Muhammad Faisal Wattoo
CURRICULUM VITAE
1. Proposed Position: Costing / Quantity / Documentation / Planning Engineer
2. Name of Firm: SMEC-EGC Pakistan
3. Name of Staff: Muhammad Faisal Wattoo
4. Date of Birth: 16 August 1976 Nationality: Pakistani
5. CNIC No. (if Pakistan) 35202-6347483-3
6. Email: faisal_wattoo843@hotmail.com, Skype ID: faisal_wattoo843, Cell No: +923004577588
7. Education:
Degree Major / Minor Institution Date
(MM/YYYY)
B.Sc. Civil Engineering University of Engineering & Technology,
Lahore
2002
8. Membership of Professional Association:
• Pakistan Engineering Council CIVIL/22990.
• Pakistan Engineering Congress: 4835.
• The Institute of Engineers, Pakistan: M-18363 / LHR-4778.
9. Other Training:
• Continuing Professional Development Programme “Process Safety Management course (0.5 CPD
Point)” on March 26, 2012, Pakistan.
• 2-Days training Work Shop on PEC Contract Documents and PICC Cost Data held in Pearl Continental,
Lahore on July 19-20, 2011.
• Training Course of Project Planning and Scheduling (Primavera P6) from Pakistan Engineering
Congress (Nov-2010).
• MS Project
• AutoCAD
10. Languages:
Speak Read Write
English Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
11. Employment Record:
Employer Position
From
(MM/YYYY)
To
(MM/YYYY)
Engineering General Consultants (Pvt) Ltd
Principal Costing and
Planning Engineer
June 2008 To date
ILF Consulting Engineers Pakistan (Pvt) Ltd Junior Engineer
Construction Planning / Cost
Feb. 2007 May 2008
1 of 10
Muhammad Faisal Wattoo
Employer Position
From
(MM/YYYY)
To
(MM/YYYY)
Estimation / AutoCAD
Design Engineer
Pakistan Engineering Services (Pvt) Ltd.
Junior Engineer
Construction Planning / Cost
Estimation / AutoCAD
Design Engineer
April 2003 February 2007
Husnain Cotex (Pvt) Ltd
Junior Engineer Cost
Estimation / Site Engineer /
Documentation Engineer
May 2002 March 2003
12. Work undertaken that best Illustrates Capability to Handle the Tasks Assigned
Name of Assignment or Project & Location: Consultancy Services for Monitoring and Evaluation (M&E) of
Tarbela 4th
Extension HPP in Pakistan Cost of Project: 830.5 Million USD
Date of Start: October 2014 Date of Completion: April 2019
Actual Time Spent on the Project: January 2015 to date
Client: WAPDA
Main project Features:
The overall Project development objective is enhancement of electricity generation capacity to help reduce power
shortages in the country. The Tarbela 4th Extension Project proposes to add additional generation to the existing
3,478 MW hydropower installed at Tarbela. The proposed project would have an installed capacity of 1,410 MW.
This would be achieved by installing three (3) new turbines and generators onto the existing irrigation Tunnel 4 which
will be converted into power without affecting the existing irrigation release capabilities from Tarbela.
Position Held: Planning and Documentation Engineer
Description of Duties:
• Assisting in preparation of weekly, monthly and quarterly progress reports.
• Assisting in the preparation of Performance Monitoring Information System (PMIS) for the Monitoring and
Evaluation of the Progress and Key Performance Indicators.
• Liaison with Technical Team and Stakeholders for progress updates and ultimately preparation of reports for
the information of the PMU.
• Assisting the Team Leader in resolving the Management and Administration issues arising at site.
• Documentation Control
Name of Assignment or Project & Location: Review, Preparation, Evaluation of EPC Tender Documents
for 720MW Karot HPP in Pakistan, KPK, Pakistan Cost of Project: 1,470 Million USD
Date of Start: July 2014 Date of Completion: January 2015
Actual Time Spent on the Project: 5 Months
Client: WAPDA
Main project Features:
Karot Hydropower Station is the 4th station in five cascade hydropower stations planed around Jhelum River within
Pakistan. The 3rd station is Azad Pattan. The 5th station is Mangla. Controlled drainage area of dam site is 26,700
km2. Long term average runoff is 819m3/s. Long term average annual runoff is 25,830 million m3. The project is the
hydropower complex with generating electricity. Full Supply Level of the reservoir is 461m. Installed capacity of the
power station is 720 MW (4×180MW)
Position Held: Contracts Engineer
Description of Duties:
• Assist in review and finalization of EPC Contract bidding criteria and Documents.
• Assist in preparation of proposal to carryout EPC Tendering Process
2 of 10
Muhammad Faisal Wattoo
• Liaison with Technical Team for preparation of specifications for tender documents on EPC basis
• Assist Technical Team in post qualification bid evaluations
• Assist the Technical Team in preparation of bid evaluation report
Name of Assignment or Project & Location:
• Feasibility Study of 340MW Gahrait Swir Lasht HPP
• 52MW Isatru Booni HHP
• Construction Supervision of 69MW Lawi HPP in Pakistan, KPK, Pakistan
Cost of Project: 1,082 Million USD, 203 Million USD and 122 Million USD respectively
Date of Start: October 2012 Date of Completion: June 2014
Actual Time Spent on the Project: 21 Months
Client: SHYDO
Main project Features:
• For 340MW Gahrait Swir Lasht HPP, the weir site is proposed about 35 km downstream of Chitral Town. The
project layout is proposed on the right bank of Chitral Valley with weir site about 35 km downstream of Chitral
and powerhouse site about 8 km downstream of Drosh Town near Swir Lasht Village. The national grid at
Chakdara is in a distance of about 170 km from the powerhouse site.
• The proposed 52MW Istaru-Booni Hydropower Project (IB HPP) has its weir site located on Turkho River about
2 km downstream of Istaru Village. The powerhouse site is proposed on the right bank of Mastuj River near
Booni Town. Both weir and powerhouse sites are accessible from Booni Town by a jeepable road.
• Management Consultancy Services for Construction of Lawi Hydropower Project (69mw) District Chitral
(Lower).”
