Sustainable Solution for Shoring Method of Cross-Creek Bridge in
Ankeng MRT System in New Taipei City: A Case Study
Tai-Yi Liu 1
, Cheng-An Lee2
, Hong-Kee Tzou3
, Shiun-Jye Lin4
, Mao-Yi Chou5
and Ke-Fan Jhan6
1
Chief Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA
2
Director, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA
3
Chairman, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA
4
Deputy Director, First District Project Office, Department of Taipei MRT system, Taiwan, REPUBLIC OF CHINA
5
Project Manager, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA
6
Leader Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA
1
Corresponding Author: tylaytpe@ms9.hinet.net
ABSTRACT
In the Ankeng Light Rail MRT system (ALRMS)
project, the U7 box girder passes crossing the Erbads creek
and needs a temporary supporting system for the
construction work. In this study, three temporary shoring
system options were proposed to be the construction method.
The D-B Contractor, New Asia construction and
Development Corporation, evaluated and selected the optimal
choice, The Steel truss frame with supporting beams, to serve
as the temporary supporting system. Compare the deflection
of Δmax and Δactual, which are 1.609 cm and 1.59 cm,
respectively. This result presented that the shoring system
composed of the H912*302*18*37 supporting beams and steel
truss frame had achieved outstanding performance and work
to construct the U7 box girder. This paper presents how the
three options are evaluated and the detailed construction
processes along with the survey verification for the method.
Keywords— Ankeng Light Rail MRT System (ALRMS),
Sustainable Solution, Shoring Method, U7box Girder,
Erbads Creek
I. INTRODUCTION
The global warming condition has caused some
extreme impact on the environment and human life.
Recently, in the world, the “sustainability” issues for the
lifecycle of infrastructures are more and more concerned
and discussed during the development of the projects.
Specifically, “green” civil projects are being emphasized
through designs and constructions that support long-term
sustainability. In Taiwan and globally, the “green
building” assessment systems had been well established
and applied for the development of building projects. It is
a regulation to use the EEWH assessment system for
public building projects [1-8]. However, the sustainability
assessment system for green civil infrastructure (SASGCI)
had been only a few research focused on this critical issue
[9]. For sustainability development, the four stages of the
whole lifecycle, including design, construction, operation,
and demolition, of an infrastructure project should be taken
into consideration [9]. In this paper, the authors would
like to share the experience on the determination of the
temporary shoring system for the cast-in-place box girder
of a cross-creek bridge of the Ankeng Light Rail MRT
system (ALRMS) in New Taipei City
The ALRMS is a 7.5 km length project, includes
nine stations. It contains four grounded stations, and five
elevated stations, respectively [10,11]. The client of the
ALRMS is the Department of Rapid Transit Systems
(DRTS), New Taipei City. The main D-B Contractor is
the New Asia Construction and Development Corporation
(NACDC). The project construction management (PCM)
and the site supervising are performed by the Sino-Tech
Consultant Company (STCC) and MAA Group,
respectively. Figure 1 shows the route map of the
ALRMS.
Figure 1: The route map of the ALRMS
There are three major types of bridges that are
designed in the ALRMS project, which are listed as
follows:
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
19 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
 Temporarily supported cast-in-place bridges by
shoring system.
 Free Cantilever Method (FCM) bridges by the
movable truss system.
 Steel trusses or steel boxes bridges [11].
The authors focus on one of the temporarily supported
cast-in-place bridges, numbered as U7 unit, which needs to
cross the existing creek named Erbads Creek. This Erbads
Creek width is approximately 12m in width and 1m in
depth. The temporary shoring system for the U7 unit is
quite different from the other cast-in-place bridges due to
the water flow needing to be maintained during the
bridge's construction. Some proposed options, including
the consideration of sustainability issues, were discussed
during the construction stage. The detailed determination
processes are presented in the following sections.
In this paper, the authors focus on the detailed
problem description, optional method discussion, and
solution determination. Figure 2 shows the research
framework for this study.
Figure 2: The research framework for this study
II. PROBLEM FACED IN THIS STUDY
One of the cast-in-place bridge between the K1
and K2 stations, which includes six units of superstructure
box girders (U6 to U11), two abutments (A4-1 and A4-2),
and five piers (P4-1to P4-5). The Erbads creek flow
through the U7 unit, which is located between the P4-1 and
P4-2 piers, with a width of 12m and depth of 3m. In the
storm season, the width could be increased up to 20m, and
the depth increased up to 2~3m. It is quite a challenge to
the construction of a cast-in-place bridge. Figure 3 shows
the plan and vertical views of the zones nearby the U7 unit.
Figure 3: The U7 unit drawings: (a) plan view and (b)
vertical view
To maintain the Erbads creek flow, it is necessary
to install a reliable and safe shoring system for the
construction of the U7 box girder. A couple of temporary
shoring options were taken into considered and discussed
when the engineers determine the methods. Not only the
safety, working duration, cost, materials, and installation
difficulty, of the shoring system were considered for
determination; the environmental and ecology issue was
also the essential factors for engineers’ consideration.
III. CONSTRUCTION OPTIONSS
DISCUSSION
There are three types of temporary shoring
options, which are considered and discussed in this study.
The discussion includes all possible influence factors for
the U7unit construction.
3.1 Option 1: Steel Truss Frame with the RCPs
This option contains some soil filling work in the
creek reservation zone. Figure 4 shows the shoring system
for this option. In this option, the center steel truss frame
is supported by the soil filling. Several Reinforced
Concrete Pipes (RCP) must be embedded into the filled
soil to maintain the creek water flow, as shown in Figure 4.
The total cross-section of the RCPs must be sufficient for
the peak water flow. The strength of the RCPs might not
be able to resist the heavy loads, which are transferred
from the superstructure. Thus, a protection RC slab should
be placed to be the bearing of the steel truss frame.
Furthermore, the compaction for the filled soil should be
very compacted
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
20 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 4: The shoring system of steel truss frame with the
RCPs
As shown in Figure 4, this option includes the
