SlideShare a Scribd company logo
1 of 23
SUBMITTED TO:PROF. R.K. MATHUR SIR
MECHANICAL DEPTT

SUBMITTED BY:SURAJ KUMAR
MECHANICAL ENGG
ROLL- 10901281303
















ACKNOWLEDGEMENT
INTRODUCTION
HISTORY OF CHITRANJAN LOCOMOTIVES
QUALITY POLICY
ENVIRONMENTAL POLICY
ACTIONS ADOPTED
LAYOUT OF CLW
ROOF
DRIVER CABIN
MACHINE ROOM
UNDERFRAME
BOGIE
ASSEMBLY ROOM
PHOTO GALLERY
THANK YOU


I feel satisfied in preparing the project on CLW. It was a great
experience at CLW in training duration. I SURAJ KUMAR
student of BHAGWANT UNIVERSITY, sincerely thanks various
department of CLW for the assistance provided to me in
preparing the report during industrial training. I thank to my
department $ college who has given permission to go for
industrial training in CLW.



Thanking You








Chittaranjan Locomotive Works (CLW) is the dream of the nation’s
visionaries, coming true. The planners of the Nation with their deep
insight and foresight set to build a Loco building Factory in West
Bengal and CLW is that vision, coming true. On the 9th of January
1948, survey of the proposed area was done.
It is the only major Electric Locomotive builder in the country. It is
situated just at the Border of West Bengal and Jharkhand and is at
about 32 km from Asansol and 237 kms from Kolkata.
The Workshop has an area of 18.34 Sq. Km. The issue of setting up a
loco building unit continued to be under active consideration of the
Central legislature and in the late thirties, a committee consisting of
M/s. Humphries and Shrinivasan was appointed to investigate the
possibility of establishing a locomotive manufacturing unit and to
consider its economic viability.
The loco works was initially established for production of 120 average
sized steam locomotives with the capacity to manufacture 50 spare
boilers.
LOKMANYA 5
The production of Electric Locomotives commenced in 1961. In the
process, fifteen versions of electric locomotives were produced by CLW and
the latest in that series is the freight locomotive WAG-7 and
passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first
Prime Minister of India, commissioned the first 1500 V dc Locomotive
named “LOKMANYA” on the 14th October, 1961. The production of
25 kV ac loco commenced on 16th November, 1963. The first Electric
Loco turned out from CLW, christened as “BIDHAN” was a Broad
Gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with
maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the
horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed
from 80 Km/h to 160 km/h. CLW also built 25 kV ac/1500 V dc, ac/dc
Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT
on Western Railway.


CLW is an ISO-9001 unit and has a well-established quality
system. The loco works of CLW obtained its
ISO-9001certification on 13.07.96 while the ISO-9002: 1994
certification for Steel Foundry was obtained on 08.08.1996. Up
gradation to ISO 9001:2001 for both Loco Works and Steel
Foundry was completed on 25.09.2003. First Surveillance Audit
was conducted during 06.10.2004 to 08.10.2004 and the Second
Surveillance Audit was conducted during 06.09.05 to 09.09.05.
Renewal audit was conducted from 28th August to 30th
August, 2006. It is worth mentioning that CLW acquired
ISO- 9001:2008 certificate on 22nd Oct 2009 for another three
years for our commitment to Quality Management system.








Improved Environmental Management System, prevention of
pollution and continuous improvement of environment
performance.
Compliance with relevant environmental legislation and
requirements as determined by appropriate regulatory and
other corporate bodies.
Conservation of natural resources and implementation of
fundamentals of waste management.
Setting environmental objectives and Targets and monitoring
progress for sustainable development.
Ensure awareness of all employees and contractors regarding
their environmental roles and responsibilities.









