ELECTRICAL ENGINEERING /PROJECT MANAGEMENT
PROFESSIONAL
Seeking Project Management Assignments with Reputed and Growth Oriented Organization in the Projects / Electrical
Equipments / Design Industries
PROFILE
 Technically accomplished professional with 10 years pioneering career in managing Electrical, Metro Projects and
Maintenance. Currently associated with Louis Berger Consulting Pvt. Ltd. as a Sr. Project Engineer PST &
SCADA for Navi Mumbai Metro Line -1 project.
 Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining to the overall
execution of the Projects, Quality Management, Design & Development, and Technical Services.
 Adopt project management tools and techniques like project planning & scheduling using project management
tools such as MS Project.
 Overall planning and monitoring of resource, cost, material and manpower for projects.
 Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and
cost parameters.
 Gained Knowledge of Planning, Installation, Commissioning and Handling Projects. Well versed with MS Project
& AutoCAD 2005
 Demonstrated abilities in formulating project plans and schedules while handling electrical equipments,
undertaking erection, testing and commissioning , failure analysis along with ensuring preventive maintenance and
condition monitoring of all electrical systems including power transformers, relays, protection schemes and circuit
breaker
 Techno commercial expertise with immense confidence to accept and meet challenging assignments with career
excellence in various areas.
 Extremely systematic and organized with quick adaptability to changing trends, technologies and processes with a
logical, analytical and scientific approach.
 Deft in swiftly ramping up projects in close coordination with project team, contractors, interfacing departments,
consultants & other external agencies and ensuring on time deliverables.
Core Competencies:
Project Planning♦ Testing and commissioning♦ Operation/ Maintenance of Electrical Systems ♦Project Management♦
Troubleshooting ♦ Reporting/Documentation ♦ Quality Compliance♦ Team Management
PROFESSIONAL EXPERIENCE
LOUIS BERGER CONSULTING PVT. LTD. OCT’15
TO TILL NOW
 Maintain QA-QC in respect to tender compliance and QAP plan for PST and SCADA system.
 Reviewing Design Drawings & Design Calculations as per Specifications & Codes/Standards for power supply
system, OHE and SCADA.
 Approvals of Preliminary Designs, Working Drawings, Equipment’s / Materials, Method Statements and other
contractual documents for power supply system, OHE and SCADA.
 Monitoring execution Works as per Drawings & Specifications.
 Preparing various Periodical Reports regarding Design/ Shop Drawings approval Status, Materials
Procurement Status & Site Progress of works for power supply system, OHE and SCADA.
 Carrying out Quality Checks & Inspections as per approved Method Statements.
 Constant Co-coordination between Client, Sub-Contractors and other concerned Authorities etc.
 RAMS – Under inputs from RAMS team refer to the Hazard log, understand and meet the requirements of
RAMS for respective equipment to meet system requirements.
 Prepare snags of sites and suggesting actions to the contractor for better management.
 Ensure and advice the executing contractor for work progress on the basis of tender guidelines and
respective local and international compliance codes and standards.
 Responsible for doing FAT and SAT inspections for various Power supply equipment, OHE material and
equipment and SCADA systems.
 Technical Support to contractors for vendor assessment and deployment.
METRO ONE OPERATION PVT LTD SEP’11
TO SEP’15
 Responsible for maintenance of OHE, power supply network, SCADA and ENM equipment’s for Mumbai Metro Line-
1.
 Preparation of Work instructions training modules and SOP’s.
 Preparation of maintenance plan and execution as per work instruction & SOP’s to maintain the RAMS.
 Worked on secondment from Metro One Operations Pvt Ltd. To Mumbai Metro One Pvt. Ltd. (Reliance) for
execution of project since February 2012 to February 2014.
 Successful execution of power supply network and ENM system for the project of Metro Train in Mumbai with train
trials and integration testing with other divisions.
 Responsible for the planning, procurement and design approvals for power system of Mumbai metro line -1.
 Design approvals, installation and testing of earthing system and lightening protection system.
 Erection, testing & commissioning of 3 nos. of 33 kV /25 kV 20 MVA Traction transformers.
 Erection, testing & commissioning of the 3 nos. of 33 kV /11 kV 20 MVA Auxiliary Main transformers.
