Electric Loco Assembly and Ancillary unit of CLW at Dankuni has been implemented on a very fast track by RVNL and the aim is to augument production capacity of Electric Locos in Indian Railways. The project was implemented by the team of CPM M RVNL Kolkata- Rajesh Prasad and this coffee table book has been conceived and concluded by him only.
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
In India constructions of cable stayed bridge are far less than the construction of such bridges in advanced countries. The concept and technical know how in India is relatively new but after execution over busy yard Barddhaman- a very busy station and yard, the construction of cable stayed bridges is going to play important role in time to come specially at stations where there is a need to use the yard and land mass for future yard remodeling and passenger amenities.This hand book cum coffee table book has been made by Rajesh Prasad to share his construction experience for education purpose. An interesting and amazing stuff....by Rajesh Prasad, Chief Project Manager(M) cum Group General Manager RVNL
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
In India constructions of cable stayed bridge are far less than the construction of such bridges in advanced countries. The concept and technical know how in India is relatively new but after execution over busy yard Barddhaman- a very busy station and yard, the construction of cable stayed bridges is going to play important role in time to come specially at stations where there is a need to use the yard and land mass for future yard remodeling and passenger amenities.This hand book cum coffee table book has been made by Rajesh Prasad to share his construction experience for education purpose. An interesting and amazing stuff....by Rajesh Prasad, Chief Project Manager(M) cum Group General Manager RVNL
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji to import 60mw power from fauji foundation, bin qasim coal based power plant
Gems international
Nov 2015
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...Dr. Amarjeet Singh
In the Ankeng Light Rail MRT system (ALRMS) project, the U7 box girder passes crossing the Erbads creek and needs a temporary supporting system for the construction work. In this study, three temporary shoring system options were proposed to be the construction method. The D-B Contractor, New Asia construction and Development Corporation, evaluated and selected the optimal choice, The Steel truss frame with supporting beams, to serve as the temporary supporting system. Compare the deflection of Δmax and Δactual, which are 1.609 cm and 1.59 cm, respectively. This result presented that the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work to construct the U7 box girder. This paper presents how the three options are evaluated and the detailed construction processes along with the survey verification for the method.
5e consulting method statement for program management5e Consulting
5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area, super builtup, mckinsey, plants, reuse, recycling, resource, reduction, Rajkot, solid waste management, ocean villa resort, cottage, tourism, tourists, survey, opinion survey, cvc, classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process Modeling Transportation
Implementation of Structural Health Monitoring System for live monitoring of ...Rajesh Prasad
For monitoring of structural health of cable stayed bridge constructed recently at Barddhaman, 6 (six) Nos. of sensors have been installed on the stay cables which are subjected to maximum loads. The ROBO control system of M/s Mageba has been used for the said purpose. The structural monitoring system can issue along with notifications based on the measurements on structure instrumentation with pre-defined threshold values. The alarm criteria can be configured on the structural design of the bridge and as per the requirement of the site. In this paper/presentation, effort has been made to highlight the bridge structural health monitoring system along with their integration, description of the management principle, system over view, software programming, assembling of ROBO control monitoring system along with web interface installation, web interface manual, live monitoring of forces in critical cables etc.
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji to import 60mw power from fauji foundation, bin qasim coal based power plant
Gems international
Nov 2015
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...Dr. Amarjeet Singh
In the Ankeng Light Rail MRT system (ALRMS) project, the U7 box girder passes crossing the Erbads creek and needs a temporary supporting system for the construction work. In this study, three temporary shoring system options were proposed to be the construction method. The D-B Contractor, New Asia construction and Development Corporation, evaluated and selected the optimal choice, The Steel truss frame with supporting beams, to serve as the temporary supporting system. Compare the deflection of Δmax and Δactual, which are 1.609 cm and 1.59 cm, respectively. This result presented that the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work to construct the U7 box girder. This paper presents how the three options are evaluated and the detailed construction processes along with the survey verification for the method.
