1. CCCVVV OOOFFF RRRAAAVVVIIINNNDDDEEERRR SSSIIINNNGGGHHH RRRAAAWWWAAATTT
A techno- commercial professional in Electrical-Power and Distribution Sector since 33
years of versatile experience in the field of TURNKEY Execution Projects
APDRP/RGGVY/SOLAR/ including route survey, design supply erection testing of material
Equipments required for 33/11KV & 11/0.4KV SUB STATION Renovation & Modernization
and capacity augmentation of existing S/s construction of New 400kv/220kv /132
kv/33KV/11KV & LT line Strengthening Re conducting of old lines, Replacement of existing
LT conductor with Areal Bunch conductor, installation of metering system at DT S/S etc
and supply of 11/0.4KV trolley mounted substation in JHANSI
/AGRA/ETAWA/MATHURAVIRANDHVAN/BULANSHARE/VANARAS/SHIKOHABAD/FEROZAB
AD/JAIPUR/KOTA/MERATA/under the sachem REC Funded projects of
REC/DVVNL/PVVNL/MVVNL/JVVNL/RVVNL-ETC. Application design, Supply Erection
Testing and commissioning of EPC projects within stipulated Time Frame .Project
Estimating Coasting contracting and Management, Operation, Projects Marketing
Business Development in Power and Distribution sector. In addition of this Supply -
Erection -Testing &Commissioning of 2X10 MW PV SOALR plant at LALITPUR under UP-
NEADA /UPPCL Luck now under the solar policy of BUNDALKHAND
AREA OF SPECIALISATION
Construction of Electrical Substation, Up to 132 Kv Power and Distribution, EPC Project
Management.
Erection-Testing -Commissioning & Implementation of Projects, Site Survey for
132/ 33/11KV electric substation and associated Transmission Line
220/132 KV/HT/LTlines project.
Interaction & co-ordination with Govt. Offices in order to get the essential approval
and clearance of ROW /Forest Clearances/route of line diversion at site with the
concerned Govt competent authority respective departments.
Preparing the contracts activities which will be in few aver of company and financially
impact on the contacts billings and in corporate / implementing the scheduling Bar
Chart as per tender completion period.
Decision of Venders and sub contractors as per the margin maintain for the contracts
Development considering the place & orders in coordination with top Projects
Management.
Building up Networking Team for Project Implementation /completion in time ..
GTP of Major equipment of substation, line Inspection then approval and get the DI
from the client before dispatching the material at site.Land accusation from
government body for construction of the substation ,line work and commission of the
substation and associated over head Transmission line .
2. Clearance of RA BILLS - payments against supply and erection from client accordingly
realize the payments of sub contractor’s at site in order to maintain the decorum of
the company in market.
Handing over and taking over after successfully commission the projects as per the
Tender specification and reconcile the material at site with sub contractors.
Gets the completion certificate from the client indicating that all the equipments in the
systems are working satisfactory
ACHIEVEMENTS:
1. Successfully commissioned the 132/33/11/0.40KV substations and -132 /
33/11/0.440 KV line work and ABC Cabling work at JAHNSI /AGRA /SAFAI
ETWA/ FEROZABAD /SHEKOHABAD/Mathura Virandavan /Bulandshare
/jaipur/kota /Mizoram/Andaman Nicobar under DVVNL AGRA
PVVNL/Meerut/JVVNL/Jaipur/Mizoram.SEB/A.N.PC/ under REC Projects
under RGGVY/APDRP SCHEM with M/S HYTHRO POWER COROPRATION LTD
/SGIL/ELSWEADY POWER PRJECTS/U FLEX LTD and utilities .
2. Successfully implemented IGMP( Integrated Guide Missal Project at
Ordinance Factory ITARSI i MP under CCERD Defense Project
3. Framed the suitable specification for the implementation of Project related
to RURAL ELECTRIFCIATION CORPORATION with its officials & SR
CONSULTAMNTS during the visit to Andaman Nikobar /Mizoram for the
designing the effective earthling system in HILL area for transmission line
and electric substation work& for Renovation & up-gradation. The same
technically approved by technical Officials of the company & Officials of
Government of MIZORUM AND ANDAMAN NIKOBAR.