 Erection, testing & commissioning of the 30 nos. of 11 kV /415 V Dry type Auxiliary transformers for Depot and
Station Auxiliary substations.
 Erection, testing & commissioning of 33 kV ABB GIS Substation.
 Erection, testing & commissioning of 25 kV AREVA GIS traction Substation.
 Erection, testing & commissioning of 11 kV AREVA AIS Substation.
 Installation and testing of Cables HT & LT at Main receiving substations and auxiliary substation as per IEEE and IS
standards.
 Erection, testing & commissioning of 11 kV Auxiliary substation at Depot and Station that includes 4 way and 3
way RMU’s, Dry type transformer and LT panels.
 Testing of protection relays i.e. ABB REF 542 +, ABB REF 610, Micom P132, Micom P438, Micom P 122, Micom
P121, Micom P127, Ashida relays and other auxiliary relays.
 Design approvals, installation and testing of earthing scheme for Substations, Auxilliary substations in Stations and
Viaduct earthing.
 Testing ,commissioning & scheme checking for Main Receiving substations, Traction substation, Auxilliary
substations of depot and stations.
 Testing & commissioning of OHE equipments i.e. interrupters, isolators, PT’s, Booster transformer and interlocks.
 Responsible for design approvals i.e. Input /output list, Cable schedules, Logical schemes, interlocks, Views of
MicroSCADA Pro with RTU 560 for Mumbai Metro Line-1.
 Successfully commissioned SCADA system of entire Mumbai Metro Line-1 corridor including Depot.
 Successfully commissioned large display panel for SCADA system in OCC and back up SCADA with automatic
control transfer scheme for OCC, Back up SCADA and Local SCADA in RSS.
 Responsible for the entire relay co-ordination of the system for Mumbai Metro Line-1 corridor and successfully
commissioned system with train trials.
 Responsible for applications and comments compliance to Electrical Inspector General and Independent engineers
for Drawings and charging approvals of Electrical System.
 Preperation of documents submittals for RDSO and CMRS.
 Providing training to employees for Power supply and SCADA system in Metro One Operations Pvt Ltd.
 Procuring, making purchase orders for the things required in the corridor.
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 Awarded training for “Train Pilot” and SCADA system.
 Assist in preparation of maintenance training modules for PST and ENM department.
 Provided training for ENM, Power Supply and Over head equipment to Operation Direction.
LARSEN & TOUBRO FEB’11 TO
SEP’11
 Execution of 220 KV Substation project.
 33 kV Distribution Substations and 11kV Distribution substation design approval.
 Design Approval of substation automation system (SCADA).
 Liasioning for power connection and import of power in open access.
 Played a vital role in relay coordination scheme for entire power system of LTSHF.
WELSPUN CORP LTD. DEC’05
TO JAN’11
 Preparation of baseline construction program at the tendering stage and detailing of the same during the project
Execution stage.
 Executed successfully 220 KV Substations, 11 KV Distribution Substations, Capacitor Banks, LV Distribution
Systems, and Distribution Transformers from 1.5 MVA to 15 MVA, Installation Application checking before
charging, Troubleshooting, Operation and Maintenance at welspun.
 Have been a key member of PMO (Project Management Office) in the organization with the responsibility of
conducting review meetings with the key project members from planning point of view.
Erection of 220 KV Switchyard equipments, earthing, transformers upto 57 MVA.
 Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor Switchgears, Power Transformer,
Relay and Control Panels, HT Cables, Battery banks and chargers.
 Preparing Interlock logic for Isolators, earth switch, HT & LT Switchgears, Cable Schedule, Retrofitting job of Control
Panel and HT Panel.
 Responsible for billing of contractors, following up with the vendors for material.
 Accountable for Billing with GEB for export surplus power and import power from GEB and TPTCL and SLDC
(Gujarat) for open access power sale.
 Responsible for conducting speedy & quality work with safety, handling routine Mechanical and Civil activities and
leading a team responsible for power factor analysis and improvement.
 Preparing the cable schedule for the control panels, RTU panels and modification work in control drawings.
 Procurement of material, negotiation, follow up with vendors.
 Knowledge of the liasioning work for New Power Connection, Open Access, state electricity board, Change of
Name, electricity duty, short term open access permission for export of power and purchasing of power through
open access.
Project Executed
 Successfully commissioned power system and OHE network for Mumbai Metro Line-1.
 Successfully commissioned SCADA system for Mumbai Metro Line-1 with training to operation direction.
 Successful trial runs for Mumbai Metro Line-1.
 Completed project of 220/11 kV Main receiving substation Phase-1 for Welspun Corp Limited.
 Completed project of 220/11 kV Power plant synchronizing and interconnecting Substation Phase-2 for Welspun
Corp Limited.
 Completed the project of 220 KV MRSS, 33 KV Substations, Energy Management System, plant lighting designing
at L&T Special Steel and Heavy forgings pvt. Ltd..
Career Path
Sr. Project Engineer- PST and SCADA Oct’15 -
Till Now
Manager- PST and SCADA Jan’15 - Sept’15
Sr. Engineer (Metro One Operation Pvt. Ltd.) Sep’11 – Dec’14
Sr. Engineer (L&T) Feb’11 – Sep’11
Sr. Engineer (WELSPUN CORP LTD.) Mar’10 – Jan’11
Engineer (WELSPUN CORP LTD.) Apr ’09 – Mar ’10
Asst. Engineer Dec ’06 – Mar ’09
Trainee Engineer Dec’ 05 –Dec ’06
Professional Accolades
 Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
 220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
 GT transformer, 57 MVA of ABB make.
 Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
 Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
 Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
 Recipient of the Best Performance Award for the year 2006 – 07.
 Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati
Professional Accolades
 Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
 220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
 GT transformer, 57 MVA of ABB make.
 Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
 Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
 Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
 Recipient of the Best Performance Award for the year 2006 – 07.
 Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati

Ankit updated Resume

  • 1.
    ANKIT AGARWAL 303, HaridraApartment, Sector 35G, Kharghar, Navi Mumbai 410210. Contact: +91 9619731806 E-mail: ankit.grwl1@gmail.com Skype ID:ankit.agarwal820 ELECTRICAL ENGINEERING /PROJECT MANAGEMENT PROFESSIONAL Seeking Project Management Assignments with Reputed and Growth Oriented Organization in the Projects / Electrical Equipments / Design Industries PROFILE  Technically accomplished professional with 10 years pioneering career in managing Electrical, Metro Projects and Maintenance. Currently associated with Louis Berger Consulting Pvt. Ltd. as a Sr. Project Engineer PST & SCADA for Navi Mumbai Metro Line -1 project.  Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining to the overall execution of the Projects, Quality Management, Design & Development, and Technical Services.  Adopt project management tools and techniques like project planning & scheduling using project management tools such as MS Project.  Overall planning and monitoring of resource, cost, material and manpower for projects.  Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and cost parameters.  Gained Knowledge of Planning, Installation, Commissioning and Handling Projects. Well versed with MS Project & AutoCAD 2005  Demonstrated abilities in formulating project plans and schedules while handling electrical equipments, undertaking erection, testing and commissioning , failure analysis along with ensuring preventive maintenance and condition monitoring of all electrical systems including power transformers, relays, protection schemes and circuit breaker  Techno commercial expertise with immense confidence to accept and meet challenging assignments with career excellence in various areas.  Extremely systematic and organized with quick adaptability to changing trends, technologies and processes with a logical, analytical and scientific approach.  Deft in swiftly ramping up projects in close coordination with project team, contractors, interfacing departments, consultants & other external agencies and ensuring on time deliverables. Core Competencies: Project Planning♦ Testing and commissioning♦ Operation/ Maintenance of Electrical Systems ♦Project Management♦ Troubleshooting ♦ Reporting/Documentation ♦ Quality Compliance♦ Team Management PROFESSIONAL EXPERIENCE LOUIS BERGER CONSULTING PVT. LTD. OCT’15 TO TILL NOW
  • 2.
     Maintain QA-QCin respect to tender compliance and QAP plan for PST and SCADA system.  Reviewing Design Drawings & Design Calculations as per Specifications & Codes/Standards for power supply system, OHE and SCADA.  Approvals of Preliminary Designs, Working Drawings, Equipment’s / Materials, Method Statements and other contractual documents for power supply system, OHE and SCADA.  Monitoring execution Works as per Drawings & Specifications.  Preparing various Periodical Reports regarding Design/ Shop Drawings approval Status, Materials Procurement Status & Site Progress of works for power supply system, OHE and SCADA.  Carrying out Quality Checks & Inspections as per approved Method Statements.  Constant Co-coordination between Client, Sub-Contractors and other concerned Authorities etc.  RAMS – Under inputs from RAMS team refer to the Hazard log, understand and meet the requirements of RAMS for respective equipment to meet system requirements.  Prepare snags of sites and suggesting actions to the contractor for better management.  Ensure and advice the executing contractor for work progress on the basis of tender guidelines and respective local and international compliance codes and standards.  Responsible for doing FAT and SAT inspections for various Power supply equipment, OHE material and equipment and SCADA systems.  Technical Support to contractors for vendor assessment and deployment. METRO ONE OPERATION PVT LTD SEP’11 TO SEP’15  Responsible for maintenance of OHE, power supply network, SCADA and ENM equipment’s for Mumbai Metro Line- 1.  Preparation of Work instructions training modules and SOP’s.  Preparation of maintenance plan and execution as per work instruction & SOP’s to maintain the RAMS.  Worked on secondment from Metro One Operations Pvt Ltd. To Mumbai Metro One Pvt. Ltd. (Reliance) for execution of project since February 2012 to February 2014.  Successful execution of power supply network and ENM system for the project of Metro Train in Mumbai with train trials and integration testing with other divisions.  Responsible for the planning, procurement and design approvals for power system of Mumbai metro line -1.  Design approvals, installation and testing of earthing system and lightening protection system.  Erection, testing & commissioning of 3 nos. of 33 kV /25 kV 20 MVA Traction transformers.  Erection, testing & commissioning of the 3 nos. of 33 kV /11 kV 20 MVA Auxiliary Main transformers.  Erection, testing & commissioning of the 30 nos. of 11 kV /415 V Dry type Auxiliary transformers for Depot and Station Auxiliary substations.  Erection, testing & commissioning of 33 kV ABB GIS Substation.  Erection, testing & commissioning of 25 kV AREVA GIS traction Substation.
  • 3.
     Erection, testing& commissioning of 11 kV AREVA AIS Substation.  Installation and testing of Cables HT & LT at Main receiving substations and auxiliary substation as per IEEE and IS standards.  Erection, testing & commissioning of 11 kV Auxiliary substation at Depot and Station that includes 4 way and 3 way RMU’s, Dry type transformer and LT panels.  Testing of protection relays i.e. ABB REF 542 +, ABB REF 610, Micom P132, Micom P438, Micom P 122, Micom P121, Micom P127, Ashida relays and other auxiliary relays.  Design approvals, installation and testing of earthing scheme for Substations, Auxilliary substations in Stations and Viaduct earthing.  Testing ,commissioning & scheme checking for Main Receiving substations, Traction substation, Auxilliary substations of depot and stations.  Testing & commissioning of OHE equipments i.e. interrupters, isolators, PT’s, Booster transformer and interlocks.  Responsible for design approvals i.e. Input /output list, Cable schedules, Logical schemes, interlocks, Views of MicroSCADA Pro with RTU 560 for Mumbai Metro Line-1.  Successfully commissioned SCADA system of entire Mumbai Metro Line-1 corridor including Depot.  Successfully commissioned large display panel for SCADA system in OCC and back up SCADA with automatic control transfer scheme for OCC, Back up SCADA and Local SCADA in RSS.  Responsible for the entire relay co-ordination of the system for Mumbai Metro Line-1 corridor and successfully commissioned system with train trials.  Responsible for applications and comments compliance to Electrical Inspector General and Independent engineers for Drawings and charging approvals of Electrical System.  Preperation of documents submittals for RDSO and CMRS.  Providing training to employees for Power supply and SCADA system in Metro One Operations Pvt Ltd.  Procuring, making purchase orders for the things required in the corridor.  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  Awarded training for “Train Pilot” and SCADA system.  Assist in preparation of maintenance training modules for PST and ENM department.  Provided training for ENM, Power Supply and Over head equipment to Operation Direction. LARSEN & TOUBRO FEB’11 TO SEP’11  Execution of 220 KV Substation project.  33 kV Distribution Substations and 11kV Distribution substation design approval.  Design Approval of substation automation system (SCADA).  Liasioning for power connection and import of power in open access.  Played a vital role in relay coordination scheme for entire power system of LTSHF. WELSPUN CORP LTD. DEC’05 TO JAN’11  Preparation of baseline construction program at the tendering stage and detailing of the same during the project
  • 4.