5e consulting method statement for program management5e Consulting
5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area, super builtup, mckinsey, plants, reuse, recycling, resource, reduction, Rajkot, solid waste management, ocean villa resort, cottage, tourism, tourists, survey, opinion survey, cvc, classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process Modeling Transportation
Implementation of Structural Health Monitoring System for live monitoring of ...Rajesh Prasad
For monitoring of structural health of cable stayed bridge constructed recently at Barddhaman, 6 (six) Nos. of sensors have been installed on the stay cables which are subjected to maximum loads. The ROBO control system of M/s Mageba has been used for the said purpose. The structural monitoring system can issue along with notifications based on the measurements on structure instrumentation with pre-defined threshold values. The alarm criteria can be configured on the structural design of the bridge and as per the requirement of the site. In this paper/presentation, effort has been made to highlight the bridge structural health monitoring system along with their integration, description of the management principle, system over view, software programming, assembling of ROBO control monitoring system along with web interface installation, web interface manual, live monitoring of forces in critical cables etc.
Disputes and Arbitration- How to Avoid and ManageRajesh Prasad
The presentation deals with the management tool to avoid and manage Arbitration in view of the new act ( arbitration and conciliation amendment act) notified on 01.01.2016 The paper presented during an All India Seminar on “Law & Practice of Arbitration in India as per Amended Law” held on 09.12.2016
Detailed Power point presentation on Implementation of 4 lane Cable Stayed Road over bridge at Bardhman- a future fast track model for construction over busy and longer Railway yards in India
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
A Paper titled:
"High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective"
was presented during the 4th Annual South Asia Transport Infrastructure Conference 2016 held at Shanri-La's- Eros Hotel, New Delhi on 19-20 th september 2016 by Rajesh Prasad, IRSE, Chief Project Manager & Group General Manager, Rail Vikas Nigam Ltd, Kolkata
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
For the construction of Cable Stayed Bridge at Bardhman, a simulation model was made using LARSA 4D and accordingly design were concluded considering all the possible situation. At the execution stage the profile/geometry control is very important. Accordingly construction stage analysis along with geometry control is being done using LUSAS software. These software are 4D and the fourth dimension is Time. The said presentation covers the LARSA, LUSAS and few pictures on execution at site along with sample of documentation.
Balanced Three-Phase Grid Supply for Traction PowerKarl Berger, P.E.
Proposed technology for balancing the single-phase traction power on the three-phase grid. Benefits include the elimination of phase-breaks and isolation of traction power harmonics from the grid supply.
“Construction and Contracts Engineering Professional with more than10 years of hands on experience in Mega Multi-discipline Energy Sector and Building Utilities projects, having key Skills of Supervision, QA/QC, FATs, Erection of; Hydropower Plant, Hydraulic Gates, Cranes, Tunnel Steel Lining, Mechanical Equipment (Static, Rotating, Piping) & Allied Steel Structures, HVAC System and MEP Works. Acquainted with FIDIC, Preparation and Evaluation of Contract / Tender Documents, Claims and Variation Orders.
Worked with renowned lenders including World Bank - WB, Asian Development Bank - ADB, Islamic Development Bank – IDB, International Finance Corporation – IFC and Commonwealth Development Corporation - CDC.”
Hello Sir/Madam,
Greetings!!!
I the undersigned have done BE in Electrical Engineering & working as Sr. Manager Project Planning & Maintenance in Cummins India Ltd, Phaltan,
And the past experiences are as below,
1) Siemens Ltd, Mumbai.
Work period : Aug'2007 to Oct'2010
2) Mahindra Vehicle Manufacturers Ltd, Chakan Pune
Work period : Nov'2010 to June'2016
3) Cummins India Ltd, Phaltan Satara.
Work period : Since Jul’2016.
I am attaching my latest updated Resume for your kind perusal. It is my request to you to forward the same to the suitable person / agency, to consider the same for the suitable post if any in your organization.
I have 9-years plus of enriched experience in Power Projects, Electrical Project Planning & Execution, Operation / Maintenance & Facility Management, Green field project, during in Siemens, Mahindra & in Current Organization.
