Kaizen – Forms & Checklists Forms to support Kaizen and other quality improvement programs Anand Subramaniam
2 “Make everything as simple as possible, but not simpler."  - Albert Einstein
3 Highlights Kaizen – Overview Kaizen – Forms, Checklists
Kaizen – Overview
5 Why Kaizen Events? Kaizen drives the improvements which lead to a leaner  business operating system Future State (Lean) (To~Be) Current State (As~Is) Kaizen
6 Do It Again Start Here Celebrate Document Reality Make this the Standard  Identify Waste Kaizen Measure Results Plan Counter Measures Verify Change Reality Check Make Changes 6 Kaizen Cycle
Kaizen Event - Implementation Successful implementation of Kaizen Event, include – 5-S 8-W  The 5 Whys Value Stream Mapping PDCA (Plan, Do, Check, Act) 7
8 Lean - Tools 5S 7 W (Waste) Jidoka /  Andon / PokaYoke / Mistake Proofing Single minute exchange of die (SMED) Standard Operating Proced-ures Kaizen Tools Kanban Total Preventa-tiveMainten-ance Takt time Through-put time Spaghetti diagram Value Stream Mapping Kaizen blitz or event
Kaizen Umbrella Quality Improvement Customer Orientation Total Quality Control Discipline in Work Place Productivity Improvement Total Productive Maintenance New Product Development Co-operative Labour Management Relations Kanban Robotics Zero Defect Q.C. Circle Automation Just-in–Time Suggestion System Small Group Activity 9
Kaizen – Checklist / Forms
Kaizen Tools – When, Where, What.. 11 ,[object Object]
Identify problems
Set targets and enter on Target Progress Report
Plan & initiate Kaizen Workshop
Pair up 2 for each process
One times w/ stopwatch, other jots down times
Verify if Cycle Time meets TaktTime
Observe site
Identify Process
Prepare StandardisedWork Sheet
If equipment seems to lack in capacity, use Capacity Sheet to define problems
Fill out StandardisedWork Combination Sheet with best times
Note long times on Combination Sheet, there are opportunities for Kaizen
Continue to observe site, note problems on Kaizen Newspaper
Try out ideas for kaizen immediately, verify results
Prepare Kaizen Proposal Sheets for effective kaizen ideas
Update Kaizen newspaper
Update Target Progress Report
Kaizen Every Day !!.,[object Object]
Kaizen Workshop Target Sheet 13
Kaizen – Work Sheet 14 DATE: _____/____/____ Approvals: Process: __________________________ Part # ____________________________ Part Name: ________________________ Scope of Operation FROM: TO: SYMBOLS Takt  Time Cycle  Time Operators this op/line total Total Pcs of Std  Work in Process Standard Work  In Process Safety  Precaution Quality  Check BASIC DATA NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on Combination Sheet), and numbers of Standard Work in Process must be known to define StandardisedWork. Identify all safety concerns, points where quality must be verified (go/no-go) and numbers of pieces of standard work in process using the symbols to the right. sec. 1 /

More Related Content

What's hot

SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
Anand Subramaniam
 
Kaizen
Kaizen Kaizen
Kaizen
saiju1706
 
Kaizen PPT revised 2.pdf
Kaizen PPT revised 2.pdfKaizen PPT revised 2.pdf
Kaizen PPT revised 2.pdf
yepopi
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
Flevy.com Best Practices
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & Implementation
Mira Anuar
 
My machine camp
My machine campMy machine camp
My machine camp
Jitesh Gaurav
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
Thomas Abraham
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
Deepak Sharma
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
Zakir Husain
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
flevko
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
Clive Sury
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation Pranav B. Gujjar
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
Hardil Shah
 
Creating World Class Organization Through 5S and Visual Management @ 3rd Ann...
Creating World Class Organization Through 5S and Visual Management @  3rd Ann...Creating World Class Organization Through 5S and Visual Management @  3rd Ann...
Creating World Class Organization Through 5S and Visual Management @ 3rd Ann...
ADD VALUE CONSULTING Inc
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
sudarshan jadwal
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
Zeeshan Syed
 
