Project : SOHAR REFINERIES IMPROVEMENT PROJECT.
Period : 13th SEPT.2015 to till date.
Nature of Project
The refinery was originally constructed and commissioned in 2006 and ORPIC is now investing in
improvements at the site to enhance the current production capacity. When complete, it is anticipated
that the revamped facility will increase current output by more than 70%
Responsibilities
 Execution of installation activities for transformers, MV and LV switchgear,control
panel, cable tray, cables laying,glanding termination etc.
 Ensure the quality of work is in compliance with contract requirements, good practice
and only approved materials are used.
 Review of contractor submittals related method statements, project quality
plan,safety plan, schedules and compliance with Project objective.
 Attend weekely meeting with dicipline manager and plan for the next week activities.
CAREER OBJECTIVES
To obtain a challenging management, technical position as deemed suitable to my skills and experience to
help a successful organization to expand further and to help myself grow further professionally, technically,
and financially. I gained practical work experience in Engineering, covering a wide range of commissioning
and execution activities in oil/gas, power plant & Refineries project.
Work History & Experience:
Years of Work Experience: 21 Years
A review of my credentials will confirm that I have over 21 years of execution and
commissioning experience including EPC as Senior Supervisor Electrical, co-ordination and
execution of duties with clients as per their specification and requirements in OIL/GAS, Power plant &
Refinery projects.
Team Management and Human Resource Management complimented with PG Diploma in Travel and
Tour Management, Certificate in Computer Operations, ISO 9001:2000 Internal Auditor Certification and
National Stock Exchange certification in Capital Markets, Derivatives. Over 9 + years of
experience
2
Most Recent Employment
Employer : PETROFAC INTERNATIONAL
Owner : TURKMEN GAS
Position : SENIOR SUPERVISOR ELECTRICAL
Project : GAS FIELD DEVELOPMENT PLANT PROJECT.
Period : 11th APRIL.2012 to 8T H AUGUST. 2015
Nature of Project
This gas treatment plant at the field is capable of processing 10 billion cubic meters of gas per year. The
feed gas from the field contains up to 6% H2S, and the development includes gas treatment and
sulpher handling facilities, along with well pad facilities, gathering facilities, infrastructure and utilities,
condensate processing storage and 100 kilometers of 56” export pipelines
Responsibilities
 Execution the installation activities for transformers, MV and LV switchgear,control
panel, cable tray, cables laying,glanding termination etc.
 Ensure the quality of work is in compliance with contract requirements, good practice
and only approved materials are used.
 Attend weekely meeting with dicipline manager and plan for the next week activities.
Supervise and monitor the work of subcontractors to complete the work as per the
customers satisfaction.
 Execute the installation activities and conformance with design & Specification
To anticipate the problems, find solution, discuss with manager and inform the subcontractor
Follow up the activities related to electrical matters and ensure compliance with project
specifications.
 Involve the commissioning activities of LV panels, Heat tracing system, Oxygen and Nitrogen Plant
Previous Employed Position
Employer : Hyundai Heavy Industries Co. (HHI)
Project coordinator : GE INTERNATIONAL INC.
Owner : MEW (Ministry of Electricity and Water)
Position : Electrical Engineer
Project : SABIYA CCGT power plant project, Sabiya, Kuwait.
Period : 26th August.2010 to 25th MARCH-2012
Nature of Project
A CCGT project with 2022 MW output with 6 units of gas turbine generators having capacity 206MW
each combined with 3 no’s of steam turbine generators with capacity of 262 MW, and 6 units of HRSG
having a capacity 424T/unit associated with 400KV,4000A ,SF6 – two bus one breaker type GIS.
3
Responsibilities
 Assisting & coordinating with QC inspection team. (Transformer & switchgear).
 Cable termination in charge in power block 1&3
 Organizing the support staffs for supervision of site activities, administration &document control.
 Formulating long term & day to day plans for the project.
 Assisting commissioning activities of DC/AC UPS system in GIS area.
 Ensuring accuracy of work as per approved drawings, method and documents.
 Check the quality of work as per approved shop drawing, method statement, progress and program.
 Forecasting manpower, equipment, materials and other requirements.
 Monitoring and follow up electrical subcontractor's works and supplies.
 Strict implement of construction program.
 Ensuring that the latest drawings and approved materials are used at site.
 Safety of the worker and control safety regular.
 Ensuring co-ordination among various department and with appointed specialized subcontractors.
 Attending site management meetings with the Project Manager to discuss possible electrical systems and
progress schedule.
 Preparation of daily progress reports.
 Attending queries of electrical construction staff and providing them solution.
Previous Employed Position
Employer : Hyundai Heavy Industries Co. (HHI)
Owner : Kuwait Oil Company
Position : Electrical Engineer
Project : Crude Oil Export Facilities, Kuwait.
Period : 26th August.2007 to 20th July-2010
Nature of Project
The Crude Oil Export Facilities Project as one of the largest contract in the oil sector of the State of
Kuwait as well as the Gulf area to install new storage tanks operating capacity of 11.4 million barrels,
gravity lines, metering systems, offshore pipelines, CALM buoys, and upgrade and modify existing CALM
buoys, etc.
Responsibilities
 Execute the installation activities and conformance with design and equipment
specification and safety standards.
 To anticipate the problems,find solution, discuss with manager and inform the
subcontractor.
 Deep anode ground bed installations, including casing Pipe, support pipe &
Installation of MMO tubular anode.
 MMO ribbon anode & Titanium conductor bar Installation & Spot welding for Tank
External Bottom Plate CP system.
 Cable laying, termination and precommissioning activities for the crude oil tank
dewatering system
 Follow up the activities related to electrical matters and ensure compliance with
project specifications and with the requirements of the project specification.
 Make the asbuilt drawings and make sure that all site conditions are properly
addressed
4
Previous Employed Position
Employer : Daelim International Company.
Client : Kuwait Oil Company
Duration : 3rd August 2005 to 24th June 2007
Designation : Electrical Engineer.
Project : Effluent Water Disposal Plant -Kuwait
Nature of Project
Collect Effluent water from Gathering Centers through Pipelines to EWDP, Filter Oil and water and it is
disposed to wells.
Responsibilities
 Panel erection and alignment work of the same.
 Power and control cable, granting & termination and feruling the same.
 Testing of MCC panels.
 Coordination with Client for getting approval.
 Monitoring the resource management.
 Preparation of daily progress reports.
 Co-ordination with clients and third party inspection agency.
 Day to day coordination with subcontractors Co-ordinate with project planning, monitoring and
manpower control.
 Generating documents such as Material Take off, Project Schedule.
 Studying of all documents and Drawing including SLD & LAYOUT which are necessary for project
execution.
 Assisting Testing & commissioning of Insulated Phase Bus Duct (IPB).
Projects Handled
Employer : Aar Gee Constructors (I) Pvt. Ltd.
Duration : 10th Jan 2000 to 21st July 2005
Designation : SITE IN CHARGE.
Major Projects
 Reliance Info COM Mumbai, India
 Metallurgical Products (I) Ltd, Mumbai India
 Cipla Pharmaceuticals Ltd., Maharashtra India
 National Aluminum Company Orissa, India
Responsibilities
 Installation of electric panels in main control room.
 Direction of works as per the drawings and methods.
 Co-ordinate with project planning, monitoring and manpower control.
 Estimation of Project tools & tackles consumables and other resources.
 Day to day coordination with subcontractors.
 Preparation of daily progress reports.
5
Projects Handled
Organization : Fujairah National construction (FNC) LLC Dubai
Designation : ELECTRICAL SUPERVISOR
Duration : 3rd Oct 1998 to 28th Dec 1999
Responsibilities
 Completing the internal wiring of Electrical Panel, its installation & termination of cables of various
sites.
 Installation of panels, Cable pulling &termination.
 Managing manpower & preparing Daily progress report.
 Discussion with clients & implements as per their requirement.
 Approval of drawing from client.
 Arranging the materials as per the site requirements.
Projects Handled
Employer : TENCHNIMONT ICB LTD.
Duration : 15th July 1994 to 24th Sept 2008
Designation : SITE ENGINEER.
Major Projects
 Larson & Toubro Limited, Group II GTFB, Captive Power Plant 2 x 23 for L&T
Cement Maharashtra, India
 Bharat Shell Mumbai, India for Lube Oil Blending Plant
 M/s National Rayon Corporation Ltd for New Caustic Soda Plant in Mumbai
India
 ITC Bhadrachalam Expansion Project
Responsibilities
 Direct Supervise and coordinate the shut down activities with planning section
during tie-ups with existing system
 HT Switch gear with Double Bus bar system installation
 Installation of 11 KV Bus duct from transformer to switch gear
 Installation of 30 MVA, 11 KV/6.6 KV Transformers
 Laying and Termination HT cables through Trenches
 Complete cable tray, cable laying activities
 Lighting for belt conveyors, transfer tower, Boiler, ESP system etc
 Entire earthing and lightning protection system of the Plant
 Heat tracing and Heater control panel installation
 Installation of 4 Pole Structure for 22 KV systems
 assisting with Field engineering Group and Quality Control department
6
Computer Proficiency
 Working knowledge in AUTOCAD,
 MS office
 Platforms: Windows 8.1
Personal Details
Father’s Name : K Chandu
Date of birth : 03rd September 1974
Nationality : Indian
Gender : Male
Marital Status : Married
Languages Known : English, Hindi, Tamil and Malayalam
Permanent Address :Koyili House,
KanhirodePO,Kodali
Kannur (Dt), Kerala, INDIA, Pin 670591
Contact Details : Ph- +968 94743371, Mob: +91-8547353638
Passport Details
Number : J 5551707
Place of Issue : Kozhikode
Date of Expiry : 26/06/2021
The above mentioned details are correct to the best of my knowledge.
Ranjith Koyili

Ranjith cv

  • 1.
    1 RANJITH KOYILI CURRICULUM VITAEkoyili23@yahoo.co.in Born – 3rd Sept, 1974. Phone: +968-94743371, +91-8547353638 (IND) Present Employer Employer : PETROFAC INTERNATIONAL Owner : OMAN REFINERIES AND PETROCHEMICALS INDUSTRIES CO. Position : SENIOR SUPERVISOR ELECTRICAL Project : SOHAR REFINERIES IMPROVEMENT PROJECT. Period : 13th SEPT.2015 to till date. Nature of Project The refinery was originally constructed and commissioned in 2006 and ORPIC is now investing in improvements at the site to enhance the current production capacity. When complete, it is anticipated that the revamped facility will increase current output by more than 70% Responsibilities  Execution of installation activities for transformers, MV and LV switchgear,control panel, cable tray, cables laying,glanding termination etc.  Ensure the quality of work is in compliance with contract requirements, good practice and only approved materials are used.  Review of contractor submittals related method statements, project quality plan,safety plan, schedules and compliance with Project objective.  Attend weekely meeting with dicipline manager and plan for the next week activities. CAREER OBJECTIVES To obtain a challenging management, technical position as deemed suitable to my skills and experience to help a successful organization to expand further and to help myself grow further professionally, technically, and financially. I gained practical work experience in Engineering, covering a wide range of commissioning and execution activities in oil/gas, power plant & Refineries project. Work History & Experience: Years of Work Experience: 21 Years A review of my credentials will confirm that I have over 21 years of execution and commissioning experience including EPC as Senior Supervisor Electrical, co-ordination and execution of duties with clients as per their specification and requirements in OIL/GAS, Power plant & Refinery projects. Team Management and Human Resource Management complimented with PG Diploma in Travel and Tour Management, Certificate in Computer Operations, ISO 9001:2000 Internal Auditor Certification and National Stock Exchange certification in Capital Markets, Derivatives. Over 9 + years of experience
  • 2.
    2 Most Recent Employment Employer: PETROFAC INTERNATIONAL Owner : TURKMEN GAS Position : SENIOR SUPERVISOR ELECTRICAL Project : GAS FIELD DEVELOPMENT PLANT PROJECT. Period : 11th APRIL.2012 to 8T H AUGUST. 2015 Nature of Project This gas treatment plant at the field is capable of processing 10 billion cubic meters of gas per year. The feed gas from the field contains up to 6% H2S, and the development includes gas treatment and sulpher handling facilities, along with well pad facilities, gathering facilities, infrastructure and utilities, condensate processing storage and 100 kilometers of 56” export pipelines Responsibilities  Execution the installation activities for transformers, MV and LV switchgear,control panel, cable tray, cables laying,glanding termination etc.  Ensure the quality of work is in compliance with contract requirements, good practice and only approved materials are used.  Attend weekely meeting with dicipline manager and plan for the next week activities. Supervise and monitor the work of subcontractors to complete the work as per the customers satisfaction.  Execute the installation activities and conformance with design & Specification To anticipate the problems, find solution, discuss with manager and inform the subcontractor Follow up the activities related to electrical matters and ensure compliance with project specifications.  Involve the commissioning activities of LV panels, Heat tracing system, Oxygen and Nitrogen Plant Previous Employed Position Employer : Hyundai Heavy Industries Co. (HHI) Project coordinator : GE INTERNATIONAL INC. Owner : MEW (Ministry of Electricity and Water) Position : Electrical Engineer Project : SABIYA CCGT power plant project, Sabiya, Kuwait. Period : 26th August.2010 to 25th MARCH-2012 Nature of Project A CCGT project with 2022 MW output with 6 units of gas turbine generators having capacity 206MW each combined with 3 no’s of steam turbine generators with capacity of 262 MW, and 6 units of HRSG having a capacity 424T/unit associated with 400KV,4000A ,SF6 – two bus one breaker type GIS.
  • 3.
    3 Responsibilities  Assisting &coordinating with QC inspection team. (Transformer & switchgear).  Cable termination in charge in power block 1&3  Organizing the support staffs for supervision of site activities, administration &document control.  Formulating long term & day to day plans for the project.  Assisting commissioning activities of DC/AC UPS system in GIS area.  Ensuring accuracy of work as per approved drawings, method and documents.  Check the quality of work as per approved shop drawing, method statement, progress and program.  Forecasting manpower, equipment, materials and other requirements.  Monitoring and follow up electrical subcontractor's works and supplies.  Strict implement of construction program.  Ensuring that the latest drawings and approved materials are used at site.  Safety of the worker and control safety regular.  Ensuring co-ordination among various department and with appointed specialized subcontractors.  Attending site management meetings with the Project Manager to discuss possible electrical systems and progress schedule.  Preparation of daily progress reports.  Attending queries of electrical construction staff and providing them solution. Previous Employed Position Employer : Hyundai Heavy Industries Co. (HHI) Owner : Kuwait Oil Company Position : Electrical Engineer Project : Crude Oil Export Facilities, Kuwait. Period : 26th August.2007 to 20th July-2010 Nature of Project The Crude Oil Export Facilities Project as one of the largest contract in the oil sector of the State of Kuwait as well as the Gulf area to install new storage tanks operating capacity of 11.4 million barrels, gravity lines, metering systems, offshore pipelines, CALM buoys, and upgrade and modify existing CALM buoys, etc. Responsibilities  Execute the installation activities and conformance with design and equipment specification and safety standards.  To anticipate the problems,find solution, discuss with manager and inform the subcontractor.  Deep anode ground bed installations, including casing Pipe, support pipe & Installation of MMO tubular anode.  MMO ribbon anode & Titanium conductor bar Installation & Spot welding for Tank External Bottom Plate CP system.  Cable laying, termination and precommissioning activities for the crude oil tank dewatering system  Follow up the activities related to electrical matters and ensure compliance with project specifications and with the requirements of the project specification.  Make the asbuilt drawings and make sure that all site conditions are properly addressed
  • 4.
