A REVIEW ON QUANTIFIED IMPACTS OF CONSTRUCTION LABOUR
PRODUCTIVITY TOWARDS PROJECT PERFORMANCE
S.S.Kavithra 1, D.Ambika 2, R.Shreena Shankari 3
1 PostGraduate Student, Department of Civil Engineering, Kongu Engineering College, Perundurai, India.
2 Assistant Professor, Department of Civil Engineering, Kongu Engineering College, Perundurai, India.
3 PostGraduate Student, Department of Civil Engineering, Kongu Engineering College, Perundurai, India.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Construction projects suffer various problems
and critical factors such as cost, duration, quality and safety.
Construction sector is multifarious as it contains engineers,
quantified surveyors, contractors, consultants, design
planners, site supervisors and owners. The purpose of this
study is to identify factors affecting labour productivity at a
building construction project. It was concluded that ultimate
cost of the projects were higher than estimated cost. It is
recommended to develop human resources through
appropriate and progressive training programs that frame a
well built assignment, field of vision and an organized
approach to overcome the disruptions on the performance of
the construction projects. Eventually, the chosen key factors
are anticipated to assist in completing construction projects
successfully.
Key Words: Construction sector, critical factors, labour
productivity, human resource, training programs.
1. INTRODUCTION
Construction has the massive potential for creating
employment. Construction labour Productivity is one of the
key components of each and every company’s success and
competitiveness in the market. Labour Productivity
interprets directly into cost savings and profitability.
Incremental growth in labour productivity does not connote
for any compromise in quality of construction. A contractor
stands to attain or lose, depending on how well the
productivity responds to competition. Companies may gain
advantage over their competitors by improving upon
productivity to build projects at inexpensive costs. The
concept of labour productivity is significantly linked to the
quality of both input and output. Labour Productivity is also
fundamentaltolong-termgrowth.Bettermentinconstruction
productivity cannot be done without identifying factors that
possess greater impact on labour productivity.
2. DEFINITION
The phrase “productivity” evinces the relationship between
outputs and inputs. Input and output vary fromoneindustry
to another. The productivity definition varies when applied
to distinct areas of the identical industry. Labour is one of
the fundamental requirements in the construction industry.
Labour productivitygenerallycorrelates manpowerinterms
of labour cost to the quantity of labour outputs produced. In
other words, labour productivity is the amount of goodsand
services produced by a productive factor in the unit of time
or cost.
Labour Productivity =
3. NEED FOR THE STUDY
The research study explores vital factors affecting labour
productivity in building construction.Interpretationofthese
factors is helpful for the construction professionals who
work on the inceptive phases of construction planning in
order to successfully deliver the project plan. The principle
goal of the research study is to provide crucial information
about factors influencing labour productivity to the project
management teams who qualify the project’s success. The
research study seeks to impart knowledge of corresponding
building construction affiliated factors that are prone to
affect the project’s success.
4. RESEARCH OBJECTIVE
The objectives of this research are stated below
 To identify the critical factors affecting labour
productivity in the construction projects
 To statistically examine the impact of factors
influencing labour productivity
 To suggest recommendations in order to improve
construction labour productivity towards project
performance
5. SCOPE OF WORK
The project undertaken by various construction firms differ
widely, but the planning system adopted for all the firms are
mostly one at the same. Rather than adopting the same
system a detailed study on specific firms and its computing
system could help firm in a more comprehensive manner.
 To improve the overall efficiency of the Project.
