Conheça os critérios de investidores na hora de vender uma empresa.
Resultado apresentado nesse estudo é fruto da pesquisa realizada entre os dias 30 de março a 10 de abril com 4552 Investidores de empresas em todo o território nacional pela Think Consultoria.
O estudo não tem fins lucrativos e visa contribuir com investidores ao oferecer o ponto de vista de um empresário que está decidido a vender a empresa.
Site: http://www.thinkconsultoria.com.br
Postagem do estudo: http://www.thinkconsultoria.com.br/consultor/estudo-sobre-venda-de-empresas-resultado-da-pesquisa
HydroBox HD™ Hydrographic Echosounder ManualSyQwest Inc.
The HydroBox HD™ is a portable, low power, high-resolution, and water-resistant marine hydrographic echosounding instrument capable of delivering cm resolution for bottom depth measurements. When used with SyQwest’s survey grade transducers the instrument provides depth measurement accuracy that meets all of the IHO requirements. It is designed exclusively for inshore and coastal hydrographic marine survey up to 1,000 meters of water depth and operates at either 33, 50, or 210kHz. An simultanious dual channel dual frequency option is also available for dual frequency surveys.
Inventory Management
Use of Inventory
Types of Costs
ABC Analysis
VED Analysis
Economic Order Quantity (EOQ)
Types of Inventory Management System
Assumptions of EOQ
Basic Fixed Order Quantity Model (EOQ)
EOQ Curve
ABC and VED Classification
Function / Use of Inventory
Hello Sir/Madam,
Greetings!!!
I the undersigned have done BE in Electrical Engineering & working as Sr. Manager Project Planning & Maintenance in Cummins India Ltd, Phaltan,
And the past experiences are as below,
1) Siemens Ltd, Mumbai.
Work period : Aug'2007 to Oct'2010
2) Mahindra Vehicle Manufacturers Ltd, Chakan Pune
Work period : Nov'2010 to June'2016
3) Cummins India Ltd, Phaltan Satara.
Work period : Since Jul’2016.
I am attaching my latest updated Resume for your kind perusal. It is my request to you to forward the same to the suitable person / agency, to consider the same for the suitable post if any in your organization.
I have 9-years plus of enriched experience in Power Projects, Electrical Project Planning & Execution, Operation / Maintenance & Facility Management, Green field project, during in Siemens, Mahindra & in Current Organization.
Presently working as Sr. Manager - Projects (Electrical) Involved in the Design, Erection, Commissioning activities of HT, LT substation, plant Lighting, FADS, UPS, HVAC, DATA Centre etc…
Responsibilities included Electrical design & Control wiring design, Cable schedule and Electrical protection Design. Prepare annual maintenance Calendar for maintenance of all electrical system, Machine maintenance.
I will be highly obliged, if I can have an opportunity to serve to the world leading organization in India or in Abroad.
Have a nice day.
Best Regards,
Prashant B. Maulikar
Email – Prashant.maulikar@gmail.com
Mob. +91-9595504591
1. CURRICULAM VITAE
SHASHI KANT THAKUR. Email: thakur12shashi@gmail.com
Mob.9471818829,09452189831 thakur12shashi@yahoo.co.in
Experience: 13 YEARS (InRE,RGGVY,FSP,HVDS,33/11KVS/s and 220/132KVSwitchyard,R-APDRP Project)
SYNOPSIS
B.TECH(Electrical), Its Class,68.86%from U.N.S.I.E.T.PURVANCHAL UNIVERSITY JAUNPUR in the Year 2003, &
MBA (FINANCE& MARKETING)&TOTAL QUALITY MANAGEMENT 1ST Class 72.10%from The SIKKIM
MANIPAL UNIVERSITY with nearly 13 Years of experience in Power Sector-Transmission & Distribution, Sub-
Stations etc. Well versed in Project Management & Construction Management.
Name of Present Organization : M/s Technofab Engineering Ltd.
Total Experience : 13 Year’s
Present.
Employer : M/s Technofab Engineering Ltd.
Period of Service : From 15th June 2015 & Continuing (1 Years.2 Months)
Position Hold : Project Manager
Project Cost : 242 Cr.
Project Details
Customer : SOUTH BIHAR POWER DISTRIBUTION CO. LTD
Project : RGGVY Project at Banka (Bihar).
11kv feeders and installation of of 33/11 kv GSS at diff location in Banka District
New PSS of 33/11 kv at diff location in Banka District
RGGVY Project (Village electrification-1658 No’s villages) at Dist. Banka District.
Job Profile/Responsibilities
Survey and preparation of route alignment drawing.
Fixing of contractors, allocation of jobs to the contractors, Monitoring and evaluation of contractors jobs.
Quality & Safety of work, progress for the betterment of the projects.
Marking of Substation Layout, Execution of civil work as per approved drawing.
Erection of new HT and LT lines, Installation of transformer (63 &100 KVA) & BPL Connection in Banka
Dist (Bihar)
Work planning and scheduling with contractors and monitoring day by day progress.
Relationship building and goodwill making with client and contractors.
Coordination with Customer, Consultant, Home office and multiple contractors for execution of multi
disciplinary projects within schedule and cost.
Coordination with suppliers of equipment and bulks for timely delivery.
Estimating of Bulks and resource requirement for Preparation of Cost Estimate for project scope.
Preparation of Progress and Productivity Reports, Bar Charts & Look-ahead schedules for Site / HO
management reporting.
Preparation of Job Cost Report, Invoice / Collection reports and cost monitoring.
Analysis of delay in Project & preparation of Time-Extension documents.
Reviewing Work Orders and certifying /monitoring vendor payments.
Preparation of Billing Break-up Schedule for timely invoicing and follow up for receivables.
Past.
Employer : M/s RAMKY INFRASTRUCTURE LTD.
Period of Service : From 30th September 2012 to 10.06.2015 (2 Years.9 Months)
Position Hold : Project Manager
2. Project Cost : 180 Cr.
Project Handling
: Supply of Materials, survey, installation, testing and commissioning and maintain the system Improvement.
Strengthening and Augmentation of Distribution for bringing down AT&C Losses and Improve consumers
supply of Bulandsahar, Debai,& Khurja Towns in Electricity Distribution Circle-I Bulandsahar Under R-APDRP
Part-B, NEW SUB-STATION 33/11KV Augmentation of Power Transformer(10MVA,5MVA,3.15MVA,1.5MVA)
existing 33/11KV and11 KV Feeders under Feeder Separation Programme for separations of non-agricultural &
agricultural consumers in rural area for Lot No-XII, O&M Division waidhan, MPPKVVCL, Jabalpur (MP)
TECHNICAL CONSULTANCY
Understanding requirements and providing technical services in Project Management, Contract
Management, Site, Resource & Construction Management
Providing management consultancy services to clients by preparation of plans and restructuring as well
as making plan of action for different sub – functions.
PROJECT PLANNING
Implementing detailed project reports and project execution plans/ drawings after thorough discussion
with clients, selection of sites, project evaluation in terms of outlays and profits attached.
Listing down the resource needs for projects, after considering the budgetary parameters set.
Attain cost effectiveness by alternative design methodology, proper work planning and controlling the
wastage of material and labor.
Establishing time span of project execution as per client specifics.
Monitoring project status during the course of periodic project review meetings.
Proficiency Forte
Interacting with site purchasers & suppliers for achieving cost effective purchase of equipments,
accessories, materials with timely delivery so as to minimize project cost.
ContinuousVendorDevelopment in view of sloping down the demand-supply curve.
Inspection of various materials at vendor’s premises.
Scrap sale of the materials which are excess in our stores & warehouses after due approval.
Nature of Job:
Erection, Testing & commissioning of 33/11Kv, sub-station, and 33Kv line work and 33Kv Bay
Extension.
Mobile service center at 33/11Kv sub-station, 400kva Trolley mounted mobile sub-station for
Emergency.
Erection, Testing & commissioning of Electrical equipments i.e. Transformers of 400 KVA to 630 KVA,
Feeder Panels. Transmission and Distribution System / Sub-station Equipments.
