PREDICTION MODEL OF FACTORS CAUSING INCREASE IN OVERHEAD
COST IN CONSTRUCTON
Vivek S1, Shibi Varghese2
1PG Student, Structural Engineering and Construction Management, Dept. of Civil Engineering, Mar Athanasius
College of Engineering, Kothamangalam P.O, Ernakulam, Kerala, India
2Professor, Dept. of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam P.O, Ernakulam,
Kerala, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - General overhead costs are those costs that cannot be identified readily with a specific project. General overhead costs
are items that represent the cost of doing business and often are considered as fixed expenses that must be paid by the constructor
(firm). General overhead expenses include the general business expenses that are included by the home-office in support of the
company’s construction program (main-office or home office expenses). Office running cost (office rental, clerical, utilities…etc.).
Therefore, these cost items are distributed over all the company projects by some basis.
The main factors that cause variations in overhead cost in the Indian building construction industry is identified and
investigated. Relative Important index is find byusingSPSS Software. Thereliablepredictionofoverheadcostpercentagedecreases
time, effort and economy for construction firms.
Key Words: Construction, Overhead cost, Relative Important Index, Factors, SPSS
1. INTRODUCTION
Contractors doing specialised works are important in the construction industry. In such an altered environment, a general
contractor or construction firm overhead cost continuously increases. The total cost of a construction firm can be classifiedin
to direct and indirect costs. Direct costs which are directly attribute to project work items E.g. labour, materials, production
equipment, and supplies that must be incorporated into a distinct future in order to complete the work. Indirect costs include
other items that are not made a part of the completed work such as contractor's overheads, contingencies,escalation,risk,and
interest during the construction period. Overhead costs are generally divided into two categories: general overhead costsand
job overhead costs. General overhead costs are those costs that cannot be identified readily with a specific project. General
overhead costs are items that represent the cost of doing business andoftenareconsideredasfixedexpensesthat mustbe paid
by the constructor. General overhead expenses include the general business expenses that are included by the home-office in
support of the company’s construction program (main office or home-office expenses). They are intended to include all those
expenses (items) incurred by the home-office that cannot be tied directly to a given project such as,
1. Office Secretary
2. Office Engineers
3. Office running cost (office rental, clerical, utilities…etc.). These costs are included in the total cost on some basis.
Site overhead costs (project overhead costs) are similar to general overhead cost but it must be distributed over the project,
since it cannot be allocated to specific work item. Site overhead costs include expenses that cannot be charged directly to a
particular type of work, but are essential to construct the project, such as:
 Site accommodation
 Temporary services
 Site staff
 Clearing and levelling the site
 Mechanical plant not previously included in the item rates
 Welfare, first-aid and safety provisions
 Final clearance and handover
 Defects liability
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1019
These above-mentioned factors if not accounted for in the total bid pricethenthecompetitiveness,success,profitabilityofthe
construction firm will be affected badly.
However, the construction industry has not changed the method of controlling overhead costs in construction companies.
Traditionally, a construction company uses resource-based costing and volume-based allocation. Resources-based costing is
the method in which costs are allocated to object cost in accordance with the volume of direct labourhours,directlabourcosts
or contract amount.
The Indian construction industry is in need of a financial engineered estimating methodology (Model) that can assess project
site overhead cost prior to the submission of the bid documents. In order to achieve such a model itisimperativethatdifferent
techniques to be evaluated. This model will consider all the impacts of site overhead costs on boththegeneral contractor/firm
and client, through examining all the previous research and studies performed and focusing on the fact that accurate cost
categorization, cost reporting, and profit calculation are the heart of the construction business.
When a construction company decide to bid which implies that the direct and indirect costs thattheprojectwill consumehave
to be estimated. Numerous factors are involved in this highly unstructured process. Thus, the need for automated systems
(Models) to assist construction firms during the project phase is essential.
Overhead cost constitutes a major cost element for any construction project. Identifying the expected overhead cost is an
important issue that can materially help construction contractors to arrive at a reliable assessment for the expected tender