4. Successfully commissioned the 2X10MW PV Solar Plant at Lalitpur –Jhansi
with in stipulated Time frame by UPNEDA-UPPCL -.The PV-SOLAR plant has
been Innu gated by our honorable Chief Minister UP on 7th May 2015.
Detail Experience is given in Annexure I
3. PERSONAL BACKGROUND:
Name : Ravinder Singh Rawat
Date of Birth : 13th January 1957
Email : ravindersinghrawat@rediffmail.com
Permanent Address : HNO-132A, B-10 BLOCK Udyagiri
Apartment-II Sector -34 NOIDA-
201301
Ph.: 0120-2504985
Mobil No : 09650721113/08800332235
QUALIFICATION : Three years Diploma in Electrical
Engineering (1977-1980) from
K.L.Poly Technical ROORKEE{U.k} in
Pursuing- PGDM from IMT Ghaziabad.
4. PROFESSIONAL TRAINING & CONCEPTUAL EXPOSURE:
Training at DMT FRANCE for Electrical Control System applicable for BI OXIALLY
POLY PROPLEEN PLANT `s Panels including Inspection of all the equipments of
BOPP LINE for worldwide U-FLEX GROUP OF INDUSTRIES AT NOIDA
L&T –ACB Operation and Maintenance Training at Luck now
One Month Training course at DMT FRANCE for PCC/MCC/DC Drive and control
Panels for BOPP LINE.
ISO-9000 Internal auditor seminar Organized By Company.
All India Supervisory Licenses Electrical -UP-987346-00234
Present Remuneration : Rs. 18.55 Lac+ perks
Expected Remuneration : Negotiable
Notice Period : One Month.
R.S.RAWAT
5. ANNEXURE-1
EXPERIENCE
M/s BEST & CROMPTON ENGINEERING LIMITED WORLD WIDE ‘A’ CLASS
EPC CONTRACTING COMPAN From: Oct., 1980 – May, 1994 Start from DET -
to - Deputy Manger (Projects) at New Delhi
Assignee, Estimating, Costing and Quoting EPC Tender for Electrical Contracts for
Northern India region.ie Sub Station 132/33/11kv,and associated 132 KV Transmission
Line work including Internal/ External Electrification, HT/LT/Control Cable Laying,
including PCC/MCC Panels Earthing etc.
Identified the potential customers and Developed the Electrical Project Business
Opportunity with Semi Government and Government clients as NTPC Shakti Nagar /
Rail Coach Factory Kapurthala / Bharat Electronics Limited Panchkula Chandigarh /
Indian Telephone Industries GONDA / Upstate Textile Corporation Kanpur Integrated
Guide Missile Project Itarsi / Chief Construction Engineer R&D Hydrabad / Auto
Tractor Pratap arh / Indian Telephone Industries Rai Barely, they are the biggest
contributor achievement in terms of turnover.
Successfully Managing construction of Transmission Line work at site and selection of
suitable Sub Contractor having sufficient skill man power depend upon the value of
contract in order to complete the project with in stipulated time frame as per contracts
including site establishments accordingly Technical and non technical commercial staff,
at site.
Monitoring of raising site Running Account Bills and payment follow-up till the out
standing become zero, site survey then mobilization man power and electrical equipment
accordingly. Customer satisfactions at site with quality oriented work proper planning
completion schedule as per contract. Including liaising job up to the handing over and
taking over the entire project to the customer and site wind up after collection of balance
payment etc.
Prepared the Line chart 220 Kv and 132 kv Sub station RC F Kapurthala get the
certificate
Erection testing commissioning of 220KV at Rajasthan Jhallward Under RSEB .
