Rajib Ali Kehar is seeking an entry-level position in a national or multinational organization. He has over 18 years of experience as a surveyor and supervisor on various infrastructure projects in Pakistan including barrages, bridges, roads, buildings, and transmission lines. He is proficient in surveying software like AutoCAD, Eagle Point, and Prolink and has experience using total stations and theodolites.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
My overall Experience 16 year and 8 year in Saudi Arab. Supervise the
mega Highways, water pipe line, sewerage pipeline, infrastructure,
Buildings, Architect, Bridges projects in KSA Responsible position as a
Site Inspector. where my educational potential and Professional
Experience endeavors, chances of growth and challenge.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
My overall Experience 16 year and 8 year in Saudi Arab. Supervise the
mega Highways, water pipe line, sewerage pipeline, infrastructure,
Buildings, Architect, Bridges projects in KSA Responsible position as a
Site Inspector. where my educational potential and Professional
Experience endeavors, chances of growth and challenge.
You can use social media to build your true-to-self personal brand and work to shape the ways you’re perceived by the world. Learn how with Kelly Barrett, United Way Worldwide’s social media manager.
Δημοσιεύθηκε το πρόγραμμα της ενίσχυσης έως 50%, έως €200.000, υφιστάμενων πολύ μικρών και μικρών επιχειρήσεων μέσω της ανάπτυξης των ικανοτήτων τους στις νέες αγορές και που δραστηριοποιούνται στους τομείς της αγροδιατροφής & βιομηχανίας τροφίμων, των πολιτιστικών & δημιουργικών βιομηχανιών, των υλικών & των κατασκευών, της εφοδιαστικής αλυσίδας, της ενέργειας, του περιβάλλοντος, των τεχνολογιών πληροφορικής & επικοινωνιών και της υγείας. Πληροφορίες: info@wintowin.gr, 2103608609
Βρείτε τις συχνές ερωτήσεις και απαντήσεις που δημοσιεύονται από το Υπουργείο για το πρόγραμμα επιδότησης: Ενίσχυση Τουριστικών Μικρομεσαίων Επιχειρήσεων. Για περισσότερες πληροφορίες, info@wintowin.gr, 2103608609
Νέο Αρχείο: 26/05/2016
Currently working in Saudi Arabia.
4.5 Years Work Experience in Infrastructure [Roads & Utilities(Pipelines and Water Reservoirs), Bridges and High rise Building Structure].
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
Electrical Engineer with around 7 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
Electrical Engineer with around 6.8 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
CV of Karan Vinayak - piping design engineerKaran Vinayak
I have experience in the field of Oil and Gas, Chemical Process Plant and Water Transmission Network Pipeline. (Piping Layout, Piping GAD, isometric, Bill of Materials, Pipeline Profile, Alignment Sheet, Co-Ordinate Drawing). I have software skills in Autocad, Autoplant, PDMS and CAESAR-II. Currently I am working in Sharjah on UG Water Pipeline Projects.
I am technically qualified for job positions like Piping/Pipeline Designer, Piping/Pipeline Engineer, Piping Quantity Estimator etc.
1. 1 | P a g e
RAJIB ALI KEHAR
Email: rajib.ali@descon.com/ ralikehar@gmail.com
Cell No: +92-300-7038487 / 03012792527
PERSONAL OBJECTIVE:
To seek an entry position in a national or multinational organization to perform and utilize the
quality work.
ACADEMIC QUALIFICATIONS:
Computer Skills:
Auto CAD (Shop Drawings, Coordinates for Site Working etc.)
Eagle Point (Contouring, X-Sections With Volume, Plan Profile etc.)
Microsoft Office (Survey Data Setting & Official Letters)
Prolink (Import & Export Data From Total Station)
Internet
Technical/Professional Training:
Management Training In DESCON Engineering Limited.
HSE Training In DESCON & Engro
GPS Training
Total Stations Training (Sokkia, Leica, Pentax, Topcon, Foif, Nikon,Kolida, etc.)
Highlights (Experiences):
Barrage, Bridges, Canals, Roads(High Way), Buildings, Chemical Plants, Fertilizer Plants,
Wind & Hydro Power Plants, Oil & Gas Fields, Textile Mills, Transmission Lines.(11KV 66KV
132KV 220KV 500- KVs)
INSTRUMENT USED IN FIELD:
Total Station.
Topcon (All kinds) – Sokkia (All kinds) – Pentax (All kinds) South (All kinds) Leica etc.
Theodolite.
All kinds of theodolite used on different projects. (Output – Input Degree Digital and
Manual operating machines)
Levels. All kinds of leveling machines used (Auto and Digital)
DISCRIPTION OF JOBS:
Major Earth & Super Structure Works
Barrage Works (Civil & Mechanical):
Sheet Piling, Under Sluice, Silt Excluder & Main Weir Panels, Fish Ladder & Divide Walls,
Abutment & Wing Walls, Guide Banks U/S & D/S, Piers, Radial & Stoplog Gate 1st
& 2ND
Stage Embedded Parts with Installation, Trunnion & Hydraulic Jacks, Complete Bridge Work
and Head Regulator with Canal.
Sr. No
Course
/Degree
Trade
Grade/
Class
Board / University
1 D.A.E Civil Engineering 2nd
Class S.B.T.E Karachi Sindh.
2 Metric Science 2nd
Class B.I.S.E Larkana Sindh.
2. 2 | P a g e
Roads works:
Embankments – sub grade – sub base – aggregate / water bound – asphalt base course –
wearing course – center line with coordinate and manually alignment with theodolite curb
and all structure of road pipe culverts and box culverts surveying and supervision.