Presently working as Sr. Manager - Projects (Electrical) Involved in the Design, Erection, Commissioning activities of HT, LT substation, plant Lighting, FADS, UPS, HVAC, DATA Centre etc…
Responsibilities included Electrical design & Control wiring design, Cable schedule and Electrical protection Design. Prepare annual maintenance Calendar for maintenance of all electrical system, Machine maintenance.
I will be highly obliged, if I can have an opportunity to serve to the world leading organization in India or in Abroad.
Have a nice day.
Best Regards,
Prashant B. Maulikar
Email – Prashant.maulikar@gmail.com
Mob. +91-9595504591
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
7th RaiIndia Conference and Expo 7th edition was held on 27th Oct 2023 and a presentation was made on "Opportunities in Railway Construction - development/operations of railway infrastructure. This was held at Shangri-La Eros New Delhi and the theme was Next Gen Railways: Smart, Safe and Sustainable....
This is Keynote Address by Rajesh Prasad, Director Operations, Rail Vikas Nigam Ltd dt 11.09.2023 during 20th Safety Convention- Back to Basics for Strengthening EHS and Sustainable Foundation at Hotel Le-Meridien New Delhi being held from 11th to 13th Sept 2023
The presentation on Cyber Security and Data Protection in RVNL is being made on 8th April 2022 before the Board of Directors of RVNL by Rajesh Prasad Director Operations RVNL
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...Rajesh Prasad
The said paper presented as KEY NOTE ADDRESS presented by Rajesh Prasad during the 17th Safety Convention on theme- Safety in Mobility held on 17-18th March 2021 at Hotel Le Meridien New Delhi organised by Institution of Engineers (india)
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
Rajesh Prasad Director Operations RVNL participated as a speaker in 5th edition of 'Rail India Conference and Expo' organised under the aegis of MFI Safe Connect (Messe Frankfurt India) in Delhi on 11.03.2021
During the present crisis the whole country is shut down and all the InfraStructure projects have been stopped. Wheels of the Indian Railways carrying passengers have also stopped moving after inception in April 1853. A small ppt has been prepared for the RVNL family.
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
A 4 lane cable stayed bridge with 4 approaches over a very busy yard at Bardhman of E. Rly is an iconic structure at Bardhman- a gift to the nation by RVNL opened for road traffic yesterday ie 27.09.19. Proud to be the part and head of the team from concept to completion to commissioning.
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Rajesh Prasad
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019 by Rajesh Prasad, Executive Director RVNL organised by Institute of Engineers in Kolkata
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...Rajesh Prasad
The said paper was presented by Rajesh Prasad in IC TRAM 2018 (International Conference- Technological Advancement in Railways and Metro Projects at Manekshaw Centre New Delhi on 04.10.2018
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
The said technical paper was presented by Rajesh Prasad in IC TRAM 2018 (International Conference- Technological Advancement in Railways and Metro Projects at Manekshaw Centre New Delhi on 04.10.2018
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Rajesh Prasad
There was a Bridge conference on Innovative Technologies on 25.05.18 and 26.05.18 at Lucknow. This presentation was made by Rajesh Prasad, ED RVNL during the panel discussion. This PPT contains a lot cartoons and images and conveys a big message on ensuring safety at construction worksites.
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
This is a Handbook cum Coffee Table Book on Bridging over River Bhagirathi (alias Ganges)- Concept to Completion by Rajesh Prasad, Executive Director, Rail Vikas Nigam Ltd (RVNL) depicting from the concept to completion of the Railway Bridge including cantilever launching of the open web girders with span size of 103 m.
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
What is the purpose of the Sabbath Law in the Torah. It is interesting to compare how the context of the law shifts from Exodus to Deuteronomy. Who gets to rest, and why?
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
How to Create Map Views in the Odoo 17 ERPCeline George
The map views are useful for providing a geographical representation of data. They allow users to visualize and analyze the data in a more intuitive manner.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
ELAAU, Dankuni executed on very fast track by RVNL
1. ElectricLocoAssembly
andAncillaryUnitofCLW
Dankuni
Project Implementation on Fast Track Basis
Rail Vikas Nigam Limited
(A Government of India Enterprise)
Go not to the temple to put flowers upon the feet of God,
First fill your own house with the fragrance of love...
Go not to the temple to light candles before the altar of God,
First remove the darkness of sin from your heart...
