Implementation of Structural Health Monitoring
System for live Monitoring of the Cable Forces
at Barddhaman ROB
Good Physique
Regular Check ups
Preventive Measures &
Medicines
Proper & Timely Cure &
Restoration
A KEY TO LONG HEALTH LIFE OF MAN/STRUCTURE
Good Construction
Regular Inspections
Preventive Measures &
Materials
Proper & Timely Repairs
& Restoration
SCOPE
• Why Structural Health Monitoring (SHM)
required?
• How Structural Health Monitoring (SHM)
function in this case?
• Methodology and Monitoring
• Output and Report generation
SHM Consists of :-
• Design, Installation, Commissioning of SHMS
• Operation, Maintenance, Data Recording,
Analysing and Reporting
• Sensors to measure environmental and
structural response factors (F&T).
• Signal acquisition solution, signal verification
and temperature adjustment, conversion of
signal to digital format etc.
• LARSA 4D model for design
• Wind tunnel test
• Use of precast RCC slabs to avoid scaffolding on deck
• Composite structures for easier construction
• Monolithic Back Span
• Durable painting by epoxy based paint of Akzonobel
• Erection scheme
• LUSAS model for Construction Stage Analysis
• Geometry Control during execution.
• ROBO Control (Monitoring System) by M/s Mageba
FEATURES
• For monitoring of the structural health of the bridge during its service
life, 6 nos. of sensors have been installed on the stay cables
subjected to maximum loads.
• The structural monitoring system issues alarm notification based on
measurements by the on-structure instrumentation when pre-
defined threshold values of structural loads are passed. Alarm criteria
can be configured based on the structural design of the bridge
MONITORING SYSTEM (ROBO-CONTROL)
• Long term monitoring system.
• Measurement of forces on stay cables.
• Compact Monitoring System.
• System sustenance to extreme conditions.
• Graphical data output in web interface
with redundant data storage.
MAJOR COMPONENTS OF THE MONITORING SYSTEM
SENSOR SCHEME
6(six) Nos. of sensors have been provided on the central pylon and
extreme cables to monitor the forces on these critical cables which are
subjected to maximum load. (10% of the total Cables need to be
instrumented)
Sensors Used
SENSOR SCHEME
Electromagnetic Sensors
Login Window
First screen after login
Cockpit display
Cable Force and Temperature variation
Live Force on Cable 7001
Month wise variation
• Placed inside
protected box
• Round the clock
running
• Data redundancy
• Internet connection
required
• Uninterrupted power
supply required
SYSTEM INSIDE THE PYLON
Sensor tied up on the required strand Sensor on strand inside the AV tube
INSTALLATION
Onsite calibration Cabling left inside for future connections
LOAD TEST
Cable
No.
Observed Value Reference range
Reading during
load test on
30.08.2016 (KN)
Lower limit
(KN)
Upper limit
(KN)
7001 55.7 33.39 77.28
7002 89.4 72.22 112.95
7003 75.4 69.71 109.44
7016 99.8 84.97 117.01
7017 78.1 50.99 91.21
7018 75.8 41.70 82.26
LIVE MONITORING
Cable
No.
Observed Value Reference range
Reading on
04.01.2017 (KN)
Lower limit
(KN)
Upper limit
(KN)
7001 55.6 33.39 77.28
7002 84.8 72.22 112.95
7003 83.4 69.71 109.44
7016 96.8 84.97 117.01
7017 73.5 50.99 91.21
7018 67.8 41.70 82.26
LOAD TEST AND LIVE MONITORING SAMPLE
Cable
No.
Observed Value Reference range
Reading during
load test on
30.08.2016 (KN)
Reading on
07.01.2017
(KN)
Lower
limit
(KN)
Upper
limit (KN)
7001 55.7 55.4 33.39 77.28
7002 89.4 84.6 72.22 112.95
7003 75.4 83.1 69.71 109.44
7016 99.8 96.8 84.97 117.01
7017 78.1 73.3 50.99 91.21
7018 75.8 67.3 41.70 82.26
Main benefits of Structural
Health Monitoring:
• Design Confirmation.
• Safety of the structure.
• Understanding behaviour
of structures at certain
environmental
conditions.
• Load Validation
• Generation of time
dependent record of
structure’s behaviour for
further studies/decision.
CONCLUSION