    4 Previous Employed Position Employer: Daelim International Company. Client : Kuwait Oil Company Duration : 3rd August 2005 to 24th June 2007 Designation : Electrical Engineer. Project : Effluent Water Disposal Plant -Kuwait Nature of Project Collect Effluent water from Gathering Centers through Pipelines to EWDP, Filter Oil and water and it is disposed to wells. Responsibilities  Panel erection and alignment work of the same.  Power and control cable, granting & termination and feruling the same.  Testing of MCC panels.  Coordination with Client for getting approval.  Monitoring the resource management.  Preparation of daily progress reports.  Co-ordination with clients and third party inspection agency.  Day to day coordination with subcontractors Co-ordinate with project planning, monitoring and manpower control.  Generating documents such as Material Take off, Project Schedule.  Studying of all documents and Drawing including SLD & LAYOUT which are necessary for project execution.  Assisting Testing & commissioning of Insulated Phase Bus Duct (IPB). Projects Handled Employer : Aar Gee Constructors (I) Pvt. Ltd. Duration : 10th Jan 2000 to 21st July 2005 Designation : SITE IN CHARGE. Major Projects  Reliance Info COM Mumbai, India  Metallurgical Products (I) Ltd, Mumbai India  Cipla Pharmaceuticals Ltd., Maharashtra India  National Aluminum Company Orissa, India Responsibilities  Installation of electric panels in main control room.  Direction of works as per the drawings and methods.  Co-ordinate with project planning, monitoring and manpower control.  Estimation of Project tools & tackles consumables and other resources.  Day to day coordination with subcontractors.  Preparation of daily progress reports.
  • 5.
    5 Projects Handled Organization :Fujairah National construction (FNC) LLC Dubai Designation : ELECTRICAL SUPERVISOR Duration : 3rd Oct 1998 to 28th Dec 1999 Responsibilities  Completing the internal wiring of Electrical Panel, its installation & termination of cables of various sites.  Installation of panels, Cable pulling &termination.  Managing manpower & preparing Daily progress report.  Discussion with clients & implements as per their requirement.  Approval of drawing from client.  Arranging the materials as per the site requirements. Projects Handled Employer : TENCHNIMONT ICB LTD. Duration : 15th July 1994 to 24th Sept 2008 Designation : SITE ENGINEER. Major Projects  Larson & Toubro Limited, Group II GTFB, Captive Power Plant 2 x 23 for L&T Cement Maharashtra, India  Bharat Shell Mumbai, India for Lube Oil Blending Plant  M/s National Rayon Corporation Ltd for New Caustic Soda Plant in Mumbai India  ITC Bhadrachalam Expansion Project Responsibilities  Direct Supervise and coordinate the shut down activities with planning section during tie-ups with existing system  HT Switch gear with Double Bus bar system installation  Installation of 11 KV Bus duct from transformer to switch gear  Installation of 30 MVA, 11 KV/6.6 KV Transformers  Laying and Termination HT cables through Trenches  Complete cable tray, cable laying activities  Lighting for belt conveyors, transfer tower, Boiler, ESP system etc  Entire earthing and lightning protection system of the Plant  Heat tracing and Heater control panel installation  Installation of 4 Pole Structure for 22 KV systems  assisting with Field engineering Group and Quality Control department
  • 6.
    6 Computer Proficiency  Workingknowledge in AUTOCAD,  MS office  Platforms: Windows 8.1 Personal Details Father’s Name : K Chandu Date of birth : 03rd September 1974 Nationality : Indian Gender : Male Marital Status : Married Languages Known : English, Hindi, Tamil and Malayalam Permanent Address :Koyili House, KanhirodePO,Kodali Kannur (Dt), Kerala, INDIA, Pin 670591 Contact Details : Ph- +968 94743371, Mob: +91-8547353638 Passport Details Number : J 5551707 Place of Issue : Kozhikode Date of Expiry : 26/06/2021 The above mentioned details are correct to the best of my knowledge. Ranjith Koyili