 Technically accomplished professional with 10 years pioneering career in managing Electrical, Metro Projects and
Maintenance. Currently associated with Louis Berger Consulting Pvt. Ltd. as a Sr. Project Engineer PST &
SCADA for Navi Mumbai Metro Line -1 project.
 Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining to the overall
execution of the Projects, Quality Management, Design & Development, and Technical Services.
 Adopt project management tools and techniques like project planning & scheduling using project management
tools such as MS Project.
 Overall planning and monitoring of resource, cost, material and manpower for projects.
 Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and
cost parameters.
 Gained Knowledge of Planning, Installation, Commissioning and Handling Projects. Well versed with MS Project
& AutoCAD 2005
 Demonstrated abilities in formulating project plans and schedules while handling electrical equipments,
undertaking erection, testing and commissioning , failure analysis along with ensuring preventive maintenance and
condition monitoring of all electrical systems including power transformers, relays, protection schemes and circuit
breaker
 Techno commercial expertise with immense confidence to accept and meet challenging assignments with career
excellence in various areas.
 Extremely systematic and organized with quick adaptability to changing trends, technologies and processes with a
logical, analytical and scientific approach.
 Deft in swiftly ramping up projects in close coordination with project team, contractors, interfacing departments,
consultants & other external agencies and ensuring on time deliverables.
Core Competencies:
Project Planning♦ Testing and commissioning♦ Operation/ Maintenance of Electrical Systems ♦Project Management♦
Troubleshooting ♦ Reporting/Documentation ♦ Quality Compliance♦ Team Management
PROFESSIONAL EXPERIENCE
LOUIS BERGER CONSULTING PVT. LTD. OCT’15
TO TILL NOW
 Maintain QA-QC in respect to tender compliance and QAP plan for PST and SCADA system.
 Reviewing Design Drawings & Design Calculations as per Specifications & Codes/Standards for power supply
system, OHE and SCADA.
 Approvals of Preliminary Designs, Working Drawings, Equipment’s / Materials, Method Statements and other
contractual documents for power supply system, OHE and SCADA.
 Monitoring execution Works as per Drawings & Specifications.
 Preparing various Periodical Reports regarding Design/ Shop Drawings approval Status, Materials
Procurement Status & Site Progress of works for power supply system, OHE and SCADA.
 Carrying out Quality Checks & Inspections as per approved Method Statements.
 Constant Co-coordination between Client, Sub-Contractors and other concerned Authorities etc.
 RAMS – Under inputs from RAMS team refer to the Hazard log, understand and meet the requirements of
RAMS for respective equipment to meet system requirements.
 Prepare snags of sites and suggesting actions to the contractor for better management.
 Ensure and advice the executing contractor for work progress on the basis of tender guidelines and
respective local and international compliance codes and standards.
 Responsible for doing FAT and SAT inspections for various Power supply equipment, OHE material and
equipment and SCADA systems.
 Technical Support to contractors for vendor assessment and deployment.
METRO ONE OPERATION PVT LTD SEP’11
TO SEP’15
 Responsible for maintenance of OHE, power supply network, SCADA and ENM equipment’s for Mumbai Metro Line-
1.
 Preparation of Work instructions training modules and SOP’s.
 Preparation of maintenance plan and execution as per work instruction & SOP’s to maintain the RAMS.
 Worked on secondment from Metro One Operations Pvt Ltd. To Mumbai Metro One Pvt. Ltd. (Reliance) for
execution of project since February 2012 to February 2014.
 Successful execution of power supply network and ENM system for the project of Metro Train in Mumbai with train
trials and integration testing with other divisions.
 Responsible for the planning, procurement and design approvals for power system of Mumbai metro line -1.
 Design approvals, installation and testing of earthing system and lightening protection system.
 Erection, testing & commissioning of 3 nos. of 33 kV /25 kV 20 MVA Traction transformers.
 Erection, testing & commissioning of the 3 nos. of 33 kV /11 kV 20 MVA Auxiliary Main transformers.
 Erection, testing & commissioning of the 30 nos. of 11 kV /415 V Dry type Auxiliary transformers for Depot and
Station Auxiliary substations.
 Erection, testing & commissioning of 33 kV ABB GIS Substation.
 Erection, testing & commissioning of 25 kV AREVA GIS traction Substation.
 Erection, testing & commissioning of 11 kV AREVA AIS Substation.
 Installation and testing of Cables HT & LT at Main receiving substations and auxiliary substation as per IEEE and IS
standards.
 Erection, testing & commissioning of 11 kV Auxiliary substation at Depot and Station that includes 4 way and 3
way RMU’s, Dry type transformer and LT panels.
 Testing of protection relays i.e. ABB REF 542 +, ABB REF 610, Micom P132, Micom P438, Micom P 122, Micom
P121, Micom P127, Ashida relays and other auxiliary relays.
 Design approvals, installation and testing of earthing scheme for Substations, Auxilliary substations in Stations and
Viaduct earthing.
 Testing ,commissioning & scheme checking for Main Receiving substations, Traction substation, Auxilliary
substations of depot and stations.
 Testing & commissioning of OHE equipments i.e. interrupters, isolators, PT’s, Booster transformer and interlocks.
 Responsible for design approvals i.e. Input /output list, Cable schedules, Logical schemes, interlocks, Views of