 To enhance the knowledge of labours and workers.
 To minimize the overall cost of the project.
 To accomplish the project within stipulated time.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1295
6. SIGNIFICANCE OF THE PROJECT
Labour Productivity has a substantial importancein
construction. Labour productivity comprises an essential
part of production input for construction projects. In the
construction industry, many external and internal factors
will never be persistent and are troublesome to anticipate.
This factor leads to a constant variation in labour
productivity. It is necessary to make sure that a reduction in
productivity affects the plan and schedule of the work and
cause delays. The consequences of these delays could result
in serious money losses. Considerable cost can be rescued if
productivity is improved because the same work can be
done with less manpower, thus reducing overall labourcost.
Fig. 1. Causal loops of inefficiency
7. LITERATURE REVIEW
Dheenadhayalan et al (2016) signifies that this study is to
get the latest information and to identify the critical factors
that affect the labour productivity in Coimbatore.
Benviolent et al (2014) identified and ranked according to
relative importance, factors affecting labour productivityon
building projects.
Mahamid Ibrahim (2013) aims at identifying the factors
affecting labour productivity in building construction
projects in the West Bank. Contractors working in building
construction completed a structured questionnaire survey
and the factors were categorized according to their levels of
influence.
Nurulzatushima et al (2013) identified the factor that
affects the labour productivity in construction industry and
to discover the impacts of labour productivity in
construction.
Mostafa et al (2012) describes proper management of
resources in construction projects can yield substantial
savings in time and cost.
Abdul Kadir et al (2005) states Construction labour
productivity is of great interest to practitioners and
researchers because it governs project cost and time
overrun. This study analyzes and ranks the importance,
frequency and severity of project delay.
8. METHODOLOGY
The methodology of this research study is described and
explained based on the objectives of the project. This
research study is commenced by reviewing the admissible
literatures. From the literature study the factors affecting
labours in construction projects are identified. Based on the
factors the questionnaire in prepared and the questionnaire
survey is conducted among various labours in different
construction companies.
Fig 2. Research Methodology Flow Chart
A REVIEW ON QUANTIFIED IMPACTS OF
CONSTRUCTION LABOUR PRODUCTIVITY TOWARDS
PROJECT PERFORMANCE
LITERATURE REVIEW
OBJECTIVES
IDENTIFICATION OF INDUSTRIES
DATA COLLECTION
FACTORS IDENTIFICATION
PREPARATION OF QUESTIONNAIRE
COLLECTION OF RESPONSES
ANALYSIS OF DATA
RESULTS AND DISCUSSION
SPSS
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1296
Fig 2.Relative contribution of parameters in daily labour
productivity
Factors Affecting Labours
From various reviews of literature, the factors affecting
labours in construction are identified.
8.1 Personal Factors
 Gender
 Disloyalty
 Age
 Educational Qualification
 Alcoholism
8.2 Construction Factors
 Lack of experience
 Rework
 Supervision delays
 Accidents at site
 Place of material storage
 Working time
 Absenteeism
8.3 Management Factors
 Implementation of government laws
 Payment delays
8.4 Resource Oriented Factors
 Lack of required construction materials
 Lack of tools and equipment’s
 Violations of safety laws
 Improper transportation facilities
 Training sessions
8.5 Technical Factors
 Variations in the drawings
 Incomplete drawings
 Work Quality
 Design Changes
 Improper construction method
 Hike in price of materials
8.6 Communication Factors
 Communication of change orders from the owners
 Disputes among owner and contractor
 Flow of information
 Miscommunication
8.7 General Factors
 Water and/or power supply
 Poor site conditions
 Weathering conditions
 Basic Amenities
9. CONCLUSIONS
From the presentstudy,factorsaffecting labourproductivity
are identified. Project manager should focusonthesefactors
to improve the labour productivity and performance. The