• Lawi Hydropower Project is located about 40 km short of Chitral city in the northern most district of Khyber
Pakhtunkhwa Province of Pakistan. Chitral lies from 35°-15' to 36°- 55' North and 71°-12' to 73°-55' East. Lawi
Hydropower Project (69MW) is aimed to develop indigenous, non-polluting and renewable source of energy to
help meet KP’s power shortage and improve the quality and reliability of the power system, especially in
surrounding areas of Chitral.
Position Held: Principal Engineer Costing, Planning, Contracts and Head Documentation
Activities Performed:
• Bi-Monthly, Quarterly Progress Reports Management
• Compilation and Management of Technical Memorandums, Field Investigations Reports, Feasibility Study
Reports etc
• Manning Schedules and Work Plans Updations
• Preparation of Construction Schedule
• Rate analysis
• Quantities and cost estimation
• Preparation of Bill of Quantities
• Assistance in preparation of Contact documents for Geotechnical Investigations and evaluation of Contractors.
Name of Assignment or Project & Location: Review of Feasibility Study, Detailed Engineering Design,
Tender Documents and PC-1 for Munda Dam Project, KPK, Pakistan
Cost of Project: 2,151 Million USD
Date of Start: June 2012 Date of Completion: September 2012
Actual Time Spent on the Project: 4 Months
Client: Water and Power Development Authority
Main project Features:
Munda Dam site and its reservoir area is located in Swat River basin, about 5 km upstream of existing Munda
Headworks at Abazai near Shabqadar Deri, in NWFP, 37 km north of Peshawar.
Position Held: Senior Engineer Cost Estimation
Activities Performed:
• Progress Reports Management
• Quantities calculation and Cost estimation.
3 of 10
Muhammad Faisal Wattoo
• Rate analysis.
• Preparation of Bill of quantities.
• Preparation of cost estimation report.
• Preparation of Construction Planning Report.
• Preparation of a Construction / implementation Schedules
• Assistance in preparation of technical specifications for Civil works, Tender documents for contractors.
Name of Assignment or Project & Location: Feasibility Study to increase the capacity of Sans Souci Dam in
Mauritius Cost of Project: 4.711 Million USD (Radial Gates Option)
Date of Start: February 2012 Date of Completion: June 2012
Actual Time Spent on the Project: 5 Months
Client: Central Electricity Board, Republic of Mauritius
Main project Features:
It consists of a 35.5m high Rockfill Dam with Central Clay Core having crest Length of 350m, Power Tunnel 3000 m
long, fully lined with inner diameter of 2,5 m, Surface powerhouse with 2 x 15 MW Francis turbines with
horizontal axis with 66 kV Transmission Line.
Position Held: Senior Engineer Costing and Construction Planning
Activities Performed:
• Preparation of a Detailed Construction / implementation Schedules and periodic updating.
• Preparation of staffing schedule.
• Cost estimation
• Rate analysis
Name of Assignment or Project & Location: Feasibility Study, Detailed Design and Tender Documents for
Magwagwa Multipurpose Dam Development Project on Sondu River.(World Bank Funded), Nairobi, Kenya
Cost of Project: 1,214 Million USD (Civil Works Portion)
Date of Start: November 2011 Date of Completion: January 2012
Actual Time Spent on the Project: 3 Months
Client: Ministry of Regional Development Authorities and the Lake Basin Development Authority of the Republic of
Kenya.
Main project Features:
The Feasibility Study, Detailed Design and Tender Documents for Magwagwa Multipurpose Dam Development
Project under the Ministry of Regional Development Authorities and the Lake Basin Development Authority of the
Republic of Kenya.
Position Held: Senior Engineer Costing, Construction Planning
Activities Performed:
• Cost estimation
• Rate analysis
• Comparison of unit rates with different hydropower projects around the world
• Preparation of Bill of Quantities
• Assistance in the preparation of Technical Specifications for Civil Works
• Preparation of Construction schedule
Name of Assignment or Project & Location: Feasibility Review, Tender Design and Tender Documents and
Construction Supervision of 14MW Naltar – V Hydropower Project, Gilgit Baltistan Province
Cost of Project:1,612 Million PKR
Date of Start: May 2011 Date of Completion: November 2011
Actual Time Spent on the Project: 7 Months
Client: Water and Power Department Northern Areas Gilgit, Government of Pakistan.
Main project Features:
The Feasibility study submitted in 2007 was concluded with the following design parameters of this project:
• Design Capacity: 14.1 MW
• Annual Energy: 85.16 GWh
4 of 10
Muhammad Faisal Wattoo
• Design Discharge: 5.4 m3/s
• Gross Head: 332 m
• Headrace canal Length: 450 m
• Penstock Length: 4070 m
• Type and Number of Turbine: Pelton, 3
Position Held: Senior Engineer Costing & Construction Planning
Activities Performed:
• Preparation of a Detailed Construction / implementation Schedule.
• Preparation of Implementation and Contract Packaging and Construction Supervision and Quality Assurance /
Control Plan report.
• Preparation of a revised cost estimate.
Name of Assignment or Project & Location: Technical Services and Dam Safety Consultancy for (i) Raising
of Full Supply level of Corumana Dam Project, (ii) Ressano Garcia Weir for water supply and flow measurement, (iii)
Metuchira Dam for water supply, (iv) Gorongosa Dam for water supply and small hydropower generation. (World
Bank Funded), Maputo (Mozambique)
Cost of Project: 52.3 Million USD, 9.6 Million USD, 4.9 Million USD, 5.7 Million USD respectively
Date of Start: Sept. 2010 Date of Completion: December 2011 (Intermittent)
Actual Time Spent on the Project: 5 Months
Client: National Directorate of Water, Ministry of Public Works and Housing, Republic of Mozambique.
Main project Features:
(i) Corumana Dam Project having generation capacity of 14.5 MW is proposed to be raised to its full supply level.
The main purpose for constructing the dam was to supply water for downstream irrigated agriculture while a
secondary purpose was generation of hydroelectric energy (14.5 MW installed capacity).
