This document is an resume for Ankit Agarwal, an electrical engineer seeking project management roles. It summarizes his 10 years of experience managing electrical and metro projects, including his current role managing the power supply and SCADA systems for the Navi Mumbai Metro Line 1 project. It also lists his core competencies and details his professional experience with various companies, highlighting projects he has successfully executed.
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
I possess over 24 years of rich experience in Project Management, Detail Engineering, Planning, Construction, Pre-commissioning, Commissioning, Operations and Maintenance of HVAC System, Oil & Gas /Power Plant / Refinery / Gas Power Plant / GIS / Transmission and Distribution Line from 11 KV to 400 KV /Process Plants, Upgrading of Electrical HV/MV/LV & HVAC Systems. I have successfully completed B.Tech. (Electrical Engineering) and Diploma in Electrical & Instrumentation Engineering.
Balanced Three-Phase Grid Supply for Traction PowerKarl Berger, P.E.
Proposed technology for balancing the single-phase traction power on the three-phase grid. Benefits include the elimination of phase-breaks and isolation of traction power harmonics from the grid supply.
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
I possess over 24 years of rich experience in Project Management, Detail Engineering, Planning, Construction, Pre-commissioning, Commissioning, Operations and Maintenance of HVAC System, Oil & Gas /Power Plant / Refinery / Gas Power Plant / GIS / Transmission and Distribution Line from 11 KV to 400 KV /Process Plants, Upgrading of Electrical HV/MV/LV & HVAC Systems. I have successfully completed B.Tech. (Electrical Engineering) and Diploma in Electrical & Instrumentation Engineering.
Balanced Three-Phase Grid Supply for Traction PowerKarl Berger, P.E.
Proposed technology for balancing the single-phase traction power on the three-phase grid. Benefits include the elimination of phase-breaks and isolation of traction power harmonics from the grid supply.
ELAAU, Dankuni executed on very fast track by RVNLRajesh Prasad
Electric Loco Assembly and Ancillary unit of CLW at Dankuni has been implemented on a very fast track by RVNL and the aim is to augument production capacity of Electric Locos in Indian Railways. The project was implemented by the team of CPM M RVNL Kolkata- Rajesh Prasad and this coffee table book has been conceived and concluded by him only.
Implementation of Structural Health Monitoring System for live monitoring of ...Rajesh Prasad
For monitoring of structural health of cable stayed bridge constructed recently at Barddhaman, 6 (six) Nos. of sensors have been installed on the stay cables which are subjected to maximum loads. The ROBO control system of M/s Mageba has been used for the said purpose. The structural monitoring system can issue along with notifications based on the measurements on structure instrumentation with pre-defined threshold values. The alarm criteria can be configured on the structural design of the bridge and as per the requirement of the site. In this paper/presentation, effort has been made to highlight the bridge structural health monitoring system along with their integration, description of the management principle, system over view, software programming, assembling of ROBO control monitoring system along with web interface installation, web interface manual, live monitoring of forces in critical cables etc.
A competent Electrical Engineer having 6+ years extensive experience in the field of Electrical Projects Installation, testing, Commissioning, Maintenance, power distribution, transmission, Transformers, Switchgears, Machines, Designing ,Estimation, operation & Site execution etc.
I am currently looking for highly motivated and demanding job that will further enhance my knowledge and management skills where I can add value to the system and grow with the organization..
1. ANKIT AGARWAL
303, Haridra Apartment, Sector 35G, Kharghar, Navi Mumbai 410210.
Contact: +91 9619731806
E-mail: ankit.grwl1@gmail.com
Skype ID:ankit.agarwal820
ELECTRICAL ENGINEERING /PROJECT MANAGEMENT
PROFESSIONAL
Seeking Project Management Assignments with Reputed and Growth Oriented Organization in the Projects / Electrical
Equipments / Design Industries
PROFILE
Technically accomplished professional with 10 years pioneering career in managing Electrical, Metro Projects and
Maintenance. Currently associated with Louis Berger Consulting Pvt. Ltd. as a Sr. Project Engineer PST &
SCADA for Navi Mumbai Metro Line -1 project.
Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining to the overall
execution of the Projects, Quality Management, Design & Development, and Technical Services.
Adopt project management tools and techniques like project planning & scheduling using project management
tools such as MS Project.
Overall planning and monitoring of resource, cost, material and manpower for projects.
Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and
cost parameters.