Go not to the temple to bow down your head in prayer,
First learn to bow in humility before your fellowmen...
Go not to the temple to pray on bended knees,
First bend down to lift someone who is down-trodden. ..
Go not to the temple to ask for forgiveness for your sins,
First forgive from your heart those who have sinned against you.
Rabindranath Tagore
The project has been implemented by Kolkata PIU-CPM(M) Unit and this booklet has been conceived
& compiled by Rajesh Prasad, Chief Project Manager (M), RVNL, Kolkata with the help of Satyajeet
Paul, Computer Assistant, RVNL, Kolkata.
2. Foranewera
ofprogress
Sanctioned Estimate : ` 179.95 Cr.
Transfer of Project to RVNL : May 2012
Calling of Tender : May 2012
Letter of Acceptance : October 2012
Physical work Commencement : Dec’ 12
Actual Completion : Jan 2015
01
Rail Vikas Nigam Limited
It is indeed heartening to note that the construction of Electric Loco Assembly and Ancillary Unit of CLW
DankunihasbeencompletedinarecordtimebytheKolkataPIUofRVNL.
This Project was transferred by Railway Board to RVNL in May 2012 for execution on a fast track basis.
Subsequent to the awarding of the contract, physical workcommenced in December 2012 and the project
has been completed in January 2015. This endeavor has been widely appreciated by senior officials
including Member Electrical and GM/CLW during their inspections. In the past two years, RVNL has also
been able to complete the construction of Diesel Loco Component Factory, Dankuni and DMU Factory at
Haldia. These factories were also completed in record time and have already been handed over to
Railways for use. Further, RVNL has been mandated to execute the expansion of DLW/ Varanasi for which
th
Shri Narendra Modi Hon'ble Prime Minister laid the foundation stone on 25 December 2014 and work
wasalsocommencedonthesameday.
The Electric Loco Assembly and Ancillary Unit of CLW Dankuni includes certain special features such as
700 meter long shed, 6 Nos. of EOT cranes,1 traverser, 2 electric sub-stations, staff quarters, store ward
with pre-engineered building, administrative building, solar panel on top of sub- station, drainage
system, water supply along with overhead tank, water treatment plant and track connectivity from
Dankuniyard.
I take this opportunity to compliment Kolkata PIU for successfully completing this project in record time
and for bringing out a Coffee Table Book to record this achievement. This is a great achievement and I
wishtheKolkataPIUgreatsuccessforalltheirfutureendeavors.
Message
3. Rail Vikas Nigam Limited
ELAAUC,Dankuni–ArarerealityofFaster
TrackProjectImplementationbyRVNL
Background:
CLW started in 1950s with production of Steam Engines and gradually transformed to Electric Loco production unit from 1970s with
conventional 25 KG tap changer type Electric Locomotives with DC Motors. With advancement of technology it has started manufacturing
ofstateoftheartIGBTbased3phaselocomotives.
However, as CLW has transformed from steam engine manufacturing to 3 phase locos, there has always been constraint in modernizing
infrastructuretoadoptmodernmanufacturingpracticesandincreasetheproductioncapacity.
Implementation details:
ELAAUC (Electric Loco Assembly and Ancillary Unit of CLW) at Dankuni has been implemented on a very fast track to augment the
production capacity of electric locos in Indian Railways at Chittaranjan. Railway Board (Ministry of Railways) advised RVNL vide letter dt.
07.05.2012 for implementation of a turn key project with 2 years of time of completion. The detailed estimate, BOQ, freezing of scope etc.
were concluded by 23.05.2012 and the tender was invited on 28.05.2012. Subsequent to the award of the work and mobilization period
given to the agency, the physical work commenced in December, 2012 and in roughly 2 years of time the entire factory now costing about
Rs200croreshasbeencompletedandareinplace.
Salient features of the factory design implemented at site:
• Linear assembly chain with receiving of shells at one end and rolling out of Locomotive after complete assembly and testing of
Locomotivewithoutanycrossmovementofsemi-finishedproduct.Thisrequiredconstructionof700mlongshed.
