International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 930
ASSESSMENT OF ROLE OF MATERIAL MANAGEMENT IN CONSTRUCTION
PROJECTS
Ms M Sivagami1, Ms Anagha Ram2
1AssistantProfessor, Department of Civil Engineering, R.V.S. Technical Campus, Coimbatore -641402, India,
2PG Student, R.V.S. Technical Campus Coimbatore-641402, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract – Material management, is the management
procedure including planning and controlling necessary
actions to make certain that the right quality and quantity of
materials as well as equipment are specified in a timely
manner and are obtained at a reasonable cost and are made
available when needed. In construction industries, materials
management is a major target area where considerable
improvements can be made. Materials constituteover 60-70%
of the overall cost of a construction project, hence it is
required to make certain that the materials are utilized in the
most effective manner such that the material wastage and
late ordering are minimised and avoided in order to keep
construction costs down, especially in today's competitive
market. This research aims to assess the role of material
management in construction projects, to find out the various
factors affecting material management .A regression model
for effective material management in construction projects is
also presented.
Key Words:MaterialManagement,ConstructionProjects,
Material Wastage, Effective Material Management,
Regression Model.
1. INTRODUCTION
Material management is a management tool which controls
the planning, scheduling and acquiring of materials that are
required for the successful accomplishment of a project, ieit
is a process of planning and controlling the flow of materials
within a project. Material management make sure that it is
able to buy materials at a reasonable price at required
quality and quantity. It aims at utilising the materials at the
most effective manner, thereby minimising the material
wastage. It helps to produce the final productsuchthatitwill
be successful in the market. Thus the activities in material
management spans from the acquirement of raw materials
to the final dispatch of the product.
1.1 Objectives of Material Management
The following are the key objectives of material
management in construction projects.
1) Support the operational requirements.
2) Manage the material process efficiently and
effectively.
3) Select, develop and maintain supply source.
4) Support organizational goals.
5) Develop strong relationship with othergroups.
6) Develop he integrated master plans that
support organizational goals.
The fundamental aspect of material management is to
plan acquirement and govern the conveyance of materials
assuring no wastage of materials. The technique of effective
material management determines when and how much a
quantity of materials are requisite as well as directs how to
use the materials efficiently.
1.2 Role Of Material Management
An effective material managementsystemcanbringmany
benefits for a construction industry. Among these benefits
are:
1) Reducing the overall cost of materials.
2) Better handling of materials.
3) Reduction in duplicated orders.
4) Materials will be available on site when needed.
5) Improves labour productivity.
6) Improvements in project schedule.
7) Quality Control.
8) Better field material control.
9) Better relation with suppliers.
10) Reduce material surplus.
11) Results in effective storage of materials on site.
12) Stock Reduction.
13) Purchase savings
14) Better cash flow management.
15) Stock Reduction.
2. RESEARCH METHODOLOGY
The objective of this research is to investigate the role and
analyse the factors affecting material management practices
of construction projects in the northern regions of Kerala,
India so that ways of improving them may be formulated. In
order to determine the factors affecting material
management, a questionnaire survey has been conducted.
The survey was conducted by direct interview method.
2.1 Formulation of Questionnaire
The questionnaire was formulated to allow the goals of the
research to be best achieved. In order to fulfill the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 931
requirements laid down in objective of the research the
questionnaire was divided into three sections.
1. Background Information: This section was further
divided into two sub divisions, one for collectingthe
factual information concerning the name of the
organization and the field of work they were active
in. Other was to gather the data about the
interviewee regarding their role in the project,
experience, type of projects involved etc.
2. Data Collection: This final section dealt with the
discussions with experts from various firms
regarding the problems in material management
tasks and technologies needed to manage materials
better.
3. Ranking of Factors: This section consists of 10 main
factors affecting material management which were
identified based on the dataavailiablefromdifferent
journals on material management in construction
projects .BasedontheLikert’sScale,therespondents
were asked to choose any of the 5 ordinal measures
according to the level of importance.
2.2 Selection of Firms
Thequestionnairesurveywasconductedamongconstruction
companies in the Northern regions of Kerala. A total of 24
companies were selected for the questionnaire survey. Out
of these 13 firms were large industries and 8 no’s of medium
size industries. Rest of the firms were small industries.
3. DATA ANALYSIS AND FINDINGS
This section of the paper analyses the results of the survey
and draws the conclusions which establish the ranking of
factors affecting material management. Data collected from
90 respondents were analysed from different construction
firms. The responses received were relatively balancedwith
32% of Site engineers, 25.56% of project engineers, 17.78%
of contractors, 13.33 % of store managers, 7.78% of
supervisors, and 3.34% of design coordinators. A from
building and 12 from civil contractors. Most of the building
contractors are involved with commercial contracts. The
civil contractors are involved in road constructions and
other works.
Chart -1: Respondents Position Details
The data gathered was manually analysed by the RII
method by which a numerical figure for each factor is
obtained ,known as its Relative Importance index. The
Relative Importance (RII) index is used to rank the factors.
Total 64 factors were analyzed using RII Methodandranked
as shown in Table 1.
Table -1: Ranking of Factors
Name
RII Rank
Training staff on instructions about
handling the materials
0.88 1
Forecasting the market price 0.86 2
Poor communication between supplier
and purchase
0.83
3
Waste in construction sites
0.83
3
Networks line of balance
0.82
4
Using excessive quantities of materials
0.82
4
Seasonal problems
0.81
5
Non Standard specification
0.80
6
Ensuring scientific record keeping
0.76
7
Level of Design complexity
0.75
8
Recycle damaged components
0.73
9
Theft
0.73
9
Unclear design detailing
0.73
9
Mode of placing orders
0.73
9
No adequate storage space
0.73
9
Damage occurring at stores
0.73
9
Undefined Scope
0.72
10
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 932
Relative Importance Index (RII) was used to derive the
relative significance and ranking of the factors found.
RII = ∑W /(A *N)
where,
W= Weighting given to each factor by the respondents
A= The highest weight (ie, 5 in this case)
N= The total number of respondents.(ie, 90 in this case).
The RII ranges from 0 to 1 , higher the value more important
the factor is.
The above listed factors can be categorized into ten main
groups, namely:
Name
RII Rank
Damaged materials delivered 0.71 11
In complete proposals 0.70 12
Shortage of skilled and unskilled labors
0.70
12
Bar chart
0.70
12
Unavailability of material in the market
0.69
13
Implementing defect tracking
mechanism
0.69
13
Changes in design by the owner
0.68
14
Inefficient workforce
0.68
14
Incorrect Type of materials delivered
0.68
14
Lack of security personnel
0.68
14
Lack of care in transportation of
materials
0.68
14
Minimizing double handling
0.68
14
Labor strikes
0.67
15
Scarp disposal
0.67
16
Not determining when and what
materials are needed
0.66
17
Too many suppliers to qualify
0.66
17
Poor communication
0.66
17
Improper site management practices
0.66
17
Technological Obsolescence
0.66
17
Loss of materials
0.66
17
Others
0.66
17
Inaccurate material specification
0.65
18
Daily recording of using materials in the
project
0.65
18
Coordination of team work
0.65
18
Inefficient utilization of materials
0.65
18
Over ordering of material
0.65
18
No supplier quality assurance
0.64
19
Reporting the problem (wastage, defect
etc.)
0.64
20
Name
RII Rank
Material requirement planning technique
used
0.64 20
Late delivery 0.63 21
Keeping track of materials 0.63 21
Cutting of material 0.63 21
Wastage control Techniques
0.63
21
Frequency of on site material check
0.63
21
Weather conditions
0.63
21
Non Availability of material
0.62
22
Incorrect size of materials delivered
0.61
23
Incorrect quantity delivered
0.61
23
Use of incorrect material
0.61
23
ABC analysis
0.61
23
EOQ analysis
0.61
23
Change in BOQ
0.61
23
Damage due to weather
0.59
24
Corrosion
0.57
25
Lack of design team experience
0.55
26
Time taken to investigate and qualify the
suppliers
0.55
27
Previous experience with the supplier
0.55
27
Poor communication between purchase
and finance department
0.53
28
Inflation
0.53
29
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 933
1) Design Related Factors
2) Material Planning & Scheduling Factors
3) Factors Related To Vendor Selection
4) Labor Related Factors
5) Procurement Problems
6) Factors At Construction Site
7) Store Management
8) Waste Management
9) Techniques Used In Material Management
10) General Factors
Chart -1: Main Factors Effecting Material Management
Versus RII Value
Labor Related factors and material Planning andscheduling
are found to be the most influential groups of factors for
effective material management in construction projects.
Then comes the design related factors, followed by Store
Management, Waste Management, General Factors, Factors
At Construction Site, Procurement Problems, Techniques
Used In Material Management and finally FactorsRelated To
Vendor Selection.
3.1 Regression Model
The arranged factors was then analyzed based on statistical
tool , multiple regression analysis. . The regression analysis
was done using SPSS Software (Statistical Package for Social
Sciences). A number of regressionmodelswereobtained,five
of these are shown in the figure (1).
It is clear from the above tables that the factor which mostly
effect the effective material management in construction
industries is “training of staffs about the right handling of
materials within the site”. The forecasting the market price
for the required materials is also found to be important for
the effective material management. Construction Waste
management,poorcommunicationbetweensuppliers,design
complexities,technologiesusedformaterialmanagementetc.
plays a crucial role in the effective material management in
construction.
Fig-1: Regression model coefficients
4. CONCLUSION
The Construction sector is responsible for the social and
economic growth of the society. Material management is of
the major challenges for the industry since it effects the
overall cost of the project. A questionnairebasedsurvey was
used to judge the attitude of Contractors, Project
Engineers, Store In charge and Site Supervisors towards
factors affecting Material Management of constructionfirms
in Northern Regions of Kerala. The firms chosen consist of
both private and public sector. Majority of the firms chosen
were large industries coming under the category of Private
sector. About 90 respondents wereinterviewed.Outofthese
were 29 no of Site engineers, 23 no’s of Project Engineer 16
no’s of Contractors, 7 no’s of Supervisors, 12 no’s of Store
managers, 3 no’s of design coordinators. The respondents
were requested to indicate the level of importance ofeachof
the 67 factors of Material management as critically
important, Very important, Important, Fairly important, No
effect at all. Results indicated that the most important factor
affecting Material management of construction firms are
Adequate training provided for staffs regarding how to
effectively handle the materials, Poor quality of materials,
Unclear and in adequate details in drawings, Material
management technics used, technological obsolescence,
Forecasting of market price, errors in design documents,
poor waste management in construction site, Poor
communication,
REFERENCES
[1] A. A. Gulghane, Prof P. V. Khandve, “Management for
Construction Materials and Control of Construction
Waste in Construction Industry: A Review”, Int. Journal
of Engineering Research and Applications,Vol.5,Issue4
(Part -1), April2015, pp.59-64.
[2] Ashwini R. Patil, Smita V. Pataskar, “Analyzing Material
Management Techniques on Construction
Project”,International Journal of Engineering and
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 934
InnovativeTechnology, Vol. 3, Issue 4, October 2013,pp.
96-10
[3] Vikram Kulkarni and Rohit Sharma, (2017) Factors
Affecting Material Management on Construction Site,
International Research Journal of Engineering and
Technology (IRJET), Volume: 04 Issue: 01, Jan -2017
[4] P. Ezhilmathi and Dr.T. Shanmugapriya,(2016)Studyon
Material Management–An Art Of Review, International
Research Journal of Engineering and Technology
(IRJET), Volume: 03 Issue: 11, Nov -2016.
[5] Hemishkumar Patel and Dr. Jayeshkumar Pitroda,
(2015) Analysis Of Factor Affecting Material
Management And Inventory Management :
Survey,.International Conference on: “Engineering:
Issues, opportunities and Challenges for Development,
ISBN: 978-81-929339-1-7
[6] Pauline Jeruto Keitany and Daniel M. Wanyoike, (2014),
Assessment Of The Role Of Materials Management On
Organizational Performance- A Case Of New Kenya
Cooperative Creameries Limited, Eldoret Kenya,
European Journal of Material Sciences Vol.1, No.1, pp.1-
10, March 2014.
[7] K.Harish, (2014) A Study of Materials Management in
Existing Constructions at Coimbatore, Global Journal of
Engineering Science And Researches May 2014.
[8] Carlos H. Caldas, Cindy L. Menches and Pedro M. Reyes,
(2014),Materials Management Practices In The
Construction Industry, Journal of Practice Periodical on
Structural Design and Construction, July 2014.
[9] P. Lenin and L. Krishnaraj, (2014), Analysis of Improper
Material Management Affecting Cost in Construction
Projects, International
[10] Journal For ResearchInAppliedScienceandEngineering
Technology (IJRASET), Vol. 2 Issue V, May 2014.
[11] Nann Lwin Phu and Aye Mya Cho, (2014) Factors
Affecting Material ManagementinBuildingConstruction
Projects, International Journal of Scientific Engineering
and Technology Research, Vol.03, Issue.10 May- 2014.
[12] Okorocha, K.A., Factors Affecting Effective Materials
Management in Building Construction Projects – A Case
Study of Selected Building Sites, in Imo State, Nigeria
(April 10, 2013). International Journal of Management
Sciences and Business Research,Volume2,Issue4,2013
.AvailableatSSRN:https://ssrn.com/abstract=2711179
[13] Dr. Kevin Aku Okorocha, (2013) EvaluationOfMaterials
Management Strategies In The Nigerian Construction
Industry, International Journal of ManagementSciences
and Business Research, Vol. 2, Issue 3, 2013.
[14] Shehu Z., Holt G.D., Endut I.R., Akintoye A.,Analysis of
characteristics affecting completion timefor Malaysian
construction projects, Built Environ-ment Project and
Asset Management, 5, 1, 52–68,2015.
[15] T. Phani Madhavi and Steve Varghese Mathew,(2013),
Material Management In Construction – A Case Study,
International Journal of Research in Engineering and
Technology, Nov 2013.
[16] Vaisakh P.S., Dileeplal J. and Narayanan Unni,
“Inventory Management of Spare Parts by Combined
FSN and VED (CFSNVED) Analysis”, International
Journal of Engineering and Innovative Technology,
Volume-2Issue-7,January2013,2277-375Vanita Ahuja ,
Jay Yang , Ravi Shankar (2009) Study of ICTadoptionfor
building project management in the Indianconstruction
industry.

More Related Content

What's hot

A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryIRJET Journal
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryIRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...Journal For Research
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptxvirshit
 
4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptxvirshit
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...IRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
Phd literature review sample pdf
Phd literature review sample pdfPhd literature review sample pdf
Phd literature review sample pdfPhD Assistance
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
RME-085 TQM Unit-5 part 3
RME-085 TQM Unit-5  part 3RME-085 TQM Unit-5  part 3
RME-085 TQM Unit-5 part 3ssuserf6c4bd
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st moduleJim Alex
 
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...ijtsrd
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
Introduction to Production Engineering Department
Introduction to Production Engineering DepartmentIntroduction to Production Engineering Department
Introduction to Production Engineering DepartmentAmr El-Ganainy
 

What's hot (20)

A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction Industry
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
Just in time
Just in timeJust in time
Just in time
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptx
 
4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
Phd literature review sample pdf
Phd literature review sample pdfPhd literature review sample pdf
Phd literature review sample pdf
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
RME-085 TQM Unit-5 part 3
RME-085 TQM Unit-5  part 3RME-085 TQM Unit-5  part 3
RME-085 TQM Unit-5 part 3
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st module
 
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...
Agent-Based Modeling: Methods and Techniques for Scheduling Industrial Machin...
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
Introduction to Production Engineering Department
Introduction to Production Engineering DepartmentIntroduction to Production Engineering Department
Introduction to Production Engineering Department
 

Similar to IRJET- Assessment of Role of Material Management in Construction Projects

IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...IRJET Journal
 
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...IRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...IRJET Journal
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET Journal
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...IRJET Journal
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...Dereck Downing
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...IRJET Journal
 
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...IRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET Journal
 
G0363052058
G0363052058G0363052058
G0363052058theijes
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...ijtsrd
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 

Similar to IRJET- Assessment of Role of Material Management in Construction Projects (20)

IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
 
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time Overrun
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
 
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
A REVIEW ON PERFORMANCE MANAGEMENT AND APPRAISAL IN CONSTRUCTION INDUSTRY TOW...
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...A Review on Performance Management and Appraisal in Construction Industry Tow...
A Review on Performance Management and Appraisal in Construction Industry Tow...
 
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...
Agility Assessment for Enhancing Agility: a Case Study in Food Manufacturing ...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
G0363052058
G0363052058G0363052058
G0363052058
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 