Past
Employer : M/s G.E.T.POWER LTD
Period of Service : From. Aug. 2011 To September 2012. (1 Years.4 Months)
Position Hold : Project Manager
Project Handling
: Civil and Structural Design, Engineering, testing, supply, erection and commissioning of the following:
NEW SUB-STATION 220/132KV “Switchyard” Package for Muzaffarpur TPP Stage-II (2x195MW) of Kanti Bijlee
Utpadan Nigam Limited (KBUNL) BIHAR
Turnkey, Basis in: BIHAR, STATE ELECTRICITY BOAR/NATIONAL THARMAL POWER CARPORATION
LIMITED
400 KVGIS NEW SUBSTATION AT JHARKHAND POOLING (CHANDWA) UNDER TRANSMISSION SYSTEM FOR
PHASE-I GENERATION PROJECT JHARKHAND & WEST BENGAL (PART-A1)
3. Turnkey, Basis in: POWER GRIDE CORPORATION OF INDIA LTD
Project Cost : 154 Cr.
Past
Employer : M/s Genus Power Infrastructures Ltd
Period of Service : From.Aug. 2008 To JULY 2011(2 Years.11 Months)
Position Hold : Project Manager
Project Handling:
Design,Engineering,testing, supply, erection and commissioning of the following: NEW SUB-STATION
33/11KV Augmentation of Power Transformer(10MVA,5MVA,3.15MVA,1.5MVA) existing 33/11KV Sub-Station
New lines with outgoing type VCB,33kv&11Kv Domestic load of existing 11 KV feeders & RGGVY Scheme on
Turnkey, Basis in ORISS, BIHAR, CHTISGARD, DIST. N.H.P.C.LIMITED(A GOVT OF INDIA ENTERPRISES)
Project Cost : 230 Cr.
TECHNICAL CONSULTANCY
Understanding requirements and providing technical services in Project Management, Contract
Management, Site, Resource & Construction Management
Providing management consultancy services to clients by preparation of plans and restructuring as well
as making plan of action for different sub – functions.
PROJECT PLANNING`
Implementing detailed project reports and project execution plans/ drawings after thorough discussion
with clients, selection of sites, project evaluation in terms of outlays and profits attached.
Listing down the resource needs for projects, after considering the budgetary parameters set.
Attain cost effectiveness by alternative design methodology, proper work planning and controlling the
wastage of material and labor.
Establishing time span of project execution as per client specifics.
Monitoring project status during the course of periodic project review meetings.
Proficiency Forte
Interacting with site purchasers & suppliers for achieving cost effective purchase of equipments,
accessories, materials with timely delivery so as to minimize project cost.
ContinuousVendorDevelopment in view of sloping down the demand-supply curve.
Inspection of various materials at vendor’s premises.
Scrap sale of the materials which are excess in our stores & warehouses after due approval.
Past
Employer : M/S ABB LTD
Period of Service : From Jun-04 to JULY 2008 (4 Years 1 Months)
Position Hold : Planning Engineer (Electrical-PTPS-ACS) & Safety Coordinator
Project Handling
: NEW SUB-STATION 33/11KV Augmentation of Transformer(10MVA,5MVA,3.15MVA,1.5MVA) existing
33/11KV Sub-Station New lines with outgoing type VCB,33kv&11Kv Domestic load of existing 11 KV feeders &
RGGVY Scheme on 66Kv & 33Kv New Transmission Lines and Renovation of Identified 11Kv Feeders In
ALWAR Circle of (RGGVY) SCHEME ON TURNKEY BASIS FOR RURAL ELECTRICITY
INFRASTRUCTURE&HOUSEHOLD ELECTRIFICATION IN AZAMGARH(U.P) Circle of PGCIL(POWER GRID
CORPORATION OF INDIA LIMITED) Project Cost : 158 Cr.
Nature of Job:
Successfully developed Rural Electrification-Projects.
4. R.E. Project Azamgarh of 900 villages.( Project value -158 crores)
Survey& Planning for electrification of village
Performing activities Related to electrification
Nature of Job:
Erection, Testing & commissioning of Electrical equipments i.e. Transformers of 250 KVA to 630 KVA,
Feeder Panels. Transmission and Distribution System / Sub-station Equipments.