result indicates that the most significant factors affecting
labour productivity are Personal Factors, Construction
Factors, Management Factors, Resource Oriented Factors
and General Factors. Contractors should perform on these
factors to enhance labour productivity which ultimately can
help to get higher profits from the projects. Consequently, it
can also improve the productivity of the project besides
minimizing the time and cost overrun.
REFERENCES
[1] Abdulaziz M. Jarkas, (2010), “Buildability factors
influencing formwork labour productivity of
isolated foundations”, Journal of Engineering,
Design and Technology, Vol. 8, No. 3, pp. 284 – 295.
[2] Abdul Kadir M R, Lee W P, Jaafar M S, Sapuan S M
and Ali A A A, (2005), “Factors affecting
construction labour productivity for Malaysian
residential projects”, Structural Survey, Vol. 23, No.
1, pp. 42 – 54.
[3] Abraham Assefa, Tsehayae Aminah, Robinson
Fayek, (2016), “System model for analyzing
construction labour productivity”, Construction
Innovation, Vol. 16, No. 2, pp. 203 – 228
[4] Adnan Enshassi, Sherif Mohamed and Peter Mayer
Karem Abed, (2008), “Benchmarking masonry
labour productivity”, International Journal of
Productivity andPerformanceManagement,Vol.56,
No. 4, pp. 358 – 368.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1297
[5] Aynur Kazaz and Turgut Acıkara, (2015),
“Comparison of LabourProductivityPerspectivesof
Project Managers and Craft Workers in Turkish
ConstructionIndustry”,International Conferenceon
Project Management.
[6] B.Prakash Rao, Ambika Sreenivasan and Prasad
Babu NV, (2015), “Labourproductivity-analysisand
ranking”, International Research Journal of
Engineering and Technology, Vol. 02, No. 03.
[7] Benviolent Chigara_ and Tirivavi Moyo, (2014),
“Factors Affecting Labour Productivity on Building
Projects in Zimbabwe”, International Journal of
Architecture, Engineering and Construction Vol. 3,
No. 1, pp. 58-65.
[8] Hasan Hamouda, Nadine Abu-Shaaban, (2015),
“Enhancing Labour Productivity within
Construction Industry throughAnalytical Hierarchy
Process, the Case of Gaza Strip”,Universal Journal of
Management, Vol. 3, No. 8, pp. 329-336.
[9] Mahamid Ibrahim,(2013), “Contractorsperspective
toward factors affecting labour productivity in
building construction”, Engineering, Construction
and Architectural Management, Vol. 20, No. 5, pp.
446 – 460.
[10] Mostafa E. Shehata A and Khaled M. El-Gohary,
(2012), “Towards improving construction labour
productivity and projects” performance”,
Alexandria Engineering Journal, Vol. 50, pp. 321–
330.
[11] Nurulzatushima Abdul Karim, SitiHafizan Hassan,
(2013), “Factors Influence Labour Productivity and
the Impacts on Construction Industry”, Caspian
Journal of Applied Sciences Research, Vol. 2, pp.
349-354.
[12] Osama Moselhi and Zafar Khan, (2012),
“Significance ranking of parameters impacting
construction labour productivity”, International
Journal of Productivity and Performance
Management, Vol. 12, No. 3, pp. 282 – 296.
[13] S. Sharmila and K.Nirmalkumar, (2016), “Study on
the Critical Factors Influencing Labour Productivity
in Construction Industry”, International Journal of
Innovative Research in Science, Engineering and
Technology, Vol. 5, No. 3.
[14] Soekiman, K. S. Pribadi, B.W. Soemardi and R.D.
Wirahadikusumah, (2011), “Factors relating To
labour productivity affecting the project schedule
performance in Indonesia”, International Journal of
Project Management, pp. 865–883.
[15] Thiyagu.C and Dheenadhayalan.M, (2015),
“Construction Labour Productivity and its
Improvement”, International Research Journal of
Engineering and Technology, Vol 2, No. 8.
[16] Vicente Roca Puig, Inmaculada Beltran Martin and
Mercedes Segarra Cipres, (2012), ‘Commitment to
Employees, Labour Intensity and Labour
Productivity inSmall Firms’,International Journal of
Manpower, Vol. 33, No. 8, pp. 938 – 954.
[17] William Ibbs, Long D Nguyen and Seulkee Lee,
(2007), ‘Quantified Impacts of Project Change’,
Journal of Professional Issues in Engineering
Education and Practice, Vol. 4, No. 3, pp. 258 – 262.
[18] Xiaodong Li and Kwan Hang Chow, (2016),
‘Evaluating the Impacts of High-Temperature
Outdoor Working Environments on Construction
Labour Productivity in China’, Building and
Environment, pp. 42-52.

More Related Content

What's hot

A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...IRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM 022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM Dr Fereidoun Dejahang
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...eSAT Journals
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET Journal
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET Journal
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET Journal
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...IRJET Journal
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectIRJET Journal
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSIAEME Publication
 

What's hot (20)

A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...A Critical Review of the Causes of Cost Overrun in Construction Industries in...
A Critical Review of the Causes of Cost Overrun in Construction Industries in...
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM 022 B Construction Croductivity-WRITE SYSTEM
022 B Construction Croductivity-WRITE SYSTEM
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
 
The Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction ProjectThe Study of Measurement of Over-Engineering in Construction Project
The Study of Measurement of Over-Engineering in Construction Project
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 

Similar to A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential BuildingIRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET Journal
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET Journal
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONIRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.IRJET Journal
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...eSAT Journals
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTIRJET Journal
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxKaushalKumar522651
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 

Similar to A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance (18)

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
 
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISIONREWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
REWORK FACTOR AFFECTING CONSTRUCTION PROJECT IN BHOPAL DIVISION
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITYIMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
IMPORTANCE OF MANAGEMENT IN IMPROVING THE CONSTRUCTION PRODUCTIVITY
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 

Recently uploaded (20)

fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 

A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1294 A REVIEW ON QUANTIFIED IMPACTS OF CONSTRUCTION LABOUR PRODUCTIVITY TOWARDS PROJECT PERFORMANCE S.S.Kavithra 1, D.Ambika 2, R.Shreena Shankari 3 1 PostGraduate Student, Department of Civil Engineering, Kongu Engineering College, Perundurai, India. 2 Assistant Professor, Department of Civil Engineering, Kongu Engineering College, Perundurai, India. 3 PostGraduate Student, Department of Civil Engineering, Kongu Engineering College, Perundurai, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Construction projects suffer various problems and critical factors such as cost, duration, quality and safety. Construction sector is multifarious as it contains engineers, quantified surveyors, contractors, consultants, design planners, site supervisors and owners. The purpose of this study is to identify factors affecting labour productivity at a building construction project. It was concluded that ultimate cost of the projects were higher than estimated cost. It is recommended to develop human resources through appropriate and progressive training programs that frame a well built assignment, field of vision and an organized approach to overcome the disruptions on the performance of the construction projects. Eventually, the chosen key factors are anticipated to assist in completing construction projects successfully. Key Words: Construction sector, critical factors, labour productivity, human resource, training programs. 1. INTRODUCTION Construction has the massive potential for creating employment. Construction labour Productivity is one of the key components of each and every company’s success and competitiveness in the market. Labour Productivity interprets directly into cost savings and profitability. Incremental growth in labour productivity does not connote for any compromise in quality of construction. A contractor stands to attain or lose, depending on how well the productivity responds to competition. Companies may gain advantage over their competitors by improving upon productivity to build projects at inexpensive costs. The concept of labour productivity is significantly linked to the quality of both input and output. Labour Productivity is also fundamentaltolong-termgrowth.Bettermentinconstruction productivity cannot be done without identifying factors that possess greater impact on labour productivity. 2. DEFINITION The phrase “productivity” evinces the relationship between outputs and inputs. Input and output vary fromoneindustry to another. The productivity definition varies when applied to distinct areas of the identical industry. Labour is one of the fundamental requirements in the construction industry. Labour productivitygenerallycorrelates manpowerinterms of labour cost to the quantity of labour outputs produced. In other words, labour productivity is the amount of goodsand services produced by a productive factor in the unit of time or cost. Labour Productivity = 3. NEED FOR THE STUDY The research study explores vital factors affecting labour productivity in building construction.Interpretationofthese factors is helpful for the construction professionals who work on the inceptive phases of construction planning in order to successfully deliver the project plan. The principle goal of the research study is to provide crucial information about factors influencing labour productivity to the project management teams who qualify the project’s success. The research study seeks to impart knowledge of corresponding building construction affiliated factors that are prone to affect the project’s success. 