following processes:
a. Temporary diversion of the creek water flow of
the Erbads creek.
b. Smoothening work for the river bed and needed
aggregate pavement.
c. RCPs installation and connection. The RCP
diameter is calculated to be 1.5m, and the total
length needed approximately to be 90 m.
d. Soil filling and compaction. It is calculated to be
900 m3
.
e. Protection RC slab placement with a thickness of
30 cm.
f. Guidance of the water flow to the RCPs.
g. Installation of the steel truss frame and U7 box
girderr construction.
h. Removal of steel truss frame, RCPs, and the filled
soil.
In this option, the water flow route of Erbads creek is
needed to be temporarily changed. It might cause some
environmental and ecological impact on the creek. Also,
the strength of the RCPs should be special care due to the
heavy load of the steel truss frame transferred from the U7
box girder.
Figure 5 shows the typical site installation of RCPs.
Figure 5: The typical site installation of RCPs
3.2 Option 2: Steel Truss Frame with Supporting Beams
To prevent the Erbads creek impact as mentioned
in the previous option, this option uses temporary
supporting beams instead of RCPs and soil filling. Figure
6 shows the assembly of option 2.
Figure 6: The shoring system of steel truss frame with
supporting beams
There is an existing steel access platform located
neighborly to the Erbads creek. It is a functional device
for the shoring system. The following working processes
are included in this option:
a. Concrete blocks stacking with the
H400*400*13*21 steel beams installation.
b. Erection of H912*302*18*37 supporting beams
m. A total of four beams needs to be installed
with a length of 14 m.
c. Installation of the steel truss frame and U7 box
girder construction.
d. Removal of steel truss frame and the supporting
beams.
In this option, the water flow of Erbads creek could be
maintained and kept in the original water reservation zone.
Figure 7 shows the typical site installation of the steel truss
frame.
Figure 7: The typical site installation of the steel truss frame
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
21 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
3.3 Option 3: Steel Truss Frame with Advancing Shoring
System
The features of option 3 are similar to option 2.
There is no construction work in the creek reservation zone.
Figure 8 shows the assembly of option 3.
Figure 8: The shoring system of steel truss frame with
advancing shoring system
Instead of the center parts of the steel truss frame
and the supporting beams, this option uses the advancing
shoring system. to be the prime scaffolding system for the
construction of the U7 box girder. The main work
includes:
a. Installation of the steel truss frame at the location
of the piers No. P4-1 and P4-2.
b. Erection of advancing shoring truss system.
c. Construction of U7 box girder.
d. Removal of the dvancing shoring truss system.
The Erbads creek water flow will also be not influenced
during the construction of this option. But since the
dvancing shoring truss system is quite a heavy-duty advice
for superstructure construction, the duration of the system
erection will be much longer, and the cost will be
significantly increased. Figure 9 shows the typical site
assembly of the advancing shoring system
Figure 9: The typical site assembly of the advancing
shoring system
IV. DETERMINATION AND
SELECTION FOR THE CONSTRUCTION
METHOD
For evaluation and determination on the above
stated three options, the most critical issues are compared
and discussed, as shown in table 1. In Table 1, each
evaluation is marked as 1 to 5 points. Higher points
represent high performance for evaluation. The total
points obtained by the summation of each evaluation item
and listed in the “Summarization” row of Table 1. The
highest calculation result is the final determination for the
selection of structure type for the SDPs design and
construction.
Table 1: Comparison table for the three options of
Temporary Shoring System
Evaluation items
Option
1
Option
2
Option
3
Safety and risk
mitigation
2 5 5
Reliability 3 5 5
Environment
protection
4 4 4
Ecological
conservation
3 5 5
Durability 4 5 5
Landscape 4 3 3
Construction
Duration
3 5 3
Cost 4 5 3
Humanity 4 3 3
Creatibility 3 3 3
Summarization 34 43 39
The results are shown in Table 1 that indicates
option 2: the shoring system of steel truss frame with
supporting beams, which is evaluated to be43 points, is the
highest score in the comparison. In other words, option 2
is the most reliable, sustainable, and environmentally
friendly selection for the construction of the U7 box girder.
The construction procedures are quite simple and
much less than option1 and option 3, which are mentioned
above. The benefits of option 2 are summarized as follows
1. Reliability and safety on shoring strength
The H912*302*18*37 supporting beams provide
high strength for the loads transferred from the U7 box
girder.
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
22 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
2. Economic Benefit
It is more economical in terms of both material
and labor in comparison with other alternatives. It also
presents a lower cost than the alternatives.
3. Ecological and Environmental-Friendly
The steel beams achieve the recyclable feature.
The prevention of soil filling in the water reservation zone
avoids any impact on the Erbads creek.
4. Shortening the Duration
The minimized erection duration for the steel
beams leads to the shortest duration for the U7 box girder
construction.
5. Carbon Emission Reduction
The minimizing of equipment operation hours
and shortening of construction duration present the carbon
emission reduction efficiency. Table 2 shown the total
reduction of the carbon emission compares to the other
options. As shown in Table 2, this option leads to a 23.5
tons carbon emission reduction.
Table 2: The Total Reduction of the Carbon Emission
Compare to the Other Option
No Items Unit
Total
reduced
quantity
Carbon
emission
factor
Carbon
reduction
(kg)
1 Truck
Set-
day
252 1.29 325
2
Transpor
tation
km 5,612 0.24 1,346
3
Diesel
Fuel
L 3,920 3.45 13,524
4 Gas fuel L 2,613 3.11 8,126
5 Power Hrs. 240 0.85 204
Total 23,525
V. CONSTRUCTION AND LOADING
CALAULATION
After a detailed evaluation and comparison of the
proposed three construction options for the U7 box girder,
option 2: the shoring system of steel truss frame with
supporting beams, was selected to serve as the most
sustainable method. The NACDC engineers established
the working plan [12, 13] to be the construction guidance
of the U7 box girder's shoring system. The installation of
this shoring system follows the working plan, with the
supervision and inspection of the corresponding author,
Dr. Liu. Figures 10 and 11 show the shoring system's site
photos and the inspection of the supporting beams by the
corresponding author with the client engineers.
Figure 10: The site photos of the temporary shoring
system
Figure 11: The inspection of the supporting beams by the
corresponding author with the client engineers
