CURRICULUM VITAE
NAME : EHSAN ASGHAR
PROFESSION : Consulting Engineer - Mechanical
DATE OF BIRTH : December 20, 1985
NATIONALITY : Pakistani
CONTACT No : +92 346 5317190
EMAIL : ehsan_im@yahoo.com
PASSPORT : CK 1821311
SKYPE : ehsan.asghar3
ADDRESS : House No. 53, Baral Wapda Colony Mangla Cantt,
District Jhelum, Pakistan.
MEMBERSHIP OF Registered Mechanical Engineer with Pakistan Engineering
PROFESSIONAL : Council - Registration No. Mech / 22354
SOCIETIES
KEY QUALIFICATIONS:
Practicing as Professional Mechanical Engineer since 2009
“Construction and Contracts Engineering Professional with more than10 years of hands on experience in
Mega Multi-discipline Energy Sector and Building Utilities projects, having key Skills of Supervision, QA/QC,
FATs, Erection of; Hydropower Plant, Hydraulic Gates, Cranes, Tunnel Steel Lining, Mechanical Equipment
(Static, Rotating, Piping) & Allied Steel Structures, HVAC System and MEP Works. Acquainted with FIDIC,
Preparation and Evaluation of Contract / Tender Documents, Claims and Variation Orders.
Worked with renowned lenders including World Bank - WB, Asian Development Bank - ADB, Islamic
Development Bank – IDB, International Finance Corporation – IFC and Commonwealth Development
Corporation - CDC.”
PROFESSIONAL SUMMARY
Jul. 2018 to date: Working as Owner’s Sr. Hydro Mechanical Engineer representing NESPAK
at GHP Consultants for Construction of 102 MWs Gulpur Hydropower
Project, Kotli, AJ&K.
Nov. 2015 to Jun 2018: Worked as Assistant Resident Engineer – Mechanical represented NESPAK
at Neelum Jhelum Consultants – NJC for Execution of 969 MWs Neelum
Jhelum Hydroelectric Project – NJHEP, Muzaffarabad.
May 2013 to Oct. 2015: Worked as Senior Engineer / Assistant Resident Engineer – ARE
(Mechanical) represented NESPAK at PICs (Project Implementation
Consultants) on Rehabilitation and Modernization of Jinnah Barrage.
Apr 2011 to Apr 2013: Worked as Project Mechanical Engineer with M/s China Machinery
Engineering Corp. CMEC for Execution of 969 MWs Neelum Jhelum
Hydroelectric Project – NJHEP, Muzaffarabad.
Feb 2009 to March 2011: Worked at 1000 MWs Mangla Dam Raising Project – MDRP (WAPDA) as
Assistant Manager Mechanical and Electrical Works with China International
Water and Electric Corp. – CWE.
Page 2 of 8
EDUCATION
Bachelors of Mechanical Engineering (2005 – 2009)
Mirpur University of Engineering and Technology – MUST, Pakistan.
COMPUTER SKILLS
• Microsoft Office • AutoCAD • Primavera • Microsoft Project & Visio
INTERPERSONAL SKILLS
• Pleasant Personality • Self-motivated • Leadership • Adoptability & Team Work
TECHNICAL SKILLS
•Technical Report Writing •Estimations, Proposals & Claims •Site Execution & Supervision
•QA / QC & Measurements •Contract Administration •Project Monitoring
•FATs •Workshop Technology •Office Engineering
EMPLOYMENT RECORD
1. Name of Project: 102MWs Gulpur Hydropower Project
Name of Firm: Gulpur Hydropower Consultants – JV 1
Joint Venture of Stantec MWH Inc. and NESPAK
Position Held Sr. Hydro Mechanical Engineer
Contractor Daelim Lotte Joint Venture – DLJV (Andritz Hydro E&M Subcontractor)
Contract Type EPC Contract
Client: Mira Power Limited – MPL
Project Cost: USD $243,500,000
Funded by: K-Exim, CDC, ADB & IFC
Tenure: July, 2018 to date
Project Summary
Gulpur Hydropower Project is owned by Mira Power Limited (Independent Power Produces - IPP) which is
financed by international lenders to construct the project. The Construction award has awarded on Build
Own Operate and Transfer – BOOT basis to a Joint Venture of Daelim and Lotte Engineering Construction
companies – as an EPCC. The gross head is about 60 meters. Bulb Turbines (2 X 51MWs) are being
installed on the discharge of 201m3/sec of Poonch River. Gulpur Hydropower Consultant – JV 1 is hired for
the Design review, to resolve: technical site issues, Contract variations and QA/QC.
Activities Performed:
• Design review and supervision of installation / erection of following Mechanical equipment
in accordance with the technical specifications / contract provisions, approved drawings,
method statements and international standards:
- Cranes - Hydraulic Gates - Turbine Parts - Painting Works
- HVAC - Structure Fabrication - Rail Track - Pumps
• Supervision of QA/QC activities at site which mainly includes inspection of site delivered
Mechanical equipment / parts / sub-assemblies and installed equipment in accordance with
approved Quality Assurance Plan / Technical specifications.
Page 3 of 8
• Technical evaluation of Method statements, Reports, Manuals and other Technical
documents submitted by the Contractor.
• Prepare Technical Reports / Letters.
• Prepare Progress Reports.
• Expertise in using international codes & standards
2. Name of Project: 969MWs Neelum Jhelum Hydroelectric Project - NJHEP
Name of Firm: Neelum Jhelum Consultants – NJC
Joint Venture between MWH AMERICAS, NORPLAN, NESPAK, ACE & NDC
Position Held Assistant Resident Engineer – Mechanical
Contractor CGGC – CMEC Consortium
Contract Type EPC Contract
Client: Water and Power Development Authority – WAPDA
Project Cost: Rs. 404 Billion Approx.
Funded by: GOP, EXIM Bank China, IDB & Donor Agencies
Tenure: November, 2015 to June 2018
Project Summary
Neelum Jhelum Hydroelectric Project is the first Pakistan’s Underground Hydroelectric Project under
WAPDA to meet fast – growing energy requirements in Pakistan. Overall project cost is Rs.404 billion (PC-
1, Revision-3). The project utilizes a gross head of about 420 meters, to generate 969 MWs, Four (04)
Vertical Shafts Francis Turbine (VSFT) with the Installed capacity of 242.25 MWs for each Unit by diverting
River Neelum at Nauseri to the lower reach of Jhelum River at Zamianabad through a 47 km long tunnel
system (Avg. 6.5 meter Dia). Neelum Jhelum Consultants – NJC is hired for the construction & management
supervision and design review of the project.
Activities Performed:
SITE EXECUTIONAL WORKS
• Design review and supervision of installation / erection of following Mechanical equipment
in accordance with the technical specifications / contract provisions, approved drawings,
method statements and international standards:
- Cranes - Main Inlet Valves - Hydraulic Gates - Turbine Parts
- HVAC - Structure Fabrication - Rail Track - Pumps
- Piping Network - Painting Works - Welding Works
• Supervision of QA/QC activities at site which mainly includes inspection of site delivered
Mechanical equipment / parts / sub-assemblies and installed equipment in accordance with
approved Quality Assurance Plan / Technical specifications.
• Assisted Resident Engineer / Site Chief in:
- Project Coordination with Client & Contractor
- Technical issues related to Mechanical works at site
• Technical evaluation of Method statements, Reports, Manuals and other Technical
documents submitted by the Contractor.
• Prepare Technical Reports / Letters.
• Prepare Progress Reports.
• Prepared Project Completion Report
• Reviewed as built drawing submissions
• Conducted the PQR and WPS under the supervision of Resident Engineer.
• Member of HSE Committee from Consultants side to audit the HSE compliance at work site
and implemented prescribed code of conduct.
Page 4 of 8
• Attended various meeting with the Stakeholders to review the project progress, on risk
management, HSE Implementations etc.
• Expertise in using international codes & standards
• Administrate & manage the duty schedule of Junior Engineers and Inspectors to supervise
the work effectively.
• Briefing the technical / learning site visits / delegations on going site activities.
CONTRACTS AND CLAIM WORKS
• Preparation and evaluation of contract/tender documents, cost estimates, bill of quantities,
specifications, processing and scrutinizing variation orders for Mechanical and Hydraulic
Works
• Design Review and Verification of the quantities
• Scrutiny of Contractor’s Monthly Reports.
• Verification of Interim Payment Certificates.
• Checking the provisions of BOQ Items as per Contract Specifications and related supporting
documents.
• Scrutiny of Rate Analysis and Variation Orders.
• Contract administration including processing of Contractor’s Claims and Variation Orders
with compliance to other contractual matters and submission to Client.
• Monitoring the Contractor’s progress and performance to ensure goods and services
conform to the contract requirements.
• Participating, as necessary, in developing the solicitation and writing the draft documents.
• Working closely with cross functional groups and effectively supporting other Engineers in
order to complete assigned tasks within set timelines & budgetary norms.
Main Achievements:
• Reused the support structure for Steel liners and reutilized the rail track has reduced the
cost incurred on the activity which appreciated by the Client.
• After repatriation of expat Resident Engineer, I served as Resident Incharge and responsible
for the completion of remaining works, variation orders, claims & settlement of disputes.
• Successfully completed all the targeted dates of the fabrication, testing and installation of
major activities at site.
• Awarded Letter of Appreciation on outstanding performance.
3. Name of Project: Rehabilitation and Modernization of Jinnah Barrage
Name of Firm: Project Implementation Consultants – PICs
Joint Venture between NESPAK, ACE & SMEC
Position Held Senior Engineer / Assistant Resident Engineer – Mechanical
Contractor DESCON - CCC Joint Venture
Contract Type EPC Contract
Client: PMO for Punjab Barrages – Irrigation Department, Lahore
Project Cost: USD $155 Million
Funded by: WORLD BANK
Tenure: May 2013 to October 2015
Project Summary:
Jinnah Barrage is located on the Indus River with one off-taking canal (Thal Canal). Scope of Mechanical
works of Jinnah Barrage Project includes replacement of barrage and canal hydraulic gate system (Gate
leaves, hoisting systems, embedded parts and allied assemblies), Installation of new gate system for newly
constructed sub-weir and rehabilitation of old Kalabagh Railway bridge. I joined the project since its inception
and successfully completed all the assigned tasks within scheduled time.
Page 5 of 8
Responsibilities:
• Conducted the Joint Condition Survey of existing barrage gates and Thal canal gates
of Jinnah Barrage with Contractor by using Ultrasonic thickness measurement
technique.
• Supervised Installation / erection / replacement activities of Hydraulic Gate equipment
at Barrage and allied structures in accordance with the approved Design and Method
Statements.
• Supervised Welding Works involved in fabrication and installation of hydraulic gate
equipment and superstructures which mainly includes Visual examination, Repair,
procedures, Quality inspection in compliance with Approved welding procedure
(WPS). Conducted Inspection of Welding Works using standard NDT Techniques.
• Conducted condition survey of Old Kalabagh railway bridge and supervised the
rehabilitation and re-modification works of the Bridge to provide alternate vehicular
route before the commencement of dismantling works at Barrage.
• Supervised QA/QC activities at site which mainly includes inspection of site delivered
items/gate equipment from China and installed gate equipment at Main Barrage, Sub
Weir and Canal in accordance with approved Quality Assurance Plan.
• Supervised Rehabilitation activities which include the rehabilitation of superstructure
of Main Barrage and Thal Canal head and cross Regulators.
• Supervised Painting Works at site as per approved / standard coating system.
• Supervised the installation of HVAC system for SCADA Control Room, MEP Works
and FATs & installation of Turbine and Submersible Pumps for Barrage Colony.
• Responsible for preliminary review & evaluation of Contractor’s technical submittals
i.e Method statements, manuals, schedules, progress reports etc.
• Supervised of Fabrication Works carried out by Contractor at site workshop.
• Supervised the Priority Repair Works of existing / old Gates of Main barrage before
the floods of 2013.
• As Estimation Engineer, reviewed the Contractor’s proposal for the rehabilitation of
old / existing Steel Structure of Kalabagh Railway Bridge which was constructed in
1929.
• Assist Resident Engineer in:
- IPC (Payment Certificates) verification of Mechanical Works.
- Project Coordination with Client & Contractor.
- Technical issues related to Mechanical works at site.
• Prepared Technical Reports / Letters.
• Prepared Daily / Weekly / Monthly Progress Reports.
• Prepared Project Completion Report and O&M Manuals for Gate System.
Main Achievements:
• The rehabilitation & re-modification of Old Railway Bridge was first ever milestone of
the project which was completed as per schedule and divert the vehicular traffic from
barrage to this bridge. The rehabilitation of this bridge was a part SDAP. My efforts
were much appreciated by the World Bank representatives visited at site.
• The installation, testing and commissioning of Barrage gates was completed before
the flood season of year 2015 and ensured smooth operation of gates and gate
equipment.
4. Name of Project: 969MWs Neelum Jhelum Hydroelectric Project - NJHEP
Name of Firm: China Machinery Engineering Corporation - CMEC
Position Held Project Engineer – Mechanical
Contractor CGGC – CMEC Consortium
Page 6 of 8
Contract Type EPC Contract
Client: Water and Power Development Authority – WAPDA
Project Cost: Rs. 480 Billion Approx.
Funded by: GOP, EXIM Bank China, IDB & Donor Agencies
Tenure: Apr 2011 to Apr 2013
Project Summary
Construction of Neelum Jhelum Hydroelectric Project is the first Pakistan’s Underground Hydroelectric
Project under WAPDA to meet fast – growing energy requirements in Pakistan. Overall project cost is
Rs.404 billion (PC-1, Revision-3). The project utilizes a gross head of about 420 meters, to generate 969
MWs, Four (04) Vertical Shafts Francis Turbine (VSFT) with the Installed capacity of 242.25 MWs for each
Unit by diverting River Neelum at Nauseri to the lower reach of Jhelum River at Zamianabad through a 47
km long tunnel system (Avg. 6.5 meter Dia).
Responsibilities:
• Established the Site Management Office for the execution of EMH Works of the
Project.
• Maintained cordial relationship with clients, ensuring service quality norms to achieve
Client satisfaction & business retention.
• Prepared the method statement for the Mechanical & Hydraulic Steel Structural
works to be executed in Power Complex and Dam / Intake Site.
• Supervision of installation / erection of following Mechanical equipment in
accordance with the technical specifications / contract provisions, approved
drawings, method statements and international standards:
- Draft Tubes - Steel Structures - Hydraulic Gates - Turbine Parts
- Rail Track - Fabrication Works - Painting Works - Piping Network
• Involved in preparation of layout of E&M equipment, HVAC and Piping network.
• Established penstock fabrication workshop at project site.
• Worked as Office Engineer during Site Coordination Meetings between the
Contractor and the Consultant for execution of Electromechanical works of power
house & intake.
• Conducted the site inspection of delivered items including Draft tube, Spiral case,
cones for Power House.
• Hiring of Skilled workers for the execution of works with better quality of
workmanship.
• As a Logistic In charge, prepared the detailed logistic road map for the safe, sound
and in-time shipment of EMH equipment and material from Port Qasim to
Muzaffarabad, AJK
• Worked as Contract Manager involved in the preparation of tender documents,
detail civil drawings, technical specifications and contract document for EMH Staff
dormitories and Offices.
• Prepared and submitted Variation Order and Claims of various mechanical works.