The National Directorate of Water commissioned this feasibility study (Basic Design) in order to investigate the
economic viability of installing the gates and constructing the saddle dam and emergency spillway, thereby
allowing the full supply level to be raised to el 117 masl and for the firm water yield and firm energy yield to be
increased.
(ii) Ressano Garcia measuring weir has a crump type crest, a compound weir with crests at multiple levels ranging
from the lowest V notch set. A gauging tower is also provided to house the controls for the scouring gates,
gauging equipment and the pump station required for water supply to Ressano Garcia. Scour gates have been
provided to flush incoming sediment to minimise the possibility of silting of the outlets from the weir and intake. A
fish ladder is also provided. A measuring weir is also provided to measure the flow through the fish ladder.
(iii) Metuchira Dam: 3.5m high concrete dam with ogee shaped overflow Spillway. Basic purpose is to supply water
to Metuchira Village.
(iv) Gorongosa Dam: 5.24m high concrete dam with 55m wide ogee shaped overflow spillway. Basic purpose is to
provide Water supply to Gorongosa Village and power supply to Pump station.
Position Held: Senior Engineer Costing & Construction Planning
Activities Performed:
• Preparation of a Detailed Construction / implementation Schedule.
• Preparation of Implementation and Contract Packaging and Construction Supervision and Quality Assurance /
Control Plan report.
• Preparation of a revised cost estimate.
Name of Assignment or Project & Location: Updation of Feasibility Study and Preparation of Bidding Documents
on EPC Contract Basis for Olympia Hydropower Project, Punjab
Cost of Project: 28.8 Million USD
Date of Start: April 2010 Date of Completion: March 2011
Actual Time Spent on the Project: 12 Months
Client: Olympia Chemical Pvt. Ltd.
Main project Features:
Olympia Hydropower Project is a run of river hydropower project having generation capacity of 11 MW and proposed
to be constructed on a link canal. Spillway having discharge capacity of 425 m3/sec and powerhouse will be
5 of 10
Muhammad Faisal Wattoo
constructed on a side channel. Our task is to update the feasibility report already prepared by another firm and to
propose the alternative solutions.
Position Held: Senior Engineer Contracts, Costing and Construction Planning
Activities Performed:
• Rate Analysis for different items of Civil Works.
• Preparation of Bill of Quantities.
• Preparation of Construction Schedule.
• Preparation of Technical Specifications and Bidding Document on EPC Contract Basis.
Name of Assignment or Project & Location: Feasibility Study of Shushghai-Zhendoli & Shogo-Sin
Hydropower Project. (Asian Development Bank Funded), NWFP
Cost of Project: 179 Million USD, 193.8 Million USD respectively
Date of Start: January 2010 Date of Completion: April 2010
Actual Time Spent on the Project: 4 Months
Client: Pakistan Private Infrastructure Board.(PPIB)
Main project Features:
The Shogo - Sin Hydropower Project is planned on Lutkho River about 0.5 km downstream of Shogho village in the
area of Chitral region, central place Chitral located about 365 km from Peshawar. The purpose of the Project is to
produce Electric Power of 131 MW. The reservoir length will be 700 m and area will be 74300 m2
. The Shushghai-
Zhendoli Hydropower Project is planned on Turkho River in the area of Chitral region, central place Chitral located
about 365 km from Peshawar. The purpose of the Project is to produce Electric Power of 144 MW. The reservoir
length will be 636 m and area will be 5.7687 Hectares.
Position Held: Senior Engineer Cost Estimation / Construction Planning
Activities Performed:
• Quantity estimation of weir and its appurtenant structures alongwith headrace tunnel, powerhouse and affiliated
structures, all infrastructure facilities including power demand, water supply and drainage works for consultants
and contractors camps and relative Cost estimation.
• Rate Analysis for different items of Civil Works.
• Preparation of Detailed Engineering Estimate.
• Preparation of Bill of Quantities.
• Preparation of Construction Schedule.
• Planning of Access Tunnels & Access Roads for Construction Planning purposes.
• Preparation of Drawings on AutoCad for Construction Planning Report.
Name of Assignment or Project & Location: Feasibility Study, Detailed Engineering Design and Tender
Documents of Kohala Hydropower Project, Azad Jammu & Kashmir AJK
Cost of Project: 2,929 Million USD
Date of Start: June 2008 Date of Completion: January 2010
Actual Time Spent on the Project: 20 Months
Client: Water and Power Development Authority, Pakistan
Main project Features:
The project area of proposed Kohala Hydropower Project (KHPP) lies along the river Jhelum in Muzaffarabad district
of Azad Jammu and Kashmir (AJK). Dam site is situated 8 km downstream of the Hattian Bala village, whereas it is
31 km upstream from the Domel Bridge. The Kohala hydropower project consists of dam 52m high, water
conveyance system and underground powerhouse with 17 km twin headrace tunnels.
Position Held: Senior Engineer Cost Estimation / Construction Planning / Contracts
Activities Performed:
• Quantity estimation of dam and its appurtenant structures along with headrace tunnel, powerhouse and affiliated
structures and relative Cost estimation.
• Quantity estimation for all infrastructure facilities including power supply, water and drainage facilities, colony
roads etc
• Preparation of Detailed Engineering Estimate.
6 of 10
Muhammad Faisal Wattoo
• Preparation of Bill of Quantities.
• Phasing of Project cost into construction period.
• Preparation of Project Planning & Scheduling Report.
• Preparation of Tender Documents for Exploratory Adits at damsite and powerhouse area.
• Preparation of Tender Documents for Civil Works of Kohala Hydropower Project and compilation of the Whole
Lot of tender documents for submission to the Client.
• Preparation of Structure drawings on AutoCad for Feasibility, Detailed Engineering Design & Tender
Documents.
Name of Assignment or Project & Location: Pre-Feasibility Study of Chor Nala & Spat Gah Hydropower
Project
Cost of Project:
Date of Start: February 2007 Date of Completion: May 2008
Actual Time Spent on the Project: 16 Months
Client: Punjab Irrigation Department
Location: Kohistan NWFP
Position Held: Junior Engineer Construction Planning / Cost Estimation / AutoCAD Design Engineer
Activities Performed:
• Preparation of Progress Reports, Work and Time Schedules and relative estimation of the prepared schedules.
• Assistance in Design of Retaining walls and other structure features.
• Socio – Economic Survey Data entry for the Palas valley – Spat Gah HPP.
• Preparation and Digitization of Geological Maps on AutoCAD.
• Preparation of profiles and Geological-Cross Sections for various locations of dam sites.
Name of Assignment or Project & Location: Review of Feasibility Study, Detailed Engineering Design and Tender
Documents of Diamer Bhasha Dam Project, Kohistan NWFP Cost of Project: 12 Billion USD (2007)
Date of Start: April 2006 Date of Completion: February 2007
Actual Time Spent on the Project: 11 Months
Client: WAPDA
Main project Features:
The Diamer Basha Dam Project (4,500MW) is located on the Indus River. The project foresees the construction of a
272 m high concrete gravity dam and two large underground power schemes located in either flank of the Indus
River each with an installed capacity of 2,250 MW. Estimated Cost (YEAR 2008) was US$12 Billion.
Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer
Activities Performed:
• Assistance in Quantity Estimation of Dam and Appurtenant Structures like Diversion Tunnels & Canal, Headrace
& Tailrace Tunnels, Surge tanks, Manifolds, Powerhouse and related features, infrastructure works including
water supply and drainage facilities, colony roads etc.
• Sizing of Powerhouse.
• Preparation of Structure Drawings as AutoCAD Design Engineer.
• Preparation of Dam Area, Volume Capacity Curves.
Name of Assignment or Project & Location: Feasibility Study, Detailed Engineering Design and Tender
Documents of Khokhra and LBDC Hydropower Projects, Punjab Cost of Project: 247.7 Million PKR,
497 Million PKR respectively
Date of Start: June 2004 Date of Completion: April 2006
Actual Time Spent on the Project: 23 Months
Client: Punjab Irrigation and Power Department
Main project Features:
• 3.2 MW Khokhra Hydropower Project on Gujrat Branch RD0+000 off taking from Upper Jhelum Canal RD
7 of 10
Muhammad Faisal Wattoo
245+500. The purpose of the Hydropower Project is to utilize the power potential available on Gujrat Branch of
Upper Jhelum Canal (UJC), and thus provide cheaper and most needed power, keeping in view, the present and
further requirements of Punjab.
• 4.8MW LBDC Hydropower Project, has been conceived by utilizing flows of Lower Bari Doab Canal available at
RD 329+058 and head available at falls at RD 329+058 and RD 340+850, by combining the both falls.
Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer
Activities Performed:
• Quantity Estimation of the respective Hydropower Station including, Head race, Tail race, Chillianwala
Distributary, Powerhouse, Intake and off take, Power channels, Retaining walls.
• Assistance in Progress Reports Management.
• Assistance in Preparation of Feasibility Reports.
• Assistance in Preparation of Detailed Engineering Drawings.
• Assistance in Preparation of Tender Documents, Tender and Construction Drawings.
• Assistance in Preparation of Technical Specifications (Civil Works) and BOQ’s.
• Assistance in Preparation of PC-1.
• Assistance in the Evaluation of Contractors.
• Data Collection from the Canal sites for Hydrology Report, Design Reports and Environmental Impact
Assessment Reports.
Name of Assignment or Project & Location: Feasibility Study and Detailed Engineering Design of Kurram
Tangi Dam Project, NWFP Cost of Project: 17,205 Million PKR
Date of Start: April 2003 Date of Completion: June 2004
Actual Time Spent on the Project: 15 Months
Client: WAPDA
Main project Features:
Concrete face rock filled Dam. Consists of five Power houses which will be generated 83.4 mw electricity.
The command area of the Project is 362,380 acres. The Project is located on Kurram River in North Waziristan
agency. The location of Dam is 14 Kilometer upstream from Kurram Ghari Head Works
Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer / Documentation Engineer /
Environmental Engineer
Activities Performed:
• Quantity Estimation (Dam, Power Tunnels, Stilling Basin, Silt Excluder, Spillway, Cofferdams, Powerhouses,
infrastructure works including colony roads, water supply and drainage facilities, power demand etc).
• Assistance in Preparation of Structure Drawings.
• Management of Irrigation Profiles & Cross-Sections of Spaira Ragha and Sheratalla canals.
• Assistance in Preparation of BOQ.
• Assistance in Progress Reports Management.
• Assistance in Design of Spillway, Culverts and Retaining walls
• Assistance in Report management i.e Environmental Impact Assessment & Resettlement Action Plan Studies
and Feasibility Report.
Name of Assignment or Project & Location: Construction of Royal Palm Golf & Country Club, Punjab
Cost of Project: 3.0 Billion PKR (2002)
Date of Start: May 2002 March 2003
Actual Time Spent on the Project: 12 Months
Client: Maxcorp Malaysia
Main Project Features:
Golf club comprising area of 144 acres, including spacious golf course, multistory building carrying within itself
restaurant, banquet hall, saloon, rest rooms, swimming pools, etc
Position Held: Junior Engineer Cost Estimation / Site Engineer / Documentation Engineer / Procurement Engineer
Activities Performed:
• PM’s Coordinator, Site Engineer’s Coordinator
8 of 10
Muhammad Faisal Wattoo
• Site Inspector
• Procurement Engineer
• Planning Engineer
• Concreting supervisor and management of excavation, foundation treatment, preparation of footings of columns
about 180 in total, floor and roof treatment, dpc, retaining walls formwork, walls erection, inspection and pouring
of roof slabs of multi storey buildings and the relative procurement of the materials required and quantity
estimation of the works. It also included my coordination with the Malaysian team during inspections.
• Checking of Bar bending schedules.
• Quality assurance and control.
• Progress Reports Management, Inspection Requests & Coordination with client & consultant.
9 of 10
Muhammad Faisal Wattoo
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications and my experience. I understand that any willful misstatement described herein may lead to my
disqualification or dismissal, if engaged.
_________________________________________________________ Date: 09-07-2015
[Signature of Staff Member or Authorized Representative of the staff] Day/Month/Year
10 of 10

More Related Content

Similar to Muhammad Faisal Wattoo - COST OF PROJECTS

Similar to Muhammad Faisal Wattoo - COST OF PROJECTS (20)

CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
FARID CV
FARID CVFARID CV
FARID CV
 
RS Resume
RS ResumeRS Resume
RS Resume
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Resume Engineer DB
Resume Engineer DBResume Engineer DB
Resume Engineer DB
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Arsalan CV final (December 2016)
Arsalan CV final (December 2016)Arsalan CV final (December 2016)
Arsalan CV final (December 2016)
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
update
updateupdate
update
 

Muhammad Faisal Wattoo - COST OF PROJECTS

  • 1. Muhammad Faisal Wattoo CURRICULUM VITAE 1. Proposed Position: Costing / Quantity / Documentation / Planning Engineer 2. Name of Firm: SMEC-EGC Pakistan 3. Name of Staff: Muhammad Faisal Wattoo 4. Date of Birth: 16 August 1976 Nationality: Pakistani 5. CNIC No. (if Pakistan) 35202-6347483-3 6. Email: faisal_wattoo843@hotmail.com, Skype ID: faisal_wattoo843, Cell No: +923004577588 7. Education: Degree Major / Minor Institution Date (MM/YYYY) B.Sc. Civil Engineering University of Engineering & Technology, Lahore 2002 8. Membership of Professional Association: • Pakistan Engineering Council CIVIL/22990. • Pakistan Engineering Congress: 4835. • The Institute of Engineers, Pakistan: M-18363 / LHR-4778. 9. Other Training: • Continuing Professional Development Programme “Process Safety Management course (0.5 CPD Point)” on March 26, 2012, Pakistan. • 2-Days training Work Shop on PEC Contract Documents and PICC Cost Data held in Pearl Continental, Lahore on July 19-20, 2011. • Training Course of Project Planning and Scheduling (Primavera P6) from Pakistan Engineering Congress (Nov-2010). • MS Project • AutoCAD 10. Languages: Speak Read Write English Excellent Excellent Excellent Urdu Excellent Excellent Excellent 11. Employment Record: Employer Position From (MM/YYYY) To (MM/YYYY) Engineering General Consultants (Pvt) Ltd Principal Costing and Planning Engineer June 2008 To date ILF Consulting Engineers Pakistan (Pvt) Ltd Junior Engineer Construction Planning / Cost Feb. 2007 May 2008 1 of 10
  • 2. Muhammad Faisal Wattoo Employer Position From (MM/YYYY) To (MM/YYYY) Estimation / AutoCAD Design Engineer Pakistan Engineering Services (Pvt) Ltd. Junior Engineer Construction Planning / Cost Estimation / AutoCAD Design Engineer April 2003 February 2007 Husnain Cotex (Pvt) Ltd Junior Engineer Cost Estimation / Site Engineer / Documentation Engineer May 2002 March 2003 12. Work undertaken that best Illustrates Capability to Handle the Tasks Assigned Name of Assignment or Project & Location: Consultancy Services for Monitoring and Evaluation (M&E) of Tarbela 4th Extension HPP in Pakistan Cost of Project: 830.5 Million USD Date of Start: October 2014 Date of Completion: April 2019 Actual Time Spent on the Project: January 2015 to date Client: WAPDA Main project Features: The overall Project development objective is enhancement of electricity generation capacity to help reduce power shortages in the country. The Tarbela 4th Extension Project proposes to add additional generation to the existing 3,478 MW hydropower installed at Tarbela. The proposed project would have an installed capacity of 1,410 MW. This would be achieved by installing three (3) new turbines and generators onto the existing irrigation Tunnel 4 which will be converted into power without affecting the existing irrigation release capabilities from Tarbela. Position Held: Planning and Documentation Engineer Description of Duties: • Assisting in preparation of weekly, monthly and quarterly progress reports. • Assisting in the preparation of Performance Monitoring Information System (PMIS) for the Monitoring and Evaluation of the Progress and Key Performance Indicators. • Liaison with Technical Team and Stakeholders for progress updates and ultimately preparation of reports for the information of the PMU. • Assisting the Team Leader in resolving the Management and Administration issues arising at site. • Documentation Control Name of Assignment or Project & Location: Review, Preparation, Evaluation of EPC Tender Documents for 720MW Karot HPP in Pakistan, KPK, Pakistan Cost of Project: 1,470 Million USD Date of Start: July 2014 Date of Completion: January 2015 Actual Time Spent on the Project: 5 Months Client: WAPDA Main project Features: Karot Hydropower Station is the 4th station in five cascade hydropower stations planed around Jhelum River within Pakistan. The 3rd station is Azad Pattan. The 5th station is Mangla. Controlled drainage area of dam site is 26,700 km2. Long term average runoff is 819m3/s. Long term average annual runoff is 25,830 million m3. The project is the hydropower complex with generating electricity. Full Supply Level of the reservoir is 461m. Installed capacity of the power station is 720 MW (4×180MW) Position Held: Contracts Engineer Description of Duties: • Assist in review and finalization of EPC Contract bidding criteria and Documents. • Assist in preparation of proposal to carryout EPC Tendering Process 2 of 10
  • 3. Muhammad Faisal Wattoo • Liaison with Technical Team for preparation of specifications for tender documents on EPC basis • Assist Technical Team in post qualification bid evaluations • Assist the Technical Team in preparation of bid evaluation report Name of Assignment or Project & Location: • Feasibility Study of 340MW Gahrait Swir Lasht HPP • 52MW Isatru Booni HHP • Construction Supervision of 69MW Lawi HPP in Pakistan, KPK, Pakistan Cost of Project: 1,082 Million USD, 203 Million USD and 122 Million USD respectively Date of Start: October 2012 Date of Completion: June 2014 Actual Time Spent on the Project: 21 Months Client: SHYDO Main project Features: • For 340MW Gahrait Swir Lasht HPP, the weir site is proposed about 35 km downstream of Chitral Town. The project layout is proposed on the right bank of Chitral Valley with weir site about 35 km downstream of Chitral and powerhouse site about 8 km downstream of Drosh Town near Swir Lasht Village. The national grid at Chakdara is in a distance of about 170 km from the powerhouse site. • The proposed 52MW Istaru-Booni