OR @ Konkan Railways
Anjay Raj
Konkan Railways – F & F’s
• Designed and built by Indian Engineers in span of 8 years
• Konkan Railway takes you on a breathtaking journey through rugged
mountains, lush valleys, sunlit paddy fields, bustling villages and
glistening rivers that lead out to sea.
• It is undoubtedly one of the biggest and most difficult infrastructure
projects India has undertaken and successfully completed since
Independence.
• Today, the Konkan Railway travels 738 kilometers through the states of
Maharashtra, Goa and Karnataka, starting just after the Roha railway
station (75 km south of Panvel in the suburbs of Mumbai) in Maharashtra
and ending at theThokur railway station near Mangalore in southern
Karnataka.
Captions:
• 2000 Bridges & 92 tunnels to be built through this
mountainous terrain containing many rivers
• Connect Reduced travel time, Mumbai to Mangalore
41 to 15 hours, Mumbai to Cochin 36 to 24 hours,
Mumbai to Goa from 20 to 10 hours.
• Total Route Length 760 Kms
• 4850 Hectares Land, spread over 760 Kms.
• 59 Stations across
Construction Challenges
• The project threw up a whole range of difficulties – technical, financial,
emotional and psychological.
• The rocky Sahyadris had to be bored through
• As many as 1500 rivers had to be forded.
• Once in a while, a poisonous snake, or a tiger, decided to take a close look at
goings-on!
• In the face of collapsing embankments and unrelenting mountains, the
engineers had to be tough
• Engineers had to be deeply sensitive to the feelings of those who had given
up their land.
Construction Challenges
• June 1994, Mahad had floods 10 to 12 feet above the road level, and when
they receded, Konkan Railway jeeps had six-inch layers of silt on the seats
• Four workers in the Byndoor tunnel in Karnataka faced their own battle with
water when they were thrown back 60 feet by a sudden gush
• During the monsoons in July 1997, an entire mountainside collapsed at
Ukshi. Machines were buried under the debris, but 200 labourers had a
miraculous escape.
For those who kept going despite the toughest of challenges, the sense of
achievement made it all worthwhile. If people had considered this merely as
a job, it would have taken 25 years to complete. It was the team spirit that
was so crucial in the successful completion of the project.
Success Mantra’s
• First time in India funds for the project were raised without touching the
government coffers.
• The authorized capital was pooled together by the railways and the states of
Kerala, Karnataka, Goa and Maharashtra.
• They leveraging public bonds (to the extent of Rs.2250 crores) that carried
attractive rates of return, tax breaks and guaranteed repayment
• Over 4850 hectares of land was acquired from over 42000 owners in the
three states of Karnataka, Goa and Maharashtra
• Payment cheques were door-delivered at a time when India was still highly
bureaucratized, that too, within twelve months.
Success Mantra’s
• The scenic route also had India’s
then-longest ever tunnel at
Karbude, which is 5.6 km. in
length
• A visible example of
the ingenuity and the dedication
of the builders, the Panval
Viaduct connects two hills and
has 12 spans and 10 pillars, 6 of
which are taller than the Qutub
Minar ! At present, it is the third
highest viaduct in Asia.
Planning
• They had planned that the whole railway line would be divided into 7 zones,
each zone concurrent with a revenue district, and a Chief Engineer was
posted for each zone.
• They selected contractors only from the pre-qualified list.
• Decision making by the contractors had to be approved by the higher
authority.
Communication
• It was very important for the people who were involved in this project to
communicate with each other for the completion of the project.
• Department of telecommunications (DoT) lines were hired and then
established a good communication network with the headquarters of each of
the Chief Engineers. They were all given FAX machines, they were all given
computers. A computer networking was done, so that everybody can have
any information he wants from anywhere and message can be passed on
time.
• First time in the history of Indian Railway, Optical fibre cable was used in Tele-
communication network. At that time it was a new technology which sensed
a lot of opposition but today optical fiber cable is a common thing. Today in
the Indian railway system, the Konkan railway has the longest stretch of
optical fiber cable.
Communication
• Mr. E Sreedharan would sit with the contractors and concerned engineers
and used to see the problems faced by the team and on the spot used to sort
out the problems. So that there is no difficulty at all for the progress of the
work.
• Every Monday, Mr. E Sreedharan had a meeting with the Head of
Departments, where all the problems connected with the whole project were
discussed
Operational Ability
• The operating ratio, which is a parameter of operating efficiency, has
significantly improved to 80% in the year 2015-16 as compared to 86.43% in
the year 2014-15.
• Concept of Roll on Roll off (RORO)
• Truck drivers find it extremely difficult to drive loaded trucks through Ghats,
undulating surfaces, narrow roads, poor road and weather conditions.
• Saving of fuels, decrease in wear and tear of Lorries (trucks), relief to drivers
of driving in extreme conditions, can reach faster to destination which leads
to saving in travel time and money.
• The freight earnings during the year 2015-16 was Rs 459 crore, which was
30% more than last year's freight earnings off 354 crore.
Technology
Incremental launching method
• This is a new technology used for
the 1st time in India (same
technology was used in Delhi
Metro). Incremental launch is a
method of building a complete
bridge deck from one end to other
end.
Technology
Gas pressure welding
• A new technology of gas pressure
welding came from foreign countries
was used. People were trained for
this technology in Japan. The
advantage of gas pressure welding is
that it can be done at the site itself.
Traditional welding methods can only
be done in welding shops. And it was
a problem to get the welded railing
to the site again.
Technology
Geo-tech safety works
• Boulder netting – Rock fall protective
measure
• Rock bolting – To anchor loose boulders to
the parent rock in tunnels & cuttings
• Shotcreting – It is mixture of sand, cement
and aggregate up to 12 mm size spreaded
on rock surface to arrest the boulder falls
and loose rocks from falling.
• Flattening of Cuttings, Construction of toe
walls – To prevent the soil erosion
Technology
Railway Application Package
• A new Unique ERP System
• The Java Based Railway
Application Package (RAP) consists
of tightly integrated 23 modules
supporting all aspects of working
of all the departments in a Railway
System.
Technology
Patents
• Anti Collision Device
• Track Identification System
• Sky Bus – An Elevated Suspended
Coach Rail Transportation System
with Swing Arrestor, Collision
Arrester, Coach clearance,
Derailment Arrester
ThankYou

