IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance in Construction Projects
•
0 likes
•
34 views
IRJET Journal
Follow
https://www.irjet.net/archives/V5/i8/IRJET-V5I887.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 9
Download now
Download to read offline
Recommended
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET Journal
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET Journal
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
IRJET Journal
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
eSAT Journals
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET Journal
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET Journal
Recommended
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET Journal
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET Journal
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
IRJET Journal
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
eSAT Journals
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET Journal
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET Journal
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET Journal
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET Journal
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET Journal
Impact of delayness on construction projects
Impact of delayness on construction projects
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET Journal
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET Journal
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
IRJET Journal
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
IRJET- Analysis of Change Order in Road Construction Projects
IRJET- Analysis of Change Order in Road Construction Projects
IRJET Journal
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
IAEME Publication
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
IAEME Publication
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET Journal
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
IRJET Journal
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
IRJET Journal
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
IRJET Journal
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET Journal
More Related Content
What's hot
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET Journal
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET Journal
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET Journal
Impact of delayness on construction projects
Impact of delayness on construction projects
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET Journal
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET Journal
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
IRJET Journal
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
IRJET- Analysis of Change Order in Road Construction Projects
IRJET- Analysis of Change Order in Road Construction Projects
IRJET Journal
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
IAEME Publication
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
IAEME Publication
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET Journal
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
IRJET Journal
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
IRJET Journal
What's hot
(20)
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Last Planner System
IRJET- Last Planner System
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
Impact of delayness on construction projects
Impact of delayness on construction projects
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
IRJET- Analysis of Change Order in Road Construction Projects
IRJET- Analysis of Change Order in Road Construction Projects
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
Similar to IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance in Construction Projects
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
IRJET Journal
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET Journal
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET Journal
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
IRJET Journal
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET Journal
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET Journal
RII & IMPI: Effective Techniques for Finding Delay in Construction Project
RII & IMPI: Effective Techniques for Finding Delay in Construction Project
IRJET Journal
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET Journal
IRJET- The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
IRJET Journal
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET Journal
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
IRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET Journal
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
IRJET Journal
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
IRJET Journal
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
IRJET Journal
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET Journal
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET Journal
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
IRJET Journal
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
Similar to IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance in Construction Projects
(20)
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study on Comparison of Precast and Cast In-Situ Construction of the St...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
RII & IMPI: Effective Techniques for Finding Delay in Construction Project
RII & IMPI: Effective Techniques for Finding Delay in Construction Project
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET- The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction Industry
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
Internship report on mechanical engineering
Internship report on mechanical engineering
malavadedarshan25
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
slot gacor bisa pakai pulsa
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
AbhinavSharma374939
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
ranjana rawat
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Suhani Kapoor
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
wendy cai
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Mark Billinghurst
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
ssuser5c9d4b1
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
Recently uploaded
(20)
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Internship report on mechanical engineering