Waste generated in Shops have been reduced by 5% from the previous
year by improvement of operational procedures.
Air Pollution Control Device has been installed in Integrated Paint
Shop to reduce air pollution.
Dust collector has been installed in Sand Plant/SF for reduction of air
pollution.
To reduce air pollution, stack height of D.G.sets in Central Power
House has been increased.
Air Pollution Control Device has been installed at GEC Arc Furnaces in
Steel Foundry.
Consumption of water in plant area has been reduced by 5% by
arresting major leakages and provision of water meters have been
made for regular monitoring of water consumption.
New Sewage Treatment Plant (Bio-filter Plant) has been commissioned
and under operation for improvement of effluent quality before
discharge to surface inland and nearby water bodies.
ROOF
DRIVER’S

CABIN
MACHINE ROOM
UNDER FRAME
BOGIE
PANTOGRAPH
RESISTER

HARMONIC FILTER
SURGE ARRESTER
TRANSDUCER
MAIN CIRCUIT BREAKER
ROOF LINE













DRIVER DESK
LAMP FOR DRIVER $ ASS.DRIVER DESK SHEAT
ENERGY FLASHER LIGHT
PENUMATIC HORN (H.T,L.T)
PANEL( A,B,C,D)
WIPER MOTOR
HORN LEVER
PARK BRAKE GAUGE
SPEEDOMETER
EMERGENCY BRAKE COCK
SWITCHS- SANDING, BRAKE RELEASE,VIGILLANCE
 RESEVAIR:::::450Lt.=2/240lt

=1 in WAG-9/9H

240Lt.-4 in WAP7/WAG5
 TRACTION COVERTER 1$2
 AUXILLARY CONVERTER BOX 1$2
 BLOWERS
 OIL COOLING UNIT
 AUXILLARY COMPRESSOR
 PRI PANNEL/TRIPLATE PANNEL
MAIN

COMPRESSER
CIRCUIT BRAKER BATTERY
BATTERY BOX
MAIN TRANSFORMER
 SAND

BOX
 WHEEL
 BOGIE FRAME
 WHEEL SET
 SPRING—PRIMARY/SECONDERY
 BRAKE SET
 DAMPER—
PRIMARY/SECONDARY/HORIZONTAL/V
ERTICAL
STEAM ENGINE

ELECTRIC ENGINE

DIESEL ENGINE
Training ppt on clw 2011

More Related Content

What's hot

PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDTarang Mittal
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDPruthvi Raj
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shedTarang Mittal
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabadPalash Awasthi
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018SohagSarkar2
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav pptbky2756
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives worksKanhaiya Kumar
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportaman1312
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)babai das
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLWArunava Paul
 
Railay internship report
Railay internship reportRailay internship report
Railay internship reportsubham gahir
 

What's hot (20)

Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
 
Sandeep
SandeepSandeep
Sandeep
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018
 
Governor
GovernorGovernor
Governor
 
CLW
CLWCLW
CLW
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav ppt
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
 
Diesel loco shed
Diesel loco shedDiesel loco shed
Diesel loco shed
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLW
 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
Main report
Main reportMain report
Main report
 

Viewers also liked

Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Deo Nath Jha
 
Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerKarl Berger, P.E.
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electricalManoj Harsule
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eeepriyansh patel
 
Design & fabrication of Power generating system from speed breakers
Design & fabrication of Power generating system from speed breakersDesign & fabrication of Power generating system from speed breakers
Design & fabrication of Power generating system from speed breakersPrabhat Kaushik
 
IND-2012-169 SBS Hathur -Water management system and Environment Protection
IND-2012-169 SBS Hathur -Water management system and  Environment ProtectionIND-2012-169 SBS Hathur -Water management system and  Environment Protection
IND-2012-169 SBS Hathur -Water management system and Environment Protectionicandfc
 
Accident Investigation
Accident InvestigationAccident Investigation
Accident InvestigationGagan Tanwar
 
Hotspot analysis of accident spots in bhubaneswar using qgis
Hotspot analysis of accident spots in bhubaneswar using qgisHotspot analysis of accident spots in bhubaneswar using qgis
Hotspot analysis of accident spots in bhubaneswar using qgisBadal Mohanty
 
Phd Successful Approach
Phd Successful Approach Phd Successful Approach
Phd Successful Approach Najib Altawell
 
Design & Fabrication of Road Power Generator2
Design & Fabrication of Road Power Generator2Design & Fabrication of Road Power Generator2
Design & Fabrication of Road Power Generator2Zulfiqar Ali
 
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKERVIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKERVELAMMAL INSTITUTE OF TECHNOLOGY
 
Thesis Writing Proposal
Thesis Writing ProposalThesis Writing Proposal
Thesis Writing ProposalRoqui Malijan
 
Structural Health Monitoring
Structural Health MonitoringStructural Health Monitoring
Structural Health MonitoringJNTU
 

Viewers also liked (20)

Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)
 
Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction Power
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electrical
 
Resume-Guru rajan
Resume-Guru rajanResume-Guru rajan
Resume-Guru rajan
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eee
 
Design & fabrication of Power generating system from speed breakers
Design & fabrication of Power generating system from speed breakersDesign & fabrication of Power generating system from speed breakers
Design & fabrication of Power generating system from speed breakers
 
Research proposal
Research proposalResearch proposal
Research proposal
 
IND-2012-169 SBS Hathur -Water management system and Environment Protection
IND-2012-169 SBS Hathur -Water management system and  Environment ProtectionIND-2012-169 SBS Hathur -Water management system and  Environment Protection
IND-2012-169 SBS Hathur -Water management system and Environment Protection
 
HAK IP pres (2).xlsx
HAK IP pres (2).xlsxHAK IP pres (2).xlsx
HAK IP pres (2).xlsx
 
Accident Investigation
Accident InvestigationAccident Investigation
Accident Investigation
 
Electrical by speed braker
Electrical by speed brakerElectrical by speed braker
Electrical by speed braker
 
ZDC - general Introduction
ZDC - general  IntroductionZDC - general  Introduction
ZDC - general Introduction
 
Hotspot analysis of accident spots in bhubaneswar using qgis
Hotspot analysis of accident spots in bhubaneswar using qgisHotspot analysis of accident spots in bhubaneswar using qgis
Hotspot analysis of accident spots in bhubaneswar using qgis
 
Phd Successful Approach
Phd Successful Approach Phd Successful Approach
Phd Successful Approach
 
Design & Fabrication of Road Power Generator2
Design & Fabrication of Road Power Generator2Design & Fabrication of Road Power Generator2
Design & Fabrication of Road Power Generator2
 
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKERVIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
VIBRATIONAL ENERGY HARVESTING POWER FROM ROAD SPEED BRAKER
 
Thesis Writing Proposal
Thesis Writing ProposalThesis Writing Proposal
Thesis Writing Proposal
 
Structural Health Monitoring
Structural Health MonitoringStructural Health Monitoring
Structural Health Monitoring
 
Basics Of Automobile
Basics Of AutomobileBasics Of Automobile
Basics Of Automobile
 

Similar to Training ppt on clw 2011

indian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works pptindian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works pptNandlal Prajapati
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017Rishish Shukla
 
project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysDevesh Chaurasia
 
Anish report
Anish reportAnish report
Anish reportrboy001
 
Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Arvind Maurya
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportSameer Shah
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
TAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfTAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfpriyanshupal26
 
Industrial visit Report
 Industrial visit Report Industrial visit Report
Industrial visit ReportANANDU KB
 
DLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchDLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchRahul Gupta
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerVijayEngineeringandM1
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.VijayEngineeringandM1
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedisomesh dwivedi
 
Project Report on railway workshop Jhansi
Project Report on railway workshop JhansiProject Report on railway workshop Jhansi
Project Report on railway workshop JhansiVirendra Kumar Gautam
 

Similar to Training ppt on clw 2011 (20)

indian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works pptindian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works ppt
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
 
project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railways
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Anish report
Anish reportAnish report
Anish report
 
OES PPT
OES PPTOES PPT
OES PPT
 
Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01Projectreportofvtatclw 140320010037-phpapp01
Projectreportofvtatclw 140320010037-phpapp01
 
training reoprt.docx
training reoprt.docxtraining reoprt.docx
training reoprt.docx
 
Indian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory ReportIndian Railways - Rail Wheel Factory Report
Indian Railways - Rail Wheel Factory Report
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
TAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfTAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdf
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
 
