SlideShare a Scribd company logo
1 of 5
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 116
LEAN WASTE ASSESSMENT AND BLUE PRINT FOR ELIMINATION OF
WASTE THROUGH LEAN DIGITAL METHOD
Ankush Somani1, Pravin Minde2
1P.G. Scholar, Department Civil Engineering TSSM’s PVPIT, SPPU Pune, India,
2Assistant Professor, Department Civil Engineering TSSM’s PVPIT, SPPU Pune, India,
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Waste has been considered a major problem in
the construction industry for its financial and
environmental impacts. There are a lot of wastes from
managerial point of view in construction processes, which
were left unnoticed. One of the major change efforts for the
construction industry is lean construction. This thesis
analyzes the managerial perspective of lean waste
assessment in Indian construction industry from the lean
Digital construction perspective. Prior to the analysis in
question, requisite information about change in the
construction industry, lean thinking and lean construction
will be presented. A questionnaire, based on a lean
construction model is prepared and distributed to
construction firms, is used to survey the practices and
gather the data for the analysis. Various statistical analysis
methods are performed on the gathered data to make
inferences. According to these analyses, the eight types of
construction waste and mostly preferred waste elimination
method are listed out in ascending order and the lean
construction characteristics of the construction companies
will be discussed and the recommendations for improving
the lean conformance of the construction companies will be
presented. Thus the final conclusion is to determine the
primary key drivers of the construction industry leads to
enormous waste and most suitable waste elimination
method to reduce the managerial waste.
Key Words: Lean Digital Construction, Managerial waste,
Waste elimination method
1. INTRODUCTION
The Indian construction industry forms an integral part of
the economy and a conduit for a substantial part of its
development investment, is poised for growth on account
of industrialization, urbanization, economic development
and people's rising expectations for improved quality of
living. There are mainly three segments in the
construction industry like real estate construction which
includes residential and commercial construction;
infrastructure building which includes roads, railways,
power etc; and industrial construction that consists of oil
and gas refineries, pipelines, textiles etc. Construction,
without a doubt, has also been affected by improvements
in terms of the development of advanced engineering
materials, the utilization of mechanical power, the
application of information and telecommunication
technologies and the quality and the productivity
conciseness to a degree. The effects on construction are
basically over the technological utilization, application and
the adaptation of the primarily manufacturing related
phenomena. However, the adaptation and the penetration
of the organizational and the managerial foundations that
lead to some real quality improvements, cost reduction
and flexibility are questionable. Indeed, the construction
industry seems to contain seriously wasteful practices and
struggles to satisfy the parties involved. It is also such an
important and fundamental industry that its shortcomings
create huge detrimental effects.
Lean Thinking is a concept coined by Womack et al (1990)
that is based on the Toyota Production System (T. P. S.). It
was ultimately developed in a manufacturing
environment, more specifically in the automotive industry.
The main pioneers and promoters of lean thinking,
Toyota’s chief engineer Taichii Ohno and the C. E. O. Eiji
Toyoda was dedicated to eliminate both hidden and
obvious waste. Womack and Jones moved from the
automotive industry to look at manufacturing in general
and established the five principles for Lean Production;
this theoretical foundation is called Lean Thinking by
them. Lean construction is defined as “A holistic facility
design and delivery philosophy with an overarching aim of
maximizing value to all stakeholders through systematic,
synergistic, and continuous improvements in the
contractual arrangements, the product design, the
construction process design and methods selection, the
supply chain, and the workflow reliability of site
operations”.
2. Literature review
The practical stream started with Howell and Ballard's
(1995) observations that typically only half of the tasks in
a weekly plan get realized as planned on site. In a series of
experimental work, a new approach to production control,
called the Last Planner System, was developed (Ballard
2000). Whilst Last Planner covers production control and
improvement, methods for production system design have
also been developed (Ballard et al. 2001). Furthermore,
various new practices for different aspects of design and
construction management have been developed
(Bertelsen and Koskela 2002, Bertelsen et al 2002, Christ
offersen 2003).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 117
The theoretical stream started with Koskela's (1992)
analysis of the application of the new production
philosophy to construction. The question is about the
interpretation of generic principles of operations /
production management. Others (dos Santos 1999) have
examined the validity of these principles in the production
situation of construction. In (Koskela 2000) the discussion
on the principles was deepened and theoretical
explanation for the principles was presented, based on
current theories in operations management. While this
work addressed primarily the theory of production,
research on the theory of management was also embarked
on, especially in the context of project management
(Howell & Koskela 2000, Koskela & Howell 2002) and for
explaining the underlying principles of the Last Planner
system. Furthermore, the issues of complex adaptive