Internship report on mechanical engineering
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance in Construction Projects
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 489 Evaluation of Rework Factors Affecting Cost and Schedule Performance in Construction Projects. Aman Sen, A.K. Dwivedi, Dr. M.K. Trivedi Civil Engineering Department, MITS, Gwalior, Madhya Pradesh, India. ---------------------------------------------------------------------***---------------------------------------------------------------- Abstract: - Rework is a tenable problem in construction industry. The additional cost and duration due to rework can have effect on overall project performance work. The research represented in this paper aims to identify the rework factors and calculate the total rework cost in construction projects. Using a questionnaire survey, the data was analyzed from various infrastructure projects and from the past researches the four main factors and their sub factors are selected which is most responsible for rework in construction projects. The ranking of rework factors is done by the analytical hierarchy process and rework cost can be calculated by the probabilistic approach. Author Keywords: - project management, rework cost, AHP, critical path, schedule overruns. 1. Introduction: - Rework is an ordinary situation in construction projects and has been identified as the factors that can increase construction project cost, project duration and reduce the construction project performance. Abandon defects, errors, poor management and non-conformance may result into cost growth and schedule growth in construction projects. Rework is defined as the activity that was improperly performed at the first time in construction. The main factors can affect the project performance is lack of use of information technology, client involvement, unclear working procedure, changes made by the client PETER E.D. LOVE (2010). The direct cost of rework is 12.4% of total construction cost BURATI et al (1992). And the rework cost is 11% of the contract value in construction project NURIA FORCADA (2017). The awarded budget is approximately 17% of the corrected budget. This condition of rework in construction is occurred due to the insufficiency in details analysis of construction work and during the design process lack of use of technology in construction work NURIA FORCADA AND ANGELA P (2017). The rework schedule overrun is 38.26% of the total construction project duration and approximately 10 % cost overrun of the total construction project cost L.O. OYEWOBI, A.A. OKE (2011). The main object of this research is to identify the rework factors and classify the rework factors according to there weightage which is most responsible for rework in construction industry and calculate the total rework cost in construction projects. 2. OBJECTIVE: - 1. To identify rework factors and ranking of the rework factors. 2. Calculate the total rework cost in construction project. 3. SOURCES OF REWORK: - Total 20 factors of rework are taken in study and these rework factors are classified into 4 main groups as shown in table. 3.1.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 490 Table-3.1: lists of factors causes rework in construction projects. Sr no. Group Factors 1 design related factors Poor used of advanced engineering Inadequate details collection before preparing design Poor communication between members of design team Design mistake due to numerous design Insufficiency of attention on design details 2 Client related factors Money and time spent on preparation of work Poor coordination with design consultants Insufficiency of experience and understanding of design Shortage of funding for site investigation Lack of client participation 3 Contractor related factors Imperfect construction technique Unsuitable construction methods procedure Low quality of construction materials Imperfect observation of acceptance material/equipment’s Insufficiency of mechanical equipment’s 4 Extraneous environment factors Changes rules and regulation by the government Construction work affected by social and cultural factors Improper site condition Improve standard by the end users Dangerous natural climate and atmosphere The table 3.1 will be used for analyzing the data to find the rank of rework alternatives and relative importance of the rework alternatives by analytical hierarchy process. 4. Research Methodology: - The goal of this research is done by two strategies first is the relative importance of 4 main factors and there sub factors is evaluated by the analytical hierarchy process and total rework cost is calculated by the probabilistic approach. 4.1 Analytical hierarchy process: - AHP is a multi-criteria decision making tool used for designate the alternatives by pair wise comparison of each criteria’s which is accomplished by comparing pair wise alternatives this is done by following steps:- 1. Construct the model of decision matrix. 2. Evaluate the priorities of each criteria’s. 3. Evaluate the priorities of sub criteria’s. 4. Evaluate the alternatives with highest priorities or weightage, by evaluating consistency index followed by consistency ratio which should be less than 10%.
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 491 Table 4.1.1 This analysis is used for evaluating rework cost as shown in Table-4.1.1 4.2 Rework Cost Mechanism: - the method generated for calculating rework amount and rework cost Where, = this is the critical activity duration. = the weightage of rework activities, which is obtained by evaluating the priorities weightage of each criteria’s which is maximum of all. = total cost which is associated with each critical activity. =the amount of rework which is related to the cost of rework, as the rework increases, cost of project increases hence result in increasing in rework cost. The critical activity is the one which significantly affect the project cost, hence the above methodology is adopted for critical activities. 5. Data analysis:- 5.1Data analysis by analytical hierarchy process The relative importance of main group and there sub groups is determined by analytical hierarchy process. = * =
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 492 Table-5.1.1 Main Group ranking Factors weight Rank Design related factors .085 4 Client related factors .512 1 Contractor related factors .292 2 Extraneous environment factors .111 3 The ranking of the main group is s hown in table 5.1.1 Table-5.1.2 Ranking of design related factors Factors weight Rank Poor used of advanced engineering .260 2 Inadequate details collection before preparing design .077 5 Poor communication between members of design team .172 3 Design mistake due to numerous design .099 4 Insufficiency of attention on design details .393 1 The ranking of the factors under the influence of design related factors is shown in 5.1.2 Table-5.1.3 Ranking of client related factors The ranking of the factors under the influence of extraneous environment factors is shown in 5.1.3 Table-5.1.4 Ranking of contractor related factors
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 493 The ranking of the factors under the influence of contractor related factors is shown in 5.1.4 Table-5.1.5 Ranking Of Extraneous Environment Factors The ranking of the factors under the influence of extraneous environment factors is shown in 5.1.5 Table-5.1.6 Global Ranking The ranking of the factors under the influence of client related factors is shown in 5.1.6
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 494 5.2 Rework cost calculation: - In this research study Calculate the rework amount and rework cost, take an example for calculation of rework amount and rework cost. activity A,B,C,D,E,F and there duration and normal cost are show in example. And the network diagram of these activity is also shown, Activity Duration (days) Normal cost (₹) A 120 12,000/- B 20 1,800/- C 40 16,000/- D 30 1,400/- E 40 3,600/- F 60 13,500/- FIG. 1 ACTIVITY NETWORK DIAG. Table 5.2.1 cost calculation for critical activity B FACTORS DURATION (DAYS) COST WEIGHTAGE REWORK AMOUNT REWOK COST (₹) Lack of experience and knowledge of design and construction process. 20 DAYS 1800 .288 5.76 103.68 Poor quality of construction technique .266 5.32 95.76 Poor use of advanced engineering .133 2.66 47.88 Adverse natural condition .111 2.22 39.96 Lack of use of advanced mechanical equipment’s .100 2 36.00 The total rework cost for activity B is shown in table 5.2.1
7.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 495 Table 5.2.2 cost calculation for critical activity C FACTORS DURATION (DAYS) COST WEIGHTAGE REWORK AMOUNT REWORK COST (₹) Lack of experience and knowledge of design and construction process. 40 DAYS 16000 .288 11.52 1843.2 Poor quality of construction technique .266 10.64 1702 Poor use of advanced engineering .133 5.32 851.40 Adverse natural condition .111 4.44 710.40 Lack of use of advanced mechanical equipment's .100 4.0 640 The total rework cost for activity C is shown in table 5.2.2 Table 5.2.3 cost calculation for critical activity D FACTORS DURATION (DAYS) COST WEIGHTAGE REWORK AMOUNT REWORK COST (₹) Lack of experience and knowledge of design and construction process. 30 DAYS 1400 .288 8.63 120.96 Poor quality of construction technique .266 7.98 110.46 Poor use of advanced engineering .133 3.99 55.86 Adverse natural condition .111 3.33 46.62 Lack of use of advanced mechanical equipment's .100 3.00 42.00 The total rework cost for activity D is shown in table 5.2.3 Table 5.2.4 cost calculation for critical activity E FACTORS DURATION (DAYS) COST WEIGHTAGE REWORK AMOUNT REWORK COST (₹)
8.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 496 Lack of experience and knowledge of design and construction process. 40 DAYS 3600 .288 11.52 414,72 Poor quality of construction technique .266 10.64 383.04 Poor use of advanced engineering .133 5.32 191.52 Adverse natural condition .111 4.44 159.84 Lack of use of advanced mechanical equipment's .100 4.0 144.00 The total rework cost for activity E is shown in table 5.2.4 The total rework cost for critical path B-C-D-E IS 7740/- and the total project cost for overall project is 48300/- according to these data the total rework cost is 18.40% of the total project cost in construction industry. Conclusion:- The important conclusion withdraw from this research study is the client and contractor related factors are most responsible for rework in construction projects. And the ranking of four main groups respectively are client related factors, contractor related factors, extraneous environment factors and design related factors. Lack of experience and knowledge of design and construction process, poor quality of construction technique and poor used of advanced engineering are more responsible for rework in construction process. The total rework cost is approximately 15-20% of the total project cost in construction work based on the probabilistic approach. REFERENCES:- 1. Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. 2009. “Project pathogens: The anatomy of omission errors in construction and resource engineering projects.” IEEE Trans. Eng. Manage., 563, 425–435. 2. Zhang, D. (2010). “Analysis of a construction small-projects rework reduction program for a capital facility.”J. Constr. Eng. Manage., 2012, 138(12):1377-1385 3. Blacud, N. A., Bogus, S. M., Diekmann, J. E., and Molenaar, K. R. (2009). “Sensitivity of construction activities under design uncertainty.” J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:3(199), 199–206 4. Love, P. E. D., Irani, Z., and Edwards, D. J. 2004. “A rework reduction model for construction projects.” IEEE Trans. Eng. Manage., 514, 426–440. 5. Reza Dehghan and Janaka Y. Ruwnapura (2014). “model of trade-off between overlapping and rework of design activities.” J. Constr. Eng. Manage., 2014, 140(2): 04013043 6. Love, P. E. D., and Edwards, D. 2005. “Calculating total rework costs in Australian construction projects.” Civ. Eng. Environ. Syst., 221, 11– 27. 7. Nuria Forcada ,Angela P. Alvarez,Peter E. D. Love, and David J. Edwards (2017) “ Rework in Urban Renewal Projects in Colombia” j. Infrastruct., 2017, 23(2):04016034
9.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 08 | Aug 2018 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 497 8. Love, P. E. D., and Edwards, D. 2005. “Calculating total rework costs in Australian construction projects.” Civ. Eng. Environ. Syst., 221, 11– 27. 9. Gui ye, Zhigang Jin, Bo Xia (2015) “analyzing causes for reworks in construction projects in china.” J. Manage. Eng., 2015, 31(6): 04014097 10. Nuriya Forcada, Fartna Ganggolells, Miquel Casals(2017) “factors affecting rework cost in construction.” J. Constr. Eng. Manage., 2017, 143(8): 04017032 11. Love, P. E. D., and Smith, J. 2003. “Bench-marking, bench-action and bench-learning: Rework mitigation in projects.” J. Manage. Eng., 194, 147–159
Download now