• SecondarystorageareaalongwithassemblylinetoimplementJIT(JustinTime)manufacturingphilosophywithminimuminventory.
• 2Kmlongtesttrackfortestingoflocomotiveinmotion.
• Wideroadnetworkformovementofstoreswithouthindrance.
• Skylightandsolarpowerforenergyconservation.
• Administrativebuildingwithbirdeyeviewofentireassemblyline.
Management tools followed for faster implementation by RVNL:
• Work Programme:- A detailed work programme was made for completion of the various activities matching the requirement of key
datesprovidedinthecontractagreementandthiswasregularlyfollowed.
• Drawingsweremade,concludedandfrozenwellinadvance.
• 3monthsrollingprogrammeandmonthlyprogrammesweremadebytheagencymatchingtherequirementofworkprogramme.
• Weeklyreviewmeetingandtargetswerefixedforachievingintermediategoalstoaddressconstraints,resourcemobilization,etc.
• MicrosoftProjectwasusedformonitoringtheprojects,dashboardchartswerealsopreparedforbetterappreciation.
• REMS – RVNL has introduced a remote eye monitoring system and the PMC/RVNL Supervisors have been provided with mobile
phones with facility to upload pictures of the work site. This enables the officials and management to monitor the remotely located
siteinrealtimethroughwebsitewhichisprotectedwithpassword.
• Quality Management- Detailed quality assurance programmes & quality control plans were made for all the projects. General
Manager, during his inspection recorded in the inspection note about the quality and asked the officials of other Railways to visit for
thequalitycontrolmeasuresadopted.
Quality assurance:
For fast track implementation of the projects, it was necessary that the aspects related to quality should not at all be compromised. If
Quality assurance and control is not done properly, the work cannot be done on fast track and the project would go into a vicious cycle and
likelytobedelayed.
A Quality Assurance programme was prepared along with a quality control plan. The objective of quality assurance programme
was to ensure the construction activities are carried out in a systematic manner and quality of construction work is in conformity with the
approvedspecifications,drawings,etc.Itwasbasedonthefollowingqualitysystemprocedure:
• Document Control • Material Control • Non-conformance Control
• Procurement Control • Training of Personnel • Production Control
• Setout control
Control of processes and special processes were exercised through a series of instruction documents designated as Method Statements
(MS)andQualityControlPlans(QCP).
Details about the project:
The turn key contract was awarded incorporating Civil Engineering, Electrical Engineering, Mechanical Engineering and S&T. The
department-wisebriefdescriptionsoftheworkswereasunder:
Civil Engineering
(I) Mainshed(700mlong)withleantostructures:
Thevariousshopstoconstructedaspartofthemainshedareasfollows:
• OPENGANTRY 25MX70M
• SHELLSHOP 25MX140M
• PAINTSHOP 25MX190M
• PIPINGANDCABLINGSHOP 30MX250M
• TRANSFORMERMOUNTINGSHOP 30MX40M
• EQUIPMENTMOUNTINGSHOP 30MX200M
• BOGIE&WHEELINGSHOP 30MX90M
• TESTINGSHOP 30MX120M
Constructionof700Mlonggiganticshedinvolvedfabricationofthefollowingcomponents:-
• 258Columns,
• 74rooftrusses,
• 158GantryGirders
• 555BracingGirders
• 194RoofLegs
Furtheritinvolvedinstallationof–
• 57700 SQM sheeting including 20% roofing with 2 mm U/V protected polycarbonate transluscent
sheets)
• 103TurboVentsforkeepingthetemperaturepleasantandworkable
(ii) Otherstructures:
35 m x 30 m Administrative Building (G+2), 30m x 20 m Store Building(PEB), 40 m x 25 m Electric Substations(2 Nos.), 10 m x 10 m
SecurityBlocks(2Nos.),3mX3MPumpHouse.
(iii) OtherCivilworks:
• Drainagearrangementincludingnetworkof450mmdiaand750mmdia,NP4humepipesandsurfacedrains.
• Roadof2.5KMwithconcretepavementinsidethefactory.
• Pathwayswithpaverblocksformovementwithinthefactory.
• Railwaytrackof5.5KMtakingofffromthetrackofEasternRailwayatDankunistation.
• The low lying area of the factory site has been filled up with flyash (for building & shed area) and fine sand (for open area). The
concrete road has been constructed by filling coarse sand to raise the level. The track has been constructed by filling earth and
stonedust.
• Water supply arrangement including bore well, pump house, overhead tank (50,000 gallons), water supply pipelines, water
treatmentplantetc.
02 03
Rail Vikas Nigam Limited
4. Electrical works:
PowersupplyarrangementwithTwoNos.ofelectricalsub-stationseachof33KV/440V,3x2.5MVA
Signalling works:
TelecommunicationworksincludinginstallationofelectronicexchangeandLANnetworking
Mechanical works:
Supply, erection, installation, testing and commissioning of various machineries and plants including 6 Nos. of EOT cranes, traverser,
compressor,tools,gauges,instrumentsetc.
Progress report through dash board chart : Dashboard chart is one of
the most effective management tool to ensure proper monitoring and
timely completion.
Rail Vikas Nigam Limited
Railway Board’s Target vis-à-vis progress
Finalization of scope of the work and transfer by Railway Board
by30.04.2012
TheworkwastransferredtoRVNLbyRly.Boardon07.05.2012
Completion of soil, investigation, survey, sanction of detailed
estimate& BOQbyRVNLby31.05.2012
Detailedestimate& BOQworksanctionedon23.05.2012
CallingofTenderbyRVNLby15.06.2012 Tenderwascalled on28.05.2012
Contract to be awarded and the work to commence in October,
2012withdateofcompletion of2years
Letter of acceptance issued on 02.10.2012 and mobilisation period
of 42 days. Work started in Dec. 2012 and Physically completed in
Jan2015.
Additional Works executed by RVNL
RVNL has accommodated several additional works asked at the later dates :-
• Deploymentof2nos.ofadditionalcranesinthe30Mbay
• Provisionofsolarpowerplant
• Provisionofroofcoveringwithtrussesintheadministrativebuildingandcoveringwithgreencolourpolycarbonatesheet
• Provisionoffountainandgardeninsidetheadministrativebuilding
• Provisionofwatertreatmentplant
• Provisionof2nos.ofcrosstracks
• Provisionofoffice/conferenceroomonthesecondflooropenterrace area
• 140numbersofquickcouplingswhichwereearliernotintheoriginal contractspecifications.
04 05
Rail Vikas Nigam Limited
5. DetailsabouttheProject
Civil Engineering
Main Shed (700m long) with lean to Structures
• OpenGantry 25Mx70M
• ShellShop 25Mx140M
• PaintShop 25Mx190M
• PipingandCablingShop 30Mx250M
• TransformerMountingShop 30Mx40M
• EquipmentMountingShop 30Mx200M
• Bogie&WheelingShop 30Mx90M
• TestingShop 30Mx120M
Other Structures
• AdministrativeBuilding(G+2) 35Mx30M
• StoreBuilding(PEB) 30Mx20M
• ElectricSubstation(HWHEnd) 40Mx25M
• ElectricSubstation(DelhiEnd) 40Mx25M
• SecurityBlock(HWHEnd) 10Mx10M
• SecurityBlock(DelhiEnd) 10Mx10M
• PumpHouse 3Mx3M
Electrical Works
Power Supply arrangement with two nos. electrical substations each of 33
KV/440V,3x2.5MVA
Mechanical Works
• EOTCrane(50T)for30MBay 4Nos.
• EOTCrane(50T)for25MBay 2Nos.
• Traverser (50T) 1No.
• Compressor (500cfm) 3Nos.
• MIG/MAG5Nos. 5Nos.
Rail Vikas Nigam Limited
Pile,PileCap&Pedestal
Piling work commenced by CMD/RVNL in Dec. 2012
06 07
Rail Vikas Nigam Limited
Executing Contractor -M/s Simplex Infrastructures Ltd.
Project Management Consultant -M/s Data Technosys (Engineers) Private Ltd.
Design Consultant -M/s Consulting Engineering Services (India) Pvt. Ltd.
6. Rail Vikas Nigam Limited
StructuralWork SheetingSpecification
• ZincalumeSteeltrapezoidalsheet/EaveGutter/Ridge,etc.withnominal28mmdeepribs.
• End ribs designed for anti-capillary action, to avoid any seepage of water through the lateral
overlap.
• 0.55mmBaseMetalThickness(BMT)&0.6MMTotalThickness(TCT)
• Hightensilesteelwithminimum550MPayieldstrength
• Metallic hot dip coated with Aluminium Zinc Alloy as per AS 1397-AZ 150 (minimum 150 gm/m2
total on both sides) with super durable polyester quality paint coat conforming to AS/NZS 2728
Type-4.
08 09
Rail Vikas Nigam Limited
First column erected by the then Member Electrical on 01.03.2013
10. MiscellaneousWorks
Rail Vikas Nigam Limited
PowerSupplyArrangementCommissioningoftwoElectricSub-StationswithSolarPanelonrooftopofHowrahendsubstation.
16 17
Rail Vikas Nigam Limited
WaterSupplyArrangement
Construction of new over head water tank and water pipeline, an old unused water tank was dismantled. Filter plant was also installed
andaconnectionwithDCF,Dankunihasbeenmadetotakecareofeventuality.
13. Rail Vikas Nigam Limited
TreePlantation Hindrances
Removal of HT wires in Delhi end – HT wire was
removed only on 22.06.2014. It affected 36 piles. This
affected the work as the machinery was demobilized
duetonon-availabilityofsiteforaverylongtime.
Removal of the existing traction sub-station – The
structure could be dismantled in December, 2013. It
affected 101 piles and drainage system. This was a
majourbottleneck.
Removal of other LT line & HT line at Howrah end –
These were removed respectively in the months of May
& June, 2013. Piling work and movement of machinery
wasbadlyaffectedduetotheselines.
54 Nos. of trees which could be cut and disposed of as
late as in July, 2013. Piling work at some locations was
affectedduetotrees.
Encroachments – There were some encroachments
which could be relocated/ shifted only in November,
2013. These affected the railway track construction
apartfrombeinganuisance.
AbandonedRailwaybridge–RemovedinFeb.2015.
Underground HT cable at Howrah end entrance gate could be got shifted only in June,2014. Because of this cable, the regrading of
theapproachroadcouldnotbedonebeforemonsoon.
The site for construction of quarters which is a very
time consuming activity could not be made available in
time.
• BlocksC&D-07.02.2013(After4monthsofLOA)
• BlockE-12.09.2013(AfternearlyoneyearofLOA)
• Blocks A & B- 25.11.2013 (After nearly 14 months
ofLOA)
22 23
14. Rail Vikas Nigam Limited
NoteofMemberelectrical,RailwayBoard
“The manner in which the entire project site has been developed and executed within a period of 18
months, deserves commendation. I would like to place on record my appreciation for RVNL and CLW
officersforensuringcloseco-ordinationinconstructionofthisuniquefacility.
Anawardof `50,000/-wasannouncedbyMLforRVNLafterhisinspectionon19.07.2014.
InspectionNoteofGM/CLW
regardingQualityControl
11.0 Well equipped site laboratory has been set up where the required testing
equipments have been kept along with relevant code. The equipments
have been calibrated. One cube was tested for M35 pile after 28 days
casting and the results was 44 N/mm2. The same kind of quality control lab
shouldbeadoptedbyCLWandMetroRailwayatotherwork-sitesalso.
CPM/RVNL
CE/CLW
CE/Metro
Rly
InspectionNoteofCPDE,EasternRailwayInspectionNoteofHOD,EasternRailway
SafetyMeasures
RVNL Railway
ShriRajeshPrasad,ChiefProjectManager/M
ShriS.K.Srivastav,GM(Electrical–II)
ShriH.K.Sahu,GM(Finance)
ShriH.Singh,AGM/P/RVNL/KOL
ShriB.K.Roy,JGM/Mech.