MicroSCADA Pro with RTU 560 for Mumbai Metro Line-1.
 Successfully commissioned SCADA system of entire Mumbai Metro Line-1 corridor including Depot.
 Successfully commissioned large display panel for SCADA system in OCC and back up SCADA with automatic
control transfer scheme for OCC, Back up SCADA and Local SCADA in RSS.
 Responsible for the entire relay co-ordination of the system for Mumbai Metro Line-1 corridor and successfully
commissioned system with train trials.
 Responsible for applications and comments compliance to Electrical Inspector General and Independent engineers
for Drawings and charging approvals of Electrical System.
 Preperation of documents submittals for RDSO and CMRS.
 Providing training to employees for Power supply and SCADA system in Metro One Operations Pvt Ltd.
 Procuring, making purchase orders for the things required in the corridor.
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 Awarded training for “Train Pilot” and SCADA system.
 Assist in preparation of maintenance training modules for PST and ENM department.
 Provided training for ENM, Power Supply and Over head equipment to Operation Direction.
LARSEN & TOUBRO FEB’11 TO
SEP’11
 Execution of 220 KV Substation project.
 33 kV Distribution Substations and 11kV Distribution substation design approval.
 Design Approval of substation automation system (SCADA).
 Liasioning for power connection and import of power in open access.
 Played a vital role in relay coordination scheme for entire power system of LTSHF.
WELSPUN CORP LTD. DEC’05
TO JAN’11
 Preparation of baseline construction program at the tendering stage and detailing of the same during the project
Execution stage.
 Executed successfully 220 KV Substations, 11 KV Distribution Substations, Capacitor Banks, LV Distribution
Systems, and Distribution Transformers from 1.5 MVA to 15 MVA, Installation Application checking before
charging, Troubleshooting, Operation and Maintenance at welspun.
 Have been a key member of PMO (Project Management Office) in the organization with the responsibility of
conducting review meetings with the key project members from planning point of view.
Erection of 220 KV Switchyard equipments, earthing, transformers upto 57 MVA.
 Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor Switchgears, Power Transformer,
Relay and Control Panels, HT Cables, Battery banks and chargers.
 Preparing Interlock logic for Isolators, earth switch, HT & LT Switchgears, Cable Schedule, Retrofitting job of Control
Panel and HT Panel.
 Responsible for billing of contractors, following up with the vendors for material.
 Accountable for Billing with GEB for export surplus power and import power from GEB and TPTCL and SLDC
(Gujarat) for open access power sale.
 Responsible for conducting speedy & quality work with safety, handling routine Mechanical and Civil activities and
leading a team responsible for power factor analysis and improvement.
 Preparing the cable schedule for the control panels, RTU panels and modification work in control drawings.
 Procurement of material, negotiation, follow up with vendors.
 Knowledge of the liasioning work for New Power Connection, Open Access, state electricity board, Change of
Name, electricity duty, short term open access permission for export of power and purchasing of power through
open access.
Project Executed
 Successfully commissioned power system and OHE network for Mumbai Metro Line-1.
 Successfully commissioned SCADA system for Mumbai Metro Line-1 with training to operation direction.
 Successful trial runs for Mumbai Metro Line-1.
 Completed project of 220/11 kV Main receiving substation Phase-1 for Welspun Corp Limited.
 Completed project of 220/11 kV Power plant synchronizing and interconnecting Substation Phase-2 for Welspun
Corp Limited.
 Completed the project of 220 KV MRSS, 33 KV Substations, Energy Management System, plant lighting designing
at L&T Special Steel and Heavy forgings pvt. Ltd..
Career Path
Sr. Project Engineer- PST and SCADA Oct’15 -
Till Now
Manager- PST and SCADA Jan’15 - Sept’15
Sr. Engineer (Metro One Operation Pvt. Ltd.) Sep’11 – Dec’14
Sr. Engineer (L&T) Feb’11 – Sep’11
Sr. Engineer (WELSPUN CORP LTD.) Mar’10 – Jan’11
Engineer (WELSPUN CORP LTD.) Apr ’09 – Mar ’10
Asst. Engineer Dec ’06 – Mar ’09
Trainee Engineer Dec’ 05 –Dec ’06
Professional Accolades
 Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
 220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
 GT transformer, 57 MVA of ABB make.
 Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
 Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
 Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
 Recipient of the Best Performance Award for the year 2006 – 07.
 Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati
Professional Accolades
 Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle
 Gained on job Training on “Maintenance of Over Head Equipments” at DMRC
 220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.
 220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.
 GT transformer, 57 MVA of ABB make.
 Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.
 Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear
panels, Power Cables, Battery Chargers.
 Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.
 Recipient of the Best Performance Award for the year 2006 – 07.
 Had been awarded as the star performer for electrical department in March 2008 and
the exceptional performer in the year 2010.
EDUCATION DEVELOPMENT
Diploma in Electrical Engineering 2005
M. S University, Baroda
D.O.B: 1
st
Dec 1986
Languages Known: English, Hindi and Gujarati

More Related Content

What's hot

Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
Subhash +966535838322
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
Rama Nand Yadav
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 

What's hot (20)

Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
CV
CVCV
CV
 

Viewers also liked

Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction Power
Karl Berger, P.E.
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electricalManoj Harsule
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLW
Arunava Paul
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eeepriyansh patel
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxAnkan Dey
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 201127suraj
 
Structural Health Monitoring
Structural Health MonitoringStructural Health Monitoring
Structural Health Monitoring
JNTU
 
Electric circuits-chapter-2 Basic Laws
Electric circuits-chapter-2 Basic LawsElectric circuits-chapter-2 Basic Laws
Electric circuits-chapter-2 Basic Lawsrahman84
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
Arun Das
 
Chapter 2: Fundamentals of Electric Circuit
Chapter 2: Fundamentals of Electric CircuitChapter 2: Fundamentals of Electric Circuit
Chapter 2: Fundamentals of Electric Circuit
murniatis
 
ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNL
Rajesh Prasad
 
Implementation of Structural Health Monitoring System for live monitoring of ...
Implementation of Structural Health Monitoring System for live monitoring of ...Implementation of Structural Health Monitoring System for live monitoring of ...
Implementation of Structural Health Monitoring System for live monitoring of ...
Rajesh Prasad
 
Electric circuits-chapter-1 Basic Concept
Electric circuits-chapter-1 Basic ConceptElectric circuits-chapter-1 Basic Concept
Electric circuits-chapter-1 Basic Conceptrahman84
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
saryhasabadly
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation
Shrijeet Modi
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy pptshubhajit_b
 

Viewers also liked (17)

Balanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction PowerBalanced Three-Phase Grid Supply for Traction Power
Balanced Three-Phase Grid Supply for Traction Power
 
Eeg 3 phase_electrical
Eeg 3 phase_electricalEeg 3 phase_electrical
Eeg 3 phase_electrical
 
An overview of vocational training in CLW
An overview of vocational training in CLWAn overview of vocational training in CLW
An overview of vocational training in CLW
 
Lesson 1 fundamentals eee
Lesson 1 fundamentals eeeLesson 1 fundamentals eee
Lesson 1 fundamentals eee
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Training ppt on clw 2011
Training ppt on clw 2011Training ppt on clw 2011
Training ppt on clw 2011
 
Structural Health Monitoring
Structural Health MonitoringStructural Health Monitoring
Structural Health Monitoring
 
Electric circuits-chapter-2 Basic Laws
Electric circuits-chapter-2 Basic LawsElectric circuits-chapter-2 Basic Laws
Electric circuits-chapter-2 Basic Laws
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Chapter 2: Fundamentals of Electric Circuit
Chapter 2: Fundamentals of Electric CircuitChapter 2: Fundamentals of Electric Circuit
Chapter 2: Fundamentals of Electric Circuit
 
ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNL
 
Implementation of Structural Health Monitoring System for live monitoring of ...
Implementation of Structural Health Monitoring System for live monitoring of ...Implementation of Structural Health Monitoring System for live monitoring of ...
Implementation of Structural Health Monitoring System for live monitoring of ...
 
Electric circuits-chapter-1 Basic Concept
Electric circuits-chapter-1 Basic ConceptElectric circuits-chapter-1 Basic Concept
Electric circuits-chapter-1 Basic Concept
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy ppt
 

Similar to Ankit updated Resume

mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineerMubashir ahmee
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume AjayAjay kumar
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014Paul Eckardt
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014Paul Eckardt
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
IQBAL KHAN
 

Similar to Ankit updated Resume (20)

mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
DIPESH KUMAR
DIPESH KUMARDIPESH KUMAR
DIPESH KUMAR
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 

Ankit updated Resume

  • 1. ANKIT AGARWAL 303, Haridra Apartment, Sector 35G, Kharghar, Navi Mumbai 410210. Contact: +91 9619731806 E-mail: ankit.grwl1@gmail.com Skype ID:ankit.agarwal820 ELECTRICAL ENGINEERING /PROJECT MANAGEMENT PROFESSIONAL Seeking Project Management Assignments with Reputed and Growth Oriented Organization in the Projects / Electrical Equipments / Design Industries PROFILE  Technically accomplished professional with 10 years pioneering career in managing Electrical, Metro Projects and Maintenance. Currently associated with Louis Berger Consulting Pvt. Ltd. as a Sr. Project Engineer PST & SCADA for Navi Mumbai Metro Line -1 project.  Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining to the overall execution of the Projects, Quality Management, Design & Development, and Technical Services.  Adopt project management tools and techniques like project planning & scheduling using project management tools such as MS Project.  Overall planning and monitoring of resource, cost, material and manpower for projects.  Managing project operations with a view to ensure timely accomplishment of targets within the scope, time and cost parameters.  Gained Knowledge of Planning, Installation, Commissioning and Handling Projects. Well versed with MS Project & AutoCAD 2005  Demonstrated abilities in formulating project plans and schedules while handling electrical equipments, undertaking erection, testing and commissioning , failure analysis along with ensuring preventive maintenance and condition monitoring of all electrical systems including power transformers, relays, protection schemes and circuit breaker  Techno commercial expertise with immense confidence to accept and meet challenging assignments with career excellence in various areas.  Extremely systematic and organized with quick adaptability to changing trends, technologies and processes with a logical, analytical and scientific approach.  Deft in swiftly ramping up projects in close coordination with project team, contractors, interfacing departments, consultants & other external agencies and ensuring on time deliverables. Core Competencies: Project Planning♦ Testing and commissioning♦ Operation/ Maintenance of Electrical Systems ♦Project Management♦ Troubleshooting ♦ Reporting/Documentation ♦ Quality Compliance♦ Team Management PROFESSIONAL EXPERIENCE LOUIS BERGER CONSULTING PVT. LTD. OCT’15 TO TILL NOW
  • 2.  Maintain QA-QC in respect to tender compliance and QAP plan for PST and SCADA system.  Reviewing Design Drawings & Design Calculations as per Specifications & Codes/Standards for power supply system, OHE and SCADA.  Approvals of Preliminary Designs, Working Drawings, Equipment’s / Materials, Method Statements and other contractual documents for power supply system, OHE and SCADA.  Monitoring execution Works as per Drawings & Specifications.  Preparing various Periodical Reports regarding Design/ Shop Drawings approval Status, Materials Procurement Status & Site Progress of works for power supply system, OHE and SCADA.  Carrying out Quality Checks & Inspections as per approved Method Statements.  Constant Co-coordination between Client, Sub-Contractors and other concerned Authorities etc.  RAMS – Under inputs from RAMS team refer to the Hazard log, understand and meet the requirements of RAMS for respective equipment to meet system requirements.  Prepare snags of sites and suggesting actions to the contractor for better management.  Ensure and advice the executing contractor for work progress on the basis of tender guidelines and respective local and international compliance codes and standards.  Responsible for doing FAT and SAT inspections for various Power supply equipment, OHE material and equipment and SCADA systems.  Technical Support to contractors for vendor assessment and deployment. METRO ONE OPERATION PVT LTD SEP’11 TO SEP’15  Responsible for maintenance of OHE, power supply network, SCADA and ENM equipment’s for Mumbai Metro Line- 1.  Preparation of Work instructions training modules and SOP’s.  Preparation of maintenance plan and execution as per work instruction & SOP’s to maintain the RAMS.  Worked on secondment from Metro One Operations Pvt Ltd. To Mumbai Metro One Pvt. Ltd. (Reliance) for execution of project since February 2012 to February 2014.  Successful execution of power supply network and ENM system for the project of Metro Train in Mumbai with train trials and integration testing with other divisions.  Responsible for the planning, procurement and design approvals for power system of Mumbai metro line -1.  Design approvals, installation and testing of earthing system and lightening protection system.  Erection, testing & commissioning of 3 nos. of 33 kV /25 kV 20 MVA Traction transformers.  Erection, testing & commissioning of the 3 nos. of 33 kV /11 kV 20 MVA Auxiliary Main transformers.  Erection, testing & commissioning of the 30 nos. of 11 kV /415 V Dry type Auxiliary transformers for Depot and Station Auxiliary substations.  Erection, testing & commissioning of 33 kV ABB GIS Substation.  Erection, testing & commissioning of 25 kV AREVA GIS traction Substation.
  • 3.  Erection, testing & commissioning of 11 kV AREVA AIS Substation.  Installation and testing of Cables HT & LT at Main receiving substations and auxiliary substation as per IEEE and IS standards.  Erection, testing & commissioning of 11 kV Auxiliary substation at Depot and Station that includes 4 way and 3 way RMU’s, Dry type transformer and LT panels.  Testing of protection relays i.e. ABB REF 542 +, ABB REF 610, Micom P132, Micom P438, Micom P 122, Micom P121, Micom P127, Ashida relays and other auxiliary relays.  Design approvals, installation and testing of earthing scheme for Substations, Auxilliary substations in Stations and Viaduct earthing.  Testing ,commissioning & scheme checking for Main Receiving substations, Traction substation, Auxilliary substations of depot and stations.  Testing & commissioning of OHE equipments i.e. interrupters, isolators, PT’s, Booster transformer and interlocks.  Responsible for design approvals i.e. Input /output list, Cable schedules, Logical schemes, interlocks, Views of MicroSCADA Pro with RTU 560 for Mumbai Metro Line-1.  Successfully commissioned SCADA system of entire Mumbai Metro Line-1 corridor including Depot.  Successfully commissioned large display panel for SCADA system in OCC and back up SCADA with automatic control transfer scheme for OCC, Back up SCADA and Local SCADA in RSS.  Responsible for the entire relay co-ordination of the system for Mumbai Metro Line-1 corridor and successfully commissioned system with train trials.  Responsible for applications and comments compliance to Electrical Inspector General and Independent engineers for Drawings and charging approvals of Electrical System.  Preperation of documents submittals for RDSO and CMRS.  Providing training to employees for Power supply and SCADA system in Metro One Operations Pvt Ltd.  Procuring, making purchase orders for the things required in the corridor.  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  Awarded training for “Train Pilot” and SCADA system.  Assist in preparation of maintenance training modules for PST and ENM department.  Provided training for ENM, Power Supply and Over head equipment to Operation Direction. LARSEN & TOUBRO FEB’11 TO SEP’11  Execution of 220 KV Substation project.  33 kV Distribution Substations and 11kV Distribution substation design approval.  Design Approval of substation automation system (SCADA).  Liasioning for power connection and import of power in open access.  Played a vital role in relay coordination scheme for entire power system of LTSHF. WELSPUN CORP LTD. DEC’05 TO JAN’11  Preparation of baseline construction program at the tendering stage and detailing of the same during the project