Industrial visit Report
 Industrial visit Report Industrial visit Report
Industrial visit Report
 
DLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL BranchDLW, Varanasi Summer Training Report- CIVIL Branch
DLW, Varanasi Summer Training Report- CIVIL Branch
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment Menufacturer
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Project Report on railway workshop Jhansi
Project Report on railway workshop JhansiProject Report on railway workshop Jhansi
Project Report on railway workshop Jhansi
 

More from 27suraj

Smoothness Running of Train on Uneven Tracks With the Help of Air Spring
Smoothness Running of Train on Uneven Tracks With the Help of Air SpringSmoothness Running of Train on Uneven Tracks With the Help of Air Spring
Smoothness Running of Train on Uneven Tracks With the Help of Air Spring27suraj
 
To Reduce the Maintenance Cost in Transportation System by Using Air Spring
To Reduce the Maintenance Cost in Transportation System by Using Air Spring To Reduce the Maintenance Cost in Transportation System by Using Air Spring
To Reduce the Maintenance Cost in Transportation System by Using Air Spring 27suraj
 
production ,development and management
production ,development and managementproduction ,development and management
production ,development and management27suraj
 
production, development and management
production, development and managementproduction, development and management
production, development and management27suraj
 
Abstract nanotechnology
Abstract   nanotechnologyAbstract   nanotechnology
Abstract nanotechnology27suraj
 
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,27suraj
 
Abstract nanotechnology
Abstract   nanotechnologyAbstract   nanotechnology
Abstract nanotechnology27suraj
 

More from 27suraj (7)

Smoothness Running of Train on Uneven Tracks With the Help of Air Spring
Smoothness Running of Train on Uneven Tracks With the Help of Air SpringSmoothness Running of Train on Uneven Tracks With the Help of Air Spring
Smoothness Running of Train on Uneven Tracks With the Help of Air Spring
 
To Reduce the Maintenance Cost in Transportation System by Using Air Spring
To Reduce the Maintenance Cost in Transportation System by Using Air Spring To Reduce the Maintenance Cost in Transportation System by Using Air Spring
To Reduce the Maintenance Cost in Transportation System by Using Air Spring
 
production ,development and management
production ,development and managementproduction ,development and management
production ,development and management
 
production, development and management
production, development and managementproduction, development and management
production, development and management
 
Abstract nanotechnology
Abstract   nanotechnologyAbstract   nanotechnology
Abstract nanotechnology
 
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
Energy HARVESTING USING NANOTECH,,,,,,,,,,,,,,,,,,,,,,,,,
 
Abstract nanotechnology
Abstract   nanotechnologyAbstract   nanotechnology
Abstract nanotechnology
 

Recently uploaded

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Recently uploaded (20)