More Related Content

What's hot

Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
Renosh R
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway Technology
Pradeep Kumar
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
vinaybidarimath
 
Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management
SIDDHARTH SWAIN
 
report
reportreport
report
Ravi Panchal
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro ppt
sachin kr
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
Mohit Gaur
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
Amit Trivedi
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
Vinay Bardia
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin bana
Nitin Bana
 
PM Gatishakti scheme
PM Gatishakti schemePM Gatishakti scheme
PM Gatishakti scheme
shrikrishna kesharwani
 
Construction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity ModelConstruction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity Model
SSudhaVelan
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
Bimenpreet Kaur
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
Yogesh Vijay
 
Kochi metro stakeholder analysis
Kochi metro stakeholder analysisKochi metro stakeholder analysis
Kochi metro stakeholder analysis
EVERSENDAI ENGINEERING (L.L.C.)
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
BRIDGE School of Management
 
Indian railways
Indian railwaysIndian railways
Indian railways
FedEx Express
 
C 1 highway development in india
C 1 highway development in indiaC 1 highway development in india
C 1 highway development in india
Sachin PatiL
 
Narendra Modi : An exemplary leader
Narendra Modi : An exemplary leaderNarendra Modi : An exemplary leader
Narendra Modi : An exemplary leader
Vatsal Arora
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
Ravi Mehta
 

What's hot (20)

Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway Technology
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management
 
report
reportreport
report
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro ppt
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin bana
 
PM Gatishakti scheme
PM Gatishakti schemePM Gatishakti scheme
PM Gatishakti scheme
 
Construction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity ModelConstruction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity Model
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
 
Kochi metro stakeholder analysis
Kochi metro stakeholder analysisKochi metro stakeholder analysis
Kochi metro stakeholder analysis
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
C 1 highway development in india
C 1 highway development in indiaC 1 highway development in india
C 1 highway development in india
 
Narendra Modi : An exemplary leader
Narendra Modi : An exemplary leaderNarendra Modi : An exemplary leader
Narendra Modi : An exemplary leader
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 

Similar to Konkan railways

Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
Unni Krishnan
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
Rajeev Bhargava
 
Fatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge constructionFatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge construction
smatijay
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
Aditya Shekhar
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
Shikha Verma
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
Shobhit Acharya
 
wdfcil
wdfcilwdfcil
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
Joseph Jincy
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
GarimaSharma754550
 
Tunneling
TunnelingTunneling
Tunneling
Avdhesh Mathur
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
Sunil Kumar Meena
 
Karcham wangtoo
Karcham wangtooKarcham wangtoo
Karcham wangtoo
Abhay Bhuva
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in india
Sandeep Patel
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
Bhavya Jaiswal
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
moinerd
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
Chandan Dubey
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
Yousuf Captain
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
Aswin132028
 
CBSE Class X-Geo(7) : Lifelines of National Economy
CBSE Class X-Geo(7) : Lifelines of National Economy CBSE Class X-Geo(7) : Lifelines of National Economy
CBSE Class X-Geo(7) : Lifelines of National Economy
SrivathsaThotakura
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
KRISHNA PRASAD RAO
 