systems have been addressed (Bertelsen 2002, 2003 a and
b). Growing interest towards exploring the theories of
inherent social and psychological functions in production
and its management, such as cognition, communication,
learning, decision-making, etc. can be perceived
(Macomber and Howell 2003).
3. OBJECTIVES
1) To Study the various types of wastes in construction
industry from managerial perspective i.e. (Material
Waste & Time Waste)
2) Understanding the barriers in the construction
industry related to Cost, Quality & Time.
3) Preparation of Questionnaire related to lean waste
assessment based on above two objectives and
distribution of the Questionnaire in many
construction companies to gather the information
related to waste management system.
4) To determine the most suitable lean waste assessment
method based on questionnaire.
5) Analysis of the Questionnaire is carried out by means
of SPSS software to determine the primary drivers
which lead to generation of enormous managerial
waste.
4. PROJECT METHODOLOGY
Lean construction aims to maximize the customer’s
satisfaction through concurrent design of both the
constructed facilities and the construction process that
delivers these facilities, and through the consequent
control of each stage in the construction process. In
addition, by focusing on the workflow, lean construction is
able to unplug the clogs in the project stream. Thus,
construction processes like planning, engineering,
designing, constructing, producing and delivering of
materials are all better coordinated to deliver maximum
value for the project owner. The methodology adopted for
lean waste assessment from construction firm is explained
as follows:
Factors for Selection of the Population under Study:
The population considered for this study stretches over a
vast number. The construction industry by large
comprising both the infrastructure and real estate
industry is contemplated. Since Lean concepts are still in
the premature stage in the Indian construction industry,
the population selected for study includes firms which
have and don’t have lean management methodology in
place. With reference to the fact that lean concept is by
itself unaccustomed, Lean Digital concept is far from
reality.
The factors considered for the selection of population are
as follows:
1. Operational expanse of the firm (within country,
abroad or both)
This factor will throw a light on the construction
practices that are being adopted across the various parts
of the country and also the globe giving us a wider
perspective for analysis.
2. Nature of clients served (Public, private or both)
The firms essentially mould themselves in terms of
processes, practices and policies depending on the nature
of the clients that they serve. It ranges widely from the
elaborate methodologies of the public sector to the more
quality driven practices of the private sector. The
management methodologies undergo metamorphosis to
adapt to the changes.
3. Years of operation in the industry
Any firm’s management methodologies revel around the
various projects that have been accomplished over the
years. However, we cannot really ascertain that the longer
their existence in the industry, the better is the end
product. It is subject to various other factors. But this
study is centered on the management practices.
Eventually, the approach to a project will depend on the
experiences attained in various projects down the years.
Hence this factor is also quite critical in this analysis.
4. Areas of expertise in the industry
The project management approach to every project is
unique at some level or the other. The more complicated
the projects are the more complex the management
becomes. Thereby, the areas of expertise like residential
and commercial buildings, industrial facilities, tunnel
works, power plants etc have to be identified for the
wholesome analysis of the subject.
5. Scale of the firm
The scale of the firm is a pivotal factor to be considered in
any construction firm. The scale of the firm determines the
hierarchical arrangement and hence the flow of authority.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 118
4.2 Types of Waste Elimination Method:
Following are the types of waste elimination method used
in various construction companies;
1. Material Kanban Cards
2. Quality Management
3. Concurrent Engineering
4. Last Planner System
5. Daily Huddle Meetings
6. Value Stream Mapping
4.3 Methodology for Analysis:
The analysis aims to;
 Rank the eight managerial wastes based on the
significance of their occurrence in the industry,
 Establish a correlation between the various
managerial attributes that contribute to these wastes,
 Rank the most feasible lean waste elimination method
that can be adopted by the construction firms.
4.4 Limitations of the Study:
Some of the limitations of the study are:
1. The questionnaire was prepared to be filled by only
contractors however it was administered to all types
of firms.
2. All respondents were chosen among lower, mid or
upper level management only. However, most
respondents belonged to the mid and lower level
management.
3. The questionnaire was more widely applied to Indian
firms only.
4. The questionnaire is mainly focused on internal
operational aspects of firms, rather than
environmental effects.
5. RESULT
The questionnaire was distributed to over 90 construction
firms. It was administered to Real estate, infrastructure
companies and project management consultants. Out of 90
attempts, 50 responses were collected. From the 50
responses, 30% were primarily Real estate firms while
40% were primarily Infrastructure firms and 20% operate
in both sectors and 10% were consultants
Respondents Attributes:
There are 4 questions in the questionnaire to identify
respondents' attributes. These questions are about
respondents
1. Professions.
2. Levels of education.
3. Positions.
4. Levels of experience.
By profession, 10% respondents were Architect, 74%
were Civil Engineer and 16% were Construction
Technician. The level of education of the respondents were
spread in the ratio 12% respondents were holding
Associate degree, 64% respondents were holding a
Bachelor’s degree and 24% respondents were holding
Master degree. As for the position, 36% respondents were
from the lower level management while 52% respondents
were from the middle level management and 12%
respondents belongs to upper level management. As for
the level of experience, 60% respondents belonged to the
range of 0-5 years’ experience, 28% respondents belonged
to the range of 5-10 years and 12% were belonged to the
range of 10-20 years.
Firms Attributes:
There are 6 questions in the questionnaire to identify firm
attributes. These questions are about firms.
1. Areas of operation.
2. Operational times since their foundations.
3. Average numbers of employees.
4. Average annual turnovers.
5. Major clients
6. Geographical operational locations.
1. The areas of operations of the firm has constitutes
Project and Design 16%, Building Construction 34%,
Industrial facilities 12%, Infrastructure facilities 8%,
Highway and Transportation 12%, Airports 8%,
Pipelines 6%, Tunnel works 4%.
2. As for operational time since establishment, 24% have
been operating beyond 20 years, 36% have been
operating between 10-20 years, 32% have been
operating between 5-10 years and 8% have been
operating fewer 5 years.
3. The spread of the average number of employees in
the Respondent firms has been in the ratio of 26%
having employees in the range of 0-100, 22% having
100-500 employees, 36% having 500-1500
employees and 16% having more than 1500
employees.
4. As for the average annual turnover, 16% firms have
INR 10-100 crores, 52% have INR 100-1000 crores
and 32% have more than INR 1000 crores.
5. The respondent firm’s major clients have been in
the ratio of 24% public organizations, 48% private
organizations and 28% both public and private
organizations.
6. The geographical spreads of the respondent firms
have been in the ratio of 36% in the country, 60%
within the country and abroad and 4% in abroad
only.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 119
Result of the Waste Ranking:
Rank Waste Frequency
1 Waiting 39
2 Rework 35
3 Inventory 37
4 Transport of materials 36
5 Motion of people 38
6 Over production 34
7 Over processing 35
8
Unutilized human
potential
32
Result of Rankings of Waste Elimination Methods:
Rank Method Frequency
1 Quality Mgt. 29
2 Last Planner System 31
3 Daily Huddle Meetings 36
4 Material Kanban Cards 33
5 Value Stream Map 30
6 Concurrent Engineering 27
6. CONCLUSION
 Through this study, the various managerial wastes
impeding the progress of a construction have been
prioritized, thereby facilitating the design of a suitable
elimination method.
 The elimination methods suggested in this study are
the more prevalent methods in the industry. However,
there are numerous lean digital elimination methods
which have been surfacing recently.
 However, for the absolute implementation of Lean
digital in the construction industry, a radical change in
the outlook of the construction industrialists is the only
solution.
 It has been deduced that organization culture, quality
and safety facets and the handling of drawings are the
primary drivers for the generation of these enormous
managerial wastes.
 The firms evaluate the projects based on costs and
conformance to specifications. However, they overlook
the aspect of level of constructability which determines
the success or failure of a project.
7. ACKNOWLEDGEMENT
The auther of this paper is highly obliged to the
Department of Civil Engineering, Padmabhushan
Vasantadada Patil Institute of Technology, Bavdhan, Pune
and the Management of TSSM . Auther would like to
expess their deep sence of gratitude towards Indian
Construction Industry Water and Power Consultancy
Services Limited Mumbai and P.G. coordinator
Department of Civil Engineering, Padmabhushan
Vasantadada Patil Institute of Technology, Head of the
Departments and the other staff of the Institute.
REFERENCES
[1] Chen Wang et al., Waste processing framework for
non-value adding activities using lean construction,
2005
[2] O. Salem and E. Zimmer, Applications of lean
manufacturing principles to construction, Volume 2,
Lean construction journal 2005.
[3] Sven Bertelsen and Lauri Koskela, Construction beyond
lean: A new understanding of construction
management, 12th Annual conference in International
group for Lean construction, Elsinore, Denmark, 2004.
[4] K. Kraemer, G. Henrich, L. Koskela and M. Kagioglou,
How construction flows have been understood in Lean
construction, 2000.
[5] Glenn Ballard and Greg Howell, Implementing lean
construction: Stabilizing work flow, 1997.
[6] Lauren Pinch, Lean Construction- Eliminating waste,
2010.
[7] Pekka Huovila and Lauri J. Koskela, Contribution of the
principles of lean construction to meet the challenges
of sustainable development, 2015.
[8] Flavio Augusto Picchi and Ariovaldo Denis Granja,
Construction sites: Using lean principles to seek
broader implementations, 2005
[9] Sven Bertelsen and Lauri Koskela, Managing the three
aspects of production in construction, 10th Annual
conference in the International group of Lean
construction, 2002
[10] Shant A Dajadian and Daphene C Koch, Waste
management models and their applications on
construction sites, International journal of
construction engineering and management, 2014
[11] Hamzah Abdul Rahman, Chen Wang, Irene Yen Wui
Lim, Waste processing framework non value adding
activities using lean construction, Journal of
Frontiers in Construction engineering, 2012.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 120
BIOGRAPHIES
I have completed my B-Tech in
Civil Engineering from
Government college of
Engineering Amravati (2013).
After that started to Work in
WAPCOS Limited (Government
of India Undertaking). In 2015
started to Pursue Masters of
Engineering in Construction
Management from TSSM’s PVPIT,
SPPU Pune, India.

More Related Content

What's hot

EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONEFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONIAEME Publication
 
A Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryA Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryIRJET Journal
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET Journal
 
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEM
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEMRECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEM
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEMakshay ghanwat
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...IJECEIAES
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Conceptsvengefulwind
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Publishing House
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryIRJET Journal
 
Introduction to Production Engineering Department
Introduction to Production Engineering DepartmentIntroduction to Production Engineering Department
Introduction to Production Engineering DepartmentAmr El-Ganainy
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurementSiddharth Mantri
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st moduleJim Alex
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 
Resource Management, Construction labour and labour acts, safety, labour prod...
Resource Management, Construction labour and labour acts, safety, labour prod...Resource Management, Construction labour and labour acts, safety, labour prod...
Resource Management, Construction labour and labour acts, safety, labour prod...Amit Kumbar
 
A Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkA Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkRicardo Magno Antunes
 
“Prediction of industrial solid waste with anfis model and its comparison wit...
“Prediction of industrial solid waste with anfis model and its comparison wit...“Prediction of industrial solid waste with anfis model and its comparison wit...
“Prediction of industrial solid waste with anfis model and its comparison wit...Manoj Kumar Tiwari
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 

What's hot (20)

EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONEFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
 
A Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction IndustryA Review on Waste Material Minimization in Construction Industry
A Review on Waste Material Minimization in Construction Industry
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEM
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEMRECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEM
RECENT TRAINDS IN ADVANCED MANUFACTURING SYSTEM
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...
 
Fu3610581067
Fu3610581067Fu3610581067
Fu3610581067
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Concepts
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
 
Introduction to Production Engineering Department
Introduction to Production Engineering DepartmentIntroduction to Production Engineering Department
Introduction to Production Engineering Department
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
INDUSTRIAL ENGINEERING 1st module
INDUSTRIAL  ENGINEERING  1st moduleINDUSTRIAL  ENGINEERING  1st module
INDUSTRIAL ENGINEERING 1st module
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
Resource Management, Construction labour and labour acts, safety, labour prod...
Resource Management, Construction labour and labour acts, safety, labour prod...Resource Management, Construction labour and labour acts, safety, labour prod...
Resource Management, Construction labour and labour acts, safety, labour prod...
 
A Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkA Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical Framework
 
“Prediction of industrial solid waste with anfis model and its comparison wit...
“Prediction of industrial solid waste with anfis model and its comparison wit...“Prediction of industrial solid waste with anfis model and its comparison wit...
“Prediction of industrial solid waste with anfis model and its comparison wit...
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction Projects
 

Similar to Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Digital Method

USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...IRJET Journal
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsAnn Johnson
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewIRJET Journal
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesIRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsIRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance Dhrumil Pandya
 
An Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionAn Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionIRJET Journal
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET Journal
 

Similar to Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Digital Method (20)

USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...The new trend to Project Management: Lean construction. A methodology to miti...
The new trend to Project Management: Lean construction. A methodology to miti...
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Identification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building ConstructionIdentification & Minimization Of Waste In Building Construction
Identification & Minimization Of Waste In Building Construction
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A Review
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction Companies
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
B44090512
B44090512B44090512
B44090512
 
Dhrumil pandya Maintance
Dhrumil pandya  Maintance  Dhrumil pandya  Maintance
Dhrumil pandya Maintance
 
An Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionAn Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps Adoption
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Digital Method

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 116 LEAN WASTE ASSESSMENT AND BLUE PRINT FOR ELIMINATION OF WASTE THROUGH LEAN DIGITAL METHOD Ankush Somani1, Pravin Minde2 1P.G. Scholar, Department Civil Engineering TSSM’s PVPIT, SPPU Pune, India, 2Assistant Professor, Department Civil Engineering TSSM’s PVPIT, SPPU Pune, India, ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Waste has been considered a major problem in the construction industry for its financial and environmental impacts. There are a lot of wastes from managerial point of view in construction processes, which were left unnoticed. One of the major change efforts for the construction industry is lean construction. This thesis analyzes the managerial perspective of lean waste assessment in Indian construction industry from the lean Digital construction perspective. Prior to the analysis in question, requisite information about change in the construction industry, lean thinking and lean construction will be presented. A questionnaire, based on a lean construction model is prepared and distributed to construction firms, is used to survey the practices and gather the data for the analysis. Various statistical analysis methods are performed on the gathered data to make inferences. According to these analyses, the eight types of construction waste and mostly preferred waste elimination method are listed out in ascending order and the lean construction characteristics of the construction companies will be discussed and the recommendations for improving the lean conformance of the construction companies will be presented. Thus the final conclusion is to determine the primary key drivers of the construction industry leads to enormous waste and most suitable waste elimination method to reduce the managerial waste. Key Words: Lean Digital Construction, Managerial waste, Waste elimination method 1. INTRODUCTION The Indian construction industry forms an integral part of the economy and a conduit for a substantial part of its development investment, is poised for growth on account of industrialization, urbanization, economic development and people's rising expectations for improved quality of living. There are mainly three segments in the construction industry like real estate construction which includes residential and commercial construction; infrastructure building which includes roads, railways, power etc; and industrial construction that consists of oil and gas refineries, pipelines, textiles etc. Construction, without a doubt, has also been affected by improvements in terms of the development of advanced engineering materials, the utilization of mechanical power, the application of information and telecommunication technologies and the quality and the productivity conciseness to a degree. The effects on construction are basically over the technological utilization, application and the adaptation of the primarily manufacturing related phenomena. However, the adaptation and the penetration of the organizational and the managerial foundations that lead to some real quality improvements, cost reduction and flexibility are questionable. Indeed, the construction industry seems to contain seriously wasteful practices and struggles to satisfy the parties involved. It is also such an important and fundamental industry that its shortcomings create huge detrimental effects. Lean Thinking is a concept coined by Womack et al (1990) that is based on the Toyota Production System (T. P. S.). It was ultimately developed in a manufacturing environment, more specifically in the automotive industry. The main pioneers and promoters of lean thinking, Toyota’s chief engineer Taichii Ohno and the C. E. O. Eiji Toyoda was dedicated to eliminate both hidden and obvious waste. Womack and Jones moved from the automotive industry to look at manufacturing in general and established the five principles for Lean Production; this theoretical foundation is called Lean Thinking by them. Lean construction is defined as “A holistic facility design and delivery philosophy with an overarching aim of maximizing value to all stakeholders through systematic, synergistic, and continuous improvements in the contractual arrangements, the product design, the construction process design and methods selection, the supply chain, and the workflow reliability of site operations”. 2. Literature review The practical stream started with Howell and Ballard's (1995) observations that typically only half of the tasks in a weekly plan get realized as planned on site. In a series of experimental work, a new approach to production control, called the Last Planner System, was developed (Ballard 2000). Whilst Last Planner covers production control and improvement, methods for production system design have also been developed (Ballard et al. 2001). Furthermore, various new practices for different aspects of design and construction management have been developed (Bertelsen and Koskela 2002, Bertelsen et al 2002, Christ offersen 2003).
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 117 The theoretical stream started with Koskela's (1992) analysis of the application of the new production philosophy to construction. The question is about the interpretation of generic principles of operations / production management. Others (dos Santos 1999) have examined the validity of these principles in the production situation of construction. In (Koskela 2000) the discussion on the principles was deepened and theoretical explanation for the principles was presented, based on current theories in operations management. While this work addressed primarily the theory of production, research on the theory of management was also embarked on, especially in the context of project management (Howell & Koskela 2000, Koskela & Howell 2002) and for explaining the underlying principles of the Last Planner system. Furthermore, the issues of complex adaptive systems have been addressed (Bertelsen 2002, 2003 a and b). Growing interest towards exploring the theories of inherent social and psychological functions in production and its management, such as cognition, communication, learning, decision-making, etc. can be perceived (Macomber and Howell 2003). 3. OBJECTIVES 1) To Study the various types of wastes in construction industry from managerial perspective i.e. (Material Waste & Time Waste) 2) Understanding the barriers in the construction industry related to Cost, Quality & Time. 3) Preparation of Questionnaire related to lean waste assessment based on above two objectives and distribution of the Questionnaire in many construction companies to gather the information related to waste management system. 4) To determine the most suitable lean waste assessment method based on questionnaire. 5) Analysis of the Questionnaire is carried out by means of SPSS software to determine the primary drivers which lead to generation of enormous managerial waste. 4. PROJECT METHODOLOGY Lean construction aims to maximize the customer’s satisfaction through concurrent design of both the constructed facilities and the construction process that delivers these facilities, and through the consequent control of each stage in the construction process. In addition, by focusing on the workflow, lean construction is able to unplug the clogs in the project stream. Thus, construction processes like planning, engineering, designing, constructing, producing and delivering of materials are all better coordinated to deliver maximum value for the project owner. The methodology adopted for lean waste assessment from construction firm is explained as follows: Factors for Selection of the Population under Study: The population considered for this study stretches over a vast number. The construction industry by large comprising both the infrastructure and real estate industry is contemplated. Since Lean concepts are still in the premature stage in the Indian construction industry, the population selected for study includes firms which have and don’t have lean management methodology in place. With reference to the fact that lean concept is by itself unaccustomed, Lean Digital concept is far from reality. The factors considered for the selection of population are as follows: 1. Operational expanse of the firm (within country, abroad or both) This factor will throw a light on the construction practices that are being adopted across the various parts of the country and also the globe giving us a wider perspective for analysis. 2. Nature of clients served (Public, private or both) The firms essentially mould themselves in terms of processes, practices and policies depending on the nature of the clients that they serve. It ranges widely from the elaborate methodologies of the public sector to the more quality driven practices of the private sector. The management methodologies undergo metamorphosis to adapt to the changes. 3. Years of operation in the industry Any firm’s management methodologies revel around the various projects that have been accomplished over the years. However, we cannot really ascertain that the longer their existence in the industry, the better is the end product. It is subject to various other factors. But this study is centered on the management practices. Eventually, the approach to a project will depend on the experiences attained in various projects down the years. Hence this factor is also quite critical in this analysis. 4. Areas of expertise in the industry The project management approach to every project is unique at some level or the other. The more complicated the projects are the more complex the management becomes. Thereby, the areas of expertise like residential and commercial buildings, industrial facilities, tunnel works, power plants etc have to be identified for the wholesome analysis of the subject. 5. Scale of the firm The scale of the firm is a pivotal factor to be considered in any construction firm. The scale of the firm determines the hierarchical arrangement and hence the flow of authority.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 118 4.2 Types of Waste Elimination Method: Following are the types of waste elimination method used in various construction companies; 1. Material Kanban Cards 2. Quality Management 3. Concurrent Engineering 4. Last Planner System 5. Daily Huddle Meetings 6. Value Stream Mapping 4.3 Methodology for Analysis: The analysis aims to;  Rank the eight managerial wastes based on the significance of their occurrence in the industry,  Establish a correlation between the various managerial attributes that contribute to these wastes,  Rank the most feasible lean waste elimination method that can be adopted by the construction firms. 4.4 Limitations of the Study: Some of the limitations of the study are: 1. The questionnaire was prepared to be filled by only contractors however it was administered to all types of firms. 2. All respondents were chosen among lower, mid or upper level management only. However, most respondents belonged to the mid and lower level management. 3. The questionnaire was more widely applied to Indian firms only. 4. The questionnaire is mainly focused on internal operational aspects of firms, rather than environmental effects. 5. RESULT The questionnaire was distributed to over 90 construction firms. It was administered to Real estate, infrastructure companies and project management consultants. Out of 90 attempts, 50 responses were collected. From the 50 responses, 30% were primarily Real estate firms while 40% were primarily Infrastructure firms and 20% operate in both sectors and 10% were consultants Respondents Attributes: There are 4 questions in the questionnaire to identify respondents' attributes. These questions are about respondents 1. Professions. 2. Levels of education. 3. Positions. 4. Levels of experience. By profession, 10% respondents were Architect, 74% were Civil Engineer and 16% were Construction Technician. The level of education of the respondents were spread in the ratio 12% respondents were holding Associate degree, 64% respondents were holding a Bachelor’s degree and 24% respondents were holding Master degree. As for the position, 36% respondents were from the lower level management while 52% respondents were from the middle level management and 12% respondents belongs to upper level management. As for the level of experience, 60% respondents belonged to the range of 0-5 years’ experience, 28% respondents belonged to the range of 5-10 years and 12% were belonged to the range of 10-20 years. Firms Attributes: There are 6 questions in the questionnaire to identify firm attributes. These questions are about firms. 1. Areas of operation. 2. Operational times since their foundations. 3. Average numbers of employees. 4. Average annual turnovers. 5. Major clients 6. Geographical operational locations. 1. The areas of operations of the firm has constitutes Project and Design 16%, Building Construction 34%, Industrial facilities 12%, Infrastructure facilities 8%, Highway and Transportation 12%, Airports 8%, Pipelines 6%, Tunnel works 4%. 2. As for operational time since establishment, 24% have been operating beyond 20 years, 36% have been operating between 10-20 years, 32% have been operating between 5-10 years and 8% have been operating fewer 5 years. 3. The spread of the average number of employees in the Respondent firms has been in the ratio of 26% having employees in the range of 0-100, 22% having 100-500 employees, 36% having 500-1500 employees and 16% having more than 1500 employees. 4. As for the average annual turnover, 16% firms have INR 10-100 crores, 52% have INR 100-1000 crores and 32% have more than INR 1000 crores. 5. The respondent firm’s major clients have been in the ratio of 24% public organizations, 48% private organizations and 28% both public and private organizations. 6. The geographical spreads of the respondent firms have been in the ratio of 36% in the country, 60% within the country and abroad and 4% in abroad only.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 119 Result of the Waste Ranking: Rank Waste Frequency 1 Waiting 39 2 Rework 35 3 Inventory 37 4 Transport of materials 36 5 Motion of people 38 6 Over production 34 7 Over processing 35 8 Unutilized human potential 32 Result of Rankings of Waste Elimination Methods: Rank Method Frequency 1 Quality Mgt. 29 2 Last Planner System 31 3 Daily Huddle Meetings 36 4 Material Kanban Cards 33 5 Value Stream Map 30 6 Concurrent Engineering 27 6. CONCLUSION  Through this study, the various managerial wastes impeding the progress of a construction have been prioritized, thereby facilitating the design of a suitable elimination method.  The elimination methods suggested in this study are the more prevalent methods in the industry. However, there are numerous lean digital elimination methods which have been surfacing recently.  However, for the absolute implementation of Lean digital in the construction industry, a radical change in the outlook of the construction industrialists is the only solution.  It has been deduced that organization culture, quality and safety facets and the handling of drawings are the primary drivers for the generation of these enormous managerial wastes.  The firms evaluate the projects based on costs and conformance to specifications. However, they overlook the aspect of level of constructability which determines the success or failure of a project. 7. ACKNOWLEDGEMENT The auther of this paper is highly obliged to the Department of Civil Engineering, Padmabhushan Vasantadada Patil Institute of Technology, Bavdhan, Pune and the Management of TSSM . Auther would like to expess their deep sence of gratitude towards Indian Construction Industry Water and Power Consultancy Services Limited Mumbai and P.G. coordinator Department of Civil Engineering, Padmabhushan Vasantadada Patil Institute of Technology, Head of the Departments and the other staff of the Institute. REFERENCES [1] Chen Wang et al., Waste processing framework for non-value adding activities using lean construction, 2005 [2] O. Salem and E. Zimmer, Applications of lean manufacturing principles to construction, Volume 2, Lean construction journal 2005. [3] Sven Bertelsen and Lauri Koskela, Construction beyond lean: A new understanding of construction management, 12th Annual conference in International group for Lean construction, Elsinore, Denmark, 2004. [4] K. Kraemer, G. Henrich, L. Koskela and M. Kagioglou, How construction flows have been understood in Lean construction, 2000. [5] Glenn Ballard and Greg Howell, Implementing lean construction: Stabilizing work flow, 1997. [6] Lauren Pinch, Lean Construction- Eliminating waste, 2010. [7] Pekka Huovila and Lauri J. Koskela, Contribution of the principles of lean construction to meet the challenges of sustainable development, 2015. [8] Flavio Augusto Picchi and Ariovaldo Denis Granja, Construction sites: Using lean principles to seek broader implementations, 2005 [9] Sven Bertelsen and Lauri Koskela, Managing the three aspects of production in construction, 10th Annual conference in the International group of Lean construction, 2002 [10] Shant A Dajadian and Daphene C Koch, Waste management models and their applications on construction sites, International journal of construction engineering and management, 2014 [11] Hamzah Abdul Rahman, Chen Wang, Irene Yen Wui Lim, Waste processing framework non value adding activities using lean construction, Journal of Frontiers in Construction engineering, 2012.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 120 BIOGRAPHIES I have completed my B-Tech in Civil Engineering from Government college of Engineering Amravati (2013). After that started to Work in WAPCOS Limited (Government of India Undertaking). In 2015 started to Pursue Masters of Engineering in Construction Management from TSSM’s PVPIT, SPPU Pune, India.