More Related Content

What's hot

A real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsA real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsDerya Dinçer
 
Structural health monitoring system an embedded system approach
Structural health monitoring system an embedded system approachStructural health monitoring system an embedded system approach
Structural health monitoring system an embedded system approachAshutha K
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureMECandPMV
 
Smart Sensors for Infrastructure and Structural Health Monitoring
Smart Sensors for Infrastructure and Structural Health MonitoringSmart Sensors for Infrastructure and Structural Health Monitoring
Smart Sensors for Infrastructure and Structural Health MonitoringJeffrey Funk
 
Shm 120326070343-phpapp02
Shm 120326070343-phpapp02Shm 120326070343-phpapp02
Shm 120326070343-phpapp02HITESH KUMAR
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringPieter Jan Jordaens
 
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Full Scale Dynamics
 
Sensor based structural health monitoring of concrete structures
Sensor based structural health monitoring of concrete structuresSensor based structural health monitoring of concrete structures
Sensor based structural health monitoring of concrete structuresSayed Abulhasan Quadri
 
Power System Engineering Training Courses
Power System Engineering Training CoursesPower System Engineering Training Courses
Power System Engineering Training CoursesTonex
 
Piezoelectric Sensor as Smart Material in structural Health Monitoring
Piezoelectric Sensor as Smart Material in structural Health MonitoringPiezoelectric Sensor as Smart Material in structural Health Monitoring
Piezoelectric Sensor as Smart Material in structural Health MonitoringPRAVEEN KUMAR YADAV
 
DEMOKRITOS - Supreemo midih presentation-oc2_demo_day
DEMOKRITOS -  Supreemo midih presentation-oc2_demo_dayDEMOKRITOS -  Supreemo midih presentation-oc2_demo_day
DEMOKRITOS - Supreemo midih presentation-oc2_demo_dayMIDIH_EU
 
Power System Engineering Training
Power System Engineering TrainingPower System Engineering Training
Power System Engineering TrainingTonex
 
Eea conference 2014 paper acoustic survey of overhead electricity netw...
Eea conference 2014 paper   acoustic survey of overhead electricity netw...Eea conference 2014 paper   acoustic survey of overhead electricity netw...
Eea conference 2014 paper acoustic survey of overhead electricity netw...Aleksandar Klisaric
 
Fault Diagnosis for Electric Drive system of EV Based on Structural Analysis
Fault Diagnosis for Electric Drive system of EV Based on Structural AnalysisFault Diagnosis for Electric Drive system of EV Based on Structural Analysis
Fault Diagnosis for Electric Drive system of EV Based on Structural AnalysisTANUJJHANKAL1
 
Micro-Electromechanical Systems (Mems)
Micro-Electromechanical Systems (Mems)Micro-Electromechanical Systems (Mems)
Micro-Electromechanical Systems (Mems)IJMER
 
Coal Mine Ventilator Smart Monitoring System
Coal Mine Ventilator Smart Monitoring SystemCoal Mine Ventilator Smart Monitoring System
Coal Mine Ventilator Smart Monitoring SystemIJMTST Journal
 
Energy consumption of wsn
Energy consumption of wsnEnergy consumption of wsn
Energy consumption of wsnDeepaDasarathan
 

What's hot (20)

A real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnelsA real time instrumentation approach for bridges and tunnels
A real time instrumentation approach for bridges and tunnels
 
Structural health monitoring system an embedded system approach
Structural health monitoring system an embedded system approachStructural health monitoring system an embedded system approach
Structural health monitoring system an embedded system approach
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Smart Sensors for Infrastructure and Structural Health Monitoring
Smart Sensors for Infrastructure and Structural Health MonitoringSmart Sensors for Infrastructure and Structural Health Monitoring
Smart Sensors for Infrastructure and Structural Health Monitoring
 
Shm 120326070343-phpapp02
Shm 120326070343-phpapp02Shm 120326070343-phpapp02
Shm 120326070343-phpapp02
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoring
 
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...Structural Health Monitoring: The paradigm and the benefits shown in some mon...
Structural Health Monitoring: The paradigm and the benefits shown in some mon...
 