IRJET- Assessment of Role of Material Management in Construction Projects

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 930 ASSESSMENT OF ROLE OF MATERIAL MANAGEMENT IN CONSTRUCTION PROJECTS Ms M Sivagami1, Ms Anagha Ram2 1AssistantProfessor, Department of Civil Engineering, R.V.S. Technical Campus, Coimbatore -641402, India, 2PG Student, R.V.S. Technical Campus Coimbatore-641402, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract – Material management, is the management procedure including planning and controlling necessary actions to make certain that the right quality and quantity of materials as well as equipment are specified in a timely manner and are obtained at a reasonable cost and are made available when needed. In construction industries, materials management is a major target area where considerable improvements can be made. Materials constituteover 60-70% of the overall cost of a construction project, hence it is required to make certain that the materials are utilized in the most effective manner such that the material wastage and late ordering are minimised and avoided in order to keep construction costs down, especially in today's competitive market. This research aims to assess the role of material management in construction projects, to find out the various factors affecting material management .A regression model for effective material management in construction projects is also presented. Key Words:MaterialManagement,ConstructionProjects, Material Wastage, Effective Material Management, Regression Model. 1. INTRODUCTION Material management is a management tool which controls the planning, scheduling and acquiring of materials that are required for the successful accomplishment of a project, ieit is a process of planning and controlling the flow of materials within a project. Material management make sure that it is able to buy materials at a reasonable price at required quality and quantity. It aims at utilising the materials at the most effective manner, thereby minimising the material wastage. It helps to produce the final productsuchthatitwill be successful in the market. Thus the activities in material management spans from the acquirement of raw materials to the final dispatch of the product. 1.1 Objectives of Material Management The following are the key objectives of material management in construction projects. 1) Support the operational requirements. 2) Manage the material process efficiently and effectively. 3) Select, develop and maintain supply source. 4) Support organizational goals. 5) Develop strong relationship with othergroups. 6) Develop he integrated master plans that support organizational goals. The fundamental aspect of material management is to plan acquirement and govern the conveyance of materials assuring no wastage of materials. The technique of effective material management determines when and how much a quantity of materials are requisite as well as directs how to use the materials efficiently. 1.2 Role Of Material Management An effective material managementsystemcanbringmany benefits for a construction industry. Among these benefits are: 1) Reducing the overall cost of materials. 2) Better handling of materials. 3) Reduction in duplicated orders. 4) Materials will be available on site when needed. 5) Improves labour productivity. 6) Improvements in project schedule. 7) Quality Control. 8) Better field material control. 9) Better relation with suppliers. 10) Reduce material surplus. 11) Results in effective storage of materials on site. 12) Stock Reduction. 13) Purchase savings 14) Better cash flow management. 15) Stock Reduction. 2. RESEARCH METHODOLOGY The objective of this research is to investigate the role and analyse the factors affecting material management practices of construction projects in the northern regions of Kerala, India so that ways of improving them may be formulated. In order to determine the factors affecting material management, a questionnaire survey has been conducted. The survey was conducted by direct interview method. 2.1 Formulation of Questionnaire The questionnaire was formulated to allow the goals of the research to be best achieved. In order to fulfill the
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 931 requirements laid down in objective of the research the questionnaire was divided into three sections. 1. Background Information: This section was further divided into two sub divisions, one for collectingthe factual information concerning the name of the organization and the field of work they were active in. Other was to gather the data about the interviewee regarding their role in the project, experience, type of projects involved etc. 2. Data Collection: This final section dealt with the discussions with experts from various firms regarding the problems in material management tasks and technologies needed to manage materials better. 3. Ranking of Factors: This section consists of 10 main factors affecting material management which were identified based on the dataavailiablefromdifferent journals on material management in construction projects .BasedontheLikert’sScale,therespondents were asked to choose any of the 5 ordinal measures according to the level of importance. 2.2 Selection of Firms Thequestionnairesurveywasconductedamongconstruction companies in the Northern regions of Kerala. A total of 24 companies were selected for the questionnaire survey. Out of these 13 firms were large industries and 8 no’s of medium size industries. Rest of the firms were small industries. 3. DATA ANALYSIS AND FINDINGS This section of the paper analyses the results of the survey and draws the conclusions which establish the ranking of factors affecting material management. Data collected from 90 respondents were analysed from different construction firms. The responses received were relatively balancedwith 32% of Site engineers, 25.56% of project engineers, 17.78% of contractors, 13.33 % of store managers, 7.78% of supervisors, and 3.34% of design coordinators. A from building and 12 from civil contractors. Most of the building contractors are involved with commercial contracts. The civil contractors are involved in road constructions and other works. Chart -1: Respondents Position Details The data gathered was manually analysed by the RII method by which a numerical figure for each factor is obtained ,known as its Relative Importance index. The Relative Importance (RII) index is used to rank the factors. Total 64 factors were analyzed using RII Methodandranked as shown in Table 1. Table -1: Ranking of Factors Name RII Rank Training staff on instructions about handling the materials 0.88 1 Forecasting the market price 0.86 2 Poor communication between supplier and purchase 0.83 3 Waste in construction sites 0.83 3 Networks line of balance 0.82 4 Using excessive quantities of materials 0.82 4 Seasonal problems 0.81 5 Non Standard specification 0.80 6 Ensuring scientific record keeping 0.76 7 Level of Design complexity 0.75 8 Recycle damaged components 0.73 9 Theft 0.73 9 Unclear design detailing 0.73 9 Mode of placing orders 0.73 9 No adequate storage space 0.73 9 Damage occurring at stores 0.73 9 Undefined Scope 0.72 10
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 932 Relative Importance Index (RII) was used to derive the relative significance and ranking of the factors found. RII = ∑W /(A *N) where, W= Weighting given to each factor by the respondents A= The highest weight (ie, 5 in this case) N= The total number of respondents.(ie, 90 in this case). The RII ranges from 0 to 1 , higher the value more important the factor is. The above listed factors can be categorized into ten main groups, namely: Name RII Rank Damaged materials delivered 0.71 11 In complete proposals 0.70 12 Shortage of skilled and unskilled labors 0.70 12 Bar chart 0.70 12 Unavailability of material in the market 0.69 13 Implementing defect tracking mechanism 0.69 13 Changes in design by the owner 0.68 14 Inefficient workforce 0.68 14 Incorrect Type of materials delivered 0.68 14 Lack of security personnel 0.68 14 Lack of care in transportation of materials 0.68 14 Minimizing double handling 0.68 14 Labor strikes 0.67 15 Scarp disposal 0.67 16 Not determining when and what materials are needed 0.66 17 Too many suppliers to qualify 0.66 17 Poor communication 0.66 17 Improper site management practices 0.66 17 Technological Obsolescence 0.66 17 Loss of materials 0.66 17 Others 0.66 17 Inaccurate material specification 0.65 18 Daily recording of using materials in the project 0.65 18 Coordination of team work 0.65 18 Inefficient utilization of materials 0.65 18 Over ordering of material 0.65 18 No supplier quality assurance 0.64 19 Reporting the problem (wastage, defect etc.) 0.64 20 Name RII Rank Material requirement planning technique used 0.64 20 Late delivery 0.63 21 Keeping track of materials 0.63 21 Cutting of material 0.63 21 Wastage control Techniques 0.63 21 Frequency of on site material check 0.63 21 Weather conditions 0.63 21 Non Availability of material 0.62 22 Incorrect size of materials delivered 0.61 23 Incorrect quantity delivered 0.61 23 Use of incorrect material 0.61 23 ABC analysis 0.61 23 EOQ analysis 0.61 23 Change in BOQ 0.61 23 Damage due to weather 0.59 24 Corrosion 0.57 25 Lack of design team experience 0.55 26 Time taken to investigate and qualify the suppliers 0.55 27 Previous experience with the supplier 0.55 27 Poor communication between purchase and finance department 0.53 28 Inflation 0.53 29
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 933 1) Design Related Factors 2) Material Planning & Scheduling Factors 3) Factors Related To Vendor Selection 4) Labor Related Factors 5) Procurement Problems 6) Factors At Construction Site 7) Store Management 8) Waste Management 9) Techniques Used In Material Management 10) General Factors Chart -1: Main Factors Effecting Material Management Versus RII Value Labor Related factors and material Planning andscheduling are found to be the most influential groups of factors for effective material management in construction projects. Then comes the design related factors, followed by Store Management, Waste Management, General Factors, Factors At Construction Site, Procurement Problems, Techniques Used In Material Management and finally FactorsRelated To Vendor Selection. 3.1 Regression Model The arranged factors was then analyzed based on statistical tool , multiple regression analysis. . The regression analysis was done using SPSS Software (Statistical Package for Social Sciences). A number of regressionmodelswereobtained,five of these are shown in the figure (1). It is clear from the above tables that the factor which mostly effect the effective material management in construction industries is “training of staffs about the right handling of materials within the site”. The forecasting the market price for the required materials is also found to be important for the effective material management. Construction Waste management,poorcommunicationbetweensuppliers,design complexities,technologiesusedformaterialmanagementetc. plays a crucial role in the effective material management in construction. Fig-1: Regression model coefficients 4. CONCLUSION The Construction sector is responsible for the social and economic growth of the society. Material management is of the major challenges for the industry since it effects the overall cost of the project. A questionnairebasedsurvey was used to judge the attitude of Contractors, Project Engineers, Store In charge and Site Supervisors towards factors affecting Material Management of constructionfirms in Northern Regions of Kerala. The firms chosen consist of both private and public sector. Majority of the firms chosen were large industries coming under the category of Private sector. About 90 respondents wereinterviewed.Outofthese were 29 no of Site engineers, 23 no’s of Project Engineer 16 no’s of Contractors, 7 no’s of Supervisors, 12 no’s of Store managers, 3 no’s of design coordinators. The respondents were requested to indicate the level of importance ofeachof the 67 factors of Material management as critically important, Very important, Important, Fairly important, No effect at all. Results indicated that the most important factor affecting Material management of construction firms are Adequate training provided for staffs regarding how to effectively handle the materials, Poor quality of materials, Unclear and in adequate details in drawings, Material management technics used, technological obsolescence, Forecasting of market price, errors in design documents, poor waste management in construction site, Poor communication, REFERENCES [1] A. A. Gulghane, Prof P. V. Khandve, “Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review”, Int. Journal of Engineering Research and Applications,Vol.5,Issue4 (Part -1), April2015, pp.59-64. [2] Ashwini R. Patil, Smita V. Pataskar, “Analyzing Material Management Techniques on Construction Project”,International Journal of Engineering and
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 05 | May 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 934 InnovativeTechnology, Vol. 3, Issue 4, October 2013,pp. 96-10 [3] Vikram Kulkarni and Rohit Sharma, (2017) Factors Affecting Material Management on Construction Site, International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 01, Jan -2017 [4] P. Ezhilmathi and Dr.T. Shanmugapriya,(2016)Studyon Material Management–An Art Of Review, International Research Journal of Engineering and Technology (IRJET), Volume: 03 Issue: 11, Nov -2016. [5] Hemishkumar Patel and Dr. Jayeshkumar Pitroda, (2015) Analysis Of Factor Affecting Material Management And Inventory Management : Survey,.International Conference on: “Engineering: Issues, opportunities and Challenges for Development, ISBN: 978-81-929339-1-7 [6] Pauline Jeruto Keitany and Daniel M. Wanyoike, (2014), Assessment Of The Role Of Materials Management On Organizational Performance- A Case Of New Kenya Cooperative Creameries Limited, Eldoret Kenya, European Journal of Material Sciences Vol.1, No.1, pp.1- 10, March 2014. [7] K.Harish, (2014) A Study of Materials Management in Existing Constructions at Coimbatore, Global Journal of Engineering Science And Researches May 2014. [8] Carlos H. Caldas, Cindy L. Menches and Pedro M. Reyes, (2014),Materials Management Practices In The Construction Industry, Journal of Practice Periodical on Structural Design and Construction, July 2014. [9] P. Lenin and L. Krishnaraj, (2014), Analysis of Improper Material Management Affecting Cost in Construction Projects, International [10] Journal For ResearchInAppliedScienceandEngineering Technology (IJRASET), Vol. 2 Issue V, May 2014. [11] Nann Lwin Phu and Aye Mya Cho, (2014) Factors Affecting Material ManagementinBuildingConstruction Projects, International Journal of Scientific Engineering and Technology Research, Vol.03, Issue.10 May- 2014. [12] Okorocha, K.A., Factors Affecting Effective Materials Management in Building Construction Projects – A Case Study of Selected Building Sites, in Imo State, Nigeria (April 10, 2013). International Journal of Management Sciences and Business Research,Volume2,Issue4,2013 .AvailableatSSRN:https://ssrn.com/abstract=2711179 [13] Dr. Kevin Aku Okorocha, (2013) EvaluationOfMaterials Management Strategies In The Nigerian Construction Industry, International Journal of ManagementSciences and Business Research, Vol. 2, Issue 3, 2013. [14] Shehu Z., Holt G.D., Endut I.R., Akintoye A.,Analysis of characteristics affecting completion timefor Malaysian construction projects, Built Environ-ment Project and Asset Management, 5, 1, 52–68,2015. [15] T. Phani Madhavi and Steve Varghese Mathew,(2013), Material Management In Construction – A Case Study, International Journal of Research in Engineering and Technology, Nov 2013. [16] Vaisakh P.S., Dileeplal J. and Narayanan Unni, “Inventory Management of Spare Parts by Combined FSN and VED (CFSNVED) Analysis”, International Journal of Engineering and Innovative Technology, Volume-2Issue-7,January2013,2277-375Vanita Ahuja , Jay Yang , Ravi Shankar (2009) Study of ICTadoptionfor building project management in the Indianconstruction industry.