  • 4. Execution stage.  Executed successfully 220 KV Substations, 11 KV Distribution Substations, Capacitor Banks, LV Distribution Systems, and Distribution Transformers from 1.5 MVA to 15 MVA, Installation Application checking before charging, Troubleshooting, Operation and Maintenance at welspun.  Have been a key member of PMO (Project Management Office) in the organization with the responsibility of conducting review meetings with the key project members from planning point of view. Erection of 220 KV Switchyard equipments, earthing, transformers upto 57 MVA.  Erection, Testing and commissioning of CT, PT, Isolators, Sf6 Ckt. Breaker, Indoor Switchgears, Power Transformer, Relay and Control Panels, HT Cables, Battery banks and chargers.  Preparing Interlock logic for Isolators, earth switch, HT & LT Switchgears, Cable Schedule, Retrofitting job of Control Panel and HT Panel.  Responsible for billing of contractors, following up with the vendors for material.  Accountable for Billing with GEB for export surplus power and import power from GEB and TPTCL and SLDC (Gujarat) for open access power sale.  Responsible for conducting speedy & quality work with safety, handling routine Mechanical and Civil activities and leading a team responsible for power factor analysis and improvement.  Preparing the cable schedule for the control panels, RTU panels and modification work in control drawings.  Procurement of material, negotiation, follow up with vendors.  Knowledge of the liasioning work for New Power Connection, Open Access, state electricity board, Change of Name, electricity duty, short term open access permission for export of power and purchasing of power through open access. Project Executed  Successfully commissioned power system and OHE network for Mumbai Metro Line-1.  Successfully commissioned SCADA system for Mumbai Metro Line-1 with training to operation direction.  Successful trial runs for Mumbai Metro Line-1.  Completed project of 220/11 kV Main receiving substation Phase-1 for Welspun Corp Limited.  Completed project of 220/11 kV Power plant synchronizing and interconnecting Substation Phase-2 for Welspun Corp Limited.  Completed the project of 220 KV MRSS, 33 KV Substations, Energy Management System, plant lighting designing at L&T Special Steel and Heavy forgings pvt. Ltd.. Career Path Sr. Project Engineer- PST and SCADA Oct’15 - Till Now Manager- PST and SCADA Jan’15 - Sept’15 Sr. Engineer (Metro One Operation Pvt. Ltd.) Sep’11 – Dec’14 Sr. Engineer (L&T) Feb’11 – Sep’11 Sr. Engineer (WELSPUN CORP LTD.) Mar’10 – Jan’11 Engineer (WELSPUN CORP LTD.) Apr ’09 – Mar ’10 Asst. Engineer Dec ’06 – Mar ’09 Trainee Engineer Dec’ 05 –Dec ’06
  • 5. Professional Accolades  Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.  220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.  GT transformer, 57 MVA of ABB make.  Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.  Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear panels, Power Cables, Battery Chargers.  Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.  Recipient of the Best Performance Award for the year 2006 – 07.  Had been awarded as the star performer for electrical department in March 2008 and the exceptional performer in the year 2010. EDUCATION DEVELOPMENT Diploma in Electrical Engineering 2005 M. S University, Baroda D.O.B: 1 st Dec 1986 Languages Known: English, Hindi and Gujarati
  • 6. Professional Accolades  Awarded training for “Train Pilot” for driving Maintenance Rail Vehicle  Gained on job Training on “Maintenance of Over Head Equipments” at DMRC  220KV (Line in Line out) Substation consisting of two 220 / 11 KV 50 MVA transformer of AREVA make in May’07.  220KV Synchronizing substation consisting of one 220 / 11KV 50 MVA transformer of AREVA make in Jul’07.  GT transformer, 57 MVA of ABB make.  Ht section of the plate mill division consisting distribution transformers, HT and LT switchgears, Capacitor banks.  Played a vital role in Erection, Testing and Commissioning of EHV / HV Switchyard, HV / LV Indoor Switchgear panels, Power Cables, Battery Chargers.  Recipient of Star of the month award for Metro One operation Pvt. Ltd in 2014.  Recipient of the Best Performance Award for the year 2006 – 07.  Had been awarded as the star performer for electrical department in March 2008 and the exceptional performer in the year 2010. EDUCATION DEVELOPMENT Diploma in Electrical Engineering 2005 M. S University, Baroda D.O.B: 1 st Dec 1986 Languages Known: English, Hindi and Gujarati