Structural Health Monitoring
Structural Health MonitoringStructural Health Monitoring
Structural Health Monitoring
 
Sensor based structural health monitoring of concrete structures
Sensor based structural health monitoring of concrete structuresSensor based structural health monitoring of concrete structures
Sensor based structural health monitoring of concrete structures
 
Power System Engineering Training Courses
Power System Engineering Training CoursesPower System Engineering Training Courses
Power System Engineering Training Courses
 
Piezoelectric Sensor as Smart Material in structural Health Monitoring
Piezoelectric Sensor as Smart Material in structural Health MonitoringPiezoelectric Sensor as Smart Material in structural Health Monitoring
Piezoelectric Sensor as Smart Material in structural Health Monitoring
 
DEMOKRITOS - Supreemo midih presentation-oc2_demo_day
DEMOKRITOS -  Supreemo midih presentation-oc2_demo_dayDEMOKRITOS -  Supreemo midih presentation-oc2_demo_day
DEMOKRITOS - Supreemo midih presentation-oc2_demo_day
 
Power System Engineering Training
Power System Engineering TrainingPower System Engineering Training
Power System Engineering Training
 
Eea conference 2014 paper acoustic survey of overhead electricity netw...
Eea conference 2014 paper   acoustic survey of overhead electricity netw...Eea conference 2014 paper   acoustic survey of overhead electricity netw...
Eea conference 2014 paper acoustic survey of overhead electricity netw...
 
Fault Diagnosis for Electric Drive system of EV Based on Structural Analysis
Fault Diagnosis for Electric Drive system of EV Based on Structural AnalysisFault Diagnosis for Electric Drive system of EV Based on Structural Analysis
Fault Diagnosis for Electric Drive system of EV Based on Structural Analysis
 
HVAC_CSIRO_Proof_2015
HVAC_CSIRO_Proof_2015HVAC_CSIRO_Proof_2015
HVAC_CSIRO_Proof_2015
 
Micro-Electromechanical Systems (Mems)
Micro-Electromechanical Systems (Mems)Micro-Electromechanical Systems (Mems)
Micro-Electromechanical Systems (Mems)
 
Coal Mine Ventilator Smart Monitoring System
Coal Mine Ventilator Smart Monitoring SystemCoal Mine Ventilator Smart Monitoring System
Coal Mine Ventilator Smart Monitoring System
 
Energy consumption of wsn
Energy consumption of wsnEnergy consumption of wsn
Energy consumption of wsn
 
Gtc2016 poster v1
Gtc2016 poster v1Gtc2016 poster v1
Gtc2016 poster v1
 

Viewers also liked

ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLRajesh Prasad
 
Disputes and Arbitration- How to Avoid and Manage
Disputes and Arbitration- How to Avoid and ManageDisputes and Arbitration- How to Avoid and Manage
Disputes and Arbitration- How to Avoid and ManageRajesh Prasad
 
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.20165th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016Rajesh Prasad
 
Thinking high 4 achieving higher.....
Thinking high 4 achieving higher.....Thinking high 4 achieving higher.....
Thinking high 4 achieving higher.....Rajesh Prasad
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemRajesh Prasad
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 
Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerKarl Berger, P.E.
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electricalManoj Harsule
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLWArunava Paul
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eeepriyansh patel
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxAnkan Dey
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 201127suraj
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesMike Whaling
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...Hiroyuki Nakaji
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistantKris Kiran
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Hajar Ch
 

Viewers also liked (20)

ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNL
 
Disputes and Arbitration- How to Avoid and Manage
Disputes and Arbitration- How to Avoid and ManageDisputes and Arbitration- How to Avoid and Manage
Disputes and Arbitration- How to Avoid and Manage
 
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.20165th metro rail summit at shangri la, cp, new delhi on 11.03.2016
5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
 
Thinking high 4 achieving higher.....
Thinking high 4 achieving higher.....Thinking high 4 achieving higher.....
Thinking high 4 achieving higher.....
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring system
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction Power
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electrical
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLW
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eee
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 2011
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing Properties
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistant
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111
 

Similar to Implementation of Structural Health Monitoring System for live monitoring of the cable forces at Barddhaman ROB Presented in International Technical Seminar Mumbai on 13.01.2017

Manoj ahire resume
Manoj ahire resumeManoj ahire resume
Manoj ahire resumeManoj Ahire
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
Wide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & ApplicationsWide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & ApplicationsPower System Operation
 
Industrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationIndustrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationAvinash Vemula
 
Scada For G Mgt
Scada For G MgtScada For G Mgt
Scada For G MgtAnil Patil
 
Numerical Relaying.pptx
Numerical Relaying.pptxNumerical Relaying.pptx
Numerical Relaying.pptxrohith650557
 
Building Management Services
Building Management Services Building Management Services
Building Management Services Aroh Thombre
 
Overcoming challenges of_verifying complex mixed signal designs
Overcoming challenges of_verifying complex mixed signal designsOvercoming challenges of_verifying complex mixed signal designs
Overcoming challenges of_verifying complex mixed signal designsPankaj Singh
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
SCADA Masterclass Presentation on power transmission substations
SCADA Masterclass Presentation on power transmission substationsSCADA Masterclass Presentation on power transmission substations
SCADA Masterclass Presentation on power transmission substationsBeatrice Terer
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsEvigia
 
Hardware & and software system for comparative analysis of GPS modules and ch...
Hardware & and software system for comparative analysis of GPS modules and ch...Hardware & and software system for comparative analysis of GPS modules and ch...
Hardware & and software system for comparative analysis of GPS modules and ch...UNITESS
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxsurangagw
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfSmritiGarg21
 
Cygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCarl Cygan, MSEE
 
Cygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCarl Cygan, MSEE
 

Similar to Implementation of Structural Health Monitoring System for live monitoring of the cable forces at Barddhaman ROB Presented in International Technical Seminar Mumbai on 13.01.2017 (20)

Manoj ahire resume
Manoj ahire resumeManoj ahire resume
Manoj ahire resume
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
Wide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & ApplicationsWide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & Applications
 
Lou Fusco - PG&E
Lou Fusco - PG&ELou Fusco - PG&E
Lou Fusco - PG&E
 
Industrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationIndustrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod application
 
Scada For G Mgt
Scada For G MgtScada For G Mgt
Scada For G Mgt
 
Numerical Relaying.pptx
Numerical Relaying.pptxNumerical Relaying.pptx
Numerical Relaying.pptx
 
Building Management Services
Building Management Services Building Management Services
Building Management Services
 
Overcoming challenges of_verifying complex mixed signal designs
Overcoming challenges of_verifying complex mixed signal designsOvercoming challenges of_verifying complex mixed signal designs
Overcoming challenges of_verifying complex mixed signal designs
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
Resume_Rajeev
Resume_RajeevResume_Rajeev
Resume_Rajeev
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
SCADA Masterclass Presentation on power transmission substations
SCADA Masterclass Presentation on power transmission substationsSCADA Masterclass Presentation on power transmission substations
SCADA Masterclass Presentation on power transmission substations
 
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia SystemsSensors Expo 2013: Condition Based Maintenance, Evigia Systems
Sensors Expo 2013: Condition Based Maintenance, Evigia Systems
 
Online monitoring system
Online monitoring systemOnline monitoring system
Online monitoring system
 
Hardware & and software system for comparative analysis of GPS modules and ch...
Hardware & and software system for comparative analysis of GPS modules and ch...Hardware & and software system for comparative analysis of GPS modules and ch...
Hardware & and software system for comparative analysis of GPS modules and ch...
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
Cygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedIn
 
Cygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCygan Resume Senior Systems Engineer
Cygan Resume Senior Systems Engineer
 

More from Rajesh Prasad

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdfRajesh Prasad
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLRajesh Prasad
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 Rajesh Prasad
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfRajesh Prasad
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...Rajesh Prasad
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Rajesh Prasad
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Rajesh Prasad
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalRajesh Prasad
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Rajesh Prasad
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...Rajesh Prasad
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
 

More from Rajesh Prasad (20)

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNL
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdf
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 

Implementation of Structural Health Monitoring System for live monitoring of the cable forces at Barddhaman ROB Presented in International Technical Seminar Mumbai on 13.01.2017