Re-conduct ring of 33/11KV Lines and Augmentation of Transformer(10MVA,5MVA,3.15MVA,1.5MVA)
Construction of new LT Lines, 11KV Lines.33KV Lines
Designing and preparation of electrical Single Line Diagram for power distribution network
The ABB Safety Coordinator has overall responsibility for ABB health and safety management for this
project. His role includes:
Planning and scheduling of activities with a view to execute the project successfully
Identify significant health and safety risks and eliminate or minimize them
Documentation and document control
Identify training needs and conduct of training and emergency drills
Assist the safety team to investigate all accidents
Ensure that all safety rules and regulations are followed at all his work sites
Responsibility : Project Management & Co-ordination relationship management
Past
1. Trainee : Thermal power Station (U.P.R V.U.N.LTD) Obra Distt. Sonebhadar
Post Held: : Graduate Apprentice (Assistant Engineer)
Duration: : jun2003 to jun2004 (1 Years)
INDUSTRIAL TRAINING
Project Name : Speed Control of three Phases Slip ring Induction Motor Vis Rotor Chopper
Controller
Description : This project was done at the institute under the guidance by Professor
Dr.S.N.Singh (B.H.U.)
Duration : 1 year
Team Size : 3
Role : Team Member
Hardware : Windows NT, Windows 98
Responsibility:
Electrical Machine, Electrical Drives
Power System power Electronics
Summer Training : Power Proction and Switch Gear
Description : This training is done at B.H.E.L (H.E.R.P) shivpur Tarana Varanasi-221003
Duration : 6-weeks
Team Size : 2
Role : Team Member
Hardware :
:
Windows NT, Windows 98
Responsibility:
To get the detail of system
To check out the generation Tran. & Diss.
Project Name : Electrical Drive System and component
Client : U.P.R.V.U.N.LTD
Duration : April- 2005 – That not complete
5. Team Size : 4
Role : Team member
Specific Responsibilities:
Project Planning, Co-ordination, Management and Execution.
Preparation of Quality Control Plan and Inspection Test Plan.
Review of contractor job schedule and monitoring the same on weekly basis
Computer Skills
OS : Windows NT 4.0, and Windows 95-98,2000
IT Skills : MS off. & Auto- CAD
Programming Languages : VB 6, C&C++UNIX&Shell Programming
Scripting Languages : JavaScript, VBScript
Internet Technology : HTML, DHTML,
Networking Platforms : Windows 2000 Advanced Server, NT 4.0
Skills: Independently Decision Making, Independently Project Handling, Self Confident, Good Team Leading
Abilities, Comprehensive Problem Solving Abilities, Good Adaptive, Logical approach to problem solving.
PERSONAL DATA
Name : SHASHI KANT THAKUR
Father’s Name : Dr.LakshmanThakur
Date of Birth : 5 Oct 1980
Marital Status : Married
Language Known : Hindi, English.
Permanent Address : Shashi Kant thakur
Present Location : Lal Kothi,Banka (Bihar), India
Current Salary : INR 12.60 Lac/ Annum + other Allowanance
Excepted Salary : Negotiable
Career Objective : To develop & apply my skills to the full capacity & thereby render fruitful
Growth to my organization as well as my professional career.
SHASHI KANT THAKUR DATE:
6. Team Size : 4
Role : Team member
Specific Responsibilities:
Project Planning, Co-ordination, Management and Execution.
Preparation of Quality Control Plan and Inspection Test Plan.
Review of contractor job schedule and monitoring the same on weekly basis
Computer Skills
OS : Windows NT 4.0, and Windows 95-98,2000
IT Skills : MS off. & Auto- CAD
Programming Languages : VB 6, C&C++UNIX&Shell Programming
Scripting Languages : JavaScript, VBScript
Internet Technology : HTML, DHTML,
Networking Platforms : Windows 2000 Advanced Server, NT 4.0
Skills: Independently Decision Making, Independently Project Handling, Self Confident, Good Team Leading
Abilities, Comprehensive Problem Solving Abilities, Good Adaptive, Logical approach to problem solving.
PERSONAL DATA
Name : SHASHI KANT THAKUR
Father’s Name : Dr.LakshmanThakur
Date of Birth : 5 Oct 1980
Marital Status : Married
Language Known : Hindi, English.
Permanent Address : Shashi Kant thakur
Present Location : Lal Kothi,Banka (Bihar), India
Current Salary : INR 12.60 Lac/ Annum + other Allowanance
Excepted Salary : Negotiable
Career Objective : To develop & apply my skills to the full capacity & thereby render fruitful
Growth to my organization as well as my professional career.
SHASHI KANT THAKUR DATE: