1. `
Noman Qudrat
Sr.Electrical Engineer
House No.12 Street #08 H-Block Soan Garden Islamabad
Email: nomanqudrat@yahoo.com
Email: nomanqudrat@hotmail.com
Cell: +92334-5271408
+92336-5597642
Passport No: BQ4421401
Objective:
Looking forward to an organization that offers a challenging, stimulating, learning environment
to work in and provide scope for individual development, which offers attractive prospect for
long-term personal development and career growth.
Skills:
• Team Management & Team Player.
• Strong interpersonal and leadership skills.
• Fluency in English language both written and spoken.
• HSE Awareness.
• Drawing Rev
• Project Biding experience
• Overall Lightning protection System design Uch-II Gas Field
• Lighting design in overall all Engro LNG project.
Work Summary:
Having more than 5-years of experience as an E&I Engineer in oil and gas Onshore & Offshore
projects.
2. `
Organization: Zealcon Engineering PVT LTD
Designation: Sr.Electrical Engineer
Bukhari Amine Project-Green Field UNITED ENERGY OF PAKISAN
• Supervision of installation testing & commissioning E- House (Power Generation)
• Supervision of installation testing & commissioning ESV, BDVs, Control Valves
• Supervision of installation testing & commissioning House (BOP)
• Supervision of installation testing & commissioning Amine Plant (Spartan)
Organization: Zealcon Engineerin (Pvt) Ltd
Designation: Sr.Electrical Engineer
Working on wellhead of MOL PAKISTAN OIL & GAS CO. B.V
• Maramzai-3
• Mokori East-4
Organization: Zealcon Engineering PVT LTD
Designation: Sr.Electrical Engineer
Namit Gas Field Phase 5B&A 160MMCFD
• Supervision of testing and commissioning of Gas Generator
• Supervision of testing and commissioning of Auxiliary panel
• Supervision of testing and commissioning of UCP & NER panel
• Supervision testing and commissioning of LV Panel
• Testing of MV/LV cables
• Supervision of testing and commissioning of instrument ( LIT,TIT,PDIT,PI,TI,CV,SV,PSV,)
3. `
Organization: Zealcon Engineering PVT LTD
Designation: Site Incharge E&I
Engro offshore LNG Project Port Qasim Karachi(Pakistan)(400MMCFD)
• Testing & commissioning of MLA(Marine Loading Arm)(Asia 1st
& world 3rd
Heaviest MLA)
• Installation Termination testing of offshore Communication panel
• Termination testing & commissioning of QRH panel.
• Termination testing & commissioning of SSL panel.
• Termination testing & commissioning of Gangway.
Organization: Zealcon Engineering PVT LTD
Designation: Sr.Project E&I Engineer
UCH Power Plant dara murad jamali 560MV Sales Gas Metering skid
• Supervision of testing and commissioning of Control Panel
• Supervision testing and commissioning of MV panel
• Supervision testing and commissioning of 15 MW power turbines
• Supervision testing and commissioning of LV Panel
• Supervision testing and commissioning of ABB Transformer
• Testing of MV/LV cables
• Supervision testing commissioning of MOTORS and turbines MOTOR
Organization: Zealcon Engineering PVT LTD
Designation: Sr.Project E&I Engineer
OGDCL UCH GAS-II Project GAS PLANT FACILITY PROJECT(300MMFCD)
• Supervision of testing and commissioning of Control Panel
• Supervision testing and commissioning of MV panel
4. `
• Supervision testing and commissioning of 15 MW power turbines
• Supervision testing and commissioning of LV Panel
• Supervision testing and commissioning of ABB Transformer
• Testing of MV/LV cables
• Supervision testing commissioning of MOTORS and turbines MOTOR
• Design of lightning protection system of over Plant Area
• Cold loop & Hot loop testing
• Testing & Commission of motor & lean Amine pumps
• Supervisor of all testing & Commission activities
Organization: Flowtronix(Pvt) Ltd
Designation: Project E&I Engineer
Working on wellhead of MOL PAKISTAN OIL & GAS CO. B.V.
• Maramzai-2
• Mamikhel-2
• Makori East-2
• Makori East-3
Responsibilities at SITE as a E&I Engineer:
Supervision and installation inspection and commissioning of all listed below instruments and control
panel
• Solar Panel.
• (WHCP) Wellhead Control Panel.
• FDI, GDP, GDR, GDT, MACC, CCTV, ESD, IDP ,I phone JB.
• Working on emergency basics of 1st
Gas inn.
• Termination& Installation of RTU Panel.
• Calibration of PI, TT, PT PSV, TI.