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
23 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Furthermore, the deflection of the steel supporting
beams is one of the critical factors to influence the value of
camber for the U7 box girder. Thus, the engineers
carefully calculated the maximum deflection of the steel
supporting beams well to control the U7’s camber value
[14, 15]
The H912*302*18*37 steel supporting beams are
the critical factor of success for this shoring system.
Figure 12 shows the basic physical parameters of the
H912*302*18*37 steel supporting beam.
Figure 12: The basic physical parameters of
H912*302*18*37 steel supporting beam
In this study, the maximum superstructure loads
transferred from the steel truss frame is P = 59.2 tons. The
M could be calculated by adopting the equation (b):
M = P*L/4 + W*L2
/8 ………………………..(a)
Where:
M: The maximum bending moment occurred in
the beam loading location.
P = 59.2 tons = 59,200 kg.l14, 15]
L = 12.5 m.
W = 293.8 kg/m = 2.94 kg/cm. [14, 15]
The maximum center bending stress of the steel
supporting beams is calculated by adopting the following
equation (a):
σmax = M*y / Ix …………………..…………. (b)
Where:
σ max: The maximum stress occurred in the
member edge of the beam loading location.
M: The maximum bending moment occurred in
the beam loading location.
y: Distance between Neutral axis and member
edge, it is 45.6 cm for H912*302*18*37
(refer to Figure 12)
Ix: the moment of inertia, it is 516,281 cm4
for
H912*302*18*37 (refer to Figure 12)
By adopting equations (a) and (b), the maximum
σand M is calculated as follows:
Mmax = 17,036,992 kg-cm
σmax = 1,505 kg/cm2
The maximum stress of the member edge is 1,505
kg/cm2
, which is less than the allowable stress of 1,512
kg/cm2
of ASTM A36 carbon steel, represents a safe result
of the H912*302*18*37 supporting beam on the bending
stress caused by the superstructure loads.
For adequate control of the girder camber value,
the deflection of the is also calculated by adopting the
equation (c):
Δmax = P*L3
/(48*E*Ix) +5*W*L4
/(384*E*Ix)..(c)
Where:
Δmax: The maximum deflection occurred in the
beam loading location.
P = 59.2 tons = 59,200 kg.l14, 15]
L = 12.5 m.
W = 293.8 kg/m = 2.94 kg/cm. [14, 15]
E = Young's modulus, it is 2.1*106
kg/cm2 for
ASTM A36 steel material.
Ix: the moment of inertia, it is 516,281 cm4
for
H912*302*18*37 (refer to Figure 12)
After the calculation by using the equation (c), it
is obtained the results ofΔmax as follows:
Δmax = 1.609 cm
In this study, the electrical level equipment is
used to verify the actual deflection of the supporting beams
after the concrete placement of the U7 box girder. The
surveying result for the Δactual is as follows:
Δactual = 1.59 cm
To compare the actual deflection to the calculated
results, the shoring system composed of the
H912*302*18*37 supporting beams and steel truss frame
had achieved outstanding performance and work for the
construction of U7 box girder.
VI. CONCLUSION
In the Ankeng Light Rail MRT system (ALRMS)
project, the U7 box girder passes crossing the Erbads creek
and needs a temporary supporting system for the
construction work. The D-B Contractor, New Asia
construction and Development Corporation, evaluated and
selected the optimal option, The Steel truss frame with
supporting beams, to serve as the temporary supporting
system. Compare the deflection of Δmax and Δactual, which
are 1.609 cm and 1.59 cm, respectively. This result
presented that the shoring system composed of the
H912*302*18*37 supporting beams and steel truss frame
had achieved outstanding performance and work to
construct the U7 box girder. Not only the U7 box girder
had been successfully and safely constructed, but also the
Ecological and environmental issues are also been
protected in this study. The authors conclude the Steel
truss frame with supporting beams had performed a
sustainable solution for the Shoring Method of Cross-
International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962
Volume-11, Issue-1 (February 2021)
www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3
24 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Creek Bridge in Ankeng MRT system in New Taipei
City.
REFERENCES
[1] Liu, T.Y., Chen, P.H., & Chou, N.N.S. (2019).
Comparison of assessment systems for green building and
green civil infrastructure. Sustainability, 11, 2117.
Available at: https://doi.org/10.3390/su11072117.
[2] World Bank. (1994). World development report 1994:
Infrastructure for development. Oxford, UK: Oxford
University Press, pp. 1–12.
[3] World Bank. (2006). Infrastructure at the crossroads:
Lessons from 20 years of World Bank experience.
Washington, D.C., 1–9, 65–80.
[4] Shen, L., Wu, Y., & Zhang, X. (2011). Key assessment
indicators for the sustainability of infrastructure projects.
Journal of Construction Engineering and Management,
137(6), 441-451.
[5] Geldermans, B., Tenpierik, M., & Luscuere, P. (2018).
Circular and flexible infill concepts: Integration of the
residential user perspective. Sustainability, 11, 261.
[6] Sustainability Development Goals. (2020). 17 Goals to
transform our world. Available at:
https://www.un.org/sustainabledevelopment/sustainable-
development-goals/.
[7] Wikipedia. (2019). Effects of global warming.
Available at:
https://en.wikipedia.org/wiki/Effects_of_global_warming..
[8] Saha, D. (2018 Apr.). Low-carbon infrastructure: An
essential solution to climate change?. World Bank Blog.
[9] Liu, T.Y. (2020). Establishment of sustainability key
indicators for civil engineering and their applications in
green infrastructure projects. Department of Civil
Engineering, College of Engineering, National Taiwan
University, Doctoral Dissertation. DOI: 10.6342-
NTU202000235.
[10] Liu, T.Y., Chen, P.H., Chou, N.S., Chou, M.Y., Lin,
R. J.C., Luo, & Han-Ding. (2019 Sep.). Environmental
sustainability approaches adopted for construction of
anhsin bridge of ankeng metro system in New Taipei city.
E3S Web of Conferences, 117, pp. 00013.
[11] Liu T.Y., Lee, C.A., Chou, M.Y., Chang, P.H., Lin
J.J., & Lan, W.C. (2020). Sustainability approaches
adopted for storm water and deposit ponds construction of
ankeng mrt system in new Taipei city. Global Journal of
Engineering Science and Research Management. DOI:
10.5281/zenodo.4059507.
[12] Asia Construction and Development Corp. (2017).
Working plan for Casi-in-Place Bridges for the Ankeng
Light Rail Metro System construction project. Taiwan,
R.O.C., (2017, in Chinese)
[13] New Asia Construction and Development Corp.
(2017). Temporary shoring system arrangement planfor
the Ankeng Light Rail Metro System construction project.
Taiwan, R.O.C., (2017, in Chinese)
[14] New Asia Construction and Development Corp.
(2016). Calculation sheet for temporary shoring system for
the Ankeng light rail metro system construction project.
Taiwan, R.O.C., (2016, in Chinese)
[15] New Asia Construction and Development Corp.
(2016). Calculation sheet for U7 box girder supporting
beams for the Ankeng light rail metro system construction
project. Taiwan, R.O.C., (2016, in Chinese)