The Claims were prepared according to contract clause, technical specification and
tender drawings for the specific activity.
• Responsible for preparation and submission of Interim Payment Application to
Consultants for certification of executed Mechanical Works as per contract clauses.
• Conducted Factory inspections for under fabricated / manufactured items used at
the Project.
Main Achievements:
Page 7 of 8
• Established site management office, started the coordination between the Civil
Contractor and make necessary arrangements to start EMH site activities as per
schedule
• Successfully completed installation, testing and commissioning of Power house
Bridge Crane which was the preliminary equipment used for the installation of
electromechanical equipment in power house.
• Timely completion of Road Survey for the transportation of EMH equipment from
port Qasim to Muzaffarabad project site which appreciated by hi-ups.
• Prepared the claims for the works which were not part of the original contract.
5. Name of Project: Mangla Dam Raising Project - MDRP
Name of Firm: China International Water and Electric Corp. CWE
Position Held Assistant Manager – M&E Works
Contractor CWE-JV
Client: Water and Power Development Authority – WAPDA
Project Cost: Rs. 101.384 billion
Funded by: Government of Pakistan – GoP
Tenure: Feb 2009 to Mar 2011
Project Summary
China International Water & Electric Corp. is a well-recognized one of the world’s largest multinational
construction company working in Pakistan. CWE was involved in Mangla Dam Raising Project. Mangla dam
is one of the biggest dam in Pakistan that includes upraising 30 feet of Main Dam, Sukye Dyke, Main
Spillway, Emergency Spillway, and Gate Equipment Modification & Instrumentation. I joined the project after
my graduation. My responsibilities were as follows:
Responsibilities:
• Responsible for the evaluation, quantitative estimation, technical method
Statements and schedule the M&E Works and get approval from Consultants and
ensure the availability of material/Equipment in time.
• Supervised the fabrication and installation workmanship of Sill Beam and Liner
Plate of Spillway’s Radial Gates and Structural Repairs of Power Intake Gates of
Power House.
• Responsible to check and monitor the Sub-contractor’s works & maintain the
project quality and directed to complete in time.
• Responsible for the installation, testing & commissioning of HVAC systems in
Instrumentation Galleries and Shafts.
• Coordinate with the relative Civil construction company to ensure the execution of
project in time and safe.
• Attended various meetings with Consultant and Client on Critical issues to
complete works with in targeted dates.
• Prepared of monthly Interim Payment Application (IPA) for M&E Works.
• Prepared Technical Reports / Letters.
• Prepared Daily / Weekly / Monthly Progress Reports.
• Performed and prepared condition survey reports of Existing Power Intake Gates
of Mangla Power Station
• Supervised Painting and Sand Blasting of installed Spillway and Power Intake
Gates
• Local and Foreign Procurements of Materials / Equipment as per technical
specifications.
Page 8 of 8
• Prepared the as-built Drawing/documentations for the completed works.
• Recorded and Claimed the executed Day Work Activities.
• During Defect Liability Period (DLP) remained as representative of M&E works in
order to hand over the completed project to Client.
• Monitored departmental earthmoving / construction equipment, staff and other
related M&E works.
• Co-ordination with Client/Consultant during execution of the Project
• Prepared Various Claims and Variation orders in accordance with the Technical
Specification of the Project and Contract of Clauses as per FIDIC.
Main Achievements:
• Successfully Installed & Tested the Main Spillway Gates and Handed Over to the
Client - WAPDA.
• Successfully Installed & Tested the Power Intake Gates and Handed Over to the
Client - WAPDA.
• Prepared and submitted cost proposal and claims of works which were not a part
of the Contract but directed / instructed by the Consultants / Client to execute.
15. LANGUAGE
Speaking Reading Writing
English Proficient Proficient Proficient
Urdu Proficient Proficient Proficient
16. INTERNSHIP
Attended 4 weeks practical training at WAPDA Hydel Training Center Mangla, studied about Dams,
Hydraulic turbines & Governors, Generators etc and its Operation and Maintenance.
17. CO-CURRICULAR ACTIVITIES:
I am 6ft-2 inch in height, have healthy, smart and active sportsman physique. I like to play:
- Basket Ball - Swimming - Table Tennis - Badminton
As Captain of College Basketball Team won All Pakistan Basketball Tournament under Directorate Sports
- FBISE in year 2003.
18. REFERENCES
ENGR. JUAN F. MORALES
CHIEF MECHANICAL ENGINEER
Email: jfsalam@gmail.com
jfengineer@yahoo.com
Contact No. +58 4242201087 (Venezuela)
ENGR. JAVAID IQBAL AWAN
CHIEF ENGINEER – MECHANICAL
Associated Consulting Engineers – ACE
Pakistan
Email: jawan356@yahoo.com
Contact No. +92 3455938356 (Pakistan)
(Ehsan Asghar)

More Related Content

What's hot

CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerSoriya Mitesh
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
CV - Muhammad Faisal Wattoo
CV - Muhammad Faisal WattooCV - Muhammad Faisal Wattoo
CV - Muhammad Faisal WattooFaisal Wattoo
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Qamar Ahmad
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CVMuhammad Naeem
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Cv mechanical engineer (hamid)
Cv  mechanical engineer (hamid)Cv  mechanical engineer (hamid)
Cv mechanical engineer (hamid)
HamidAbdulSami
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 

What's hot (20)

CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
CV - Muhammad Faisal Wattoo
CV - Muhammad Faisal WattooCV - Muhammad Faisal Wattoo
CV - Muhammad Faisal Wattoo
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
Mechanical Engineer having 5+ years experience in Erection & Commissioning En...
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
QC. CV
QC. CVQC. CV
QC. CV
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Cv mechanical engineer (hamid)
Cv  mechanical engineer (hamid)Cv  mechanical engineer (hamid)
Cv mechanical engineer (hamid)
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 

Similar to Ehsan Asghar - Hydromechanical Engineer

Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
EmmanuelMatutu
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPS S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPs s n prasad akshintala
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
Abu Dhabi Oil Company (JAPAN)
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_originalNeeladri varma
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 

Similar to Ehsan Asghar - Hydromechanical Engineer (20)

V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
Resume
ResumeResume
Resume
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPS S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 

Ehsan Asghar - Hydromechanical Engineer

  • 1. Page 1 of 8 CURRICULUM VITAE NAME : EHSAN ASGHAR PROFESSION : Consulting Engineer - Mechanical DATE OF BIRTH : December 20, 1985 NATIONALITY : Pakistani CONTACT No : +92 346 5317190 EMAIL : ehsan_im@yahoo.com PASSPORT : CK 1821311 SKYPE : ehsan.asghar3 ADDRESS : House No. 53, Baral Wapda Colony Mangla Cantt, District Jhelum, Pakistan. MEMBERSHIP OF Registered Mechanical Engineer with Pakistan Engineering PROFESSIONAL : Council - Registration No. Mech / 22354 SOCIETIES KEY QUALIFICATIONS: Practicing as Professional Mechanical Engineer since 2009 “Construction and Contracts Engineering Professional with more than10 years of hands on experience in Mega Multi-discipline Energy Sector and Building Utilities projects, having key Skills of Supervision, QA/QC, FATs, Erection of; Hydropower Plant, Hydraulic Gates, Cranes, Tunnel Steel Lining, Mechanical Equipment (Static, Rotating, Piping) & Allied Steel Structures, HVAC System and MEP Works. Acquainted with FIDIC, Preparation and Evaluation of Contract / Tender Documents, Claims and Variation Orders. Worked with renowned lenders including World Bank - WB, Asian Development Bank - ADB, Islamic Development Bank – IDB, International Finance Corporation – IFC and Commonwealth Development Corporation - CDC.” PROFESSIONAL SUMMARY Jul. 2018 to date: Working as Owner’s Sr. Hydro Mechanical Engineer representing NESPAK at GHP Consultants for Construction of 102 MWs Gulpur Hydropower Project, Kotli, AJ&K. Nov. 2015 to Jun 2018: Worked as Assistant Resident Engineer – Mechanical represented NESPAK at Neelum Jhelum Consultants – NJC for Execution of 969 MWs Neelum Jhelum Hydroelectric Project – NJHEP, Muzaffarabad. May 2013 to Oct. 2015: Worked as Senior Engineer / Assistant Resident Engineer – ARE (Mechanical) represented NESPAK at PICs (Project Implementation Consultants) on Rehabilitation and Modernization of Jinnah Barrage. Apr 2011 to Apr 2013: Worked as Project Mechanical Engineer with M/s China Machinery Engineering Corp. CMEC for Execution of 969 MWs Neelum Jhelum Hydroelectric Project – NJHEP, Muzaffarabad. Feb 2009 to March 2011: Worked at 1000 MWs Mangla Dam Raising Project – MDRP (WAPDA) as Assistant Manager Mechanical and Electrical Works with China International Water and Electric Corp. – CWE.
  • 2. Page 2 of 8 EDUCATION Bachelors of Mechanical Engineering (2005 – 2009) Mirpur University of Engineering and Technology – MUST, Pakistan. COMPUTER SKILLS • Microsoft Office • AutoCAD • Primavera • Microsoft Project & Visio INTERPERSONAL SKILLS • Pleasant Personality • Self-motivated • Leadership • Adoptability & Team Work TECHNICAL SKILLS •Technical Report Writing •Estimations, Proposals & Claims •Site Execution & Supervision •QA / QC & Measurements •Contract Administration •Project Monitoring •FATs •Workshop Technology •Office Engineering EMPLOYMENT RECORD 1. Name of Project: 102MWs Gulpur Hydropower Project Name of Firm: Gulpur Hydropower Consultants – JV 1 Joint Venture of Stantec MWH Inc. and NESPAK Position Held Sr. Hydro Mechanical Engineer Contractor Daelim Lotte Joint Venture – DLJV (Andritz Hydro E&M Subcontractor) Contract Type EPC Contract Client: Mira Power Limited – MPL Project Cost: USD $243,500,000 Funded by: K-Exim, CDC, ADB & IFC Tenure: July, 2018 to date Project Summary Gulpur Hydropower Project is owned by Mira Power Limited (Independent Power Produces - IPP) which is financed by international lenders to construct the project. The Construction award has awarded on Build Own Operate and Transfer – BOOT basis to a Joint Venture of Daelim and Lotte Engineering Construction companies – as an EPCC. The gross head is about 60 meters. Bulb Turbines (2 X 51MWs) are being installed on the discharge of 201m3/sec of Poonch River. Gulpur Hydropower Consultant – JV 1 is hired for the Design review, to resolve: technical site issues, Contract variations and QA/QC. Activities Performed: • Design review and supervision of installation / erection of following Mechanical equipment in accordance with the technical specifications / contract provisions, approved drawings, method statements and international standards: - Cranes - Hydraulic Gates - Turbine Parts - Painting Works - HVAC - Structure Fabrication - Rail Track - Pumps • Supervision of QA/QC activities at site which mainly includes inspection of site delivered Mechanical equipment / parts / sub-assemblies and installed equipment in accordance with approved Quality Assurance Plan / Technical specifications.
  • 3. Page 3 of 8 • Technical evaluation of Method statements, Reports, Manuals and other Technical documents submitted by the Contractor. • Prepare Technical Reports / Letters. • Prepare Progress Reports. • Expertise in using international codes & standards 2. Name of Project: 969MWs Neelum Jhelum Hydroelectric Project - NJHEP Name of Firm: Neelum Jhelum Consultants – NJC Joint Venture between MWH AMERICAS, NORPLAN, NESPAK, ACE & NDC Position Held Assistant Resident Engineer – Mechanical Contractor CGGC – CMEC Consortium Contract Type EPC Contract Client: Water and Power Development Authority – WAPDA Project Cost: Rs. 404 Billion Approx. Funded by: GOP, EXIM Bank China, IDB & Donor Agencies Tenure: November, 2015 to June 2018 Project Summary Neelum Jhelum Hydroelectric Project is the first Pakistan’s Underground Hydroelectric Project under WAPDA to meet fast – growing energy requirements in Pakistan. Overall project cost is Rs.404 billion (PC- 1, Revision-3). The project utilizes a gross head of about 420 meters, to generate 969 MWs, Four (04) Vertical Shafts Francis Turbine (VSFT) with the Installed capacity of 242.25 MWs for each Unit by diverting River Neelum at Nauseri to the lower reach of Jhelum River at Zamianabad through a 47 km long tunnel system (Avg. 6.5 meter Dia). Neelum Jhelum Consultants – NJC is hired for the construction & management supervision and design review of the project. Activities Performed: SITE EXECUTIONAL WORKS • Design review and supervision of installation / erection of following Mechanical equipment in accordance with the technical specifications / contract provisions, approved drawings, method statements and international standards: - Cranes - Main Inlet Valves - Hydraulic Gates - Turbine Parts - HVAC - Structure Fabrication - Rail Track - Pumps - Piping Network - Painting Works - Welding Works • Supervision of QA/QC activities at site which mainly includes inspection of site delivered Mechanical equipment / parts / sub-assemblies and installed equipment in accordance with approved Quality Assurance Plan / Technical specifications. • Assisted Resident Engineer / Site Chief in: - Project Coordination with Client & Contractor - Technical issues related to Mechanical works at site • Technical evaluation of Method statements, Reports, Manuals and other Technical documents submitted by the Contractor. • Prepare Technical Reports / Letters. • Prepare Progress Reports. • Prepared Project Completion Report • Reviewed as built drawing submissions • Conducted the PQR and WPS under the supervision of Resident Engineer. • Member of HSE Committee from Consultants side to audit the HSE compliance at work site and implemented prescribed code of conduct.
  • 4. Page 4 of 8 • Attended various meeting with the Stakeholders to review the project progress, on risk management, HSE Implementations etc. • Expertise in using international codes & standards • Administrate & manage the duty schedule of Junior Engineers and Inspectors to supervise the work effectively. • Briefing the technical / learning site visits / delegations on going site activities. CONTRACTS AND CLAIM WORKS • Preparation and evaluation of contract/tender documents, cost estimates, bill of quantities, specifications, processing and scrutinizing variation orders for Mechanical and Hydraulic Works • Design Review and Verification of the quantities • Scrutiny of Contractor’s Monthly Reports. • Verification of Interim Payment Certificates. • Checking the provisions of BOQ Items as per Contract Specifications and related supporting documents. • Scrutiny of Rate Analysis and Variation Orders. • Contract administration including processing of Contractor’s Claims and Variation Orders with compliance to other contractual matters and submission to Client. • Monitoring the Contractor’s progress and performance to ensure goods and services conform to the contract requirements. • Participating, as necessary, in developing the solicitation and writing the draft documents. • Working closely with cross functional groups and effectively supporting other Engineers in order to complete assigned tasks within set timelines & budgetary norms. Main Achievements: • Reused the support structure for Steel liners and reutilized the rail track has reduced the cost incurred on the activity which appreciated by the Client. • After repatriation of expat Resident Engineer, I served as Resident Incharge and responsible for the completion of remaining works, variation orders, claims & settlement of disputes. • Successfully completed all the targeted dates of the fabrication, testing and installation of major activities at site. • Awarded Letter of Appreciation on outstanding performance. 3. Name of Project: Rehabilitation and Modernization of Jinnah Barrage Name of Firm: Project Implementation Consultants – PICs Joint Venture between NESPAK, ACE & SMEC Position Held Senior Engineer / Assistant Resident Engineer – Mechanical Contractor DESCON - CCC Joint Venture Contract Type EPC Contract Client: PMO for Punjab Barrages – Irrigation Department, Lahore Project Cost: USD $155 Million Funded by: WORLD BANK Tenure: May 2013 to October 2015 Project Summary: Jinnah Barrage is located on the Indus River with one off-taking canal (Thal Canal). Scope of Mechanical works of Jinnah Barrage Project includes replacement of barrage and canal hydraulic gate system (Gate leaves, hoisting systems, embedded parts and allied assemblies), Installation of new gate system for newly constructed sub-weir and rehabilitation of old Kalabagh Railway bridge. I joined the project since its inception and successfully completed all the assigned tasks within scheduled time.
  • 5. Page 5 of 8 Responsibilities: • Conducted the Joint Condition Survey of existing barrage gates and Thal canal gates of Jinnah Barrage with Contractor by using Ultrasonic thickness measurement technique. • Supervised Installation / erection / replacement activities of Hydraulic Gate equipment at Barrage and allied structures in accordance with the approved Design and Method Statements. • Supervised Welding Works involved in fabrication and installation of hydraulic gate equipment and superstructures which mainly includes Visual examination, Repair, procedures, Quality inspection in compliance with Approved welding procedure (WPS). Conducted Inspection of Welding Works using standard NDT Techniques. • Conducted condition survey of Old Kalabagh railway bridge and supervised the rehabilitation and re-modification works of the Bridge to provide alternate vehicular route before the commencement of dismantling works at Barrage. • Supervised QA/QC activities at site which mainly includes inspection of site delivered items/gate equipment from China and installed gate equipment at Main Barrage, Sub Weir and Canal in accordance with approved Quality Assurance Plan. • Supervised Rehabilitation activities which include the rehabilitation of superstructure of Main Barrage and Thal Canal head and cross Regulators. • Supervised Painting Works at site as per approved / standard coating system. • Supervised the installation of HVAC system for SCADA Control Room, MEP Works and FATs & installation of Turbine and Submersible Pumps for Barrage Colony. • Responsible for preliminary review & evaluation of Contractor’s technical submittals i.e Method statements, manuals, schedules, progress reports etc. • Supervised of Fabrication Works carried out by Contractor at site workshop. • Supervised the Priority Repair Works of existing / old Gates of Main barrage before the floods of 2013. • As Estimation Engineer, reviewed the Contractor’s proposal for the rehabilitation of old / existing Steel Structure of Kalabagh Railway Bridge which was constructed in 1929. • Assist Resident Engineer in: - IPC (Payment Certificates) verification of Mechanical Works. - Project Coordination with Client & Contractor. - Technical issues related to Mechanical works at site. • Prepared Technical Reports / Letters. • Prepared Daily / Weekly / Monthly Progress Reports. • Prepared Project Completion Report and O&M Manuals for Gate System. Main Achievements: • The rehabilitation & re-modification of Old Railway Bridge was first ever milestone of the project which was completed as per schedule and divert the vehicular traffic from barrage to this bridge. The rehabilitation of this bridge was a part SDAP. My efforts were much appreciated by the World Bank representatives visited at site. • The installation, testing and commissioning of Barrage gates was completed before the flood season of year 2015 and ensured smooth operation of gates and gate equipment. 4. Name of Project: 969MWs Neelum Jhelum Hydroelectric Project - NJHEP Name of Firm: China Machinery Engineering Corporation - CMEC Position Held Project Engineer – Mechanical Contractor CGGC – CMEC Consortium
  • 6. Page 6 of 8 Contract Type EPC Contract Client: Water and Power Development Authority – WAPDA Project Cost: Rs. 480 Billion Approx. Funded by: GOP, EXIM Bank China, IDB & Donor Agencies Tenure: Apr 2011 to Apr 2013 Project Summary Construction of Neelum Jhelum Hydroelectric Project is the first Pakistan’s Underground Hydroelectric Project under WAPDA to meet fast – growing energy requirements in Pakistan. Overall project cost is Rs.404 billion (PC-1, Revision-3). The project utilizes a gross head of about 420 meters, to generate 969 MWs, Four (04) Vertical Shafts Francis Turbine (VSFT) with the Installed capacity of 242.25 MWs for each Unit by diverting River Neelum at Nauseri to the lower reach of Jhelum River at Zamianabad through a 47 km long tunnel system (Avg. 6.5 meter Dia). Responsibilities: • Established the Site Management Office for the execution of EMH Works of the Project. • Maintained cordial relationship with clients, ensuring service quality norms to achieve Client satisfaction & business retention. • Prepared the method statement for the Mechanical & Hydraulic Steel Structural works to be executed in Power Complex and Dam / Intake Site. • Supervision of installation / erection of following Mechanical equipment in accordance with the technical specifications / contract provisions, approved drawings, method statements and international standards: - Draft Tubes - Steel Structures - Hydraulic Gates - Turbine Parts - Rail Track - Fabrication Works - Painting Works - Piping Network • Involved in preparation of layout of E&M equipment, HVAC and Piping network. • Established penstock fabrication workshop at project site. • Worked as Office Engineer during Site Coordination Meetings between the Contractor and the Consultant for execution of Electromechanical works of power house & intake. • Conducted the site inspection of delivered items including Draft tube, Spiral case, cones for Power House. • Hiring of Skilled workers for the execution of works with better quality of workmanship. • As a Logistic In charge, prepared the detailed logistic road map for the safe, sound and in-time shipment of EMH equipment and material from Port Qasim to Muzaffarabad, AJK • Worked as Contract Manager involved in the preparation of tender documents, detail civil drawings, technical specifications and contract document for EMH Staff dormitories and Offices. • Prepared and submitted Variation Order and Claims of various mechanical works. The Claims were prepared according to contract clause, technical specification and tender drawings for the specific activity. • Responsible for preparation and submission of Interim Payment Application to Consultants for certification of executed Mechanical Works as per contract clauses. • Conducted Factory inspections for under fabricated / manufactured items used at the Project. Main Achievements:
  • 7. Page 7 of 8 • Established site management office, started the coordination between the Civil Contractor and make necessary arrangements to start EMH site activities as per schedule • Successfully completed installation, testing and commissioning of Power house Bridge Crane which was the preliminary equipment used for the installation of electromechanical equipment in power house. • Timely completion of Road Survey for the transportation of EMH equipment from port Qasim to Muzaffarabad project site which appreciated by hi-ups. • Prepared the claims for the works which were not part of the original contract. 5. Name of Project: Mangla Dam Raising Project - MDRP Name of Firm: China International Water and Electric Corp. CWE Position Held Assistant Manager – M&E Works Contractor CWE-JV Client: Water and Power Development Authority – WAPDA Project Cost: Rs. 101.384 billion Funded by: Government of Pakistan – GoP Tenure: Feb 2009 to Mar 2011 Project Summary China International Water & Electric Corp. is a well-recognized one of the world’s largest multinational construction company working in Pakistan. CWE was involved in Mangla Dam Raising Project. Mangla dam is one of the biggest dam in Pakistan that includes upraising 30 feet of Main Dam, Sukye Dyke, Main Spillway, Emergency Spillway, and Gate Equipment Modification & Instrumentation. I joined the project after my graduation. My responsibilities were as follows: Responsibilities: • Responsible for the evaluation, quantitative estimation, technical method Statements and schedule the M&E Works and get approval from Consultants and ensure the availability of material/Equipment in time. • Supervised the fabrication and installation workmanship of Sill Beam and Liner Plate of Spillway’s Radial Gates and Structural Repairs of Power Intake Gates of Power House. • Responsible to check and monitor the Sub-contractor’s works & maintain the project quality and directed to complete in time. • Responsible for the installation, testing & commissioning of HVAC systems in Instrumentation Galleries and Shafts. • Coordinate with the relative Civil construction company to ensure the execution of project in time and safe. • Attended various meetings with Consultant and Client on Critical issues to complete works with in targeted dates. • Prepared of monthly Interim Payment Application (IPA) for M&E Works. • Prepared Technical Reports / Letters. • Prepared Daily / Weekly / Monthly Progress Reports. • Performed and prepared condition survey reports of Existing Power Intake Gates of Mangla Power Station • Supervised Painting and Sand Blasting of installed Spillway and Power Intake Gates • Local and Foreign Procurements of Materials / Equipment as per technical specifications.
  • 8. Page 8 of 8 • Prepared the as-built Drawing/documentations for the completed works. • Recorded and Claimed the executed Day Work Activities. • During Defect Liability Period (DLP) remained as representative of M&E works in order to hand over the completed project to Client. • Monitored departmental earthmoving / construction equipment, staff and other related M&E works. • Co-ordination with Client/Consultant during execution of the Project • Prepared Various Claims and Variation orders in accordance with the Technical Specification of the Project and Contract of Clauses as per FIDIC. Main Achievements: • Successfully Installed & Tested the Main Spillway Gates and Handed Over to the Client - WAPDA. • Successfully Installed & Tested the Power Intake Gates and Handed Over to the Client - WAPDA. • Prepared and submitted cost proposal and claims of works which were not a part of the Contract but directed / instructed by the Consultants / Client to execute. 15. LANGUAGE Speaking Reading Writing English Proficient Proficient Proficient Urdu Proficient Proficient Proficient 16. INTERNSHIP Attended 4 weeks practical training at WAPDA Hydel Training Center Mangla, studied about Dams, Hydraulic turbines & Governors, Generators etc and its Operation and Maintenance. 17. CO-CURRICULAR ACTIVITIES: I am 6ft-2 inch in height, have healthy, smart and active sportsman physique. I like to play: - Basket Ball - Swimming - Table Tennis - Badminton As Captain of College Basketball Team won All Pakistan Basketball Tournament under Directorate Sports - FBISE in year 2003. 18. REFERENCES ENGR. JUAN F. MORALES CHIEF MECHANICAL ENGINEER Email: jfsalam@gmail.com jfengineer@yahoo.com Contact No. +58 4242201087 (Venezuela) ENGR. JAVAID IQBAL AWAN CHIEF ENGINEER – MECHANICAL Associated Consulting Engineers – ACE Pakistan Email: jawan356@yahoo.com Contact No. +92 3455938356 (Pakistan) (Ehsan Asghar)