Hydropower Project (IB HPP) has its weir site located on Turkho River about 2 km downstream of Istaru Village. The powerhouse site is proposed on the right bank of Mastuj River near Booni Town. Both weir and powerhouse sites are accessible from Booni Town by a jeepable road. • Management Consultancy Services for Construction of Lawi Hydropower Project (69mw) District Chitral (Lower).” • Lawi Hydropower Project is located about 40 km short of Chitral city in the northern most district of Khyber Pakhtunkhwa Province of Pakistan. Chitral lies from 35°-15' to 36°- 55' North and 71°-12' to 73°-55' East. Lawi Hydropower Project (69MW) is aimed to develop indigenous, non-polluting and renewable source of energy to help meet KP’s power shortage and improve the quality and reliability of the power system, especially in surrounding areas of Chitral. Position Held: Principal Engineer Costing, Planning, Contracts and Head Documentation Activities Performed: • Bi-Monthly, Quarterly Progress Reports Management • Compilation and Management of Technical Memorandums, Field Investigations Reports, Feasibility Study Reports etc • Manning Schedules and Work Plans Updations • Preparation of Construction Schedule • Rate analysis • Quantities and cost estimation • Preparation of Bill of Quantities • Assistance in preparation of Contact documents for Geotechnical Investigations and evaluation of Contractors. Name of Assignment or Project & Location: Review of Feasibility Study, Detailed Engineering Design, Tender Documents and PC-1 for Munda Dam Project, KPK, Pakistan Cost of Project: 2,151 Million USD Date of Start: June 2012 Date of Completion: September 2012 Actual Time Spent on the Project: 4 Months Client: Water and Power Development Authority Main project Features: Munda Dam site and its reservoir area is located in Swat River basin, about 5 km upstream of existing Munda Headworks at Abazai near Shabqadar Deri, in NWFP, 37 km north of Peshawar. Position Held: Senior Engineer Cost Estimation Activities Performed: • Progress Reports Management • Quantities calculation and Cost estimation. 3 of 10
  • 4. Muhammad Faisal Wattoo • Rate analysis. • Preparation of Bill of quantities. • Preparation of cost estimation report. • Preparation of Construction Planning Report. • Preparation of a Construction / implementation Schedules • Assistance in preparation of technical specifications for Civil works, Tender documents for contractors. Name of Assignment or Project & Location: Feasibility Study to increase the capacity of Sans Souci Dam in Mauritius Cost of Project: 4.711 Million USD (Radial Gates Option) Date of Start: February 2012 Date of Completion: June 2012 Actual Time Spent on the Project: 5 Months Client: Central Electricity Board, Republic of Mauritius Main project Features: It consists of a 35.5m high Rockfill Dam with Central Clay Core having crest Length of 350m, Power Tunnel 3000 m long, fully lined with inner diameter of 2,5 m, Surface powerhouse with 2 x 15 MW Francis turbines with horizontal axis with 66 kV Transmission Line. Position Held: Senior Engineer Costing and Construction Planning Activities Performed: • Preparation of a Detailed Construction / implementation Schedules and periodic updating. • Preparation of staffing schedule. • Cost estimation • Rate analysis Name of Assignment or Project & Location: Feasibility Study, Detailed Design and Tender Documents for Magwagwa Multipurpose Dam Development Project on Sondu River.(World Bank Funded), Nairobi, Kenya Cost of Project: 1,214 Million USD (Civil Works Portion) Date of Start: November 2011 Date of Completion: January 2012 Actual Time Spent on the Project: 3 Months Client: Ministry of Regional Development Authorities and the Lake Basin Development Authority of the Republic of Kenya. Main project Features: The Feasibility Study, Detailed Design and Tender Documents for Magwagwa Multipurpose Dam Development Project under the Ministry of Regional Development Authorities and the Lake Basin Development Authority of the Republic of Kenya. Position Held: Senior Engineer Costing, Construction Planning Activities Performed: • Cost estimation • Rate analysis • Comparison of unit rates with different hydropower projects around the world • Preparation of Bill of Quantities • Assistance in the preparation of Technical Specifications for Civil Works • Preparation of Construction schedule Name of Assignment or Project & Location: Feasibility Review, Tender Design and Tender Documents and Construction Supervision of 14MW Naltar – V Hydropower Project, Gilgit Baltistan Province Cost of Project:1,612 Million PKR Date of Start: May 2011 Date of Completion: November 2011 Actual Time Spent on the Project: 7 Months Client: Water and Power Department Northern Areas Gilgit, Government of Pakistan. Main project Features: The Feasibility study submitted in 2007 was concluded with the following design parameters of this project: • Design Capacity: 14.1 MW • Annual Energy: 85.16 GWh 4 of 10
  • 5. Muhammad Faisal Wattoo • Design Discharge: 5.4 m3/s • Gross Head: 332 m • Headrace canal Length: 450 m • Penstock Length: 4070 m • Type and Number of Turbine: Pelton, 3 Position Held: Senior Engineer Costing & Construction Planning Activities Performed: • Preparation of a Detailed Construction / implementation Schedule. • Preparation of Implementation and Contract Packaging and Construction Supervision and Quality Assurance / Control Plan report. • Preparation of a revised cost estimate. Name of Assignment or Project & Location: Technical Services and Dam Safety Consultancy for (i) Raising of Full Supply level of Corumana Dam Project, (ii) Ressano Garcia Weir for water supply and flow measurement, (iii) Metuchira Dam for water supply, (iv) Gorongosa Dam for water supply and small hydropower generation. (World Bank Funded), Maputo (Mozambique) Cost of Project: 52.3 Million USD, 9.6 Million USD, 4.9 Million USD, 5.7 Million USD respectively Date of Start: Sept. 2010 Date of Completion: December 2011 (Intermittent) Actual Time Spent on the Project: 5 Months Client: National Directorate of Water, Ministry of Public Works and Housing, Republic of Mozambique. Main project Features: (i) Corumana Dam Project having generation capacity of 14.5 MW is proposed to be raised to its full supply level. The main purpose for constructing the dam was to supply water for downstream irrigated agriculture while a secondary purpose was generation of hydroelectric energy (14.5 MW installed capacity). The National Directorate of Water commissioned this feasibility study (Basic Design) in order to investigate the economic viability of installing the gates and constructing the saddle dam and emergency spillway, thereby allowing the full supply level to be raised to el 117 masl and for the firm water yield and firm energy yield to be increased. (ii) Ressano Garcia measuring weir has a crump type crest, a compound weir with crests at multiple levels ranging from the lowest V notch set. A gauging tower is also provided to house the controls for the scouring gates, gauging equipment and the pump station required for water supply to Ressano Garcia. Scour gates have been provided to flush incoming sediment to minimise the possibility of silting of the outlets from the weir and intake. A fish ladder is also provided. A measuring weir is also provided to measure the flow through the fish ladder. (iii) Metuchira Dam: 3.5m high concrete dam with ogee shaped overflow Spillway. Basic purpose is to supply water to Metuchira Village. (iv) Gorongosa Dam: 5.24m high concrete dam with 55m wide ogee shaped overflow spillway. Basic purpose is to provide Water supply to Gorongosa Village and power supply to Pump station. Position Held: Senior Engineer Costing & Construction Planning Activities Performed: • Preparation of a Detailed Construction / implementation Schedule. • Preparation of Implementation and Contract Packaging and Construction Supervision and Quality Assurance / Control Plan report. • Preparation of a revised cost estimate. Name of Assignment or Project & Location: Updation of Feasibility Study and Preparation of Bidding Documents on EPC Contract Basis for Olympia Hydropower Project, Punjab Cost of Project: 28.8 Million USD Date of Start: April 2010 Date of Completion: March 2011 Actual Time Spent on the Project: 12 Months Client: Olympia Chemical Pvt. Ltd. Main project Features: Olympia Hydropower Project is a run of river hydropower project having generation capacity of 11 MW and proposed to be constructed on a link canal. Spillway having discharge capacity of 425 m3/sec and powerhouse will be 5 of 10
  • 6. Muhammad Faisal Wattoo constructed on a side channel. Our task is to update the feasibility report already prepared by another firm and to propose the alternative solutions. Position Held: Senior Engineer Contracts, Costing and Construction Planning Activities Performed: • Rate Analysis for different items of Civil Works. • Preparation of Bill of Quantities. • Preparation of Construction Schedule. • Preparation of Technical Specifications and Bidding Document on EPC Contract Basis. Name of Assignment or Project & Location: Feasibility Study of Shushghai-Zhendoli & Shogo-Sin Hydropower Project. (Asian Development Bank Funded), NWFP Cost of Project: 179 Million USD, 193.8 Million USD respectively Date of Start: January 2010 Date of Completion: April 2010 Actual Time Spent on the Project: 4 Months Client: Pakistan Private Infrastructure Board.(PPIB) Main project Features: The Shogo - Sin Hydropower Project is planned on Lutkho River about 0.5 km downstream of Shogho village in the area of Chitral region, central place Chitral located about 365 km from Peshawar. The purpose of the Project is to produce Electric Power of 131 MW. The reservoir length will be 700 m and area will be 74300 m2 . The Shushghai- Zhendoli Hydropower Project is planned on Turkho River in the area of Chitral region, central place Chitral located about 365 km from Peshawar. The purpose of the Project is to produce Electric Power of 144 MW. The reservoir length will be 636 m and area will be 5.7687 Hectares. Position Held: Senior Engineer Cost Estimation / Construction Planning Activities Performed: • Quantity estimation of weir and its appurtenant structures alongwith headrace tunnel, powerhouse and affiliated structures, all infrastructure facilities including power demand, water supply and drainage works for consultants and contractors camps and relative Cost estimation. • Rate Analysis for different items of Civil Works. • Preparation of Detailed Engineering Estimate. • Preparation of Bill of Quantities. • Preparation of Construction Schedule. • Planning of Access Tunnels & Access Roads for Construction Planning purposes. • Preparation of Drawings on AutoCad for Construction Planning Report. Name of Assignment or Project & Location: Feasibility Study, Detailed Engineering Design and Tender Documents of Kohala Hydropower Project, Azad Jammu & Kashmir AJK Cost of Project: 2,929 Million USD Date of Start: June 2008 Date of Completion: January 2010 Actual Time Spent on the Project: 20 Months Client: Water and Power Development Authority, Pakistan Main project Features: The project area of proposed Kohala Hydropower Project (KHPP) lies along the river Jhelum in Muzaffarabad district of Azad Jammu and Kashmir (AJK). Dam site is situated 8 km downstream of the Hattian Bala village, whereas it is 31 km upstream from the Domel Bridge. The Kohala hydropower project consists of dam 52m high, water conveyance system and underground powerhouse with 17 km twin headrace tunnels. Position Held: Senior Engineer Cost Estimation / Construction Planning / Contracts Activities Performed: • Quantity estimation of dam and its appurtenant structures along with headrace tunnel, powerhouse and affiliated structures and relative Cost estimation. • Quantity estimation for all infrastructure facilities including power supply, water and drainage facilities, colony roads etc • Preparation of Detailed Engineering Estimate. 6 of 10