    Execution stage.  Executedsuccessfully 220 KV Substations, 11 KV Distribution Substations, Capacitor Banks, LV Distribution Systems, and Distribution Transformers from 1.5 MVA to 15 MVA, Installation Application checking before charging, Troubleshooting, Operation and Maintenance at welspun.  Have been a key member of PMO (Project Management Office) in the organization with the responsibility of conducting review meetings with the key project members from planning point of view. Erection of 220 KV Switchyard equipments, earthing, transformers upto 57 MVA.  Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor Switchgears, Power Transformer, Relay and Control Panels, HT Cables, Battery banks and chargers.  Preparing Interlock logic for Isolators, earth switch, HT & LT Switchgears, Cable Schedule, Retrofitting job of Control Panel and HT Panel.  Responsible for billing of contractors, following up with the vendors for material.  Accountable for Billing with GEB for export surplus power and import power from GEB and TPTCL and SLDC (Gujarat) for open access power sale.  Responsible for conducting speedy & quality work with safety, handling routine Mechanical and Civil activities and leading a team responsible for power factor analysis and improvement.  Preparing the cable schedule for the control panels, RTU panels and modification work in control drawings.  Procurement of material, negotiation, follow up with vendors.  Knowledge of the liasioning work for New Power Connection, Open Access, state electricity board, Change of Name, electricity duty, short term open access permission for export of power and purchasing of power through open access. Project Executed  Successfully commissioned power system and OHE network for Mumbai Metro Line-1.  Successfully commissioned SCADA system for Mumbai Metro Line-1 with training to operation direction.  Successful trial runs for Mumbai Metro Line-1.  Completed project of 220/11 kV Main receiving substation Phase-1 for Welspun Corp Limited.  Completed project of 220/11 kV Power plant synchronizing and interconnecting Substation Phase-2 for Welspun Corp Limited.  Completed the project of 220 KV MRSS, 33 KV Substations, Energy Management System, plant lighting designing at L&T Special Steel and Heavy forgings pvt. Ltd.. Career Path Sr. Project Engineer- PST and SCADA Oct’15 - Till Now Manager- PST and SCADA Jan’15 - Sept’15 Sr. Engineer (Metro One Operation Pvt. Ltd.) Sep’11 – Dec’14 Sr. Engineer (L&T) Feb’11 – Sep’11 Sr. Engineer (WELSPUN CORP LTD.) Mar’10 – Jan’11 Engineer (WELSPUN CORP LTD.) Apr ’09 – Mar ’10 Asst. Engineer Dec ’06 – Mar ’09 Trainee Engineer Dec’ 05 –Dec ’06
  • 5.
    Professional Accolades  Awardedtraining for “Train Pilot” for driving Maintenance Rail Vehicle  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.  220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.  GT transformer, 57 MVA of ABB make.  Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.  Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear panels, Power Cables, Battery Chargers.  Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.  Recipient of the Best Performance Award for the year 2006 – 07.  Had been awarded as the star performer for electrical department in March 2008 and the exceptional performer in the year 2010. EDUCATION DEVELOPMENT Diploma in Electrical Engineering 2005 M. S University, Baroda D.O.B: 1 st Dec 1986 Languages Known: English, Hindi and Gujarati
  • 6.
    Professional Accolades  Awardedtraining for “Train Pilot” for driving Maintenance Rail Vehicle  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.  220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.  GT transformer, 57 MVA of ABB make.  Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.  Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear panels, Power Cables, Battery Chargers.  Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.  Recipient of the Best Performance Award for the year 2006 – 07.  Had been awarded as the star performer for electrical department in March 2008 and the exceptional performer in the year 2010. EDUCATION DEVELOPMENT Diploma in Electrical Engineering 2005 M. S University, Baroda D.O.B: 1 st Dec 1986 Languages Known: English, Hindi and Gujarati