Gained Knowledge of Planning, Installation, Commissioning and Handling Projects. Well versed with MS Project
& AutoCAD 2005
Demonstrated abilities in formulating project plans and schedules while handling electrical equipments,
undertaking erection, testing and commissioning , failure analysis along with ensuring preventive maintenance and
condition monitoring of all electrical systems including power transformers, relays, protection schemes and circuit
breaker
Techno commercial expertise with immense confidence to accept and meet challenging assignments with career
excellence in various areas.
Extremely systematic and organized with quick adaptability to changing trends, technologies and processes with a
logical, analytical and scientific approach.
Deft in swiftly ramping up projects in close coordination with project team, contractors, interfacing departments,
consultants & other external agencies and ensuring on time deliverables.
Core Competencies:
Project Planning♦ Testing and commissioning♦ Operation/ Maintenance of Electrical Systems ♦Project Management♦
Troubleshooting ♦ Reporting/Documentation ♦ Quality Compliance♦ Team Management
PROFESSIONAL EXPERIENCE
LOUIS BERGER CONSULTING PVT. LTD. OCT’15
TO TILL NOW
2. Maintain QA-QC in respect to tender compliance and QAP plan for PST and SCADA system.
Reviewing Design Drawings & Design Calculations as per Specifications & Codes/Standards for power supply
system, OHE and SCADA.
Approvals of Preliminary Designs, Working Drawings, Equipment’s / Materials, Method Statements and other
contractual documents for power supply system, OHE and SCADA.
Monitoring execution Works as per Drawings & Specifications.
Preparing various Periodical Reports regarding Design/ Shop Drawings approval Status, Materials
Procurement Status & Site Progress of works for power supply system, OHE and SCADA.
Carrying out Quality Checks & Inspections as per approved Method Statements.
Constant Co-coordination between Client, Sub-Contractors and other concerned Authorities etc.
RAMS – Under inputs from RAMS team refer to the Hazard log, understand and meet the requirements of
RAMS for respective equipment to meet system requirements.
Prepare snags of sites and suggesting actions to the contractor for better management.
Ensure and advice the executing contractor for work progress on the basis of tender guidelines and
respective local and international compliance codes and standards.
Responsible for doing FAT and SAT inspections for various Power supply equipment, OHE material and
equipment and SCADA systems.
Technical Support to contractors for vendor assessment and deployment.
METRO ONE OPERATION PVT LTD SEP’11
TO SEP’15
Responsible for maintenance of OHE, power supply network, SCADA and ENM equipment’s for Mumbai Metro Line-
1.
Preparation of Work instructions training modules and SOP’s.
Preparation of maintenance plan and execution as per work instruction & SOP’s to maintain the RAMS.
Worked on secondment from Metro One Operations Pvt Ltd. To Mumbai Metro One Pvt. Ltd. (Reliance) for
execution of project since February 2012 to February 2014.
Successful execution of power supply network and ENM system for the project of Metro Train in Mumbai with train
trials and integration testing with other divisions.
Responsible for the planning, procurement and design approvals for power system of Mumbai metro line -1.
Design approvals, installation and testing of earthing system and lightening protection system.
Erection, testing & commissioning of 3 nos. of 33 kV /25 kV 20 MVA Traction transformers.
Erection, testing & commissioning of the 3 nos. of 33 kV /11 kV 20 MVA Auxiliary Main transformers.
Erection, testing & commissioning of the 30 nos. of 11 kV /415 V Dry type Auxiliary transformers for Depot and
Station Auxiliary substations.
Erection, testing & commissioning of 33 kV ABB GIS Substation.
Erection, testing & commissioning of 25 kV AREVA GIS traction Substation.
3. Erection, testing & commissioning of 11 kV AREVA AIS Substation.
Installation and testing of Cables HT & LT at Main receiving substations and auxiliary substation as per IEEE and IS
standards.
Erection, testing & commissioning of 11 kV Auxiliary substation at Depot and Station that includes 4 way and 3
way RMU’s, Dry type transformer and LT panels.
Testing of protection relays i.e. ABB REF 542 +, ABB REF 610, Micom P132, Micom P438, Micom P 122, Micom
P121, Micom P127, Ashida relays and other auxiliary relays.
Design approvals, installation and testing of earthing scheme for Substations, Auxilliary substations in Stations and
Viaduct earthing.
Testing ,commissioning & scheme checking for Main Receiving substations, Traction substation, Auxilliary
substations of depot and stations.
Testing & commissioning of OHE equipments i.e. interrupters, isolators, PT’s, Booster transformer and interlocks.