Received appreciation award letter from top management - on the successfully
commissioned of the Integrated Guide Missile project IGMP] Time Bound Project at
Ordinance Factory ITARSI (M.P.) at the tune of 10Crore, under the supervision of
C.C.E.R & D Hydrabad and in accordance consultant involves N.I.D.C. Delhi completed
in the year 1994.As a site In charge for Supply, Erection, Testing & commissioning of
Sub-station complete package including External & Internal Electrification, HT/LT
cabling complete 33 Kv Sub station up to the handing over and taking over to the
purchaser Ordinance Factory ITARSI [MP] Responsibilities for generate the suitable
vendors development pertaining manufacture of Electrical Equipment e.g. Transformers
DG Sets HT/LT Cables and locally fabricated panels e,g. PCC/ MCC/ LDB /Out door
6. Feeder Pillar Street lighting Poles/Earthling Material towards Quality oriented electrical
products
M/s FLEX GROUP OF INDUSTRIES From: March 1994 to 2005
Worked as a Executive officer Project Marketing and Plant Maintenance
Achievement and Responsibilities:
Assignment given Erection Testing & Commissioning of E&M PACKAGE for Hydro-
Electrical Project Purthi site Under HIMURJA [H.P]
Assisted for Iraq Project for LPG Cylinder & Tank Projects at initial stage of order
procuring from Iraq Govt. & its agencies as when needed on case-to-case basis for
techno-commercial matters.
Successfully Commissioned the Electrical Installation right from [2x4.5MW DG SET]
33 KV Switch Yard HT and LT Distribution cabling Individual Machine connection to
the complete [PLC] system to BOPP and Polyesters Plant [TDO-MDO –SILITER –
WINDER] entire AC Plant /Boiler Plant /R.O. Plant etc.
Successfully got the certification for ISO-9002 from DNV for ELECTRICAL
Installation In the Plant
Successfully managed to Maintenance for the entire plant daily power consumption repot
and daily check /Production loss due to electricity failure, prepare the preventive
maintenance and operation schedule of the electrical motors and panels as per the ISO
recommended formats. Clear the installation from ISO inspecting authorities time to time
Responsible for Break down report with logical reason and remedial action plan to
maintain the continue plant smooth operation.
Responsible for Shift schedule to be maintained and control all the 15-20 Shift staff
including supervisory staff for the complete 24 Hors Two shift schedule management.
Enabling to maintained the
Responsible for clear the installation from DNB Inspection Authorities Time to time.
Introduced & implemented ISO-9002 Quality Procedures for Electrical Engg. Dept. and
authorized Preventive & Preventive Maintenance. Schedule, Formats & Work
Instructions, as Level 2,3 & 4 documents for ISO-9002 at FLEX INDUSTRIES LTD.,
Total capacity of the Plant Electrical Terms is (2x4.5 MW) Won Captive Plant
(Continuous Process Polyesters BOPP Plant) in the year of 1994-97.Including project
completion planning drawing approval, estimating coasting and selection of EPC
Contractor under the guide lines of Vice President Polyester plant
7. M/s HYTHRO POWER CORPORATION LTD.
(World wide ‘A’ class EPC Contractor in Power and Distribution Sector) Fom: JUNE
2005 TO MARCH 2010. Worked as a GM PROJECTS ..
Achievement and Responsibilities
Co Ordination with State Electricity Board of UP/HP/PUNJAB /RAJESTAHAN
and NTPC/POWER GRID ion maintenance for APDRP&RGGVY /REC Projects .
Preparation of B.O.Q of 132 kv/33/11kv sub staion as per survey of Rural electrification
work of RGGVY and APDRP ABC Cabling R’E’C Funded. ROJECTS
BOQ Approval from client and freeze the actual qty. of project according estimating
costing of project +10% should be approved from ultimate customer.
G.T.P approval of all items to be used in the project before supply the material at site ;
All approved vendor material along with approved GTP got inspect form third party
appointed by the client
Preparation the completion of ASBUILT DRAWINGS of sub staion and
associatedHT/LT Lines at site .