More Related Content

What's hot

IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over Bridge
IRJET Journal
 
IRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge SoftwareIRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET Journal
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
Rajesh Prasad
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
Dr Mazin Alhamrany
 
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various PositionsIRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET Journal
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET Journal
 
Vd tinhtoan cautreo
Vd tinhtoan cautreoVd tinhtoan cautreo
Vd tinhtoan cautreo
Tuấn Phạm Ngọc
 
Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...
Dr Mazin Alhamrany
 
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
IJCMESJOURNAL
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
Rajesh Prasad
 
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
IRJET Journal
 
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
IAEME Publication
 
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
IAEME Publication
 
Abhijit kumar
Abhijit kumarAbhijit kumar
Abhijit kumar
Abhijit Kumar
 
Comparative study on Time period and Frequency of Full Arch and Vierendeel T...
Comparative study on Time period and Frequency of  Full Arch and Vierendeel T...Comparative study on Time period and Frequency of  Full Arch and Vierendeel T...
Comparative study on Time period and Frequency of Full Arch and Vierendeel T...
IRJET Journal
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
MANOJ PATNE
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Nandan Shandilya
 

What's hot (20)

IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over Bridge
 
IRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge SoftwareIRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge Software
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
 
Abdelraheim Mohamed-1
Abdelraheim Mohamed-1Abdelraheim Mohamed-1
Abdelraheim Mohamed-1
 
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various PositionsIRJET-  	  Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
IRJET- Analysis of T-Beam Bridge with Mild Steel Strip in various Positions
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: A Conc...
 
4880 5
4880 54880 5
4880 5
 
4880 4
4880 44880 4
4880 4
 
Vd tinhtoan cautreo
Vd tinhtoan cautreoVd tinhtoan cautreo
Vd tinhtoan cautreo
 
Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...Innovative solutions for complex geotechnical and tunnelling projects, april ...
Innovative solutions for complex geotechnical and tunnelling projects, april ...
 
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
Analysis of Shear Live Load Girder Distribution Factors in Integral bridges u...
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
IRJET- Study on Parametric Behaviour of Box Girder Bridges under Different Ra...
 
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
 
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
Comparison of pier cap analysis and rehabilitation using aashto and lrfd spec...
 
Abhijit kumar
Abhijit kumarAbhijit kumar
Abhijit kumar
 
Comparative study on Time period and Frequency of Full Arch and Vierendeel T...
Comparative study on Time period and Frequency of  Full Arch and Vierendeel T...Comparative study on Time period and Frequency of  Full Arch and Vierendeel T...
Comparative study on Time period and Frequency of Full Arch and Vierendeel T...
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 

Similar to Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study

IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET Journal
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
Abhijit Kumar
 
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu BarrageIRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET Journal
 
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGEMODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
International Research Journal of Modernization in Engineering Technology and Science
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Editor IJCATR
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of Bridges
Editor IJCATR
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET Journal
 
Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
IRJET Journal
 
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Ton Watanapong
 
Numerical simulation and optimization of pile design
Numerical simulation and optimization of pile designNumerical simulation and optimization of pile design
Numerical simulation and optimization of pile design
IRJET Journal
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET Journal
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Dr.Subramanian Narayanan
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at Allahabad
Abhijit Kumar
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET Journal
 
59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c
homeworkping4
 
Ijciet 08 02_044
Ijciet 08 02_044Ijciet 08 02_044
Ijciet 08 02_044
IAEME Publication
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET Journal
 

Similar to Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study (20)

IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
 
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu BarrageIRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
 
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGEMODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of Bridges
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 
Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
 
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
 
Numerical simulation and optimization of pile design
Numerical simulation and optimization of pile designNumerical simulation and optimization of pile design
Numerical simulation and optimization of pile design
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at Allahabad
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c59323623 1943-g-g-001-r c
59323623 1943-g-g-001-r c
 