price of their projects. Many different factors make the detailed calculation of overhead cost a more difficult and tedious task.
For example, some items of overhead cost are directly related to the project time. Such cost items greatly increase with any
extension in the project’s time. Another overhead cost elementsaremoredifficulttobeaccuratelyestimated,althoughtheycan
be nominated and identified in advance. In addition, many small items of overhead cost are very difficult to be identified or
estimated. However, overhead costs are greatly affected by many factors.Amongthesefactorscomeprojecttype,size,location,
client nature, and the project site conditions. All of these factors make the detailed estimation of such overhead costs a more
difficult task. Hence it is expected that a lump-sum assessment for such cost items will be a more convenience, easy, highly
accurate, and quick approach. Such approach should take into consideration the differentfactorsthataffectoverheadcost.Itis
expected that a Regression Analysis based Model would be a suitable tool for building projects overhead cost assessment.
1.1 RESEARCH OBJECTIVES
The main objective of this research is to identify and investigatethe main factors that affect overheadcostintheKeralabuilding
construction market, and develop an Regression Analysis based model that will help the construction firms in
assessing/predicting their projects overhead cost. Such a model should account for the most important factors which are
dependent on time. This would improve the existing construction industry performance and ability to overcome the market
competitiveness and enhance the company’s international reputation. Throughimprovingthebidsaccuracyanditalsoleadsto:
Decrease the time, effort and money spent during the overhead cost prediction phase;
Improving the ability to provide a reliable prediction of the overhead cost percentage;
Summing up all the governing overhead cost parameters in one well defined technique;
Reducing the probability thatunanticipated overhead costs that causes difficultiesduringthecompletionoftheprojectin-hand,
thus gaining the client’s confidence and enhancing the company’s reputation;
1.2 STUDY METHODOLOGY
The overhead cost estimating model for buildings construction projects is a prediction technique for any building project, in
order to assess its overhead cost as a percentage from the total projects contract value. The model will be developed for the
identification or anticipation of all overhead cost factors for building projects in India for various categories of construction
companies. Hence, predicting the potential consequences of those items leading to an adequate and exact estimate of the
expected overhead cost as a percentage from the total project contract value.
This research study will be performed in the following sequence:
1 Review of all previous studies performed;
2 Identifying the list of overhead cost factors for building projects from the previous studies;
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1020
3 Comparison will be made between that generated list and the factors that contribute to overhead costs in India from
the expert’s opinions (with the aid of a factors identification and verification questionnaire);
4 The collection of real-life building projects from the various selected construction companies.
Impact analysis to understand the effect that each overheadfactorhasonthepercentageofoverheadcostsforbuildingprojects
and also to understand whether a weighting of the factors is needed or not before the program is designed
2. LITERATURE REVIEW
Swapnil and Gauravdobariy (2016) Common phenomenon that affects construction industry in the world are cost overrun
and delay. It mostly affects developing countries like India. In India as per MOSPI report, 235 projects out of 410 were severely
affected cost overrun due to certain factors. A questionnaire was conducted with 15 prominent factors responsible for cost
overrun and forwarded to 190 constructional professionals across India. Analysiswasdoneusinganalysisofvariance(ANOVA)
and factor analysis tool using SPSS. Price escalation of raw material, project size, project duration, and lack of co-ordination
between constructions parties are the top factors affecting cost overruns.
Subramani et.al. (2014) Causes of Cost Overrun in Construction. Cost overrun put massive burden on client and owners.
Methods used are Desk study along with questionnaire survey for finding the causes of cost overrun. 30 filled questionnaires
were collected from clients, consultants and contractors. As on March 31,2012,555projects(withabudgetofoverRs.150crore
and above) were on-going out of which 179 projects reports cost overruns. The resultsshowedthat,slowdecisionmaking,poor
contract management, poor design/ delay in providing design, rework due to wrong work, problems in land acquisition,wrong
estimation/ estimation method, and long period between design and time of bidding/tendering are the major causes of cost
overrun.
Mulenga et al. (2015) deals with the effect of construction schedule overrun in Gauteng construction projects in South Africa.
The data was obtained from well prepared questionnaire and detailedliteraturesurvey.MISmethodwasusedfordataanalysis.
The study concluded that type of project, claims, loss of time, loss of profit, extension of time, disputes and project size are the
major criteria for project schedule overrun. Extension of time ranked 1(SD=0.829) and the last rank goes to loss of skilled
employees (SD=1.077)
Ala Siskinaet.al (2009) A statistical analysis of a homogenous group of construction companies reveals the company’s
overhead costs value distribution function, which can be used to evaluate the competitive advantages and disadvantages of a
specific construction company. Survey conducted among contractors which influenced principal parameters of the company’s
activity that depends the overhead costs. Thesizeofaconstructioncompany,fieldofitsactivitiesanditsregionallocationarethe
3 essentialcompetitiveness attributes which determine the positioningofConstructionCompanyinthemarket.Theselectionof
strategies aimed to increase the company’s competitiveness is determined by the overhead costs dependence on business
infrastructure and management system elements of the company.
Rahman et al. (2013) was focused on factors that’s causing overhead cost inconstructionprojectsinMalaysia.Aquestionnaire
was prepared for the study. In this a quantitative method is used for data collection using structured questionnaire survey
amongst contractors,consultantandclients.Thedatawasanalysedwithanadvancedmultivariatemethodofstructuralequation
modelling with PLS approach using Smart PLS software. The analysis showed that all the constructs in model contributes
significantly to budget overrun with R2 value of 0.623.
Trefor et al. (2014) has worked Predicting construction cost overruns using text mining, numerical data and ensemble
classifiers. This paper discusses how text can be combined with numerical data to produce a prediction of cost overrun using
data mining classification algorithms. The stacking model had an average accuracy of 43.72% for five model runs. It was found
that a stacking model thatusedonlynumericaldataproducedpredictionswithlowerprecisionandrecall.Apotentialapplication
of this research is to budget sufficient amount to complete a construction project. 2.C.G. Wilmot.
Peter et.al. (2013) explained the probability of project cost overrun in 276 Australian construction projects.TheKolmogorov-
Smirnov, Anderson-Darling, and chi squared nonparametric tests were used to determine the goodness of fit of the selected
probability distributions. The skewness and kurtosis values of the cost overruns are computed to determine if the empirical
distribution of the data follows a normal distribution. The contract award as the reference point, cost overruns from 276
construction and engineering projects were calculated and revealed a mean cost overrun of 12.22%.
Aziz (2013) identifiedand grouped factors significantly related to timeand cost performance and then developedthetimeand
cost overrun models found that cost was one of the major considerations throughout out the project management life cycle for
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1021
waste management project in India. It was discovered the factors such as lowest bidding procurement method, bureaucracy in
bidding/tenderingmethod,additionalwork;wrongmethodofcostestimation;fundingproblemswerecriticalforenhancingcost
variation.
Jefferey and Jack (2014) discussed the quantification of a contractor's home office overhead costs (HOOH) in real-time. The
owner needs to select the best technologies to equitably quantify HOOH and resolveHOOHclaimspriortoprojectcompletion.It
was found that extended overheadcostsoccurwhenextensionoftheperformanceperiodofaconstructioncontractleadingtoan
increase in the overhead costs for the project.
Niazi et al. (2015) identified the significant factors that lead to construction cost overruns in Afghanistan. The questionnaire
was circulated to 75construction practitioners, includingclients, consultants and contractors. Causes are determinedbased on
different categories such as contractor, client, labour, material and equipment’s and external things. RII (Relative Importance
Index) method was used for analysis. According to them Corruption was rankedasfirstmajorcontributorofcostoverrunwitha
RII value of 0.89. Corruptionconstitutes a seriousthreattotheAfghanistanConstructionIndustrybeingabletoimprovebecause
it has a serious effect on construction cost growth. Delay inprogress payment by the client, this factor was ranked the 2nd most
significant contributor of cost overrun with a RII value of 0.82
Zayyana et al. (2014) A questionnaire survey of Malaysian quantity-surveying consultants was undertaken to obtain project
characteristics andcostperformancedata,inrelationtoasampleof359recentlycompletedconstructionprojects.Questionnaire
survey was used for collecting information. First part of questionnaire includes general data of respondent company and the
second part contain data such as project sector, contract values, type of project, procurement route, and nature of projects and
tendering method used for analysis. The findings offer stakeholders descriptive statistical cost performance information in
relation to these characteristics. The data was analysed through regression and descriptive analysis.
Table -2.1: Factors Contributing to Construction Overhead Cost Percentage In Kerala
3.2 RELATIVE IMPORTANCE INDEX
The causes were examined and the ranking of their attributes was done using the RelativeImportanceIndex(RII). Therelative
importance index is given as:
……………. {2}
Where,
SI.No. FACTORS
1 The need for specialty contractors
2 Percentage of sub-contracted works
3 Projects size
4 Projects location
5 Firms need for work
6 Site preparation needs
7 Type of owner/client
8 Projects tight time schedule
9 The need for extra man power special
construction equipments
10 The delay in projects duration
11 The firm’s previous expertise with the
same projects type
12 Contract type
13 The projects cash-flow plan
14 Consultancy and supervision
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1022
RII = Relative Important Index
W = Weighting given to each factor by the respondents (ranging from 1 to 5)
A = Highest weight (here 5)
N = Total number of respondents
The collected data is given in Relative Important Index and raked according to the important index given
3.1 Likert scale
The Likert scale was named after its originator, Rennis Likert. The Likert Scale is an ordered, one- dimensional scale from
which respondents choose one option that best aligns with their view. Therearetypicallybetweenfourandsevenoptions.Five
is very common. All options usually have labels, although sometimes only a few are offered and the others are implied. A
common form is an assertion, with which the person may agree or disagree to the varying degrees. In scoring, numbers are
usually assigned to each option (such as 1 to 5). A benefit is that questions used are usually easy to understand and so lead to
consistent answers by Bishop et al (2016). A disadvantage is that only a few options are offered, with which respondents may
not fully agree. As with any other measurement, the options should be carefully selected from set of questions or statements
that act together to give a useful and coherent picture. A problem can occur where people may become influenced by the way
they have answered previous questions.
Table -3.1 Likert’s scale
Table -3.2 Ranking
SI. No. FACTORS
Importance
RII Ranking
1 2 3 4 5
1 Type-Nature of Client 1 4 3 6 6 0.675 6
2 Contract Type 2 3 5 4 6 0.687 5
3 Special Site Preparation Requirements 5 4 6 2 3 0.73 1
4 Project Location 2 5 5 3 5 0.625 9
5 Project Duration 4 6 5 3 2 0.702 3
6 The need for specialty contractors. 6 8 3 1 2 0.58 12
7 Project Location 8 6 4 1 1 0.667 7
8 The projects cash-flow plan. 3 3 5 4 5 0.606 11
9 Projects tight time schedule 4 6 3 3 4 0.52 14
10 Projects size 3 3 6 4 4 0.693 4
11 Firms needed for sub-contracted works. 4 6 4 3 1 0.562 13
12 Consultancy and supervision. 6 8 3 1 2 0.718 2
13 Need for extra man power 8 6 4 1 1 0.65 8
14 Firms previous experience 3 3 5 4 5 0.618 10
3.3 RELIABILITY TESTING
The term reliability means the degree to which the result of a measurement,calculationcanbedependedontobeaccurate.The
reliability is measured by means of Cronbach’s alpha value. The Cronbach’s alpha value should be greater than 0.6 for reliable
data set. If not eliminate the variable which contains a greater value in the ‘Cronbach alpha if item deleted’
Table 3.3. Cronbach’s Alpha
Cronbach’s Alpha N of items
0.929 14
1
No
effect
at all
2
Fairly
important
3
Important
4
Very
Important
5
Critically
Important
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1023
Fig -3.1: Reliability Result
4. CONCLUSION
The factors that influence the percentageofoverheadcostsforbuildingconstructionprojectswereidentified throughliterature
review. Fourteen factors were identified. The collected data is analysed and ranked by using Relative Importance Index.
Relative Testing is done by using SPSS Software. Cronbach’s Alpha value got is 0.929. So it is consistent.
5. REFERENCES
[1]. Rahman, I.A., Aftab H. M and Ahmad, T. A. K. (2013). “Examining factors affecting budget overrun of construction
projects undertaken through management procurement method using PLSSEM approach procedia-social and
behavioural science”. 107,120 – 128.
[2]. SWAPNIL P WANJARI* and GAURAV DOBARIYA, identifying factors causing cost overrun of the constructionprojects
in India (2016) Sadhana ¯ Vol. 41, No. 6, June 2016.
[3]. Trefor P. William S. Jie Gong (2014), Predicting construction cost overruns using text mining, numerical data and
ensemble classifiers, automation in construction,43,23-29
[4]. Touran, A. 2013. “Probabilistic Model for Cost Contingency”, Journal of Construction Engineering and Management.
129(3).
[5]. T. Subramani, P S Sruthi, M. Kavitha (2014), ―Causes of Cost Overrun in Construction‖ 1 Professor & Dean,
Department of Civil Engineering, VMKV Eng. College, Vinayaka Missions University, Salem, India 2 PG Student of
Construction Engineering and management, Department of Civil Engineering
[6]. Zayyana Shehu and Intan Rohani Endut(2014),CostoverrunintheMalaysianconstructionindustry projects:Adeeper
insight, International journal for project management.
[7]. Peter E. D. Love, Chun-Pong Sing, Brad Carey, and Jeong Tai Kim, (2015), Estimating Construction Contingency:
Accommodating the Potential for Cost Overruns in Road Construction Projects, ASCE Journal of infrastructure
system,130,1-10
[8]. Mulenga, M., Clinton, A., Wellington. T. (2015) “Effects of construction projects schedule overruns: A case of the
Gauteng Province, South Africa”. Procedia Manufacturing, 3,1690 – 1695

More Related Content

What's hot

IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Publishing House
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6Moustafa Ismail Abu Dief
 
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project ManagementA Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Managementijsrd.com
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
 
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project   an reviewEffective techniques in cost optimization of construction project   an review
Effective techniques in cost optimization of construction project an revieweSAT Journals
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsIRJET Journal
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET Journal
 
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET Journal
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET Journal
 

What's hot (20)

IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
 
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project ManagementA Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
 
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project   an reviewEffective techniques in cost optimization of construction project   an review
Effective techniques in cost optimization of construction project an review
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction Projects
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
cost-estimation-tutorial
cost-estimation-tutorialcost-estimation-tutorial
cost-estimation-tutorial
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
IRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction ProjectsIRJET- Analysis of Cost Overrun in Construction Projects
IRJET- Analysis of Cost Overrun in Construction Projects
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
 

Similar to IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in Constructon

IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction IndustryIRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET Journal
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONIRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET Journal
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
 
EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementEVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementIRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential BuildingIRJET Journal
 

Similar to IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in Constructon (20)

IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction Industry
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementEVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program Management
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in Constructon

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1018 PREDICTION MODEL OF FACTORS CAUSING INCREASE IN OVERHEAD COST IN CONSTRUCTON Vivek S1, Shibi Varghese2 1PG Student, Structural Engineering and Construction Management, Dept. of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam P.O, Ernakulam, Kerala, India 2Professor, Dept. of Civil Engineering, Mar Athanasius College of Engineering, Kothamangalam P.O, Ernakulam, Kerala, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - General overhead costs are those costs that cannot be identified readily with a specific project. General overhead costs are items that represent the cost of doing business and often are considered as fixed expenses that must be paid by the constructor (firm). General overhead expenses include the general business expenses that are included by the home-office in support of the company’s construction program (main-office or home office expenses). Office running cost (office rental, clerical, utilities…etc.). Therefore, these cost items are distributed over all the company projects by some basis. The main factors that cause variations in overhead cost in the Indian building construction industry is identified and investigated. Relative Important index is find byusingSPSS Software. Thereliablepredictionofoverheadcostpercentagedecreases time, effort and economy for construction firms. Key Words: Construction, Overhead cost, Relative Important Index, Factors, SPSS 1. INTRODUCTION Contractors doing specialised works are important in the construction industry. In such an altered environment, a general contractor or construction firm overhead cost continuously increases. The total cost of a construction firm can be classifiedin to direct and indirect costs. Direct costs which are directly attribute to project work items E.g. labour, materials, production equipment, and supplies that must be incorporated into a distinct future in order to complete the work. Indirect costs include other items that are not made a part of the completed work such as contractor's overheads, contingencies,escalation,risk,and interest during the construction period. Overhead costs are generally divided into two categories: general overhead costsand job overhead costs. General overhead costs are those costs that cannot be identified readily with a specific project. General overhead costs are items that represent the cost of doing business andoftenareconsideredasfixedexpensesthat mustbe paid by the constructor. General overhead expenses include the general business expenses that are included by the home-office in support of the company’s construction program (main office or home-office expenses). They are intended to include all those expenses (items) incurred by the home-office that cannot be tied directly to a given project such as, 1. Office Secretary 2. Office Engineers 3. Office running cost (office rental, clerical, utilities…etc.). These costs are included in the total cost on some basis. Site overhead costs (project overhead costs) are similar to general overhead cost but it must be distributed over the project, since it cannot be allocated to specific work item. Site overhead costs include expenses that cannot be charged directly to a particular type of work, but are essential to construct the project, such as:  Site accommodation  Temporary services  Site staff  Clearing and levelling the site  Mechanical plant not previously included in the item rates  Welfare, first-aid and safety provisions  Final clearance and handover  Defects liability
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1019 These above-mentioned factors if not accounted for in the total bid pricethenthecompetitiveness,success,profitabilityofthe construction firm will be affected badly. However, the construction industry has not changed the method of controlling overhead costs in construction companies. Traditionally, a construction company uses resource-based costing and volume-based allocation. Resources-based costing is the method in which costs are allocated to object cost in accordance with the volume of direct labourhours,directlabourcosts or contract amount. The Indian construction industry is in need of a financial engineered estimating methodology (Model) that can assess project site overhead cost prior to the submission of the bid documents. In order to achieve such a model itisimperativethatdifferent techniques to be evaluated. This model will consider all the impacts of site overhead costs on boththegeneral contractor/firm and client, through examining all the previous research and studies performed and focusing on the fact that accurate cost categorization, cost reporting, and profit calculation are the heart of the construction business. When a construction company decide to bid which implies that the direct and indirect costs thattheprojectwill consumehave to be estimated. Numerous factors are involved in this highly unstructured process. Thus, the need for automated systems (Models) to assist construction firms during the project phase is essential. Overhead cost constitutes a major cost element for any construction project. Identifying the expected overhead cost is an important issue that can materially help construction contractors to arrive at a reliable assessment for the expected tender price of their projects. Many different factors make the detailed calculation of overhead cost a more difficult and tedious task. For example, some items of overhead cost are directly related to the project time. Such cost items greatly increase with any extension in the project’s time. Another overhead cost elementsaremoredifficulttobeaccuratelyestimated,althoughtheycan be nominated and identified in advance. In addition, many small items of overhead cost are very difficult to be identified or estimated. However, overhead costs are greatly affected by many factors.Amongthesefactorscomeprojecttype,size,location, client nature, and the project site conditions. All of these factors make the detailed estimation of such overhead costs a more difficult task. Hence it is expected that a lump-sum assessment for such cost items will be a more convenience, easy, highly accurate, and quick approach. Such approach should take into consideration the differentfactorsthataffectoverheadcost.Itis expected that a Regression Analysis based Model would be a suitable tool for building projects overhead cost assessment. 1.1 RESEARCH OBJECTIVES The main objective of this research is to identify and investigatethe main factors that affect overheadcostintheKeralabuilding construction market, and develop an Regression Analysis based model that will help the construction firms in assessing/predicting their projects overhead cost. Such a model should account for the most important factors which are dependent on time. This would improve the existing construction industry performance and ability to overcome the market competitiveness and enhance the company’s international reputation. Throughimprovingthebidsaccuracyanditalsoleadsto: Decrease the time, effort and money spent during the overhead cost prediction phase; Improving the ability to provide a reliable prediction of the overhead cost percentage; Summing up all the governing overhead cost parameters in one well defined technique; Reducing the probability thatunanticipated overhead costs that causes difficultiesduringthecompletionoftheprojectin-hand, thus gaining the client’s confidence and enhancing the company’s reputation; 1.2 STUDY METHODOLOGY The overhead cost estimating model for buildings construction projects is a prediction technique for any building project, in order to assess its overhead cost as a percentage from the total projects contract value. The model will be developed for the identification or anticipation of all overhead cost factors for building projects in India for various categories of construction companies. Hence, predicting the potential consequences of those items leading to an adequate and exact estimate of the expected overhead cost as a percentage from the total project contract value. This research study will be performed in the following sequence: 1 Review of all previous studies performed; 2 Identifying the list of overhead cost factors for building projects from the previous studies;
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1020 3 Comparison will be made between that generated list and the factors that contribute to overhead costs in India from the expert’s opinions (with the aid of a factors identification and verification questionnaire); 4 The collection of real-life building projects from the various selected construction companies. Impact analysis to understand the effect that each overheadfactorhasonthepercentageofoverheadcostsforbuildingprojects and also to understand whether a weighting of the factors is needed or not before the program is designed 2. LITERATURE REVIEW Swapnil and Gauravdobariy (2016) Common phenomenon that affects construction industry in the world are cost overrun and delay. It mostly affects developing countries like India. In India as per MOSPI report, 235 projects out of 410 were severely affected cost overrun due to certain factors. A questionnaire was conducted with 15 prominent factors responsible for cost overrun and forwarded to 190 constructional professionals across India. Analysiswasdoneusinganalysisofvariance(ANOVA) and factor analysis tool using SPSS. Price escalation of raw material, project size, project duration, and lack of co-ordination between constructions parties are the top factors affecting cost overruns. Subramani et.al. (2014) Causes of Cost Overrun in Construction. Cost overrun put massive burden on client and owners. Methods used are Desk study along with questionnaire survey for finding the causes of cost overrun. 30 filled questionnaires were collected from clients, consultants and contractors. As on March 31,2012,555projects(withabudgetofoverRs.150crore and above) were on-going out of which 179 projects reports cost overruns. The resultsshowedthat,slowdecisionmaking,poor contract management, poor design/ delay in providing design, rework due to wrong work, problems in land acquisition,wrong estimation/ estimation method, and long period between design and time of bidding/tendering are the major causes of cost overrun. Mulenga et al. (2015) deals with the effect of construction schedule overrun in Gauteng construction projects in South Africa. The data was obtained from well prepared questionnaire and detailedliteraturesurvey.MISmethodwasusedfordataanalysis. The study concluded that type of project, claims, loss of time, loss of profit, extension of time, disputes and project size are the major criteria for project schedule overrun. Extension of time ranked 1(SD=0.829) and the last rank goes to loss of skilled employees (SD=1.077) Ala Siskinaet.al (2009) A statistical analysis of a homogenous group of construction companies reveals the company’s overhead costs value distribution function, which can be used to evaluate the competitive advantages and disadvantages of a specific construction company. Survey conducted among contractors which influenced principal parameters of the company’s activity that depends the overhead costs. Thesizeofaconstructioncompany,fieldofitsactivitiesanditsregionallocationarethe 3 essentialcompetitiveness attributes which determine the positioningofConstructionCompanyinthemarket.Theselectionof strategies aimed to increase the company’s competitiveness is determined by the overhead costs dependence on business infrastructure and management system elements of the company. Rahman et al. (2013) was focused on factors that’s causing overhead cost inconstructionprojectsinMalaysia.Aquestionnaire was prepared for the study. In this a quantitative method is used for data collection using structured questionnaire survey amongst contractors,consultantandclients.Thedatawasanalysedwithanadvancedmultivariatemethodofstructuralequation modelling with PLS approach using Smart PLS software. The analysis showed that all the constructs in model contributes significantly to budget overrun with R2 value of 0.623. Trefor et al. (2014) has worked Predicting construction cost overruns using text mining, numerical data and ensemble classifiers. This paper discusses how text can be combined with numerical data to produce a prediction of cost overrun using data mining classification algorithms. The stacking model had an average accuracy of 43.72% for five model runs. It was found that a stacking model thatusedonlynumericaldataproducedpredictionswithlowerprecisionandrecall.Apotentialapplication of this research is to budget sufficient amount to complete a construction project. 2.C.G. Wilmot. Peter et.al. (2013) explained the probability of project cost overrun in 276 Australian construction projects.TheKolmogorov- Smirnov, Anderson-Darling, and chi squared nonparametric tests were used to determine the goodness of fit of the selected probability distributions. The skewness and kurtosis values of the cost overruns are computed to determine if the empirical distribution of the data follows a normal distribution. The contract award as the reference point, cost overruns from 276 construction and engineering projects were calculated and revealed a mean cost overrun of 12.22%. Aziz (2013) identifiedand grouped factors significantly related to timeand cost performance and then developedthetimeand cost overrun models found that cost was one of the major considerations throughout out the project management life cycle for
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1021 waste management project in India. It was discovered the factors such as lowest bidding procurement method, bureaucracy in bidding/tenderingmethod,additionalwork;wrongmethodofcostestimation;fundingproblemswerecriticalforenhancingcost variation. Jefferey and Jack (2014) discussed the quantification of a contractor's home office overhead costs (HOOH) in real-time. The owner needs to select the best technologies to equitably quantify HOOH and resolveHOOHclaimspriortoprojectcompletion.It was found that extended overheadcostsoccurwhenextensionoftheperformanceperiodofaconstructioncontractleadingtoan increase in the overhead costs for the project. Niazi et al. (2015) identified the significant factors that lead to construction cost overruns in Afghanistan. The questionnaire was circulated to 75construction practitioners, includingclients, consultants and contractors. Causes are determinedbased on different categories such as contractor, client, labour, material and equipment’s and external things. RII (Relative Importance Index) method was used for analysis. According to them Corruption was rankedasfirstmajorcontributorofcostoverrunwitha RII value of 0.89. Corruptionconstitutes a seriousthreattotheAfghanistanConstructionIndustrybeingabletoimprovebecause it has a serious effect on construction cost growth. Delay inprogress payment by the client, this factor was ranked the 2nd most significant contributor of cost overrun with a RII value of 0.82 Zayyana et al. (2014) A questionnaire survey of Malaysian quantity-surveying consultants was undertaken to obtain project characteristics andcostperformancedata,inrelationtoasampleof359recentlycompletedconstructionprojects.Questionnaire survey was used for collecting information. First part of questionnaire includes general data of respondent company and the second part contain data such as project sector, contract values, type of project, procurement route, and nature of projects and tendering method used for analysis. The findings offer stakeholders descriptive statistical cost performance information in relation to these characteristics. The data was analysed through regression and descriptive analysis. Table -2.1: Factors Contributing to Construction Overhead Cost Percentage In Kerala 3.2 RELATIVE IMPORTANCE INDEX The causes were examined and the ranking of their attributes was done using the RelativeImportanceIndex(RII). Therelative importance index is given as: ……………. {2} Where, SI.No. FACTORS 1 The need for specialty contractors 2 Percentage of sub-contracted works 3 Projects size 4 Projects location 5 Firms need for work 6 Site preparation needs 7 Type of owner/client 8 Projects tight time schedule 9 The need for extra man power special construction equipments 10 The delay in projects duration 11 The firm’s previous expertise with the same projects type 12 Contract type 13 The projects cash-flow plan 14 Consultancy and supervision
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1022 RII = Relative Important Index W = Weighting given to each factor by the respondents (ranging from 1 to 5) A = Highest weight (here 5) N = Total number of respondents The collected data is given in Relative Important Index and raked according to the important index given 3.1 Likert scale The Likert scale was named after its originator, Rennis Likert. The Likert Scale is an ordered, one- dimensional scale from which respondents choose one option that best aligns with their view. Therearetypicallybetweenfourandsevenoptions.Five is very common. All options usually have labels, although sometimes only a few are offered and the others are implied. A common form is an assertion, with which the person may agree or disagree to the varying degrees. In scoring, numbers are usually assigned to each option (such as 1 to 5). A benefit is that questions used are usually easy to understand and so lead to consistent answers by Bishop et al (2016). A disadvantage is that only a few options are offered, with which respondents may not fully agree. As with any other measurement, the options should be carefully selected from set of questions or statements that act together to give a useful and coherent picture. A problem can occur where people may become influenced by the way they have answered previous questions. Table -3.1 Likert’s scale Table -3.2 Ranking SI. No. FACTORS Importance RII Ranking 1 2 3 4 5 1 Type-Nature of Client 1 4 3 6 6 0.675 6 2 Contract Type 2 3 5 4 6 0.687 5 3 Special Site Preparation Requirements 5 4 6 2 3 0.73 1 4 Project Location 2 5 5 3 5 0.625 9 5 Project Duration 4 6 5 3 2 0.702 3 6 The need for specialty contractors. 6 8 3 1 2 0.58 12 7 Project Location 8 6 4 1 1 0.667 7 8 The projects cash-flow plan. 3 3 5 4 5 0.606 11 9 Projects tight time schedule 4 6 3 3 4 0.52 14 10 Projects size 3 3 6 4 4 0.693 4 11 Firms needed for sub-contracted works. 4 6 4 3 1 0.562 13 12 Consultancy and supervision. 6 8 3 1 2 0.718 2 13 Need for extra man power 8 6 4 1 1 0.65 8 14 Firms previous experience 3 3 5 4 5 0.618 10 3.3 RELIABILITY TESTING The term reliability means the degree to which the result of a measurement,calculationcanbedependedontobeaccurate.The reliability is measured by means of Cronbach’s alpha value. The Cronbach’s alpha value should be greater than 0.6 for reliable data set. If not eliminate the variable which contains a greater value in the ‘Cronbach alpha if item deleted’ Table 3.3. Cronbach’s Alpha Cronbach’s Alpha N of items 0.929 14 1 No effect at all 2 Fairly important 3 Important 4 Very Important 5 Critically Important
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 07 | July 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1023 Fig -3.1: Reliability Result 4. CONCLUSION The factors that influence the percentageofoverheadcostsforbuildingconstructionprojectswereidentified throughliterature review. Fourteen factors were identified. The collected data is analysed and ranked by using Relative Importance Index. Relative Testing is done by using SPSS Software. Cronbach’s Alpha value got is 0.929. So it is consistent. 5. REFERENCES [1]. Rahman, I.A., Aftab H. M and Ahmad, T. A. K. (2013). “Examining factors affecting budget overrun of construction projects undertaken through management procurement method using PLSSEM approach procedia-social and behavioural science”. 107,120 – 128. [2]. SWAPNIL P WANJARI* and GAURAV DOBARIYA, identifying factors causing cost overrun of the constructionprojects in India (2016) Sadhana ¯ Vol. 41, No. 6, June 2016. [3]. Trefor P. William S. Jie Gong (2014), Predicting construction cost overruns using text mining, numerical data and ensemble classifiers, automation in construction,43,23-29 [4]. Touran, A. 2013. “Probabilistic Model for Cost Contingency”, Journal of Construction Engineering and Management. 129(3). [5]. T. Subramani, P S Sruthi, M. Kavitha (2014), ―Causes of Cost Overrun in Construction‖ 1 Professor & Dean, Department of Civil Engineering, VMKV Eng. College, Vinayaka Missions University, Salem, India 2 PG Student of Construction Engineering and management, Department of Civil Engineering [6]. Zayyana Shehu and Intan Rohani Endut(2014),CostoverrunintheMalaysianconstructionindustry projects:Adeeper insight, International journal for project management. [7]. Peter E. D. Love, Chun-Pong Sing, Brad Carey, and Jeong Tai Kim, (2015), Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects, ASCE Journal of infrastructure system,130,1-10 [8]. Mulenga, M., Clinton, A., Wellington. T. (2015) “Effects of construction projects schedule overruns: A case of the Gauteng Province, South Africa”. Procedia Manufacturing, 3,1690 – 1695