• FOC(fiber optic cable)
Organization: Flowtronix(Pvt) Ltd
5. `
Designation: Project E&I Engineer
Working on caterpillar Genset C3516 (1600KW)
Supervision and installation inspection and commissioning of all listed below Panel
• Supervision testing and commissioning of MV panel
• Supervision testing and commissioning of LV Panel
• Supervision testing and commissioning of ABB Transformer
• LT(Power Panel)
• Terberg Panel
Organization: Flowtronix(Pvt) Ltd
Designation: Project E&I Engineer.
• OGDCL Dakhni Expansion Project (Sulphar Recovery Unit) &
(Pellatizing Unit) at Dakhni Field Disst Attock.
Industrical Automation using PLC&SCADA
COMSATS Institute of Information Technology, Islamabad
• DCS
• PLC Functionality
• Types and features of SCADA
• Scada Architecture
• Analog and digital I/O field devices
• Remote terminal unit(RTU)
• Master terminal unit(MTU)
• MMI & HMI
• Data Acquisition
• Components of PLC
• Ladder Logic
• Counter & timer
• HMI open control
6. `
• Open control Architecture
• Installation of open control
• Open graph
Responsibilities in DESIGN OFFICE:
Boq, specifications & contract making:
Worked as Contracts Engineer in Design office on different on-going projects and have helped/formed B
OQS, Loop drawings, datasheets, hookup, cable routing layout, cause &effect diagram, Termination
drawings, cable block diagrams etc.
Responsibilities at SITE as E&I Engineer:
As an E&I Engineer, following are my responsibilities:
• Managing all aspects of instrumentation projects including control strategies, P&ID’s
(Piping and Instrumentation Diagram), logic diagrams, design and installation, final
check of instrumentation selection, testing and maintenance.
• Detailed Engineering Design documents packages, Request for Quotation (RFQ)/Tender
Documents, Man hours Calculation.
• Developing various documents such as specifications, datasheets, cable schedules,
various layouts, Bill of Quantities (BOQ’s), hookup drawings, Cause & Effect matrix,
control philosophy etc
• Preparing specification for Control system (DCS / PLC / Loop Controllers), Metering
Skids, Compressor Instrumentation, Fire and Gas system (F&G), control valves, field
instruments etc
• Technical and Commercial correspondence throughout the period of tender enquiry and
procurement of Instrument Items.
• Working knowledge and experience in oil & gas industry codes, specifications and
practices (API, NFPA, IEC, BS,IEEE etc.)
• Inspection and site supervision for Instrumentation construction works which includes
testing, installation and commissioning of Instruments and Control System.
• Supervision of MCCS termination testing &commissioning works
• Supervision of motor testing and termination works
• Supervision of DCS interfacing with MCC works
• Supervision of building electrification work as per drawing
• Supervision of road lighting and skid lighting works
7. `
• Supervision of Motor Megger test
• Commissioning and pre-commissioning of electrical motors
• Supervision of Electrical and instrument Earthing works
• Supervision of UPS installation
• Supervision of Inst. Installation, Inst cable laying, conduit installation, JB installation,
Hook up installation, inspection, calibration, loop checking, site acceptance test, punch
list clearance system sign off, site modification as required at site condition, discuss &
finalize with clients changes required at site, finalizing FCN. Co-ordination with vendor
representative for special Inst./system checking/commissioning. ESD/F&G system
modification/ start up loop by loop transfer. Co-ordination with client kick off meeting,
monthly progress review meeting, close out report hand over as built
documents/drawings, survey changes, field changes / spares etc.
• Project Engineering, Design activities like preparation of systems and Instrument
Specification, control schematics, Inst. Stds., Function schematics, cable schedule, logic
diagram, control room, field inst. Layouts, MTOs, Technical Bid analysis, Inspection,
familiarity with international codes & stds., Hazardous area equipment & practices, cost
estimation.
• Working experience on Honeywell DCS system, Siemens DCS system, Yokogawa DCS
System
Technical Assistance and Liaison:
Worked as communicator between Contractor and client and at any stage of work if contractor n
eed any help regarding any point of technical specification i.e. modification in design needed as
per site requirement and any coordination whatsoever needed to optimize the work pace. A Liais
on person at site and was able to run a good working relation with all the stakeholders and have a
chieved project goals in time.
Organization: OGDCL . Aug, 2010 to Dec, 2010
Designation: Trainee E & I Engineer
During my period in OGDCL, I have been involved in following Projects.
8. `
Education:
BS Electronics & comm Engineering 4-Years with 3.08 CGPA from University of LAHORE.
H.S.C (Pre Engineering) in 2007 from . F.B.I.S.E ISB.
S.S.C (Science) in 2005 from R.W.P.B.I.S.E ISB.
D.O.B: 10/10/1989
Computer Skills:
• Well versed in using MS Office, Internet Browsing, AutoCAD and MS Project.
Achievements:
• Project completed appreciation letter from client (OGDCL).
• Project completed appreciation letter from client (Engro LNG)First time in Pakistan.
• Project completed appreciation award from client (United Energy of Pakistan).