Ijciet 08 02_044
Ijciet 08 02_044Ijciet 08 02_044
Ijciet 08 02_044
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 

More from Dr. Amarjeet Singh

Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
Dr. Amarjeet Singh
 
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., BhiladA Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
Dr. Amarjeet Singh
 
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
Dr. Amarjeet Singh
 
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
Dr. Amarjeet Singh
 
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
Dr. Amarjeet Singh
 
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
Dr. Amarjeet Singh
 
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
Dr. Amarjeet Singh
 
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
Dr. Amarjeet Singh
 
A Study on Derivative Market in India
A Study on Derivative Market in IndiaA Study on Derivative Market in India
A Study on Derivative Market in India
Dr. Amarjeet Singh
 
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Dr. Amarjeet Singh
 
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological FluidAnalytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
Dr. Amarjeet Singh
 
Techno-Economic Aspects of Solid Food Wastes into Bio-Manure
Techno-Economic Aspects of Solid Food Wastes into Bio-ManureTechno-Economic Aspects of Solid Food Wastes into Bio-Manure
Techno-Economic Aspects of Solid Food Wastes into Bio-Manure
Dr. Amarjeet Singh
 
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
Dr. Amarjeet Singh
 
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
Dr. Amarjeet Singh
 
Role of Indians in the Battle of 1857
Role of Indians in the Battle of 1857Role of Indians in the Battle of 1857
Role of Indians in the Battle of 1857
Dr. Amarjeet Singh
 
Haryana's Honour Killings: A Social and Legal Point of View
Haryana's Honour Killings: A Social and Legal Point of ViewHaryana's Honour Killings: A Social and Legal Point of View
Haryana's Honour Killings: A Social and Legal Point of View
Dr. Amarjeet Singh
 
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
Dr. Amarjeet Singh
 
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
Dr. Amarjeet Singh
 
Capacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel IndustryCapacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel Industry
Dr. Amarjeet Singh
 
Metamorphosing Indian Blockchain Ecosystem
Metamorphosing Indian Blockchain EcosystemMetamorphosing Indian Blockchain Ecosystem
Metamorphosing Indian Blockchain Ecosystem
Dr. Amarjeet Singh
 

More from Dr. Amarjeet Singh (20)

Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
Total Ionization Cross Sections due to Electron Impact of Ammonia from Thresh...
 
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., BhiladA Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
A Case Study on Small Town Big Player – Enjay IT Solutions Ltd., Bhilad
 
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
Effect of Biopesticide from the Stems of Gossypium Arboreum on Pink Bollworm ...
 
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
Artificial Intelligence Techniques in E-Commerce: The Possibility of Exploiti...
 
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
Factors Influencing Ownership Pattern and its Impact on Corporate Performance...
 
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
An Analytical Study on Ratios Influencing Profitability of Selected Indian Au...
 
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
A Study on Factors Influencing the Financial Performance Analysis Selected Pr...
 
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
An Empirical Analysis of Financial Performance of Selected Oil Exploration an...
 
A Study on Derivative Market in India
A Study on Derivative Market in IndiaA Study on Derivative Market in India
A Study on Derivative Market in India
 
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
 
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological FluidAnalytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
Analytical Mechanics of Magnetic Particles Suspended in Magnetorheological Fluid
 
Techno-Economic Aspects of Solid Food Wastes into Bio-Manure
Techno-Economic Aspects of Solid Food Wastes into Bio-ManureTechno-Economic Aspects of Solid Food Wastes into Bio-Manure
Techno-Economic Aspects of Solid Food Wastes into Bio-Manure
 
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
Crypto-Currencies: Can Investors Rely on them as Investment Avenue?
 
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
Awareness of Disaster Risk Reduction (DRR) among Student of the Catanduanes S...
 
Role of Indians in the Battle of 1857
Role of Indians in the Battle of 1857Role of Indians in the Battle of 1857
Role of Indians in the Battle of 1857
 
Haryana's Honour Killings: A Social and Legal Point of View
Haryana's Honour Killings: A Social and Legal Point of ViewHaryana's Honour Killings: A Social and Legal Point of View
Haryana's Honour Killings: A Social and Legal Point of View
 
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
Optimization of Digital-Based MSME E-Commerce: Challenges and Opportunities i...
 
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
Modal Space Controller for Hydraulically Driven Six Degree of Freedom Paralle...
 
Capacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel IndustryCapacity Expansion Banes in Indian Steel Industry
Capacity Expansion Banes in Indian Steel Industry
 
Metamorphosing Indian Blockchain Ecosystem
Metamorphosing Indian Blockchain EcosystemMetamorphosing Indian Blockchain Ecosystem
Metamorphosing Indian Blockchain Ecosystem
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study

