USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE
PERFORMANCE IN MUNICIPAL CONSTRUCTION PROJECT
Author: Rahul Bhati1, Shubh Kant Yadav2
1Master of technology in Civil Engineering
2Professor in Civil Department
IEC College of Engineering & Technology Greater Noida
---------------------------------------------------------------------------***----------------------------------------------------------------------
ABSTRACT
The goal of lean techniques in construction is to reduce waste, improve communication, and create teamwork. The increasing
demand for public works projects needs a focus on efficient construction project services, hence focusing on municipal project
delivery is essential. The term “population works” refers to a broad spectrum of public-benefit infrastructure projects financed
and constructed by local governments. Municipal construction presents particular challenges when compared to other sorts of
projects. All around the metro area and the neighboring areas, these programmes are making a difference. The focus of this
thesis is on lean construction approaches, which attempt to bring new insights into how lean techniques might reduce non-
physical waste connected with the actual delivery of the project. In order to solve difficulties, speed up project development
and give recommendations for improved municipal building projects, only lean methodologies may be applied. To improve
and broaden the classification of non-physically controlled trash, this study employs the AHP. In this thesis, AHP is used to
identify the goal, classify the waste, and apply the necessary lean methodologies. Building professionals' experience was used
to determine the relative importance of a given set of alternatives. The AHP approach, which identified and prioritized issues,
reduced waste and improved performance.
Keywords: lean techniques, construction, Municipal construction, AHP, waste reduction
Introduction
A method to manufacturing that minimizes waste in materials, time and labor is known as lean construction. Improved
contractual arrangements, product design/method of selection, supply chain, and operational workflow reliability will benefit
all stakeholders if they are made in a methodical, synergistic, and continuous manner [1]. Due to a variety of challenges, the
building sector has been lagging behind the manufacturing industry for many years. A mixed strategy is preferable over a
divided one because of its adaptability and flexibility. The complexity of the building business necessitates a higher level of
technological innovation than does manufacturing [2].
Lean construction methods will cause a sea change in the construction industry. Companies in today's highly competitive
market have improved job efficiency and quality, cut waste and costs, and raised profits as a result of their efforts to stay
relevant [2]. Fewer resources are used while still satisfying customer needs in building that adheres to lean construction
principles. It is essential to understand the “Physics of Building” of production management in order to implement lean
construction. It's a radical departure from the way things are currently done. Any construction project can benefit from them,
but they are particularly well-suited to those that are both challenging and time-sensitive [2 & 3].
Cutting down on waste is one of the best ways for a business to increase revenues. In the construction of a building, materials
that are either created directly or indirectly are referred to as “construction trash.” If you want the most value for your money,
lean construction (LC) is all about eliminating errors and minimizing waste [3]. All of these elements can be reduced by
reducing the number of inputs that are used, including labor, machinery, space, and time. It is the goal of lean construction to
reduce waste while increasing quality and productivity. The goals of this document mention the integration of construction
facilities and procedures with concurrent design.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3876
Objectives
1. Investigate how lean construction approaches might boost the efficiency and effectiveness of municipal project
delivery.
2. To contribute to the corpus of knowledge on how waste might be reduced in municipal project delivery using lean
methodologies.
3. As a way to learn more about how construction companies and their clients communicate and exchange information.
Related work
Ankit Bhatla, et al. [1]. According to the findings of a life-cycle study, it is recommended that waste management for
construction and demolition be improved in order to maximize recycling and reduce construction waste disposal. It appears
that this index will be difficult to control because of the lack of precision with which it is calculated. Abdelrazig YE [2]. As per
his analysis, in recent years, a rising number of businesses have embraced lean and environmentally friendly building
practices with great success. For example, lean construction and green building concepts have shown this to be true on
numerous instances. Few studies have examined how to implement lean and green principles in real-world contexts, despite
the fact that they can be employed in a variety of ways. Being lean and being ecologically conscious are two principles that go
hand in hand, as we've seen time and time again. Aziz, R. F., and Hafez, S. M. [3]. His study goal of lean thinking to minimize
waste while simultaneously increasing value and improving on an ongoing basis. In order to lower the costs, time, and quality
of road construction, the overarching purpose of this research is to use a lean construction strategy throughout the
construction process. They conducted a number of interviews with specialists in order to have a better grasp of the advantages
and disadvantages of lean construction in road construction projects. First and first, in order to be successful in this industry,
one must be well informed of the issues and opportunities that exist.
RESEARCH METHODOLOGY
An AHP was utilized to organize the data for this investigation. The research discovered a collection of garbage from municipal
construction projects that may be managed. Julie Emerald Jiju, et al controlled waste categorization system by Mughees Aslam
et al., lean approaches are predicted to yield substantial gains if used in conjunction with it. In order to get additional
information on the implementation of lean techniques, a survey of industry experts was sent out and the decision criteria were
organized in a hierarchical framework. Using the AHP approach, these initiatives were prioritized and reviewed to see how
they fit into the larger goal of lean building practices [4].
DATA COLLECTION
In order to obtain information, the researchers had to examine secondary sources such as books and journal articles.
Databases such as ABI/Inform and the General Business files, among others, have made it feasible to have access to critical
information. It was one of the study's key aims to determine whether or not the findings had an impact on worldwide brand
trust.
DATA ANALYSIS
In quantitative research, data analysis is used to minimize, organize, and analyze the information acquired by the investigators
[4]. A statistician analysis used to analyze the research data. There are both visual and numerical representations of the data
to choose from. The aforementioned statistics were obtained by averaging, mediating, and summing the relevant variables [5].
To see if there was any correlation, the variables of interest were connected using Pearson's or Spearman's methodologies.
The confidence interval for this experiment was set at 95%.
RESULT AND DISCUSSION
The strategies and methodologies for doing research were thoroughly explored in above section. This chapter covers, among
other things, how the data was acquired, how it was analyzed, and how the results were validated [5]. This chapter discusses
the use of the AHP technique as well as the thesis' findings.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3877
DISTRIBUTION OF SURVEY RESPONDENTS
Data from the 100 survey participants were analyzed according to their location (NCR Delhi and Faridabad), sector (private
versus public), and position (Director/Principal, Project Manager/Engineer, and Others), as shown in Table 1. Table 2
illustrates how the information gathered from the 100 survey participants was categorized and analyzed by position.
Table.4.1. Waste Associated with construction Management respondents
S.No. Participants based
on areas
Respondents
categories
Total
respondents
Percentage (%) of
total respondents
1. Based on position
Director/principal 65 65%
Project manager 35 35%
Total 100 100%
2. based on sector
private 60 60%
public 40 40%
Total 100 100%
3. Based on ownership
contractors 70 70%
owners 30 30%
Total 100 100%
Figure.4.1. Based on location, the distribution of survey respondents
Figure.4.2. Based on sectors, the distribution of survey respondents
90
10
Distribution of survey respondents by
locations
NCR Delhi
Faridabad
60%
40%
Distribution of survey respondents based
on sectors
private
public
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3878
Figure.4.3. Based on position, the distribution of survey respondents
Figure.4.4. Based on ownership, the distribution of survey respondents
Table.4.2. Knowledge about lean construction concept
S.No. Level of respondents Total respondents Percentage (%) of total respondents
1.
Excellent 40 40.00%
Good 35 35.00%
Fair 25 25.00%
Never heard 0 0.00%
Total 100 100%
Figure.4.5. Knowledge about lean construction concept
65
35
Distribution of survey based on positions
Director/principal
Project manager
70
30
Distribution based on ownership
contractors
owners
40%
35%
25%
0%
Level of respondents
Excellent
Good
Fair
Never heard
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3879
Table.4.3. Controllable waste from management vs. controllable waste from flows
S.No. Level of respondents Total
respondents
Percentage (%) of
total respondents
1.
Significantly less important 0 0.00%
Less important 25 25.00%
Equally important 45 45%
More important 20 20%
Significantly more important 10 10%
Total 100 100%
Figure.4.6. Controllable waste from management vs. controllable waste from flows
CONCLUSION
This chapter contains a summary of this thesis as well as the findings of the research into the use of lean techniques to
municipal project delivery improvement. This chapter also looked at the limits of the research and made some
recommendations for future work in this area.
According to this research, the following findings can be drawn:
1. It was determined that building waste was a type of controllable waste that needed to be managed.
2. An in-depth look at waste control and enhancement as it is applied by lean concepts was also gained from this
research.
3. A wide range of lean approaches have been established in order to reach the ultimate aim of reducing waste and
improving performance and production.
4. The survey results helped decision-makers achieve their aim by displaying the decision-making problem as a
hierarchy of criteria and alternatives through the AHP approach.
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
Waste association with construction management
respondents
Series 1
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3880
5. It was possible to make compromises between waste causes and lean method choices based on the survey data.
6. Based on the results of the poll, the most important variables to focus on are management activities and flows, with a
rate of 43 percent for each.
7. Lean techniques were outlined and prioritized for implementation at each level of waste.
FUTURE RECOMMENDATION
1. To serve as a model for future research on lean construction and the application of lean concepts throughout the
construction industry, this study was conducted.
2. As a result of this study's focus on a single industry and delivery mechanism, future research should look at different
project types.
3. However, this research was unable to investigate the building business globally.
REFERENCES
1. Ankit Bhatla, Bulu Pradhan and Jin Ouk Choi, (2016). Identifying Wastes in Construction Process and Implementing
the Last Planner System in India. KICEM Journal of Construction Engineering and Project Management, Vol. 6, No. 1,
2016, pp. 11-19, http://dx.doi.org/10.6106/JCEPM.2016.6.1.011.
2. Abdelrazig YE (2015). Using Lean Techniques to Reduce Waste And Improve Performance In Municipal Construction
Project Delivery. The University of Texas at Arlington.
3. Aziz, R. F., and Hafez, S. M. (2013). Applying lean thinking in construction and
performance improvement. Alexandria Engineering Journal, 52(4), 679-695.
4. Ahmed, S., and Forbes, L. (2011). Modern Construction: Lean Project Delivery and
Integrated Practices. CRC Press, New York, NY.
5. Anon (2006). Lean construction defined. https://www.leanconstruction.org/wp-content/uploads-2016/02/TDC-
CH04.pdf .
6. Bjorn Andersen, (2012). Lean Construction Practices and its Effects: A Case study at St.Olav’s Integrated Hospital,
Norway. Lean Construction Journal, 2012.

More Related Content

Similar to USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CONSTRUCTION PROJECT

IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction SitesIRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET Journal
 
The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...IRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction ManagementIRJET Journal
 
IRJET- Green Supply Chain Management in Construction Industry: A Review
IRJET- Green Supply Chain Management in Construction Industry: A ReviewIRJET- Green Supply Chain Management in Construction Industry: A Review
IRJET- Green Supply Chain Management in Construction Industry: A ReviewIRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 

Similar to USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CONSTRUCTION PROJECT (20)

IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable Construction
 
The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building Construction
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction Management
 
IRJET- Green Supply Chain Management in Construction Industry: A Review
IRJET- Green Supply Chain Management in Construction Industry: A ReviewIRJET- Green Supply Chain Management in Construction Industry: A Review
IRJET- Green Supply Chain Management in Construction Industry: A Review
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CONSTRUCTION PROJECT

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3875 USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CONSTRUCTION PROJECT Author: Rahul Bhati1, Shubh Kant Yadav2 1Master of technology in Civil Engineering 2Professor in Civil Department IEC College of Engineering & Technology Greater Noida ---------------------------------------------------------------------------***---------------------------------------------------------------------- ABSTRACT The goal of lean techniques in construction is to reduce waste, improve communication, and create teamwork. The increasing demand for public works projects needs a focus on efficient construction project services, hence focusing on municipal project delivery is essential. The term “population works” refers to a broad spectrum of public-benefit infrastructure projects financed and constructed by local governments. Municipal construction presents particular challenges when compared to other sorts of projects. All around the metro area and the neighboring areas, these programmes are making a difference. The focus of this thesis is on lean construction approaches, which attempt to bring new insights into how lean techniques might reduce non- physical waste connected with the actual delivery of the project. In order to solve difficulties, speed up project development and give recommendations for improved municipal building projects, only lean methodologies may be applied. To improve and broaden the classification of non-physically controlled trash, this study employs the AHP. In this thesis, AHP is used to identify the goal, classify the waste, and apply the necessary lean methodologies. Building professionals' experience was used to determine the relative importance of a given set of alternatives. The AHP approach, which identified and prioritized issues, reduced waste and improved performance. Keywords: lean techniques, construction, Municipal construction, AHP, waste reduction Introduction A method to manufacturing that minimizes waste in materials, time and labor is known as lean construction. Improved contractual arrangements, product design/method of selection, supply chain, and operational workflow reliability will benefit all stakeholders if they are made in a methodical, synergistic, and continuous manner [1]. Due to a variety of challenges, the building sector has been lagging behind the manufacturing industry for many years. A mixed strategy is preferable over a divided one because of its adaptability and flexibility. The complexity of the building business necessitates a higher level of technological innovation than does manufacturing [2]. Lean construction methods will cause a sea change in the construction industry. Companies in today's highly competitive market have improved job efficiency and quality, cut waste and costs, and raised profits as a result of their efforts to stay relevant [2]. Fewer resources are used while still satisfying customer needs in building that adheres to lean construction principles. It is essential to understand the “Physics of Building” of production management in order to implement lean construction. It's a radical departure from the way things are currently done. Any construction project can benefit from them, but they are particularly well-suited to those that are both challenging and time-sensitive [2 & 3]. Cutting down on waste is one of the best ways for a business to increase revenues. In the construction of a building, materials that are either created directly or indirectly are referred to as “construction trash.” If you want the most value for your money, lean construction (LC) is all about eliminating errors and minimizing waste [3]. All of these elements can be reduced by reducing the number of inputs that are used, including labor, machinery, space, and time. It is the goal of lean construction to reduce waste while increasing quality and productivity. The goals of this document mention the integration of construction facilities and procedures with concurrent design.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3876 Objectives 1. Investigate how lean construction approaches might boost the efficiency and effectiveness of municipal project delivery. 2. To contribute to the corpus of knowledge on how waste might be reduced in municipal project delivery using lean methodologies. 3. As a way to learn more about how construction companies and their clients communicate and exchange information. Related work Ankit Bhatla, et al. [1]. According to the findings of a life-cycle study, it is recommended that waste management for construction and demolition be improved in order to maximize recycling and reduce construction waste disposal. It appears that this index will be difficult to control because of the lack of precision with which it is calculated. Abdelrazig YE [2]. As per his analysis, in recent years, a rising number of businesses have embraced lean and environmentally friendly building practices with great success. For example, lean construction and green building concepts have shown this to be true on numerous instances. Few studies have examined how to implement lean and green principles in real-world contexts, despite the fact that they can be employed in a variety of ways. Being lean and being ecologically conscious are two principles that go hand in hand, as we've seen time and time again. Aziz, R. F., and Hafez, S. M. [3]. His study goal of lean thinking to minimize waste while simultaneously increasing value and improving on an ongoing basis. In order to lower the costs, time, and quality of road construction, the overarching purpose of this research is to use a lean construction strategy throughout the construction process. They conducted a number of interviews with specialists in order to have a better grasp of the advantages and disadvantages of lean construction in road construction projects. First and first, in order to be successful in this industry, one must be well informed of the issues and opportunities that exist. RESEARCH METHODOLOGY An AHP was utilized to organize the data for this investigation. The research discovered a collection of garbage from municipal construction projects that may be managed. Julie Emerald Jiju, et al controlled waste categorization system by Mughees Aslam et al., lean approaches are predicted to yield substantial gains if used in conjunction with it. In order to get additional information on the implementation of lean techniques, a survey of industry experts was sent out and the decision criteria were organized in a hierarchical framework. Using the AHP approach, these initiatives were prioritized and reviewed to see how they fit into the larger goal of lean building practices [4]. DATA COLLECTION In order to obtain information, the researchers had to examine secondary sources such as books and journal articles. Databases such as ABI/Inform and the General Business files, among others, have made it feasible to have access to critical information. It was one of the study's key aims to determine whether or not the findings had an impact on worldwide brand trust. DATA ANALYSIS In quantitative research, data analysis is used to minimize, organize, and analyze the information acquired by the investigators [4]. A statistician analysis used to analyze the research data. There are both visual and numerical representations of the data to choose from. The aforementioned statistics were obtained by averaging, mediating, and summing the relevant variables [5]. To see if there was any correlation, the variables of interest were connected using Pearson's or Spearman's methodologies. The confidence interval for this experiment was set at 95%. RESULT AND DISCUSSION The strategies and methodologies for doing research were thoroughly explored in above section. This chapter covers, among other things, how the data was acquired, how it was analyzed, and how the results were validated [5]. This chapter discusses the use of the AHP technique as well as the thesis' findings.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3877 DISTRIBUTION OF SURVEY RESPONDENTS Data from the 100 survey participants were analyzed according to their location (NCR Delhi and Faridabad), sector (private versus public), and position (Director/Principal, Project Manager/Engineer, and Others), as shown in Table 1. Table 2 illustrates how the information gathered from the 100 survey participants was categorized and analyzed by position. Table.4.1. Waste Associated with construction Management respondents S.No. Participants based on areas Respondents categories Total respondents Percentage (%) of total respondents 1. Based on position Director/principal 65 65% Project manager 35 35% Total 100 100% 2. based on sector private 60 60% public 40 40% Total 100 100% 3. Based on ownership contractors 70 70% owners 30 30% Total 100 100% Figure.4.1. Based on location, the distribution of survey respondents Figure.4.2. Based on sectors, the distribution of survey respondents 90 10 Distribution of survey respondents by locations NCR Delhi Faridabad 60% 40% Distribution of survey respondents based on sectors private public
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3878 Figure.4.3. Based on position, the distribution of survey respondents Figure.4.4. Based on ownership, the distribution of survey respondents Table.4.2. Knowledge about lean construction concept S.No. Level of respondents Total respondents Percentage (%) of total respondents 1. Excellent 40 40.00% Good 35 35.00% Fair 25 25.00% Never heard 0 0.00% Total 100 100% Figure.4.5. Knowledge about lean construction concept 65 35 Distribution of survey based on positions Director/principal Project manager 70 30 Distribution based on ownership contractors owners 40% 35% 25% 0% Level of respondents Excellent Good Fair Never heard
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3879 Table.4.3. Controllable waste from management vs. controllable waste from flows S.No. Level of respondents Total respondents Percentage (%) of total respondents 1. Significantly less important 0 0.00% Less important 25 25.00% Equally important 45 45% More important 20 20% Significantly more important 10 10% Total 100 100% Figure.4.6. Controllable waste from management vs. controllable waste from flows CONCLUSION This chapter contains a summary of this thesis as well as the findings of the research into the use of lean techniques to municipal project delivery improvement. This chapter also looked at the limits of the research and made some recommendations for future work in this area. According to this research, the following findings can be drawn: 1. It was determined that building waste was a type of controllable waste that needed to be managed. 2. An in-depth look at waste control and enhancement as it is applied by lean concepts was also gained from this research. 3. A wide range of lean approaches have been established in order to reach the ultimate aim of reducing waste and improving performance and production. 4. The survey results helped decision-makers achieve their aim by displaying the decision-making problem as a hierarchy of criteria and alternatives through the AHP approach. 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% Waste association with construction management respondents Series 1
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3880 5. It was possible to make compromises between waste causes and lean method choices based on the survey data. 6. Based on the results of the poll, the most important variables to focus on are management activities and flows, with a rate of 43 percent for each. 7. Lean techniques were outlined and prioritized for implementation at each level of waste. FUTURE RECOMMENDATION 1. To serve as a model for future research on lean construction and the application of lean concepts throughout the construction industry, this study was conducted. 2. As a result of this study's focus on a single industry and delivery mechanism, future research should look at different project types. 3. However, this research was unable to investigate the building business globally. REFERENCES 1. Ankit Bhatla, Bulu Pradhan and Jin Ouk Choi, (2016). Identifying Wastes in Construction Process and Implementing the Last Planner System in India. KICEM Journal of Construction Engineering and Project Management, Vol. 6, No. 1, 2016, pp. 11-19, http://dx.doi.org/10.6106/JCEPM.2016.6.1.011. 2. Abdelrazig YE (2015). Using Lean Techniques to Reduce Waste And Improve Performance In Municipal Construction Project Delivery. The University of Texas at Arlington. 3. Aziz, R. F., and Hafez, S. M. (2013). Applying lean thinking in construction and performance improvement. Alexandria Engineering Journal, 52(4), 679-695. 4. Ahmed, S., and Forbes, L. (2011). Modern Construction: Lean Project Delivery and Integrated Practices. CRC Press, New York, NY. 5. Anon (2006). Lean construction defined. https://www.leanconstruction.org/wp-content/uploads-2016/02/TDC- CH04.pdf . 6. Bjorn Andersen, (2012). Lean Construction Practices and its Effects: A Case study at St.Olav’s Integrated Hospital, Norway. Lean Construction Journal, 2012.