Fly over and bridge works:
Piling layouts – Drilling (reverse rotary – purgation – auger system) – Cage lowering-
concrete pouring. Pile caps – shafts – transom – box girder – eye girder – retaining walls -
deck slips up to the asphalt. Complete supervision and survey.
Building works:
Area topography / contouring – layout as per drawings with coordinates and manual –
excavation – all kinds of foundation (residential and industrial foundations).
Drains - channels and pipeline works:
RCC – PVC – GI – MS - CI etc. pipes layout and leveling for U/G & A/G. Relating to civil works
application.
Note: Underground and aboveground drains can work also on the irrigation system for canal
water channels and modules.
Transmission lines:
Piling – Foundations – Pile caps – Erections of the towers and electric RCC and Steel Structure
pools. Also the stacking of the lines (wires) with complete supervision.
Mechanical jobs performed:
Installations of pipes lines, both, above ground (AG) & underground (UG). Installations of
Industrial machinery, static and rotary, plus vessel columns and high pressure compressors.
Also worked on the Periling tower (slip forming) and installation of pile buckets at the height
of 120m from ground. Supervised survey for the installation of furnace, CO2 recovery system,
cooling tower fans, motor foundations and fan stacks.
FIELD EXPERIENCE & PROFESSIONAL BACK GROUND (18 YEARS):
Project New Khanki Barrage at Gujranwala, Wazirabad. Punjab
Client Irrigation deportment of Punjab Govt.
Consultant SMEC
Employer DESCON Engineering Limited.
Designation Chief Surveyor
Duration 10 March 2014----- till date.
Project 50 M.W FWEL 2WIND POWER PLANT
Client FWEL (Pvt.) Ltd.
Consultant lamayer
Employer DESCON Engineering (Pvt.) Ltd.
Designation Chief Surveyor
Duration 22-03-2013 to 09 March 2014
Project Sukkur to Jacobabad N-65
3. 3 | P a g e
Client National Highway Authority.
Consultant Oriental Consultant (OC)
Employer LIMAK JV ZKB
Designation Senior Surveyor
Duration 04-09-2011 to 20-03-2013
Project Textile Mill Construction.
Client Soorty Enterprises (Pvt.) Ltd.
Consultant AA Associates.
Employer Paragon Construction (Pvt.) Ltd.
Designation Senior Surveyor
Duration 09-03-2011 to 03-09-2011
Project EngroExpansion(EnVen1.3)Daharki.
Client Engro Chemical Pakistan Ltd.
Consultant Snamprogetti (Eni).
Employer ECPL.
Designation Civil & Mech. Surveyor & Supervisor (QA/QC)
Duration 25-08-2007 to 31-12-2010
Project TarnoltoChablat57KMRoadN-5,C-09
Client National Highway Authority.
Consultant SMEC
Employer LILLEY INTERNATIONAL (PVT) LTD
Designation Surveyor
Duration 30-06-2006 to 01-07-2007.
Project BhittGasField(STP)(CLG)Development.
Client ENI.
Consultant NESPAK Pakistan.
Employer Siemens Pakistan.
Designation Civil & Mech. Surveyor.
Duration 08-11-2006 to 01-07-2006.
Project Pipe Line Modification.
Client Uch Power Plant Ltd. Baluchistan.
Consultant NESPAK Pakistan.
Employer DESCON Engineering.
Designation Surveyor.
Duration 05-11-2005 to 08-11-2006
Project JinnahBridgetoKeamariIntersectionKarachi.
Client KPT (Karachi Port Terminal).
Consultant ECIL & NESPAK Pakistan.
Employer D. Baloch Engineering.
Designation Sr. Surveyor.
Duration 29-04-2005 to 01-11-2005.
Project Industrial Expansion.
Client Nakshbandi Industries Pvt Ltd. Karachi.
Consultant SMK Associate Karachi.
Employer Principal Builders Ltd. Karachi.
Designation Surveyor.
Duration 30-12-2004 to 21-03-2005.
4. 4 | P a g e
Project Steel Mill to Sassai Bridge
Client National Highway Authority.
Consultant AA (Associate).
Employer ZKB.
Designation Sr.Surveyor.
Duration 01-01-2004 to 30-11-2004.
Project PotableWaterLine(GharotoDhabeji)Karachi
Client Karachi Water Board (KWB).
Consultant Engineering Associate (EA) Karachi.
Employer China Gonchi Corporation.
Designation Surveyor and Supervisor (Civil).
Duration 01-01-2003 to 20-12-2003.
Project 500KVTransmissionLine(Hub~Jamshoro).
Client WAPDA Pakistan.
Consultant NESPAK Pakistan.
Employer ICC Construction Company.
Designation Surveyor and Supervisor.
Duration Jan 1996 to Jan 1998.
Project 11 KV Transmission Line (Nawabshah).
Client WAPDA Pakistan.
Consultant NESPAK Pakistan.
Employer Sachal Engineering.
Designation Field Surveyor.
Duration 20-01-1995 to 25-12-1995.
Project 500KVTransmissionlineGuddo~Jamshoro).
Client WAPDA Pakistan.
Consultant NESPAK Pakistan.
Employer China Water & Electric Corporation.
Designation Surveyor.
Duration 01-11-1993 to 07-01-1995
PERSONAL:
1. Fathers name Muhammad Bachal Kehar
2. Date of birth 01-06-1975
3. CNIC # 43301-0967063-1
4. Marital status Married
5. Nationality Pakistani
6. Passport # WN1800631
7. Driving License LTV 10041
LANGUAGES:
English, Urdu, Chinese (For Working)
Temporary Address: House No.929, Sher Pao Colony, Landhi Karachi# 22
Permanent Address: P.O mirza pur, village Abad, Taluka Garhi Yasin
District Shilkarpur Sindh