  • 1. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 18 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT System in New Taipei City: A Case Study Tai-Yi Liu 1 , Cheng-An Lee2 , Hong-Kee Tzou3 , Shiun-Jye Lin4 , Mao-Yi Chou5 and Ke-Fan Jhan6 1 Chief Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA 2 Director, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA 3 Chairman, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA 4 Deputy Director, First District Project Office, Department of Taipei MRT system, Taiwan, REPUBLIC OF CHINA 5 Project Manager, Department of Rapid Transit Systems, New Taipei City, Taiwan, REPUBLIC OF CHINA 6 Leader Engineer, New Asia Construction and Development Corporation, Taiwan, REPUBLIC OF CHINA 1 Corresponding Author: tylaytpe@ms9.hinet.net ABSTRACT In the Ankeng Light Rail MRT system (ALRMS) project, the U7 box girder passes crossing the Erbads creek and needs a temporary supporting system for the construction work. In this study, three temporary shoring system options were proposed to be the construction method. The D-B Contractor, New Asia construction and Development Corporation, evaluated and selected the optimal choice, The Steel truss frame with supporting beams, to serve as the temporary supporting system. Compare the deflection of Δmax and Δactual, which are 1.609 cm and 1.59 cm, respectively. This result presented that the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work to construct the U7 box girder. This paper presents how the three options are evaluated and the detailed construction processes along with the survey verification for the method. Keywords— Ankeng Light Rail MRT System (ALRMS), Sustainable Solution, Shoring Method, U7box Girder, Erbads Creek I. INTRODUCTION The global warming condition has caused some extreme impact on the environment and human life. Recently, in the world, the “sustainability” issues for the lifecycle of infrastructures are more and more concerned and discussed during the development of the projects. Specifically, “green” civil projects are being emphasized through designs and constructions that support long-term sustainability. In Taiwan and globally, the “green building” assessment systems had been well established and applied for the development of building projects. It is a regulation to use the EEWH assessment system for public building projects [1-8]. However, the sustainability assessment system for green civil infrastructure (SASGCI) had been only a few research focused on this critical issue [9]. For sustainability development, the four stages of the whole lifecycle, including design, construction, operation, and demolition, of an infrastructure project should be taken into consideration [9]. In this paper, the authors would like to share the experience on the determination of the temporary shoring system for the cast-in-place box girder of a cross-creek bridge of the Ankeng Light Rail MRT system (ALRMS) in New Taipei City The ALRMS is a 7.5 km length project, includes nine stations. It contains four grounded stations, and five elevated stations, respectively [10,11]. The client of the ALRMS is the Department of Rapid Transit Systems (DRTS), New Taipei City. The main D-B Contractor is the New Asia Construction and Development Corporation (NACDC). The project construction management (PCM) and the site supervising are performed by the Sino-Tech Consultant Company (STCC) and MAA Group, respectively. Figure 1 shows the route map of the ALRMS. Figure 1: The route map of the ALRMS There are three major types of bridges that are designed in the ALRMS project, which are listed as follows:
  • 2. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 19 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.  Temporarily supported cast-in-place bridges by shoring system.  Free Cantilever Method (FCM) bridges by the movable truss system.  Steel trusses or steel boxes bridges [11]. The authors focus on one of the temporarily supported cast-in-place bridges, numbered as U7 unit, which needs to cross the existing creek named Erbads Creek. This Erbads Creek width is approximately 12m in width and 1m in depth. The temporary shoring system for the U7 unit is quite different from the other cast-in-place bridges due to the water flow needing to be maintained during the bridge's construction. Some proposed options, including the consideration of sustainability issues, were discussed during the construction stage. The detailed determination processes are presented in the following sections. In this paper, the authors focus on the detailed problem description, optional method discussion, and solution determination. Figure 2 shows the research framework for this study. Figure 2: The research framework for this study II. PROBLEM FACED IN THIS STUDY One of the cast-in-place bridge between the K1 and K2 stations, which includes six units of superstructure box girders (U6 to U11), two abutments (A4-1 and A4-2), and five piers (P4-1to P4-5). The Erbads creek flow through the U7 unit, which is located between the P4-1 and P4-2 piers, with a width of 12m and depth of 3m. In the storm season, the width could be increased up to 20m, and the depth increased up to 2~3m. It is quite a challenge to the construction of a cast-in-place bridge. Figure 3 shows the plan and vertical views of the zones nearby the U7 unit. Figure 3: The U7 unit drawings: (a) plan view and (b) vertical view To maintain the Erbads creek flow, it is necessary to install a reliable and safe shoring system for the construction of the U7 box girder. A couple of temporary shoring options were taken into considered and discussed when the engineers determine the methods. Not only the safety, working duration, cost, materials, and installation difficulty, of the shoring system were considered for determination; the environmental and ecology issue was also the essential factors for engineers’ consideration. III. CONSTRUCTION OPTIONSS DISCUSSION There are three types of temporary shoring options, which are considered and discussed in this study. The discussion includes all possible influence factors for the U7unit construction. 3.1 Option 1: Steel Truss Frame with the RCPs This option contains some soil filling work in the creek reservation zone. Figure 4 shows the shoring system for this option. In this option, the center steel truss frame is supported by the soil filling. Several Reinforced Concrete Pipes (RCP) must be embedded into the filled soil to maintain the creek water flow, as shown in Figure 4. The total cross-section of the RCPs must be sufficient for the peak water flow. The strength of the RCPs might not be able to resist the heavy loads, which are transferred from the superstructure. Thus, a protection RC slab should be placed to be the bearing of the steel truss frame. Furthermore, the compaction for the filled soil should be very compacted