  • 7. Muhammad Faisal Wattoo • Preparation of Bill of Quantities. • Phasing of Project cost into construction period. • Preparation of Project Planning & Scheduling Report. • Preparation of Tender Documents for Exploratory Adits at damsite and powerhouse area. • Preparation of Tender Documents for Civil Works of Kohala Hydropower Project and compilation of the Whole Lot of tender documents for submission to the Client. • Preparation of Structure drawings on AutoCad for Feasibility, Detailed Engineering Design & Tender Documents. Name of Assignment or Project & Location: Pre-Feasibility Study of Chor Nala & Spat Gah Hydropower Project Cost of Project: Date of Start: February 2007 Date of Completion: May 2008 Actual Time Spent on the Project: 16 Months Client: Punjab Irrigation Department Location: Kohistan NWFP Position Held: Junior Engineer Construction Planning / Cost Estimation / AutoCAD Design Engineer Activities Performed: • Preparation of Progress Reports, Work and Time Schedules and relative estimation of the prepared schedules. • Assistance in Design of Retaining walls and other structure features. • Socio – Economic Survey Data entry for the Palas valley – Spat Gah HPP. • Preparation and Digitization of Geological Maps on AutoCAD. • Preparation of profiles and Geological-Cross Sections for various locations of dam sites. Name of Assignment or Project & Location: Review of Feasibility Study, Detailed Engineering Design and Tender Documents of Diamer Bhasha Dam Project, Kohistan NWFP Cost of Project: 12 Billion USD (2007) Date of Start: April 2006 Date of Completion: February 2007 Actual Time Spent on the Project: 11 Months Client: WAPDA Main project Features: The Diamer Basha Dam Project (4,500MW) is located on the Indus River. The project foresees the construction of a 272 m high concrete gravity dam and two large underground power schemes located in either flank of the Indus River each with an installed capacity of 2,250 MW. Estimated Cost (YEAR 2008) was US$12 Billion. Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer Activities Performed: • Assistance in Quantity Estimation of Dam and Appurtenant Structures like Diversion Tunnels & Canal, Headrace & Tailrace Tunnels, Surge tanks, Manifolds, Powerhouse and related features, infrastructure works including water supply and drainage facilities, colony roads etc. • Sizing of Powerhouse. • Preparation of Structure Drawings as AutoCAD Design Engineer. • Preparation of Dam Area, Volume Capacity Curves. Name of Assignment or Project & Location: Feasibility Study, Detailed Engineering Design and Tender Documents of Khokhra and LBDC Hydropower Projects, Punjab Cost of Project: 247.7 Million PKR, 497 Million PKR respectively Date of Start: June 2004 Date of Completion: April 2006 Actual Time Spent on the Project: 23 Months Client: Punjab Irrigation and Power Department Main project Features: • 3.2 MW Khokhra Hydropower Project on Gujrat Branch RD0+000 off taking from Upper Jhelum Canal RD 7 of 10
  • 8. Muhammad Faisal Wattoo 245+500. The purpose of the Hydropower Project is to utilize the power potential available on Gujrat Branch of Upper Jhelum Canal (UJC), and thus provide cheaper and most needed power, keeping in view, the present and further requirements of Punjab. • 4.8MW LBDC Hydropower Project, has been conceived by utilizing flows of Lower Bari Doab Canal available at RD 329+058 and head available at falls at RD 329+058 and RD 340+850, by combining the both falls. Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer Activities Performed: • Quantity Estimation of the respective Hydropower Station including, Head race, Tail race, Chillianwala Distributary, Powerhouse, Intake and off take, Power channels, Retaining walls. • Assistance in Progress Reports Management. • Assistance in Preparation of Feasibility Reports. • Assistance in Preparation of Detailed Engineering Drawings. • Assistance in Preparation of Tender Documents, Tender and Construction Drawings. • Assistance in Preparation of Technical Specifications (Civil Works) and BOQ’s. • Assistance in Preparation of PC-1. • Assistance in the Evaluation of Contractors. • Data Collection from the Canal sites for Hydrology Report, Design Reports and Environmental Impact Assessment Reports. Name of Assignment or Project & Location: Feasibility Study and Detailed Engineering Design of Kurram Tangi Dam Project, NWFP Cost of Project: 17,205 Million PKR Date of Start: April 2003 Date of Completion: June 2004 Actual Time Spent on the Project: 15 Months Client: WAPDA Main project Features: Concrete face rock filled Dam. Consists of five Power houses which will be generated 83.4 mw electricity. The command area of the Project is 362,380 acres. The Project is located on Kurram River in North Waziristan agency. The location of Dam is 14 Kilometer upstream from Kurram Ghari Head Works Position Held: Junior Engineer Cost Estimation / AutoCAD Design Engineer / Documentation Engineer / Environmental Engineer Activities Performed: • Quantity Estimation (Dam, Power Tunnels, Stilling Basin, Silt Excluder, Spillway, Cofferdams, Powerhouses, infrastructure works including colony roads, water supply and drainage facilities, power demand etc). • Assistance in Preparation of Structure Drawings. • Management of Irrigation Profiles & Cross-Sections of Spaira Ragha and Sheratalla canals. • Assistance in Preparation of BOQ. • Assistance in Progress Reports Management. • Assistance in Design of Spillway, Culverts and Retaining walls • Assistance in Report management i.e Environmental Impact Assessment & Resettlement Action Plan Studies and Feasibility Report. Name of Assignment or Project & Location: Construction of Royal Palm Golf & Country Club, Punjab Cost of Project: 3.0 Billion PKR (2002) Date of Start: May 2002 March 2003 Actual Time Spent on the Project: 12 Months Client: Maxcorp Malaysia Main Project Features: Golf club comprising area of 144 acres, including spacious golf course, multistory building carrying within itself restaurant, banquet hall, saloon, rest rooms, swimming pools, etc Position Held: Junior Engineer Cost Estimation / Site Engineer / Documentation Engineer / Procurement Engineer Activities Performed: • PM’s Coordinator, Site Engineer’s Coordinator 8 of 10
  • 9. Muhammad Faisal Wattoo • Site Inspector • Procurement Engineer • Planning Engineer • Concreting supervisor and management of excavation, foundation treatment, preparation of footings of columns about 180 in total, floor and roof treatment, dpc, retaining walls formwork, walls erection, inspection and pouring of roof slabs of multi storey buildings and the relative procurement of the materials required and quantity estimation of the works. It also included my coordination with the Malaysian team during inspections. • Checking of Bar bending schedules. • Quality assurance and control. • Progress Reports Management, Inspection Requests & Coordination with client & consultant. 9 of 10
  • 10. Muhammad Faisal Wattoo 13. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. _________________________________________________________ Date: 09-07-2015 [Signature of Staff Member or Authorized Representative of the staff] Day/Month/Year 10 of 10