Proposal of TIME EXTENTION proposal if required to relase the Penality amount as
per the contracts condition of the project .
Proposal of Price Variation statement as peer the contact and dully approved from the
competent authority for releasing the payment from the client
Forest clearance from forest department for 33 Kv Line Route and approval from client
Liaisoning with the client for further projects with MD level.
22O KV Transmission line work at RC Green Noida and Dadri including 220 kv Dharap
sub staion Bulandshare UP under UPCLLucknow
M/s SGIL NEW DELHI JV WITH ELSEDEADY POWER PROJECTS
EGIPT BASE COMPANY CONTARCTS COMPANY (World wide ‘A’ class
EPC Contractor in Power and Distribution Sector)
From: June2010 to May 2011
AAcchhiieevveemmeenntt aanndd RReessppoonnssiibbiilliittiieess
PPrreeppaarraattiioonn ooff BB..OO..QQ aass ppeerr ssuurrvveeyy ooff RRuurraall eelleeccttrriiffiiccaattiioonn wwoorrkk ooff
RRGGGGVVYY aatt MMIIZZOORRUUMM PPRROOJJEECCTT aatt tthhee ttuunnee ooff 220000CCRR cclloossee
mmoonniittoorriinngg ffrroomm HH OO DDeellhhii ffoorrttnniigghhttllyy vviissiitt aatt ssiittee ffoorr
aatttteennddiinngg pprrooggrreessss rreevviieeww mmeeeettiinngg wwiitthh MMiizzoorraamm
eelleeccttrriicciittyy BBooaarrdd AAIIZZWWAALL MMIIZZOORRAAMM
8. OOrrggaanniizzee tthhee pprroojjeecctt ccoommpplleettiioonn rreevviieeww mmeeeettiinngg aanndd ccoommpplleetteedd tthhee
pprroojjeeccttss wwiitthhiinn ssttiippuullaatteedd ttiimmee ffrraammee iinncclluuddiinngg ddaayy ttoo ddaayy aaccttiivviittiieess ooff
tthhee pprroojjeecctt ccoommpplleettiioonn ppaayymmeenntt ccoolllleeccttiioonn aanndd hhaannddiinngg oovveerr ttaakkiinngg oovveerr
tthhee pprroojjeecctt ..
TToo ttiiee uupp wwiitthh ddiiffffeerreenntt mmaannuuffaaccttuurreerrss aanndd ccoonnssuullttaanncciieess ffoorr
tteennddeerriinngg ppuurrppoossee && ccoommmmeerrcciiaall ttiiee--uuppss aafftteerr aawwaarrdd ooff
ccoonnttrraacctt..
VVeennddoorr DDeevveellooppmmeenntt && ttoo pprreeppaarree DDaattaa--bbaannkk ooff vvaarriioouuss
bboouugghhtt oouutt iitteemmss,, tthhaatt ggoo iinn aa ttuurrnnkkeeyy EEPPCC jjoobb ooff tthhee aaffoorreessaaiidd
nnaattuurree..
LLiiaassoonniinngg iinn IIrraaqq wwiitthh GGoovvtt.. AAggeenncciieess && AAggeennttss oonn ccaassee--ttoo--
ccaassee bbaassiiss.. AAllssoo ttoo ccoo--oorrddiinnaattee bbeettwweeeenn IIrraaqq pprroojjeecctt ooffffiiccee &&
CCoorrppoorraattee OOffffiiccee aatt NNooiiddaa ffoorr aallll kkiinndd ooff tteecchhnnoo--ccoommmmeerrcciiaall
mmaatttteerrss..
M/s HYTHRO POWER CORPORATION LTD.
(World wide ‘A’ class EPC Contractor in Power and Distribution Sector)
From: 20011 Aug 2013.Worked as a GM PROJECTS
Achievement and Responsibilities
Co Ordination with State Electricity Board of UP/HP/PUNJAB /RAJESTAHAN
and NTPC/POWER GRID for Balance work of APDRP&RGGVY /REC Projects
.