ShriS.K.Das,JGM/S&T
ShriK.K.Mishra,Sr.Manager(Civil)
ShriH.Rao,CEE/CLW
Shri S.K.Agarwal, CEE Dankuni
Shri Sanjay Saha, Director/Rly. Board
ShriRajibRay,CEELoco
ShriB.R.Kanwar,CE/CLW
ShriR.K.Mishra,Dy.CE/C
ShriA.K.Dey,DEN
ShriS.P.Patra,SEE/Loco
ShriS.K.Choudhari,SEE/W
The work was executed under continuous guidance and support of Shri Kulbhushan, then ML, Rly. Board, Shri
Radhey Shyam, then GM/CLW, Shri C.P.Tayal, GM/CLW, Shri Satish Agnihotri, CMD/RVNL, Shri Vijay Anand,
Director Project/RVNL, Shri D. Ghosh Roy, ED/Mechanical RVNL, Shri Ved Prakash, ED/RS Rly. Board, Shri
SudhirKumar,ED/Dev.Rly.Board andShriH.S.Yadav,CGM/RVNL.
24 25
Rail Vikas Nigam Limited
• Agoodqualityworkwithgoodplanninghasbeenexecuted.
• The shed roof and wall is made of 0.6 MM zincalume sheet and there is also provision of 20% skylight in the form of 2 MM
thick UV protected polycarbonate sheets for enabling sunlight to enter the shed. There are turbovents for expelling hot air
through the roof without consuming electric energy. Thus shed has been designed well keeping in view for energy efficiency
andcomfort.
• There is a nice arrangement of two staircases for going to entry cranes and walk ways along the gantry girders for
comfortablemovement.
• There is a well designed drainage system and water supply system. A good arrangement has been made by connecting the
water supply system of the electric loco factory with that of the diesel loco component factory to take care of unforeseen
situationsandmaintenance.Awatertreatmentplanthasbeeninstalledforensuringbestqualityofwater.
• Foraestheticappeal,beautifulwelldesignedceramicmuralshavebeeninstalledinthefactoryatvariouslocations.Thereis
arowofmuralsshowingthejourneyofIndianRailwayfromfairyqueentomodernhighhorsepowerlocomotives.
• The administrative office is a state of the art building with beautiful elevator with transparent wall. The two faces of the
building have glazed cladding made for aesthetic appeal and proper clear view of the factory from the office. There is
provisionoffirefightingsystem.
• The trial run of track has been done and electric sub-station commissioned and water supply system commissioned. The
factoryassetsarethusreadyforhandingoverbyRVNLandusebyCLW.
OfficialsAssociated
16. “ ”
Motivation is the art of getting people
to do what you want them to do
because they want to do it. - Dwight D.
“ ”
In the middle of difficulty lies opportunity.
-Albert Einstein
“ ”
To think is easy. To act is difficult. To act as one
thinks is the most difficult.
-Joham Wolfgang Von Goeth
“ ”
Success is never certain, but self-doubt,
negativity, and low expectations guarantee
failure.
- John F. Murray
“ ”
The new source of power is not money in the
hands of a few, but information in the hands of
many.
-John Naisbitt
“ ”
You must either modify your dreams or magnify
your skills.
- Jim Rohn
RVNL’sMISSION
• CreatingstateofArtrailtransportcapacitytomeetgrowingdemand.
• Executing projects on fast track basis by adopting international project execution,
construction,managementpracticesandstandards.
• TomaketheProjectimplementationprocess,efficientbothintermsofcostandtime.
• Adhering to sound business principles and prudent commercial practices to emerge
India’stoprailinfrastructurePSU.
• To implement Rail Infrastructure Project on commercial format through various
PublicPrivatePartnershipmodels.
• ToachieveInternationalQualityStandardsthroughinnovations.
• Toachieveprojectcompletionsintargettimeandwithbestquality.
• Involving private sector in financing the construction of projects and development of
efficient models of Public Private Partnerships with joint venture SPVs with equity
participation by Strategic & Financial Investors including funding options from
externalmultilateralagenciesliketheAsianDevelopmentBank.
Mantrasfor Success
“ ”
Purity, patience, and perseverance are the three
essentials to success, and above all, love.
-Swami Vivekananda
“ ”
Be the change you want to see
in the world.
- Mahatma Gandhi