  • 3. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 20 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. Figure 4: The shoring system of steel truss frame with the RCPs As shown in Figure 4, this option includes the following processes: a. Temporary diversion of the creek water flow of the Erbads creek. b. Smoothening work for the river bed and needed aggregate pavement. c. RCPs installation and connection. The RCP diameter is calculated to be 1.5m, and the total length needed approximately to be 90 m. d. Soil filling and compaction. It is calculated to be 900 m3 . e. Protection RC slab placement with a thickness of 30 cm. f. Guidance of the water flow to the RCPs. g. Installation of the steel truss frame and U7 box girderr construction. h. Removal of steel truss frame, RCPs, and the filled soil. In this option, the water flow route of Erbads creek is needed to be temporarily changed. It might cause some environmental and ecological impact on the creek. Also, the strength of the RCPs should be special care due to the heavy load of the steel truss frame transferred from the U7 box girder. Figure 5 shows the typical site installation of RCPs. Figure 5: The typical site installation of RCPs 3.2 Option 2: Steel Truss Frame with Supporting Beams To prevent the Erbads creek impact as mentioned in the previous option, this option uses temporary supporting beams instead of RCPs and soil filling. Figure 6 shows the assembly of option 2. Figure 6: The shoring system of steel truss frame with supporting beams There is an existing steel access platform located neighborly to the Erbads creek. It is a functional device for the shoring system. The following working processes are included in this option: a. Concrete blocks stacking with the H400*400*13*21 steel beams installation. b. Erection of H912*302*18*37 supporting beams m. A total of four beams needs to be installed with a length of 14 m. c. Installation of the steel truss frame and U7 box girder construction. d. Removal of steel truss frame and the supporting beams. In this option, the water flow of Erbads creek could be maintained and kept in the original water reservation zone. Figure 7 shows the typical site installation of the steel truss frame. Figure 7: The typical site installation of the steel truss frame
  • 4. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 21 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. 3.3 Option 3: Steel Truss Frame with Advancing Shoring System The features of option 3 are similar to option 2. There is no construction work in the creek reservation zone. Figure 8 shows the assembly of option 3. Figure 8: The shoring system of steel truss frame with advancing shoring system Instead of the center parts of the steel truss frame and the supporting beams, this option uses the advancing shoring system. to be the prime scaffolding system for the construction of the U7 box girder. The main work includes: a. Installation of the steel truss frame at the location of the piers No. P4-1 and P4-2. b. Erection of advancing shoring truss system. c. Construction of U7 box girder. d. Removal of the dvancing shoring truss system. The Erbads creek water flow will also be not influenced during the construction of this option. But since the dvancing shoring truss system is quite a heavy-duty advice for superstructure construction, the duration of the system erection will be much longer, and the cost will be significantly increased. Figure 9 shows the typical site assembly of the advancing shoring system Figure 9: The typical site assembly of the advancing shoring system IV. DETERMINATION AND SELECTION FOR THE CONSTRUCTION METHOD For evaluation and determination on the above stated three options, the most critical issues are compared and discussed, as shown in table 1. In Table 1, each evaluation is marked as 1 to 5 points. Higher points represent high performance for evaluation. The total points obtained by the summation of each evaluation item and listed in the “Summarization” row of Table 1. The highest calculation result is the final determination for the selection of structure type for the SDPs design and construction. Table 1: Comparison table for the three options of Temporary Shoring System Evaluation items Option 1 Option 2 Option 3 Safety and risk mitigation 2 5 5 Reliability 3 5 5 Environment protection 4 4 4 Ecological conservation 3 5 5 Durability 4 5 5 Landscape 4 3 3 Construction Duration 3 5 3 Cost 4 5 3 Humanity 4 3 3 Creatibility 3 3 3 Summarization 34 43 39 The results are shown in Table 1 that indicates option 2: the shoring system of steel truss frame with supporting beams, which is evaluated to be43 points, is the highest score in the comparison. In other words, option 2 is the most reliable, sustainable, and environmentally friendly selection for the construction of the U7 box girder. The construction procedures are quite simple and much less than option1 and option 3, which are mentioned above. The benefits of option 2 are summarized as follows 1. Reliability and safety on shoring strength The H912*302*18*37 supporting beams provide high strength for the loads transferred from the U7 box girder.
  • 5. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 22 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. 2. Economic Benefit It is more economical in terms of both material and labor in comparison with other alternatives. It also presents a lower cost than the alternatives. 3. Ecological and Environmental-Friendly The steel beams achieve the recyclable feature. The prevention of soil filling in the water reservation zone avoids any impact on the Erbads creek. 4. Shortening the Duration The minimized erection duration for the steel beams leads to the shortest duration for the U7 box girder construction. 5. Carbon Emission Reduction The minimizing of equipment operation hours and shortening of construction duration present the carbon emission reduction efficiency. Table 2 shown the total reduction of the carbon emission compares to the other options. As shown in Table 2, this option leads to a 23.5 tons carbon emission reduction. Table 2: The Total Reduction of the Carbon Emission Compare to the Other Option No Items Unit Total reduced quantity Carbon emission factor Carbon reduction (kg) 1 Truck Set- day 252 1.29 325 2 Transpor tation km 5,612 0.24 1,346 3 Diesel Fuel L 3,920 3.45 13,524 4 Gas fuel L 2,613 3.11 8,126 5 Power Hrs. 240 0.85 204 Total 23,525 V. CONSTRUCTION AND LOADING CALAULATION After a detailed evaluation and comparison of the proposed three construction options for the U7 box girder, option 2: the shoring system of steel truss frame with supporting beams, was selected to serve as the most sustainable method. The NACDC engineers established the working plan [12, 13] to be the construction guidance of the U7 box girder's shoring system. The installation of this shoring system follows the working plan, with the supervision and inspection of the corresponding author, Dr. Liu. Figures 10 and 11 show the shoring system's site photos and the inspection of the supporting beams by the corresponding author with the client engineers. Figure 10: The site photos of the temporary shoring system Figure 11: The inspection of the supporting beams by the corresponding author with the client engineers