Preparation of old outstanding balance payment of projects wise in UP RAJASTHAN
and Uttaranchal under of RGGVY and APDRP Schemes
Handing over Taking over of all the projects of UP /JVVNL/UPPCL and close
monitoring of payment collection and Approval from client and accordingly fund
Transfer form HO `s Luck now /Jaipur and Dehradune .
Re console the material statement and same shall be approved from client for relapsing
Retention money hold by Client on account of material reconcile at site .;
Contractors Billes verification as per erection MB approved by the client.
Arrangement of Third Party Inspection NTPC/REC/RITES as per the contracts and
release the money from clients .
To tie up with different manufacturers and consultancies for tendering purpose &
commercial tie-ups after award of contract.
Vendor Development & to prepare Data-bank of various bought out items, that go in a
turnkey EPC job of the aforesaid nature.
Liaisoning with the client for further projects with MD level.
9. Testing commissioning and handing over taking over the complete projects to the client
and get final payment as well as completion certificate from the clients.
M/s VARSANA ISPAT LTD NEW DLHI .
(World wide ‘A’ class EPC Contractor in Power and Distribution Sector
From: Aug 2013 March2014.
Worked as a GM PROJECTS ––TTrraannssmmiissssiioonn LLiinnee DDiivv –– AAtt pprreesseenntt aassssiiggnneedd tthhee EEHHVV--
113322//222200//440000KKVV lliinnee UUnnddeerr MMPPPPCCLL//JJVVVVNNLL//RRVVVVNNLL--JJAAIIPPUURR ––MMEEAARRTTHHAA lliinnee ..
M/s SAMAVIST ENERGY SOLUTION PVT LTD
This company is the Special Purpose Vehicle OF WRLD WIDE U-FLEX-GROUP -
Noida Start From: Aug 2014 -- Still working as a Dy GM PROJECTS ––SSOOLLAARR
PPLLAANNTT --DDIIVV
AAtt--PPrreesseenntt --aassssiiggnneedd 22XX1100 MMWW PPVV SSOOLLAARR ––PPLLAANNTT aatt LLllaaiittppuurr JJhhaannssii uunnddeerr UUPPPPTTCCLL
//UUPPNNEEDDAA ––LLUUCCKKNNOOWW ––iinn aaccccoorrddaannccee ttoo tthhee nnoorrmmss aanndd BBuunnddllee ––KKhhaanndd ppoolliiccyy uunnddeerr
UUPPNNEEAADDAA ––LLUUCCKKNNOOWW.. SSuucccceessss ffuullllyy EErreeccttiioonn TTeessttiinngg aanndd CCoommmmiissssiioonniinngg tthhee SSOOAALLRR
PPLLAANNTT oonn 77tthh
MMaayy 22001155 pplleeaassee ttoo iinnffoorrmm iitt hhaass bbeeeenn iimmmmiiggrraatteedd bbyy hhoonnoorraabbllee CChhiieeff
MMiinniisstteerr UUPP ..IItt hhaass bbeeeenn ccoommppaacctteedd aass ppeerr tthhee ssttiippuullaatteedd ttiimmee ffrraammee ffiixxeedd bbyy UUPPNNEEDDAA
//UUPPPPTTCCLL ..
PPrreesseenntt ssaallaarryy --CCTTCC --1188..5500 LLaacceess ppeerr aannnnuumm aattttaacchheedd aappppooiinnttmmeenntt lleetttteerr ––EExxppeeccttiinngg MMoorree
tthhaann tthhiiss aass ppeerr nnoorrmmaall iinnccrreemmeenntt ppeerr yyeeaarr ssppaann,, wwhhiicchh iiss nneeggoottiiaabbllee aass ppeerr tthhee wwoorrkk ppllaaccee
ccoonnddiittiioonn ooff tthhee aappppooiinnttmmeenntt..
----------------------------------------xxxxxxxxxxxxxxxxxxxx----------------------------------------------------------------------------