CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR
ATULA ELEGANCE AT VAVOL
JAY PATEL1, KRUPA DAVE2
1PG Student, M.E. (Civil) Infrastructure Engineering, L.D.R.P. Institute of Technology & Research, Gandhinagar
2Asst. Professor, Dept. of Civil Engineering, L.D.R.P. Institute of Technology & Research, Gandhinagar
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Construction Industry in India has multipliedby using leaps and bounds in the latest decad e. Construction is a
complicated interest that contain right making plans and control of assets and capital. The natureof seasoned jects these
days is becoming complex. The opposition on this Industry is become elevated every day and additionally because of
protection issues want as get up to cognizance on pleasant and workmanship. The achievement of any Project lies in the
green management of time, QUALITY and COST. By experiencing realistic knowledge of management on website we had
concluded that Resource SCHEDULING of the assignment is the maximum critical thing of mission management. Our
venture consists of SCHEDULING of task with the information of activities and lowering the losing of TIME, RESOURCES
and MONEY
Key Words: MSP Software, Gantt chart, Cost, Materials, Quantity and Management, Planning, Scheduling, Organizing.
1. INTRODUCTION
Project Management is the Application of understanding, competencies and Techniques to venture sports to satisfy
venture requirements. It is a strategic capacity to do something effectively for businesses, permitting them to patch the
undertaking effects to Organizational goals and for that reason, higher compete in their markets. It can be additionally
defined as the manner and interest of planning, organizing, inspiring, and controlling resources, procedures and protocols
to acquire particular goals in clinical or day by day issues. A assignment is a brief aim designed to produce a unique
product, carrier or end result with a defined starting and cease, undertaken to satisfy eccentric dreams and targets,
typically to result in useful change or introduced value. The transient nature of initiatives stands in evaluation with
commercial enterprise as normal, which might be ordinary, permanentor semi-everlasting functional activities to supply
servicesor products.
1.1 Objectives of Study
 To study total project management and key elements ofproject management
 To reduce the total duration.
 To ease of work for the Labour
 Planning and scheduling of residential building.
 To prepare a realistic schedule and set baseline.
 To prepare the graph of the planning and scheduling.
 To study construction of FLAT in GANDHINAGARRegion
1.2 About Microsoft project
Microsoft Project is a challenge management softwareadvanced and sold with the aid of Microsoft, that's designed to assist
a assignment manager in growing a plan, assigning assets to duties, monitoring development, dealing with the price range,
and analyzing workloads. Project creates budgets based on mission work and aid fee. As assets are assigned to the venture
and this system calculates the fee equal to the work times the charge, which rollsup to the venture level and then to any
summary tasksstage and sooner or later to the task degree.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 312
1.3Scope
Project scope is the part of project planning that includes figuring out and documenting a list of specific assignment
dreams, deliverable, obligations, charges anddeadlines. These deliverables are derived from a undertaking's requirements.
In construction, put off could be described as the time over run both past of entirety. Date specified in a agreement, or
beyond the date that the events agreed upon for shipping of a assignment
2.Literature review
Vittal Anantatmula, Planning Techniques for Academic Advising and Learning, (2010), Journal of Engineering
Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 4, Issue 6(Version 5) Description: - Found out that
Similar toa traditional project, managing an academic degree is related to the triple constraints of time, cost, and scope. It
is concluded that by applying project management concepts, tools, and techniques, undergraduate degree program
advising and planningcan be improved after comparing the planning aspectsof a conventional business project with the
planning of an academic degree
R. Prabhahar and G. Ravichandran, Optimal planning and scheduling in multi-storied building, (2014), Journal of
Mechanical and Civil Engineering (IOSR) Description: - Analysed that; Construction planning is an important part of
the overall management process. The planning and management include organizing the work, executing the work,
correlating plan and progress information and controlling the work, the three inter-related factors of time, money and
quality need to be managed in a proper way. Completion of many ofthe projects nowadays is not in estimated duration.
Hoang, Nhat Minh Shrestha, Swastik, Project management software and its utilities (2014), Lahti University of
Applied Sciences Degree Programme in Business Information Technology Description: - Hinted that the main
function of a software is to offer help, and enhance the quality of output with less effort thanmanual ways. A project has
disparate requirements and the aim of the adopted softwareis to fulfil those requirements effectively in terms of time and
cost. In addition, the issues of scheduling, tracking and physical element must beconsidered while adopting the project
management software.
3. Methodology
This thesis is finished for the making plans and scheduling of the construction site. The site nameis ATULYA ELEGANCE it's
miles multistory constructing undertaking of 4 blocks of 8 storey. The mission is constructed by using ATULYA
DEVELOPER. In this thesis A-block is choose for the research of making plans and scheduling in Microsoft Project. From
excavation to completingpaintings time table ought to be generated in Microsoft project and notify the crucial path.
Resource allocation of ever paintings and materialneed to be provided. Cost of the paintings and fabric should be calculated
in M.S challenge.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 313
3.1.1 Data collection
Block-A
Clearing of plot 3/7/2020 4/7/2020
Planning 3/7/2020 4/7/2020
Marking of excavation 4/7/2020 4/7/2020
Excavation 4/7/2020 8/7/2020
Concrete work
Basement
p.c.c 8/7/2020 9/7/2020
Footing, column and lift padi 9/7/2020 21/7/2020
Slab, beam. starter andstair 16/7/2020 31/7/2020
Ground floor
column and lift padi 25/7/2020 4/8/2020
Slab, beam,starter and stair 1/8/2020 15/8/2020
1st floor
column and lift padi 8/8/2020 20/8/2020
Slab, beam,starter and stair 15/8/2020 29/8/2020
2nd floor
column and lift padi 23/8/2020 3/9/2020
Slab, beam,starter and stai 29/8/2020 13/9/2020
3rd floor
column and lift padi 6/9/2020 19/9/2020
Slab, beam,starter and stai 13/9/2020 27/9/2020
4th floor
column and lift padi 22/9/2020 3/10/2020
Slab, beam, starter andstai 27/9/2020 12/10/2020
3.1.1 Date Collection
Activity name Start date End date
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
3.2 Data analysis
4. RESULT AND DISCUSSION
4.1 Planning and scheduling of ATULY ELEGANCE using M.S project
Activity name Start date End date
A- Block
Clearing of plot 3/7/2022 04/7/2020
Planning 3/7/2022 04/7/2020
Marking ofexcavation 4/7/2020 4/7/2020
Excavation 4/7/2020 4/7/2020
Concrete work
Basement
p.c.c 8/7/2020 10/7/2020
Footing , colummand lift padi
Reinforcementmarking 10/7/2020 10/7/2020
Bar cutting 11/7/2020 11/7/2020
Bar bending 11/7/2020 12/7/2020
Reinforcementplacing 12/7/2020 12/7/2020
Bar tyoing 12/7/2020 12/7/2020
formwork 12/7/2020 14/7/2020
Concreting 15/7/2020 16/7/2020
Side opening 17/7/2020 18/7/2020
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 314
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
4.3.3 Resource allocation and cost calculation
4.4 Resources overview
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 315
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
4.5Work hour remaininig table
4.6Cost overview
5. Conclusion
Based at the mission paintings, “MS PROJECT SOFTWARE AND ITS APPLICATION IN CONSTRUCTION PROJECT AND CASE
STUDY AT GANDHINAGAR” the following conclusionsare drawn out Practice and Understanding of general task control
provides higher end result, product, and carrier to the undertaking /company. Effective undertaking control provides
balance among Scope,Time,Cost, Quality,Resourceand Communication. Project control Software MS Project presents higher
making plans, scheduling, tracking and controlling of small as well as large initiatives. During the execution of a mission,
software is useful for promoting powerful coordination. Research and Study nation that implementation of MS Project
software for Time and Cost Management is proven method. Implementation of MS Project software program for production
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 316
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
of Buildings such asflat, for Time and Cost Management presents effective display and manage. For infrastructure venture
like production of Buildings, implementation of MS Project software program gives higher time table to manipulate the
venture. Time management which gives correct planning and scheduling of assignment and Cost management which gives
earned fee management of undertaking. Earned Value Management gives higher economic manipulate of typical cost of the
undertaking. It can be used for measuring undertaking performance and development in an goal manner. Software
provides effective Monitoring and Controlling through various Reports.
6. ACKNOWLEDGEMENT
We specific in care and heartfelt thanks to Prof. A. N. Bhavsar Sir, asst. Prof. Birla Vishvakarma Mahavidyalaya Engineering
College, Vallabh Vidyanagar for giving us an possibility to adopt this challenge for study. We specific a deep feel of
gratitude to Prof. A. N. Bhavsar Sir, Civil Engineering Department, Birla Vishvakarma Mahavidyalaya Engineering College,
Vallabh Vidyanagar & Svayam Symphony Group, Sir Pramodkumar Singh, Director General Manager and Sir Nirav Modi,
Project Co-ordinator, who helped us for his or her excessive constructive help, consistent encouragement, steering and
channelizing our efforts in the proper directionwithout which this project might no longer have attained the prevailing shape.
We might also like respect and thank to our loving PARENTS, CLASSMATES and FRIENDS for all their help and
encouragement, given in the course of the assignment period.
7. REFERENCES
[1]. A.K.Munns & B.F.Bjeirmi, The Role of Project ManagementIn Achieving Project Success, International Journals of Project
Management, Vol. 14, No. 2, Pp. 81-87, 1996.
[2] Aftab Hameed Memon and Ismail Abdul Rahman (2014) suggested that time is the biggest element that every
contractor has to deal with while practicing the construction activities.
[3]. Tsichritzis, 8070 communications of the association for computing machinery, vol.25 (1892), July no. 7, New York USA.
[4] Hoang, Nhat Minh Shrestha, Swastik (2014) hinted that themain function of a software is to offer help, and enhance the
quality of output with less effort than manual ways.
[6] Minh Shrestha, hinted that the main function of a softwareis help, and develop the quality of output with less effort than
manual ways.
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 317

More Related Content

Similar to CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT VAVOL

IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction ManagementIRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...IRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 

Similar to CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT VAVOL (20)

IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction Management
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
Planning, Scheduling and Allocation of Resources for Multi-Storied Structure ...
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT VAVOL

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 311 CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT VAVOL JAY PATEL1, KRUPA DAVE2 1PG Student, M.E. (Civil) Infrastructure Engineering, L.D.R.P. Institute of Technology & Research, Gandhinagar 2Asst. Professor, Dept. of Civil Engineering, L.D.R.P. Institute of Technology & Research, Gandhinagar ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Construction Industry in India has multipliedby using leaps and bounds in the latest decad e. Construction is a complicated interest that contain right making plans and control of assets and capital. The natureof seasoned jects these days is becoming complex. The opposition on this Industry is become elevated every day and additionally because of protection issues want as get up to cognizance on pleasant and workmanship. The achievement of any Project lies in the green management of time, QUALITY and COST. By experiencing realistic knowledge of management on website we had concluded that Resource SCHEDULING of the assignment is the maximum critical thing of mission management. Our venture consists of SCHEDULING of task with the information of activities and lowering the losing of TIME, RESOURCES and MONEY Key Words: MSP Software, Gantt chart, Cost, Materials, Quantity and Management, Planning, Scheduling, Organizing. 1. INTRODUCTION Project Management is the Application of understanding, competencies and Techniques to venture sports to satisfy venture requirements. It is a strategic capacity to do something effectively for businesses, permitting them to patch the undertaking effects to Organizational goals and for that reason, higher compete in their markets. It can be additionally defined as the manner and interest of planning, organizing, inspiring, and controlling resources, procedures and protocols to acquire particular goals in clinical or day by day issues. A assignment is a brief aim designed to produce a unique product, carrier or end result with a defined starting and cease, undertaken to satisfy eccentric dreams and targets, typically to result in useful change or introduced value. The transient nature of initiatives stands in evaluation with commercial enterprise as normal, which might be ordinary, permanentor semi-everlasting functional activities to supply servicesor products. 1.1 Objectives of Study  To study total project management and key elements ofproject management  To reduce the total duration.  To ease of work for the Labour  Planning and scheduling of residential building.  To prepare a realistic schedule and set baseline.  To prepare the graph of the planning and scheduling.  To study construction of FLAT in GANDHINAGARRegion 1.2 About Microsoft project Microsoft Project is a challenge management softwareadvanced and sold with the aid of Microsoft, that's designed to assist a assignment manager in growing a plan, assigning assets to duties, monitoring development, dealing with the price range, and analyzing workloads. Project creates budgets based on mission work and aid fee. As assets are assigned to the venture and this system calculates the fee equal to the work times the charge, which rollsup to the venture level and then to any summary tasksstage and sooner or later to the task degree.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 312 1.3Scope Project scope is the part of project planning that includes figuring out and documenting a list of specific assignment dreams, deliverable, obligations, charges anddeadlines. These deliverables are derived from a undertaking's requirements. In construction, put off could be described as the time over run both past of entirety. Date specified in a agreement, or beyond the date that the events agreed upon for shipping of a assignment 2.Literature review Vittal Anantatmula, Planning Techniques for Academic Advising and Learning, (2010), Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 4, Issue 6(Version 5) Description: - Found out that Similar toa traditional project, managing an academic degree is related to the triple constraints of time, cost, and scope. It is concluded that by applying project management concepts, tools, and techniques, undergraduate degree program advising and planningcan be improved after comparing the planning aspectsof a conventional business project with the planning of an academic degree R. Prabhahar and G. Ravichandran, Optimal planning and scheduling in multi-storied building, (2014), Journal of Mechanical and Civil Engineering (IOSR) Description: - Analysed that; Construction planning is an important part of the overall management process. The planning and management include organizing the work, executing the work, correlating plan and progress information and controlling the work, the three inter-related factors of time, money and quality need to be managed in a proper way. Completion of many ofthe projects nowadays is not in estimated duration. Hoang, Nhat Minh Shrestha, Swastik, Project management software and its utilities (2014), Lahti University of Applied Sciences Degree Programme in Business Information Technology Description: - Hinted that the main function of a software is to offer help, and enhance the quality of output with less effort thanmanual ways. A project has disparate requirements and the aim of the adopted softwareis to fulfil those requirements effectively in terms of time and cost. In addition, the issues of scheduling, tracking and physical element must beconsidered while adopting the project management software. 3. Methodology This thesis is finished for the making plans and scheduling of the construction site. The site nameis ATULYA ELEGANCE it's miles multistory constructing undertaking of 4 blocks of 8 storey. The mission is constructed by using ATULYA DEVELOPER. In this thesis A-block is choose for the research of making plans and scheduling in Microsoft Project. From excavation to completingpaintings time table ought to be generated in Microsoft project and notify the crucial path. Resource allocation of ever paintings and materialneed to be provided. Cost of the paintings and fabric should be calculated in M.S challenge.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 313 3.1.1 Data collection Block-A Clearing of plot 3/7/2020 4/7/2020 Planning 3/7/2020 4/7/2020 Marking of excavation 4/7/2020 4/7/2020 Excavation 4/7/2020 8/7/2020 Concrete work Basement p.c.c 8/7/2020 9/7/2020 Footing, column and lift padi 9/7/2020 21/7/2020 Slab, beam. starter andstair 16/7/2020 31/7/2020 Ground floor column and lift padi 25/7/2020 4/8/2020 Slab, beam,starter and stair 1/8/2020 15/8/2020 1st floor column and lift padi 8/8/2020 20/8/2020 Slab, beam,starter and stair 15/8/2020 29/8/2020 2nd floor column and lift padi 23/8/2020 3/9/2020 Slab, beam,starter and stai 29/8/2020 13/9/2020 3rd floor column and lift padi 6/9/2020 19/9/2020 Slab, beam,starter and stai 13/9/2020 27/9/2020 4th floor column and lift padi 22/9/2020 3/10/2020 Slab, beam, starter andstai 27/9/2020 12/10/2020 3.1.1 Date Collection Activity name Start date End date