Similar to Konkan railways (20)

Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Fatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge constructionFatimanagar to mamnoor bridge construction
Fatimanagar to mamnoor bridge construction
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
wdfcil
wdfcilwdfcil
wdfcil
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
 
Tunneling
TunnelingTunneling
Tunneling
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 
Karcham wangtoo
Karcham wangtooKarcham wangtoo
Karcham wangtoo
 
Ten remarkable infrastructure developments in india
Ten remarkable infrastructure developments in indiaTen remarkable infrastructure developments in india
Ten remarkable infrastructure developments in india
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
 
CBSE Class X-Geo(7) : Lifelines of National Economy
CBSE Class X-Geo(7) : Lifelines of National Economy CBSE Class X-Geo(7) : Lifelines of National Economy
CBSE Class X-Geo(7) : Lifelines of National Economy
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 

More from Anjay Rajanahalli

Operational efficiency of Jyothi Henkel
Operational efficiency of Jyothi HenkelOperational efficiency of Jyothi Henkel
Operational efficiency of Jyothi Henkel
Anjay Rajanahalli
 
Responsibility centers in MCS
Responsibility centers in MCSResponsibility centers in MCS
Responsibility centers in MCS
Anjay Rajanahalli
 
Retail Insurance
Retail InsuranceRetail Insurance
Retail Insurance
Anjay Rajanahalli
 
MCS- Tension
MCS- TensionMCS- Tension
MCS- Tension
Anjay Rajanahalli
 
Project Roles Assignment
Project Roles AssignmentProject Roles Assignment
Project Roles Assignment
Anjay Rajanahalli
 
Jayadeva v/s Narayana Health Hospitals
Jayadeva v/s Narayana Health HospitalsJayadeva v/s Narayana Health Hospitals
Jayadeva v/s Narayana Health Hospitals
Anjay Rajanahalli
 
ISRO v/s NASA
ISRO v/s NASAISRO v/s NASA
ISRO v/s NASA
Anjay Rajanahalli
 

More from Anjay Rajanahalli (7)

Operational efficiency of Jyothi Henkel
Operational efficiency of Jyothi HenkelOperational efficiency of Jyothi Henkel
Operational efficiency of Jyothi Henkel
 
Responsibility centers in MCS
Responsibility centers in MCSResponsibility centers in MCS
Responsibility centers in MCS
 
Retail Insurance
Retail InsuranceRetail Insurance
Retail Insurance
 
MCS- Tension
MCS- TensionMCS- Tension
MCS- Tension
 
Project Roles Assignment
Project Roles AssignmentProject Roles Assignment
Project Roles Assignment
 
Jayadeva v/s Narayana Health Hospitals
Jayadeva v/s Narayana Health HospitalsJayadeva v/s Narayana Health Hospitals
Jayadeva v/s Narayana Health Hospitals
 
ISRO v/s NASA
ISRO v/s NASAISRO v/s NASA
ISRO v/s NASA
 

Recently uploaded

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 

Recently uploaded (20)

ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 

Konkan railways

  • 1. OR @ Konkan Railways Anjay Raj
  • 2. Konkan Railways – F & F’s • Designed and built by Indian Engineers in span of 8 years • Konkan Railway takes you on a breathtaking journey through rugged mountains, lush valleys, sunlit paddy fields, bustling villages and glistening rivers that lead out to sea. • It is undoubtedly one of the biggest and most difficult infrastructure projects India has undertaken and successfully completed since Independence. • Today, the Konkan Railway travels 738 kilometers through the states of Maharashtra, Goa and Karnataka, starting just after the Roha railway station (75 km south of Panvel in the suburbs of Mumbai) in Maharashtra and ending at theThokur railway station near Mangalore in southern Karnataka.
  • 3. Captions: • 2000 Bridges & 92 tunnels to be built through this mountainous terrain containing many rivers • Connect Reduced travel time, Mumbai to Mangalore 41 to 15 hours, Mumbai to Cochin 36 to 24 hours, Mumbai to Goa from 20 to 10 hours. • Total Route Length 760 Kms • 4850 Hectares Land, spread over 760 Kms. • 59 Stations across
  • 4. Construction Challenges • The project threw up a whole range of difficulties – technical, financial, emotional and psychological. • The rocky Sahyadris had to be bored through • As many as 1500 rivers had to be forded. • Once in a while, a poisonous snake, or a tiger, decided to take a close look at goings-on! • In the face of collapsing embankments and unrelenting mountains, the engineers had to be tough • Engineers had to be deeply sensitive to the feelings of those who had given up their land.
  • 5. Construction Challenges • June 1994, Mahad had floods 10 to 12 feet above the road level, and when they receded, Konkan Railway jeeps had six-inch layers of silt on the seats • Four workers in the Byndoor tunnel in Karnataka faced their own battle with water when they were thrown back 60 feet by a sudden gush • During the monsoons in July 1997, an entire mountainside collapsed at Ukshi. Machines were buried under the debris, but 200 labourers had a miraculous escape. For those who kept going despite the toughest of challenges, the sense of achievement made it all worthwhile. If people had considered this merely as a job, it would have taken 25 years to complete. It was the team spirit that was so crucial in the successful completion of the project.
  • 6. Success Mantra’s • First time in India funds for the project were raised without touching the government coffers. • The authorized capital was pooled together by the railways and the states of Kerala, Karnataka, Goa and Maharashtra. • They leveraging public bonds (to the extent of Rs.2250 crores) that carried attractive rates of return, tax breaks and guaranteed repayment • Over 4850 hectares of land was acquired from over 42000 owners in the three states of Karnataka, Goa and Maharashtra • Payment cheques were door-delivered at a time when India was still highly bureaucratized, that too, within twelve months.
  • 7. Success Mantra’s • The scenic route also had India’s then-longest ever tunnel at Karbude, which is 5.6 km. in length • A visible example of the ingenuity and the dedication of the builders, the Panval Viaduct connects two hills and has 12 spans and 10 pillars, 6 of which are taller than the Qutub Minar ! At present, it is the third highest viaduct in Asia.
  • 8. Planning • They had planned that the whole railway line would be divided into 7 zones, each zone concurrent with a revenue district, and a Chief Engineer was posted for each zone. • They selected contractors only from the pre-qualified list. • Decision making by the contractors had to be approved by the higher authority.
  • 9. Communication • It was very important for the people who were involved in this project to communicate with each other for the completion of the project. • Department of telecommunications (DoT) lines were hired and then established a good communication network with the headquarters of each of the Chief Engineers. They were all given FAX machines, they were all given computers. A computer networking was done, so that everybody can have any information he wants from anywhere and message can be passed on time. • First time in the history of Indian Railway, Optical fibre cable was used in Tele- communication network. At that time it was a new technology which sensed a lot of opposition but today optical fiber cable is a common thing. Today in the Indian railway system, the Konkan railway has the longest stretch of optical fiber cable.
  • 10. Communication • Mr. E Sreedharan would sit with the contractors and concerned engineers and used to see the problems faced by the team and on the spot used to sort out the problems. So that there is no difficulty at all for the progress of the work. • Every Monday, Mr. E Sreedharan had a meeting with the Head of Departments, where all the problems connected with the whole project were discussed
  • 11. Operational Ability • The operating ratio, which is a parameter of operating efficiency, has significantly improved to 80% in the year 2015-16 as compared to 86.43% in the year 2014-15. • Concept of Roll on Roll off (RORO) • Truck drivers find it extremely difficult to drive loaded trucks through Ghats, undulating surfaces, narrow roads, poor road and weather conditions. • Saving of fuels, decrease in wear and tear of Lorries (trucks), relief to drivers of driving in extreme conditions, can reach faster to destination which leads to saving in travel time and money. • The freight earnings during the year 2015-16 was Rs 459 crore, which was 30% more than last year's freight earnings off 354 crore.
  • 12. Technology Incremental launching method • This is a new technology used for the 1st time in India (same technology was used in Delhi Metro). Incremental launch is a method of building a complete bridge deck from one end to other end.
  • 13. Technology Gas pressure welding • A new technology of gas pressure welding came from foreign countries was used. People were trained for this technology in Japan. The advantage of gas pressure welding is that it can be done at the site itself. Traditional welding methods can only be done in welding shops. And it was a problem to get the welded railing to the site again.
  • 14. Technology Geo-tech safety works • Boulder netting – Rock fall protective measure • Rock bolting – To anchor loose boulders to the parent rock in tunnels & cuttings • Shotcreting – It is mixture of sand, cement and aggregate up to 12 mm size spreaded on rock surface to arrest the boulder falls and loose rocks from falling. • Flattening of Cuttings, Construction of toe walls – To prevent the soil erosion
  • 15. Technology Railway Application Package • A new Unique ERP System • The Java Based Railway Application Package (RAP) consists of tightly integrated 23 modules supporting all aspects of working of all the departments in a Railway System.
  • 16. Technology Patents • Anti Collision Device • Track Identification System • Sky Bus – An Elevated Suspended Coach Rail Transportation System with Swing Arrestor, Collision Arrester, Coach clearance, Derailment Arrester