20130619 kaizen final
20130619 kaizen final20130619 kaizen final
20130619 kaizen final
adcom2015
 

What's hot (20)

SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Kaizen
Kaizen Kaizen
Kaizen
 
Kaizen PPT revised 2.pdf
Kaizen PPT revised 2.pdfKaizen PPT revised 2.pdf
Kaizen PPT revised 2.pdf
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & Implementation
 
My machine camp
My machine campMy machine camp
My machine camp
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
5s ppt
5s ppt5s ppt
5s ppt
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
QCC Presentation
QCC PresentationQCC Presentation
QCC Presentation
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
Change Management - 4 m change
Change Management - 4 m changeChange Management - 4 m change
Change Management - 4 m change
 
Creating World Class Organization Through 5S and Visual Management @ 3rd Ann...
Creating World Class Organization Through 5S and Visual Management @  3rd Ann...Creating World Class Organization Through 5S and Visual Management @  3rd Ann...
Creating World Class Organization Through 5S and Visual Management @ 3rd Ann...
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
20130619 kaizen final
20130619 kaizen final20130619 kaizen final
20130619 kaizen final
 

Viewers also liked

Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
Orange Slides
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
Renee Troughton
 
5S: A Lean Transformation Tool
5S: A Lean Transformation Tool5S: A Lean Transformation Tool
5S: A Lean Transformation Tool
Hussain Yasin Al-Ahmed
 
5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace
Ananth Palaniappan
 
5 s in office environment
5 s in office environment5 s in office environment
5 s in office environmentchaqcs
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
Adrian Oprea
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...
Iskcon Ahmedabad
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
Operational Excellence Consulting
 
Visual Controls - Mieruka
Visual Controls - MierukaVisual Controls - Mieruka
Visual Controls - Mieruka
Ketan Mokal, CSSGB
 
5s Method In 100 Slides Slideshare
5s Method In 100 Slides Slideshare5s Method In 100 Slides Slideshare
5s Method In 100 Slides Slideshare
5scom
 
5 S
5 S5 S
5 s ppt
5 s ppt5 s ppt
Visual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing ManagementVisual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing Management
Master Sun-Consulting Brand of Adiva L Pvt. Ltd.
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
pratik207
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
vinaybidarimath
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
Prateek Singh Bapna
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
Operational Excellence Consulting
 
5S: A Workplace Organization Method
5S: A Workplace Organization Method5S: A Workplace Organization Method
5S: A Workplace Organization Method
Nanette Bajador
 

Viewers also liked (20)

Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
5S: A Lean Transformation Tool
5S: A Lean Transformation Tool5S: A Lean Transformation Tool
5S: A Lean Transformation Tool
 
5s presentation
5s presentation5s presentation
5s presentation
 
5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace
 
5 s in office environment
5 s in office environment5 s in office environment
5 s in office environment
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...How to implement 5S - Japanese technique presentation by netpeckers managemen...
How to implement 5S - Japanese technique presentation by netpeckers managemen...
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Poka Yoke
Poka YokePoka Yoke
Poka Yoke
 
Visual Controls - Mieruka
Visual Controls - MierukaVisual Controls - Mieruka
Visual Controls - Mieruka
 
5s Method In 100 Slides Slideshare
5s Method In 100 Slides Slideshare5s Method In 100 Slides Slideshare
5s Method In 100 Slides Slideshare
 
5 S
5 S5 S
5 S
 
5 s ppt
5 s ppt5 s ppt
5 s ppt
 
Visual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing ManagementVisual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing Management
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
5S: A Workplace Organization Method
5S: A Workplace Organization Method5S: A Workplace Organization Method
5S: A Workplace Organization Method
 

Similar to Kaizen – Forms & Checklists

Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course Content
Timothy Wooi
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
Anand Subramaniam
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
ssuser72b8e8
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
ssuser75d4911
 
5s
5s5s
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellence
ramstar
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720營松 林
 
Project cycle
Project cycleProject cycle
Project cycle
Dema Dias
 
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
Government engineering College- Banswara,Rajasthan
 
Lean Management
Lean ManagementLean Management
Lean Management
Ashish Dev
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Romains Bos, PMP, MBA
 
Toyota Kata How to Use the Key Improvement Kata Forms
Toyota Kata How to Use the Key Improvement Kata FormsToyota Kata How to Use the Key Improvement Kata Forms
Toyota Kata How to Use the Key Improvement Kata Forms
RichardCGreen
 
standardised-work-overview-and-documents
standardised-work-overview-and-documentsstandardised-work-overview-and-documents
standardised-work-overview-and-documentsAngelo Del Grosso
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
 

Similar to Kaizen – Forms & Checklists (20)

Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course Content
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 
5S
5S5S
5S
 
5S
5S5S
5S
 
5s
5s5s
5s
 
5 S Presentation
5 S Presentation5 S Presentation
5 S Presentation
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellence
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
 
Project cycle
Project cycleProject cycle
Project cycle
 
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
Lead Time Reduction of Power Control Center (Pcc) Electric Panel by Lean Phil...
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 
Toyota Kata How to Use the Key Improvement Kata Forms
Toyota Kata How to Use the Key Improvement Kata FormsToyota Kata How to Use the Key Improvement Kata Forms
Toyota Kata How to Use the Key Improvement Kata Forms
 
5s smpl 1
5s smpl 15s smpl 1
5s smpl 1
 
standardised-work-overview-and-documents
standardised-work-overview-and-documentsstandardised-work-overview-and-documents
standardised-work-overview-and-documents
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 

More from Anand Subramaniam

Lean transformation
Lean transformationLean transformation
Lean transformation
Anand Subramaniam
 
Lean principles
Lean principlesLean principles
Lean principles
Anand Subramaniam
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
Anand Subramaniam
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
Anand Subramaniam
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
Anand Subramaniam
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
Anand Subramaniam
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
Anand Subramaniam
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
Anand Subramaniam
 
3 MU
3 MU3 MU
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
Anand Subramaniam
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
Anand Subramaniam
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
Anand Subramaniam
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
Anand Subramaniam
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
Anand Subramaniam
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
Anand Subramaniam
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
Anand Subramaniam
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Anand Subramaniam
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
Anand Subramaniam
 

More from Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 

Recently uploaded

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 

Recently uploaded (20)

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 

Kaizen – Forms & Checklists

  • 1. Kaizen – Forms & Checklists Forms to support Kaizen and other quality improvement programs Anand Subramaniam
  • 2. 2 “Make everything as simple as possible, but not simpler." - Albert Einstein
  • 3. 3 Highlights Kaizen – Overview Kaizen – Forms, Checklists
  • 5. 5 Why Kaizen Events? Kaizen drives the improvements which lead to a leaner business operating system Future State (Lean) (To~Be) Current State (As~Is) Kaizen
  • 6. 6 Do It Again Start Here Celebrate Document Reality Make this the Standard Identify Waste Kaizen Measure Results Plan Counter Measures Verify Change Reality Check Make Changes 6 Kaizen Cycle
  • 7. Kaizen Event - Implementation Successful implementation of Kaizen Event, include – 5-S 8-W The 5 Whys Value Stream Mapping PDCA (Plan, Do, Check, Act) 7
  • 8. 8 Lean - Tools 5S 7 W (Waste) Jidoka / Andon / PokaYoke / Mistake Proofing Single minute exchange of die (SMED) Standard Operating Proced-ures Kaizen Tools Kanban Total Preventa-tiveMainten-ance Takt time Through-put time Spaghetti diagram Value Stream Mapping Kaizen blitz or event
  • 9. Kaizen Umbrella Quality Improvement Customer Orientation Total Quality Control Discipline in Work Place Productivity Improvement Total Productive Maintenance New Product Development Co-operative Labour Management Relations Kanban Robotics Zero Defect Q.C. Circle Automation Just-in–Time Suggestion System Small Group Activity 9
  • 11.
  • 13. Set targets and enter on Target Progress Report
  • 14. Plan & initiate Kaizen Workshop
  • 15. Pair up 2 for each process
  • 16. One times w/ stopwatch, other jots down times
  • 17. Verify if Cycle Time meets TaktTime
  • 21. If equipment seems to lack in capacity, use Capacity Sheet to define problems
  • 22. Fill out StandardisedWork Combination Sheet with best times
  • 23. Note long times on Combination Sheet, there are opportunities for Kaizen
  • 24. Continue to observe site, note problems on Kaizen Newspaper
  • 25. Try out ideas for kaizen immediately, verify results
  • 26. Prepare Kaizen Proposal Sheets for effective kaizen ideas
  • 29.
  • 31. Kaizen – Work Sheet 14 DATE: _____/____/____ Approvals: Process: __________________________ Part # ____________________________ Part Name: ________________________ Scope of Operation FROM: TO: SYMBOLS Takt Time Cycle Time Operators this op/line total Total Pcs of Std Work in Process Standard Work In Process Safety Precaution Quality Check BASIC DATA NOTE: Takt Time, Work Sequence (same as numbers in “Step” column on Combination Sheet), and numbers of Standard Work in Process must be known to define StandardisedWork. Identify all safety concerns, points where quality must be verified (go/no-go) and numbers of pieces of standard work in process using the symbols to the right. sec. 1 /
  • 32. Kaizen - Time Observation 15 Date / Time: ___/____/____/_________________:________ Observed by: _____________________________________ Line / Process: __________________________________________________ # Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Best Time Observations (changeover time) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Complete Cycle Time
  • 33. Task / Process -Time Observation 16
  • 35. Progress Report – Current vs. Target 18 Department / Section / Site Date: ___/____/____/____/__________ Takt Time: _______________________ CATEGORY CURRENT TARGET DAY 1 DAY 2 DAY 3 DAY 4 FINAL RESULT % CHANGE SPACE (sq. ft.) INVENTORY WALKING DISTANCE MATERIAL TRAVEL DISTANCE LEAD TIME (sec.) CYCLE TIME (sec.) OUTPUT (units / day) CREW SIZE PRODUCTIVITY CHANGEOVER TIME (sec.) REMARKS:
  • 36. Standardised Work Sheet 19 Date: ______/______/_______ Quota / Shift: ____________ MANUAL: AUTO: WALKING: Process: _________________________ Section: __________________ Takt Time: ______________ sec. Step Description Time TIME (unit: 1 sec.) Line #_________________________ Man Auto Walk 65 70 75 80 85 90 5 10 15 20 25 30 35 40 45 50 55 60 1 Waiting Totals
  • 37. Kaizen - Capacity / Load Planning 20 Part No. Line Current Output Per Day pieces Authorisations: Part Name Max Output per Day pieces Workers Needed Times: Manual Automatic Walking Step Description Machine ID Tools Capacity Remarks Base Times Walking Time Manual Time Auto Run Time Completion Time Pieces/Run Change Time Time/Piece 1 Subtotal NOTE Update times when improvements are achieved through kaizen, and detail reasons for improvement in “Remarks” column. Total
  • 38. Kaizen – Proposal Sheet 21 Location Objective Date Operator Before After Problem Effects (cycle time / inventory / changeover time reduction,poka yoke etc.)
  • 39. Kaizen Newspaper 22 DATE: _______/_______/_______/___________ TEAM: __________________________________ No. PROBLEM WHO BY WHEN CHECK
  • 40. Standard Work Instruction Sheet 23 Revision Date Signature Standard Work Instruction Sheet Work Sequence Operation Name Operation Number Element 1 2 3 4 5 6 7 Critical Safety Char. Critical Quality Check Critical Quality Check Job Assists Tools Required Parts Required Job Assists Notes
  • 46. Visual Management Checklists Skills Matrix Color coding Colored Lines Address Grids Kanban Cards Pictures / Graphics Signage—Directions / Instructions Labeling Scoreboards Signals (lights, horns) Defect Boards / Tables Sample Boards / Tables Area Information Boards Production Control Boards Suggestion Program 29
  • 47. 30 “A mathematician is a device for turning coffee into theorems.” - Paul Erdos
  • 48. 31 Good Luck http://www.linkedin.com/in/anandsubramaniam