  • 1. By Rajesh Prasad Executive Director (Metro) Rail Vikas Nigam Limited Implementation of Structural Health Monitoring System for live Monitoring of the Cable Forces at Barddhaman ROB
  • 2. Good Physique Regular Check ups Preventive Measures & Medicines Proper & Timely Cure & Restoration A KEY TO LONG HEALTH LIFE OF MAN/STRUCTURE Good Construction Regular Inspections Preventive Measures & Materials Proper & Timely Repairs & Restoration
  • 3. SCOPE • Why Structural Health Monitoring (SHM) required? • How Structural Health Monitoring (SHM) function in this case? • Methodology and Monitoring • Output and Report generation
  • 4. SHM Consists of :- • Design, Installation, Commissioning of SHMS • Operation, Maintenance, Data Recording, Analysing and Reporting • Sensors to measure environmental and structural response factors (F&T). • Signal acquisition solution, signal verification and temperature adjustment, conversion of signal to digital format etc.
  • 5. • LARSA 4D model for design • Wind tunnel test • Use of precast RCC slabs to avoid scaffolding on deck • Composite structures for easier construction • Monolithic Back Span • Durable painting by epoxy based paint of Akzonobel • Erection scheme • LUSAS model for Construction Stage Analysis • Geometry Control during execution. • ROBO Control (Monitoring System) by M/s Mageba FEATURES
  • 6. • For monitoring of the structural health of the bridge during its service life, 6 nos. of sensors have been installed on the stay cables subjected to maximum loads. • The structural monitoring system issues alarm notification based on measurements by the on-structure instrumentation when pre- defined threshold values of structural loads are passed. Alarm criteria can be configured based on the structural design of the bridge MONITORING SYSTEM (ROBO-CONTROL)
  • 7. • Long term monitoring system. • Measurement of forces on stay cables. • Compact Monitoring System. • System sustenance to extreme conditions. • Graphical data output in web interface with redundant data storage. MAJOR COMPONENTS OF THE MONITORING SYSTEM
  • 8. SENSOR SCHEME 6(six) Nos. of sensors have been provided on the central pylon and extreme cables to monitor the forces on these critical cables which are subjected to maximum load. (10% of the total Cables need to be instrumented)
  • 13. Cable Force and Temperature variation
  • 14. Live Force on Cable 7001
  • 16. • Placed inside protected box • Round the clock running • Data redundancy • Internet connection required • Uninterrupted power supply required SYSTEM INSIDE THE PYLON
  • 17. Sensor tied up on the required strand Sensor on strand inside the AV tube INSTALLATION Onsite calibration Cabling left inside for future connections
  • 18. LOAD TEST Cable No. Observed Value Reference range Reading during load test on 30.08.2016 (KN) Lower limit (KN) Upper limit (KN) 7001 55.7 33.39 77.28 7002 89.4 72.22 112.95 7003 75.4 69.71 109.44 7016 99.8 84.97 117.01 7017 78.1 50.99 91.21 7018 75.8 41.70 82.26
  • 19. LIVE MONITORING Cable No. Observed Value Reference range Reading on 04.01.2017 (KN) Lower limit (KN) Upper limit (KN) 7001 55.6 33.39 77.28 7002 84.8 72.22 112.95 7003 83.4 69.71 109.44 7016 96.8 84.97 117.01 7017 73.5 50.99 91.21 7018 67.8 41.70 82.26
  • 20. LOAD TEST AND LIVE MONITORING SAMPLE Cable No. Observed Value Reference range Reading during load test on 30.08.2016 (KN) Reading on 07.01.2017 (KN) Lower limit (KN) Upper limit (KN) 7001 55.7 55.4 33.39 77.28 7002 89.4 84.6 72.22 112.95 7003 75.4 83.1 69.71 109.44 7016 99.8 96.8 84.97 117.01 7017 78.1 73.3 50.99 91.21 7018 75.8 67.3 41.70 82.26
  • 21. Main benefits of Structural Health Monitoring: • Design Confirmation. • Safety of the structure. • Understanding behaviour of structures at certain environmental conditions. • Load Validation • Generation of time dependent record of structure’s behaviour for further studies/decision. CONCLUSION