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 3.2 Data analysis 4. RESULT AND DISCUSSION 4.1 Planning and scheduling of ATULY ELEGANCE using M.S project Activity name Start date End date A- Block Clearing of plot 3/7/2022 04/7/2020 Planning 3/7/2022 04/7/2020 Marking ofexcavation 4/7/2020 4/7/2020 Excavation 4/7/2020 4/7/2020 Concrete work Basement p.c.c 8/7/2020 10/7/2020 Footing , colummand lift padi Reinforcementmarking 10/7/2020 10/7/2020 Bar cutting 11/7/2020 11/7/2020 Bar bending 11/7/2020 12/7/2020 Reinforcementplacing 12/7/2020 12/7/2020 Bar tyoing 12/7/2020 12/7/2020 formwork 12/7/2020 14/7/2020 Concreting 15/7/2020 16/7/2020 Side opening 17/7/2020 18/7/2020 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 314
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 4.3.3 Resource allocation and cost calculation 4.4 Resources overview © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 315
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 4.5Work hour remaininig table 4.6Cost overview 5. Conclusion Based at the mission paintings, “MS PROJECT SOFTWARE AND ITS APPLICATION IN CONSTRUCTION PROJECT AND CASE STUDY AT GANDHINAGAR” the following conclusionsare drawn out Practice and Understanding of general task control provides higher end result, product, and carrier to the undertaking /company. Effective undertaking control provides balance among Scope,Time,Cost, Quality,Resourceand Communication. Project control Software MS Project presents higher making plans, scheduling, tracking and controlling of small as well as large initiatives. During the execution of a mission, software is useful for promoting powerful coordination. Research and Study nation that implementation of MS Project software for Time and Cost Management is proven method. Implementation of MS Project software program for production © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 316
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 of Buildings such asflat, for Time and Cost Management presents effective display and manage. For infrastructure venture like production of Buildings, implementation of MS Project software program gives higher time table to manipulate the venture. Time management which gives correct planning and scheduling of assignment and Cost management which gives earned fee management of undertaking. Earned Value Management gives higher economic manipulate of typical cost of the undertaking. It can be used for measuring undertaking performance and development in an goal manner. Software provides effective Monitoring and Controlling through various Reports. 6. ACKNOWLEDGEMENT We specific in care and heartfelt thanks to Prof. A. N. Bhavsar Sir, asst. Prof. Birla Vishvakarma Mahavidyalaya Engineering College, Vallabh Vidyanagar for giving us an possibility to adopt this challenge for study. We specific a deep feel of gratitude to Prof. A. N. Bhavsar Sir, Civil Engineering Department, Birla Vishvakarma Mahavidyalaya Engineering College, Vallabh Vidyanagar & Svayam Symphony Group, Sir Pramodkumar Singh, Director General Manager and Sir Nirav Modi, Project Co-ordinator, who helped us for his or her excessive constructive help, consistent encouragement, steering and channelizing our efforts in the proper directionwithout which this project might no longer have attained the prevailing shape. We might also like respect and thank to our loving PARENTS, CLASSMATES and FRIENDS for all their help and encouragement, given in the course of the assignment period. 7. REFERENCES [1]. A.K.Munns & B.F.Bjeirmi, The Role of Project ManagementIn Achieving Project Success, International Journals of Project Management, Vol. 14, No. 2, Pp. 81-87, 1996. [2] Aftab Hameed Memon and Ismail Abdul Rahman (2014) suggested that time is the biggest element that every contractor has to deal with while practicing the construction activities. [3]. Tsichritzis, 8070 communications of the association for computing machinery, vol.25 (1892), July no. 7, New York USA. [4] Hoang, Nhat Minh Shrestha, Swastik (2014) hinted that themain function of a software is to offer help, and enhance the quality of output with less effort than manual ways. [6] Minh Shrestha, hinted that the main function of a softwareis help, and develop the quality of output with less effort than manual ways. © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 317