Responsible for design approvals i.e. Input /output list, Cable schedules, Logical schemes, interlocks, Views of
MicroSCADA Pro with RTU 560 for Mumbai Metro Line-1.
Successfully commissioned SCADA system of entire Mumbai Metro Line-1 corridor including Depot.
Successfully commissioned large display panel for SCADA system in OCC and back up SCADA with automatic
control transfer scheme for OCC, Back up SCADA and Local SCADA in RSS.
Responsible for the entire relay co-ordination of the system for Mumbai Metro Line-1 corridor and successfully
commissioned system with train trials.
Responsible for applications and comments compliance to Electrical Inspector General and Independent engineers
for Drawings and charging approvals of Electrical System.
Preperation of documents submittals for RDSO and CMRS.
Providing training to employees for Power supply and SCADA system in Metro One Operations Pvt Ltd.
Procuring, making purchase orders for the things required in the corridor.
Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
Awarded training for “Train Pilot” and SCADA system.
Assist in preparation of maintenance training modules for PST and ENM department.
Provided training for ENM, Power Supply and Over head equipment to Operation Direction.
LARSEN & TOUBRO FEB’11 TO
SEP’11
Execution of 220 KV Substation project.
33 kV Distribution Substations and 11kV Distribution substation design approval.
Design Approval of substation automation system (SCADA).
Liasioning for power connection and import of power in open access.
Played a vital role in relay coordination scheme for entire power system of LTSHF.
WELSPUN CORP LTD. DEC’05
TO JAN’11
Preparation of baseline construction program at the tendering stage and detailing of the same during the project
4. Execution stage.
Executed successfully 220 KV Substations, 11 KV Distribution Substations, Capacitor Banks, LV Distribution
Systems, and Distribution Transformers from 1.5 MVA to 15 MVA, Installation Application checking before
charging, Troubleshooting, Operation and Maintenance at welspun.
Have been a key member of PMO (Project Management Office) in the organization with the responsibility of
conducting review meetings with the key project members from planning point of view.
Erection of 220 KV Switchyard equipments, earthing, transformers upto 57 MVA.
Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor Switchgears, Power Transformer,
Relay and Control Panels, HT Cables, Battery banks and chargers.
Preparing Interlock logic for Isolators, earth switch, HT & LT Switchgears, Cable Schedule, Retrofitting job of Control
Panel and HT Panel.
Responsible for billing of contractors, following up with the vendors for material.
Accountable for Billing with GEB for export surplus power and import power from GEB and TPTCL and SLDC
(Gujarat) for open access power sale.
Responsible for conducting speedy & quality work with safety, handling routine Mechanical and Civil activities and
leading a team responsible for power factor analysis and improvement.
Preparing the cable schedule for the control panels, RTU panels and modification work in control drawings.
Procurement of material, negotiation, follow up with vendors.
Knowledge of the liasioning work for New Power Connection, Open Access, state electricity board, Change of
Name, electricity duty, short term open access permission for export of power and purchasing of power through
open access.
Project Executed
Successfully commissioned power system and OHE network for Mumbai Metro Line-1.
Successfully commissioned SCADA system for Mumbai Metro Line-1 with training to operation direction.
Successful trial runs for Mumbai Metro Line-1.
Completed project of 220/11 kV Main receiving substation Phase-1 for Welspun Corp Limited.
Completed project of 220/11 kV Power plant synchronizing and interconnecting Substation Phase-2 for Welspun
Corp Limited.
Completed the project of 220 KV MRSS, 33 KV Substations, Energy Management System, plant lighting designing
at L&T Special Steel and Heavy forgings pvt. Ltd..
Career Path
Sr. Project Engineer- PST and SCADA Oct’15 -
Till Now
Manager- PST and SCADA Jan’15 - Sept’15
Sr. Engineer (Metro One Operation Pvt. Ltd.) Sep’11 – Dec’14
Sr. Engineer (L&T) Feb’11 – Sep’11
Sr. Engineer (WELSPUN CORP LTD.) Mar’10 – Jan’11
Engineer (WELSPUN CORP LTD.) Apr ’09 – Mar ’10
Asst. Engineer Dec ’06 – Mar ’09
Trainee Engineer Dec’ 05 –Dec ’06
5. Professional Accolades
Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
GT transformer, 57 MVA of ABB make.
Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
Recipient of the Best Performance Award for the year 2006 – 07.
Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati
6. Professional Accolades
Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
GT transformer, 57 MVA of ABB make.
Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
Recipient of the Best Performance Award for the year 2006 – 07.
Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati