o Notification: Information to the previous and next
processes, relevant divisions, customers, etc.
o Consultation: Emergency measures for the
abnormalities and prevention of recurrence
3. Making the framework for recurrence prevention of
abnormalities
Rules on Abnormalities
Upon detecting or perceiving abnormalities either in own process or in other
processes, report to the superiors and notify the inspection division for prompt
remedies.
Upon detecting or perceiving abnormalities of equipment which may lead to quality
defects, report to the superiors for the prevention of defects.
Aim
1. Out line of the system 2. Route of application
1) Targets
I. Defects of parts purchased
II. Defects of preceding processes
III.Troubles with equipment
Operators (Report to the superiors)
Managers Notification and processing
Drafting of the application
Manager of the QA Department
(Examination)
An abnormality was detected or perceived by the
efforts of the employees, appropriate measures
were taken by the organization and quality defects
were prevented
Commendation System for Detection of
Abnormalities
Report (1) Quickly to the superiors
(2) Notify relevant parties in precedent and
following processes
2. Identification of abnormal situation (1) Comparison with previous level
- Rough analysis of the phenomenon (2) Comparison with non-defective
products
(3) Observation of the defectives, Micro
analysis
3. Identification of the lots (1) Tracing the background of production
and material
4. Measures taken to the specified goods (1) Production shutdown
(2) Separation of the specified goods
(3) Judgements as lots
(4) Arrangement of substitutes, observing
the delivery time
(5) Treatment: Disposal, selection, reworks
5. Measures taken to the processes and design (1) Detailed analysis of the phenomenon
- Identification of the cause
(2) Investigation of the cause
(3) Emergency measures: Target subject and
similar product. Both for occurrence and
outflow
(4) Permanent measures: Target subject and
similar product. Both for occurrence and
outflow
5M: Equipment (Machine) + 1D: Design
Materials and parts (Material)
Production standards (Method)
Skill, human factors (Man)
Measurement, inspection (Measurement)
Quick Judgment and Measures
Thatโ€™s a Wrap!
Feel free to contact:
๏† Antonius P. Bramono e: pbramono@gmail.com
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

More Related Content

What's hot

Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
Hardil Shah
ย 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cet
Marlon Grande
ย 
Kaizen training
Kaizen trainingKaizen training
Kaizen trainingSukin Shetty
ย 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
Jan Sabat
ย 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
roycohen
ย 
Hindi 5 s
Hindi 5 sHindi 5 s
Hindi 5 s
Prerna Patel
ย 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
Global Manager Group
ย 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
flevko
ย 
5S Training
5S Training5S Training
5S Training
Raymond Keane
ย 
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
KetanKumar43
ย 
Kaizen โ€“ Forms & Checklists
Kaizen โ€“ Forms & ChecklistsKaizen โ€“ Forms & Checklists
Kaizen โ€“ Forms & Checklists
Anand Subramaniam
ย 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
gurmukh singh
ย 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
avijit biswas
ย 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
sudarshan jadwal
ย 
My machine camp
My machine campMy machine camp
My machine camp
Jitesh Gaurav
ย 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
QC Labs
ย 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
Suraj1911
ย 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
Clive Sury
ย 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
Md.Muzahid Khan
ย 

What's hot (20)

Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
ย 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cet
ย 
Kaizen training
Kaizen trainingKaizen training
Kaizen training
ย 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
ย 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
ย 
Hindi 5 s
Hindi 5 sHindi 5 s
Hindi 5 s
ย 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
ย 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
ย 
5S Training
5S Training5S Training
5S Training
ย 
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
Autonomous Maintenance (Jishu Hozen) by Ketan Kumar (Raavinnovate)
ย 
Kaizen โ€“ Forms & Checklists
Kaizen โ€“ Forms & ChecklistsKaizen โ€“ Forms & Checklists
Kaizen โ€“ Forms & Checklists
ย 
Dwm ppt
Dwm pptDwm ppt
Dwm ppt
ย 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
ย 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
ย 
My machine camp
My machine campMy machine camp
My machine camp
ย 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
ย 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
ย 
QCC Presentation
QCC PresentationQCC Presentation
QCC Presentation
ย 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
ย 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
ย 