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 

Training ppt on clw 2011

  • 1. SUBMITTED TO:PROF. R.K. MATHUR SIR MECHANICAL DEPTT SUBMITTED BY:SURAJ KUMAR MECHANICAL ENGG ROLL- 10901281303
  • 2.                ACKNOWLEDGEMENT INTRODUCTION HISTORY OF CHITRANJAN LOCOMOTIVES QUALITY POLICY ENVIRONMENTAL POLICY ACTIONS ADOPTED LAYOUT OF CLW ROOF DRIVER CABIN MACHINE ROOM UNDERFRAME BOGIE ASSEMBLY ROOM PHOTO GALLERY THANK YOU
  • 3.  I feel satisfied in preparing the project on CLW. It was a great experience at CLW in training duration. I SURAJ KUMAR student of BHAGWANT UNIVERSITY, sincerely thanks various department of CLW for the assistance provided to me in preparing the report during industrial training. I thank to my department $ college who has given permission to go for industrial training in CLW.  Thanking You
  • 4.     Chittaranjan Locomotive Works (CLW) is the dream of the nation’s visionaries, coming true. The planners of the Nation with their deep insight and foresight set to build a Loco building Factory in West Bengal and CLW is that vision, coming true. On the 9th of January 1948, survey of the proposed area was done. It is the only major Electric Locomotive builder in the country. It is situated just at the Border of West Bengal and Jharkhand and is at about 32 km from Asansol and 237 kms from Kolkata. The Workshop has an area of 18.34 Sq. Km. The issue of setting up a loco building unit continued to be under active consideration of the Central legislature and in the late thirties, a committee consisting of M/s. Humphries and Shrinivasan was appointed to investigate the possibility of establishing a locomotive manufacturing unit and to consider its economic viability. The loco works was initially established for production of 120 average sized steam locomotives with the capacity to manufacture 50 spare boilers.
  • 5.
  • 7. The production of Electric Locomotives commenced in 1961. In the process, fifteen versions of electric locomotives were produced by CLW and the latest in that series is the freight locomotive WAG-7 and passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first Prime Minister of India, commissioned the first 1500 V dc Locomotive named “LOKMANYA” on the 14th October, 1961. The production of 25 kV ac loco commenced on 16th November, 1963. The first Electric Loco turned out from CLW, christened as “BIDHAN” was a Broad Gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed from 80 Km/h to 160 km/h. CLW also built 25 kV ac/1500 V dc, ac/dc Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT on Western Railway.
  • 8.  CLW is an ISO-9001 unit and has a well-established quality system. The loco works of CLW obtained its ISO-9001certification on 13.07.96 while the ISO-9002: 1994 certification for Steel Foundry was obtained on 08.08.1996. Up gradation to ISO 9001:2001 for both Loco Works and Steel Foundry was completed on 25.09.2003. First Surveillance Audit was conducted during 06.10.2004 to 08.10.2004 and the Second Surveillance Audit was conducted during 06.09.05 to 09.09.05. Renewal audit was conducted from 28th August to 30th August, 2006. It is worth mentioning that CLW acquired ISO- 9001:2008 certificate on 22nd Oct 2009 for another three years for our commitment to Quality Management system.
  • 9.      Improved Environmental Management System, prevention of pollution and continuous improvement of environment performance. Compliance with relevant environmental legislation and requirements as determined by appropriate regulatory and other corporate bodies. Conservation of natural resources and implementation of fundamentals of waste management. Setting environmental objectives and Targets and monitoring progress for sustainable development. Ensure awareness of all employees and contractors regarding their environmental roles and responsibilities.
  • 10.        Waste generated in Shops have been reduced by 5% from the previous year by improvement of operational procedures. Air Pollution Control Device has been installed in Integrated Paint Shop to reduce air pollution. Dust collector has been installed in Sand Plant/SF for reduction of air pollution. To reduce air pollution, stack height of D.G.sets in Central Power House has been increased. Air Pollution Control Device has been installed at GEC Arc Furnaces in Steel Foundry. Consumption of water in plant area has been reduced by 5% by arresting major leakages and provision of water meters have been made for regular monitoring of water consumption. New Sewage Treatment Plant (Bio-filter Plant) has been commissioned and under operation for improvement of effluent quality before discharge to surface inland and nearby water bodies.
  • 13.            DRIVER DESK LAMP FOR DRIVER $ ASS.DRIVER DESK SHEAT ENERGY FLASHER LIGHT PENUMATIC HORN (H.T,L.T) PANEL( A,B,C,D) WIPER MOTOR HORN LEVER PARK BRAKE GAUGE SPEEDOMETER EMERGENCY BRAKE COCK SWITCHS- SANDING, BRAKE RELEASE,VIGILLANCE
  • 14.  RESEVAIR:::::450Lt.=2/240lt =1 in WAG-9/9H  240Lt.-4 in WAP7/WAG5  TRACTION COVERTER 1$2  AUXILLARY CONVERTER BOX 1$2  BLOWERS  OIL COOLING UNIT  AUXILLARY COMPRESSOR  PRI PANNEL/TRIPLATE PANNEL
  • 16.  SAND BOX  WHEEL  BOGIE FRAME  WHEEL SET  SPRING—PRIMARY/SECONDERY  BRAKE SET  DAMPER— PRIMARY/SECONDARY/HORIZONTAL/V ERTICAL
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.