  • 6. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 23 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. Furthermore, the deflection of the steel supporting beams is one of the critical factors to influence the value of camber for the U7 box girder. Thus, the engineers carefully calculated the maximum deflection of the steel supporting beams well to control the U7’s camber value [14, 15] The H912*302*18*37 steel supporting beams are the critical factor of success for this shoring system. Figure 12 shows the basic physical parameters of the H912*302*18*37 steel supporting beam. Figure 12: The basic physical parameters of H912*302*18*37 steel supporting beam In this study, the maximum superstructure loads transferred from the steel truss frame is P = 59.2 tons. The M could be calculated by adopting the equation (b): M = P*L/4 + W*L2 /8 ………………………..(a) Where: M: The maximum bending moment occurred in the beam loading location. P = 59.2 tons = 59,200 kg.l14, 15] L = 12.5 m. W = 293.8 kg/m = 2.94 kg/cm. [14, 15] The maximum center bending stress of the steel supporting beams is calculated by adopting the following equation (a): σmax = M*y / Ix …………………..…………. (b) Where: σ max: The maximum stress occurred in the member edge of the beam loading location. M: The maximum bending moment occurred in the beam loading location. y: Distance between Neutral axis and member edge, it is 45.6 cm for H912*302*18*37 (refer to Figure 12) Ix: the moment of inertia, it is 516,281 cm4 for H912*302*18*37 (refer to Figure 12) By adopting equations (a) and (b), the maximum σand M is calculated as follows: Mmax = 17,036,992 kg-cm σmax = 1,505 kg/cm2 The maximum stress of the member edge is 1,505 kg/cm2 , which is less than the allowable stress of 1,512 kg/cm2 of ASTM A36 carbon steel, represents a safe result of the H912*302*18*37 supporting beam on the bending stress caused by the superstructure loads. For adequate control of the girder camber value, the deflection of the is also calculated by adopting the equation (c): Δmax = P*L3 /(48*E*Ix) +5*W*L4 /(384*E*Ix)..(c) Where: Δmax: The maximum deflection occurred in the beam loading location. P = 59.2 tons = 59,200 kg.l14, 15] L = 12.5 m. W = 293.8 kg/m = 2.94 kg/cm. [14, 15] E = Young's modulus, it is 2.1*106 kg/cm2 for ASTM A36 steel material. Ix: the moment of inertia, it is 516,281 cm4 for H912*302*18*37 (refer to Figure 12) After the calculation by using the equation (c), it is obtained the results ofΔmax as follows: Δmax = 1.609 cm In this study, the electrical level equipment is used to verify the actual deflection of the supporting beams after the concrete placement of the U7 box girder. The surveying result for the Δactual is as follows: Δactual = 1.59 cm To compare the actual deflection to the calculated results, the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work for the construction of U7 box girder. VI. CONCLUSION In the Ankeng Light Rail MRT system (ALRMS) project, the U7 box girder passes crossing the Erbads creek and needs a temporary supporting system for the construction work. The D-B Contractor, New Asia construction and Development Corporation, evaluated and selected the optimal option, The Steel truss frame with supporting beams, to serve as the temporary supporting system. Compare the deflection of Δmax and Δactual, which are 1.609 cm and 1.59 cm, respectively. This result presented that the shoring system composed of the H912*302*18*37 supporting beams and steel truss frame had achieved outstanding performance and work to construct the U7 box girder. Not only the U7 box girder had been successfully and safely constructed, but also the Ecological and environmental issues are also been protected in this study. The authors conclude the Steel truss frame with supporting beams had performed a sustainable solution for the Shoring Method of Cross-
  • 7. International Journal of Engineering and Management Research e-ISSN: 2250-0758 | p-ISSN: 2394-6962 Volume-11, Issue-1 (February 2021) www.ijemr.net https://doi.org/10.31033/ijemr.11.1.3 24 This Work is under Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. Creek Bridge in Ankeng MRT system in New Taipei City. REFERENCES [1] Liu, T.Y., Chen, P.H., & Chou, N.N.S. (2019). Comparison of assessment systems for green building and green civil infrastructure. Sustainability, 11, 2117. Available at: https://doi.org/10.3390/su11072117. [2] World Bank. (1994). World development report 1994: Infrastructure for development. Oxford, UK: Oxford University Press, pp. 1–12. [3] World Bank. (2006). Infrastructure at the crossroads: Lessons from 20 years of World Bank experience. Washington, D.C., 1–9, 65–80. [4] Shen, L., Wu, Y., & Zhang, X. (2011). Key assessment indicators for the sustainability of infrastructure projects. Journal of Construction Engineering and Management, 137(6), 441-451. [5] Geldermans, B., Tenpierik, M., & Luscuere, P. (2018). Circular and flexible infill concepts: Integration of the residential user perspective. Sustainability, 11, 261. [6] Sustainability Development Goals. (2020). 17 Goals to transform our world. Available at: https://www.un.org/sustainabledevelopment/sustainable- development-goals/. [7] Wikipedia. (2019). Effects of global warming. Available at: https://en.wikipedia.org/wiki/Effects_of_global_warming.. [8] Saha, D. (2018 Apr.). Low-carbon infrastructure: An essential solution to climate change?. World Bank Blog. [9] Liu, T.Y. (2020). Establishment of sustainability key indicators for civil engineering and their applications in green infrastructure projects. Department of Civil Engineering, College of Engineering, National Taiwan University, Doctoral Dissertation. DOI: 10.6342- NTU202000235. [10] Liu, T.Y., Chen, P.H., Chou, N.S., Chou, M.Y., Lin, R. J.C., Luo, & Han-Ding. (2019 Sep.). Environmental sustainability approaches adopted for construction of anhsin bridge of ankeng metro system in New Taipei city. E3S Web of Conferences, 117, pp. 00013. [11] Liu T.Y., Lee, C.A., Chou, M.Y., Chang, P.H., Lin J.J., & Lan, W.C. (2020). Sustainability approaches adopted for storm water and deposit ponds construction of ankeng mrt system in new Taipei city. Global Journal of Engineering Science and Research Management. DOI: 10.5281/zenodo.4059507. [12] Asia Construction and Development Corp. (2017). Working plan for Casi-in-Place Bridges for the Ankeng Light Rail Metro System construction project. Taiwan, R.O.C., (2017, in Chinese) [13] New Asia Construction and Development Corp. (2017). Temporary shoring system arrangement planfor the Ankeng Light Rail Metro System construction project. Taiwan, R.O.C., (2017, in Chinese) [14] New Asia Construction and Development Corp. (2016). Calculation sheet for temporary shoring system for the Ankeng light rail metro system construction project. Taiwan, R.O.C., (2016, in Chinese) [15] New Asia Construction and Development Corp. (2016). Calculation sheet for U7 box girder supporting beams for the Ankeng light rail metro system construction project. Taiwan, R.O.C., (2016, in Chinese)