Viewers also liked

Developing Creative Employees Through QCC
Developing Creative Employees Through QCCDeveloping Creative Employees Through QCC
Developing Creative Employees Through QCCAntonius Pompi Bramono
ย 
10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System
Antonius Pompi Bramono
ย 
G: Problem solving step #6- evaluate
G: Problem solving step #6- evaluateG: Problem solving step #6- evaluate
G: Problem solving step #6- evaluate
Robyn Cook-Ritchie
ย 
F: Problem solving step #5 -implement
F: Problem solving step #5 -implementF: Problem solving step #5 -implement
F: Problem solving step #5 -implement
Robyn Cook-Ritchie
ย 
D: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstormD: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstorm
Robyn Cook-Ritchie
ย 
What does quality means
What does quality meansWhat does quality means
What does quality means
Antonius Pompi Bramono
ย 
Suggestions for continual improvement
Suggestions for continual improvementSuggestions for continual improvement
Suggestions for continual improvement
Antonius Pompi Bramono
ย 
Lloyd's register industrial training
Lloyd's register industrial trainingLloyd's register industrial training
Lloyd's register industrial trainingMohd Syahmi Nuruddin
ย 
Creating A Culture of Quality
Creating A Culture of QualityCreating A Culture of Quality
Creating A Culture of QualityAntonius Pompi Bramono
ย 
Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industry
Lloyd's Register Energy
ย 
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAANPELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
Shobrie Hardhi, SE, CFA, CLA, CPHR, CPTr.
ย 
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAINQCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
Riya Jain
ย 
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
KaiNexus
ย 
Ps session 1 introduction to problem solving
Ps session 1 introduction to problem solvingPs session 1 introduction to problem solving
Ps session 1 introduction to problem solvingRobyn Cook-Ritchie
ย 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507Krishna Thobhani
ย 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...
The Pathway Group
ย 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Antonius Pompi Bramono
ย 
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
Krishna Goyal
ย 

Viewers also liked (20)

Developing Creative Employees Through QCC
Developing Creative Employees Through QCCDeveloping Creative Employees Through QCC
Developing Creative Employees Through QCC
ย 
Improving Workplace by 5S
Improving Workplace by 5SImproving Workplace by 5S
Improving Workplace by 5S
ย 
10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System
ย 
G: Problem solving step #6- evaluate
G: Problem solving step #6- evaluateG: Problem solving step #6- evaluate
G: Problem solving step #6- evaluate
ย 
F: Problem solving step #5 -implement
F: Problem solving step #5 -implementF: Problem solving step #5 -implement
F: Problem solving step #5 -implement
ย 
D: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstormD: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstorm
ย 
What does quality means
What does quality meansWhat does quality means
What does quality means
ย 
Suggestions for continual improvement
Suggestions for continual improvementSuggestions for continual improvement
Suggestions for continual improvement
ย 
Lloyd's register industrial training
Lloyd's register industrial trainingLloyd's register industrial training
Lloyd's register industrial training
ย 
5S Project
5S Project5S Project
5S Project
ย 
Creating A Culture of Quality
Creating A Culture of QualityCreating A Culture of Quality
Creating A Culture of Quality
ย 
Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industry
ย 
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAANPELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
ย 
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAINQCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
ย 
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
ย 
Ps session 1 introduction to problem solving
Ps session 1 introduction to problem solvingPs session 1 introduction to problem solving
Ps session 1 introduction to problem solving
ย 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
ย 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...
ย 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
ย 
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
Qcl 15-v4 challenge no. 1-institute of management, nirma university_krishan k...
ย 

Similar to Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
babarsaleeem11
ย 
operator -self inspection.pdf
operator -self inspection.pdfoperator -self inspection.pdf
operator -self inspection.pdf
UlhasKavathekar
ย 
Introduรงรฃo ao World Class Manufacturing - WCM.pdf
Introduรงรฃo ao World Class Manufacturing - WCM.pdfIntroduรงรฃo ao World Class Manufacturing - WCM.pdf
Introduรงรฃo ao World Class Manufacturing - WCM.pdf
IsraelHolanda5
ย 
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
SaumyaGunawardana
ย 
Autonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptxAutonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptx
ssuser6cedd3
ย 
Managerial andย Technical skills of supervisors
Managerial andย Technical skills of supervisorsManagerial andย Technical skills of supervisors
Managerial andย Technical skills of supervisors
Nabila Naik
ย 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Traum Academy
ย 
cGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.chcGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.ch
sai sasidhar
ย 
Face.ppt
Face.pptFace.ppt
Face.ppt
DarshanSingh667502
ย 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
sharyarnawaz
ย 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
Mamoonurrasheed9
ย 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
Fin1
ย 
good manufacturing practices presentation
good manufacturing practices presentationgood manufacturing practices presentation
good manufacturing practices presentation
Ultratech4
ย 
GMP compliances of Audit
GMP compliances of AuditGMP compliances of Audit
GMP compliances of Audit
Megha bhise
ย 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 Controlling
Laura Law
ย 
5S Rules HSE Training workers (1).pptx
5S Rules HSE Training workers   (1).pptx5S Rules HSE Training workers   (1).pptx
5S Rules HSE Training workers (1).pptx
usmanahmad901
ย 
Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.
RajviParmar5
ย 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
Samiksha Sawant
ย 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in Pharma
Subhash Sanghani
ย 

Similar to Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality (20)

Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
ย 
operator -self inspection.pdf
operator -self inspection.pdfoperator -self inspection.pdf
operator -self inspection.pdf
ย 
Introduรงรฃo ao World Class Manufacturing - WCM.pdf
Introduรงรฃo ao World Class Manufacturing - WCM.pdfIntroduรงรฃo ao World Class Manufacturing - WCM.pdf
Introduรงรฃo ao World Class Manufacturing - WCM.pdf
ย 
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
ย 
Autonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptxAutonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptx
ย 
Managerial andย Technical skills of supervisors
Managerial andย Technical skills of supervisorsManagerial andย Technical skills of supervisors
Managerial andย Technical skills of supervisors
ย 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)
ย 
cGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.chcGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.ch
ย 
Face.ppt
Face.pptFace.ppt
Face.ppt
ย 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
ย 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
ย 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
ย 
good manufacturing practices presentation
good manufacturing practices presentationgood manufacturing practices presentation
good manufacturing practices presentation
ย 
GMP compliances of Audit
GMP compliances of AuditGMP compliances of Audit
GMP compliances of Audit
ย 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 Controlling
ย 
5S Rules HSE Training workers (1).pptx
5S Rules HSE Training workers   (1).pptx5S Rules HSE Training workers   (1).pptx
5S Rules HSE Training workers (1).pptx
ย 
Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.
ย 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
ย 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in Pharma
ย 
Standard
StandardStandard
Standard
ย 

More from Antonius Pompi Bramono

Lean Construction: From Theory to Implementation
Lean Construction: From Theory to ImplementationLean Construction: From Theory to Implementation
Lean Construction: From Theory to Implementation
Antonius Pompi Bramono
ย 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
Antonius Pompi Bramono
ย 
Penetrant testing
Penetrant testingPenetrant testing
Penetrant testing
Antonius Pompi Bramono
ย 
8 tips for 5S Success
8 tips for 5S Success8 tips for 5S Success
8 tips for 5S Success
Antonius Pompi Bramono
ย 
Employee Suggestion System
Employee Suggestion SystemEmployee Suggestion System
Employee Suggestion System
Antonius Pompi Bramono
ย 
Weld Repair
Weld RepairWeld Repair
Weld Repair
Antonius Pompi Bramono
ย 
Destructive test
Destructive testDestructive test
Destructive test
Antonius Pompi Bramono
ย 
Weld Inspection - Non Destructive Test
Weld Inspection - Non Destructive TestWeld Inspection - Non Destructive Test
Weld Inspection - Non Destructive Test
Antonius Pompi Bramono
ย 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
Antonius Pompi Bramono
ย 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
Antonius Pompi Bramono
ย 
The 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management SystemThe 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management System
Antonius Pompi Bramono
ย 
Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?
Antonius Pompi Bramono
ย 
Fundamentals of Quality Control
Fundamentals of Quality ControlFundamentals of Quality Control
Fundamentals of Quality Control
Antonius Pompi Bramono
ย 
Are You Auditing QMS Requirementsย In The 21st Century?
Are You Auditing QMS Requirementsย In The 21st Century?Are You Auditing QMS Requirementsย In The 21st Century?
Are You Auditing QMS Requirementsย In The 21st Century?Antonius Pompi Bramono
ย 

More from Antonius Pompi Bramono (14)

Lean Construction: From Theory to Implementation
Lean Construction: From Theory to ImplementationLean Construction: From Theory to Implementation
Lean Construction: From Theory to Implementation
ย 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
ย 
Penetrant testing
Penetrant testingPenetrant testing
Penetrant testing
ย 
8 tips for 5S Success
8 tips for 5S Success8 tips for 5S Success
8 tips for 5S Success
ย 
Employee Suggestion System
Employee Suggestion SystemEmployee Suggestion System
Employee Suggestion System
ย 
Weld Repair
Weld RepairWeld Repair
Weld Repair
ย 
Destructive test
Destructive testDestructive test
Destructive test
ย 
Weld Inspection - Non Destructive Test
Weld Inspection - Non Destructive TestWeld Inspection - Non Destructive Test
Weld Inspection - Non Destructive Test
ย 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
ย 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
ย 
The 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management SystemThe 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management System
ย 
Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?
ย 
Fundamentals of Quality Control
Fundamentals of Quality ControlFundamentals of Quality Control
Fundamentals of Quality Control
ย 
Are You Auditing QMS Requirementsย In The 21st Century?
Are You Auditing QMS Requirementsย In The 21st Century?Are You Auditing QMS Requirementsย In The 21st Century?
Are You Auditing QMS Requirementsย In The 21st Century?
ย 

Recently uploaded

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
ย 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
ย 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
ย 

Recently uploaded (20)

Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
ย 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
ย 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
ย 

Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

  • 1. Daily Production Management โ€œ5 Tips to Maintain Stability & Exclusion of Abnormalityโ€
  • 3. 5S is one of the most widely adopted techniques from the lean manufacturing. 5S is a "foundational" lean management (waste removing) concept, as it establishes the operational stability required for making and sustaining continuous improvements.
  • 4. 1. Sort: Separate what is needed and what is not needed, and keep only those things that are needed in the workplace. Discard unnecessary items. 2. Set-In-Order: Neatly place and identify needed work items. Designate a place for everything so that anyone can find it. Always put things back in their designated spots. 3. Shine: Clean up thoroughly and take measures against the sources of dust, leakage of oil, etc. 4. Standardize: Maintain 5 Sโ€™s by indicating the rules in visible forms. 5. Sustain: Guide the people never to allow a violation of the rule. Maintain and practice the first four Sโ€™s. Points of 5Sโ€™s
  • 6. Purpose of Visual Control โ€ข Visual control methods aim to increase the efficiency and effectiveness of a process by making the steps in that process more visible.
  • 7. Requirements for Visual Control 1. Make control items and criteria clear 2. Make everyone instantly recognize the situation. Normally called โ€œvisual expression.โ€
  • 8. Points of Visual Control 1. Abnormalities and problems to be instantly identified with the item on the spot โ€ข Control criteria are incorporated in the things on the spot โ€ข Conventional visual control 2. The status of control to be identified at a glance with the things on the spot โ€ข Control on 5M conditions and characteristics visually identified 3. Observance of rules and standards visually identified, including the checking by manager
  • 9. 3. Observing & Enforcement of Standard
  • 10. Points of Observance and Enforcement of Standard Clarificationofrolesand responsibilities Devicestoimprovedifficult works Devicestomakenormalconditions andabnormalitiesvisuallyidentifiable Standard Observance and enforcement of Observance and enforcement of Observance and enforcement of Securingbasicquality 100%assurance working standard working standard working standard Improvement to enable observance and enforcement Enhancement of quality consciousness for observance and enforcement of standards
  • 11. Three Standards at The Production Site Standard Operation Confirmation of Quality Remedies of Abnormalities ๏ƒ˜ Production Standard ๏ƒ˜ Operation Standard ๏ƒ˜ One Operation, One Production ๏ƒ˜ First In, First Out ๏ƒ˜ Daily Check of Facilities, Jigs and Tools ๏ƒ˜ Control of Manufacturing Conditions ๏ƒ˜ Safety Standard ๏ƒ˜ Recording of Production and Material Use Histories ๏ƒ˜ Identification and Classifications by Lots ๏ƒ˜ Working Qualification System ๏ƒ˜ Rules on Special Process ๏ƒ˜ Inspection Standard ๏ƒ˜ Rules on Self Check of The Process ๏ƒ˜ Rules on third-party confirmation ๏ƒ˜ Rules on Daily Checking of Measuring Instruments ๏ƒ˜ Rules on Quality Confirmation at The Time Set-Up or Equipment Abnormalities ๏ƒ˜ Rules on Quality Confirmation at The Time Renewal or Improvement of Equipment and Tools ๏ƒ˜ Rules on Control of Measuring Instruments ๏ƒ˜ Definition of Abnormalities ๏ƒ˜ Rules on Remedies for Abnormalities ๏ƒ˜ โ€œGo to The Jobsite, See The Object, and Confirm The Phenomenon Immediatelyโ€ ๏ƒ˜ Rules on Control of Changed Points ๏ƒ˜ Judgment of The Lots and Taking Measures Against The Defect Product
  • 12. Promotion of Observance and Enforcement of Standards Review and Improvement Set Up the Right Standards Sort Out the Work Hard To Do or Standards Difficult To Observe, & Propose Improvements Observe the Standards Securely (Confirm Secure Observance of Standards) - Create the Climate of the Jobsite Strict on Fundamentals ๏‚งFirmly Observe What was Determined ๏‚งAlways Follow the Right Procedures When Changing Rules Build Up Dependable Qualities
  • 13. Points to be Noticed in Establishing Standards 1. Focus on the necessary rules. ๏‚ง Is it really necessary? (Not influenced by nominal principles or preoccupations) ๏‚ง Can it be done by the hardware? (By automatization or failsafe devices) 2. Make clear the objectives, scope of work, sharing the roles, responsibilities and authorizations. 3. Make clear the risks if the rules are not observed. 4. Reflect the opinion of the operators. 5. Avoid vague expressions 6. Make the points clear.
  • 14. 14 Managers and supervisors Make standards that can be observed Revision of the standards Study the improvement of standards Sort out the points by observation of jobsite Operators Observe the right methods Implementation Propose improvement of the standards that are hard to be observed 1. Is the work done according to the right procedure? 2. Are points of work observed? 3. Are there any work hard to do or standards difficult to observe? The Roles of the Operators and Supervisors in Rotating the PDCA Cycle
  • 15. Devices to make off-standards apparent Third-party confirmation (Confirmation of the state of confirmation) Building up the quality (Causes) ๏‚ท Failsafe devices ๏‚ท Alarm devices work when condition not fulfilled ๏‚ท Automatic shutdown of equipment ๏‚ท Standardization of the place and manner of storage ๏‚ท Effective use of computers ๏‚ท Checking of production records ๏‚ท Checking by patrol ๏‚ท Indication of standard passage ๏‚ท Simplification and standardization of work ๏‚ท Shortening the cycle by โ€œone-piece-at-a- time system Confirmation of quality (Results) ๏‚ท Equipment for 100% inspection ๏‚ท Failsafe devices ๏‚ท Computer checking ๏‚ท Comparison with actual checking ๏‚ท Graphic management ๏‚ท Automatic shutdown of equipment ๏‚ท Retaining of actual product ๏‚ท Inspection records ๏‚ท Checking by patrol ๏‚ท Audit (Not double-checks) Framework to Identify Off-Standards
  • 17. Fact: People Make Mistakes. A good failsafe device makes it impossible to make a mistake.
  • 18. Points to be Noticed on Failsafe Devices โ€ข Checking of the functions of failsafe devices is necessary (at regular intervals) โ€ข Design the process upon full understanding of actual situation of the jobsite (work) โ€ข Reflect the opinions from the jobsite to avoid unnecessary difficulties of work โ€ข Let the operators well understand the significance of failsafe devices
  • 19. Abnormality is the condition different from normal, but not necessarily troubles or defects. Select and put out acceptable products only Right treatment for finished products. Preventive measures against possible claims. The group is in trouble! Combine all the technologies and skills 5. Abnormality Control
  • 20. Heavy injury Claim <Latent> Slight injury Near miss or near accident Defects Quality abnormalities ๏‚ง Insufficient enforcement of standards ๏‚ง Insufficient establishment of rules ๏‚ง Insufficient horizontal deployment of know-how ๏‚ง Insufficient succession of technologies Identification of potential defects is the points (just as with safety) <Apparent> (Safety) (Quality) <Latent> Causes of Quality & Safety Defect
  • 21. Detection of abnormalities and remedies Early detection of abnormalities Quick judgment and countermeasures Rules of remedies for abnormalities Atmosphere of jobsite to make reporting customary Enhancement of abilities to detect abnormalities Abnormalities are: conditions different from normal ๏‚ง Work cannot be done in accordance with standards. ๏‚ง Inexperienced defects occurred ๏‚ง Conditions of materials or equipment differ from normal ๏‚ง Continuous defects occurred ๏‚ง The results went off the control limit. (Control chart, etc.) Points of Abnormality Control
  • 22. - Off-specification products - Out of controlled conditions - Off-company-rule products* but within - Quality different from normal official specifications - Quality abnormalities - Off-specification products but accepted - Abnormalities in 5 Mโ€™s with by the customer equipment, materials, etc Defects are Waiver concessions are Manners of occurrence, Characteristics and appearance, Beyond control limits Manners of occurrence Beyond control limits *Company rules: Established on the basis of process Abnormalities are Defects and Abnormalities
  • 23. Abnormality control by control chart A control chart is a time series linear graph representing data with specific control lines, in order to see if the processes are in stable condition (whether there are abnormalities) or to maintain the processes in stable condition. Upper control limit (UCL) Center line (CL) Lower control limit (LCL) Early Detection of Abnormalities
  • 24. Qualitative characteristics cannot be controlled by control charts. Enhancement of the abilities to detect abnormalities of the forefront operators Detecting Abnormalities ๏ฑ Abnormalities are the differences in sound, colour, touch, smell, temperature, etc. from normal. ๏ฑ Repeated education on abnormalities. ๏ฑ Example of identifying a problem by detection of abnormalities A part-timer identified the change in material quality of piston sealing by a slight difference of touch Education on Abnormalities
  • 25. 1. Definition of abnormalities and education on them o Clarification of rules of measures and easy-to-see indication o Enhancement of abilities to detect abnormalities o Simulated training on measure for abnormalities 2. Enforcement of rules on irregularity measures for abnormalities o Report: Quick report to the superiors o Notification: Information to the previous and next processes, relevant divisions, customers, etc. o Consultation: Emergency measures for the abnormalities and prevention of recurrence 3. Making the framework for recurrence prevention of abnormalities Rules on Abnormalities
  • 26. Upon detecting or perceiving abnormalities either in own process or in other processes, report to the superiors and notify the inspection division for prompt remedies. Upon detecting or perceiving abnormalities of equipment which may lead to quality defects, report to the superiors for the prevention of defects. Aim 1. Out line of the system 2. Route of application 1) Targets I. Defects of parts purchased II. Defects of preceding processes III.Troubles with equipment Operators (Report to the superiors) Managers Notification and processing Drafting of the application Manager of the QA Department (Examination) An abnormality was detected or perceived by the efforts of the employees, appropriate measures were taken by the organization and quality defects were prevented Commendation System for Detection of Abnormalities
  • 27. Report (1) Quickly to the superiors (2) Notify relevant parties in precedent and following processes 2. Identification of abnormal situation (1) Comparison with previous level - Rough analysis of the phenomenon (2) Comparison with non-defective products (3) Observation of the defectives, Micro analysis 3. Identification of the lots (1) Tracing the background of production and material 4. Measures taken to the specified goods (1) Production shutdown (2) Separation of the specified goods (3) Judgements as lots (4) Arrangement of substitutes, observing the delivery time (5) Treatment: Disposal, selection, reworks 5. Measures taken to the processes and design (1) Detailed analysis of the phenomenon - Identification of the cause (2) Investigation of the cause (3) Emergency measures: Target subject and similar product. Both for occurrence and outflow (4) Permanent measures: Target subject and similar product. Both for occurrence and outflow 5M: Equipment (Machine) + 1D: Design Materials and parts (Material) Production standards (Method) Skill, human factors (Man) Measurement, inspection (Measurement) Quick Judgment and Measures
  • 29.