4. RESEARCH OBJECTIVE The objectives of this research are stated below  To identify the critical factors affecting labour productivity in the construction projects  To statistically examine the impact of factors influencing labour productivity  To suggest recommendations in order to improve construction labour productivity towards project performance 5. SCOPE OF WORK The project undertaken by various construction firms differ widely, but the planning system adopted for all the firms are mostly one at the same. Rather than adopting the same system a detailed study on specific firms and its computing system could help firm in a more comprehensive manner.  To improve the overall efficiency of the Project.  To enhance the knowledge of labours and workers.  To minimize the overall cost of the project.  To accomplish the project within stipulated time.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1295 6. SIGNIFICANCE OF THE PROJECT Labour Productivity has a substantial importancein construction. Labour productivity comprises an essential part of production input for construction projects. In the construction industry, many external and internal factors will never be persistent and are troublesome to anticipate. This factor leads to a constant variation in labour productivity. It is necessary to make sure that a reduction in productivity affects the plan and schedule of the work and cause delays. The consequences of these delays could result in serious money losses. Considerable cost can be rescued if productivity is improved because the same work can be done with less manpower, thus reducing overall labourcost. Fig. 1. Causal loops of inefficiency 7. LITERATURE REVIEW Dheenadhayalan et al (2016) signifies that this study is to get the latest information and to identify the critical factors that affect the labour productivity in Coimbatore. Benviolent et al (2014) identified and ranked according to relative importance, factors affecting labour productivityon building projects. Mahamid Ibrahim (2013) aims at identifying the factors affecting labour productivity in building construction projects in the West Bank. Contractors working in building construction completed a structured questionnaire survey and the factors were categorized according to their levels of influence. Nurulzatushima et al (2013) identified the factor that affects the labour productivity in construction industry and to discover the impacts of labour productivity in construction. Mostafa et al (2012) describes proper management of resources in construction projects can yield substantial savings in time and cost. Abdul Kadir et al (2005) states Construction labour productivity is of great interest to practitioners and researchers because it governs project cost and time overrun. This study analyzes and ranks the importance, frequency and severity of project delay. 8. METHODOLOGY The methodology of this research study is described and explained based on the objectives of the project. This research study is commenced by reviewing the admissible literatures. From the literature study the factors affecting labours in construction projects are identified. Based on the factors the questionnaire in prepared and the questionnaire survey is conducted among various labours in different construction companies. Fig 2. Research Methodology Flow Chart A REVIEW ON QUANTIFIED IMPACTS OF CONSTRUCTION LABOUR PRODUCTIVITY TOWARDS PROJECT PERFORMANCE LITERATURE REVIEW OBJECTIVES IDENTIFICATION OF INDUSTRIES DATA COLLECTION FACTORS IDENTIFICATION PREPARATION OF QUESTIONNAIRE COLLECTION OF RESPONSES ANALYSIS OF DATA RESULTS AND DISCUSSION SPSS
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1296 Fig 2.Relative contribution of parameters in daily labour productivity Factors Affecting Labours From various reviews of literature, the factors affecting labours in construction are identified. 8.1 Personal Factors  Gender  Disloyalty  Age  Educational Qualification  Alcoholism 8.2 Construction Factors  Lack of experience  Rework  Supervision delays  Accidents at site  Place of material storage  Working time  Absenteeism 8.3 Management Factors  Implementation of government laws  Payment delays 8.4 Resource Oriented Factors  Lack of required construction materials  Lack of tools and equipment’s  Violations of safety laws  Improper transportation facilities  Training sessions 8.5 Technical Factors  Variations in the drawings  Incomplete drawings  Work Quality  Design Changes  Improper construction method  Hike in price of materials 8.6 Communication Factors  Communication of change orders from the owners  Disputes among owner and contractor  Flow of information  Miscommunication 8.7 General Factors  Water and/or power supply  Poor site conditions  Weathering conditions  Basic Amenities 9. CONCLUSIONS From the presentstudy,factorsaffecting labourproductivity are identified. Project manager should focusonthesefactors to improve the labour productivity and performance. The result indicates that the most significant factors affecting labour productivity are Personal Factors, Construction Factors, Management Factors, Resource Oriented Factors and General Factors. Contractors should perform on these factors to enhance labour productivity which ultimately can help to get higher profits from the projects. Consequently, it can also improve the productivity of the project besides minimizing the time and cost overrun. REFERENCES [1] Abdulaziz M. Jarkas, (2010), “Buildability factors influencing formwork labour productivity of isolated foundations”, Journal of Engineering, Design and Technology, Vol. 8, No. 3, pp. 284 – 295. [2] Abdul Kadir M R, Lee W P, Jaafar M S, Sapuan S M and Ali A A A, (2005), “Factors affecting construction labour productivity for Malaysian residential projects”, Structural Survey, Vol. 23, No. 1, pp. 42 – 54. [3] Abraham Assefa, Tsehayae Aminah, Robinson Fayek, (2016), “System model for analyzing construction labour productivity”, Construction Innovation, Vol. 16, No. 2, pp. 203 – 228 [4] Adnan Enshassi, Sherif Mohamed and Peter Mayer Karem Abed, (2008), “Benchmarking masonry labour productivity”, International Journal of Productivity andPerformanceManagement,Vol.56, No. 4, pp. 358 – 368.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1297 [5] Aynur Kazaz and Turgut Acıkara, (2015), “Comparison of LabourProductivityPerspectivesof Project Managers and Craft Workers in Turkish ConstructionIndustry”,International Conferenceon Project Management. [6] B.Prakash Rao, Ambika Sreenivasan and Prasad Babu NV, (2015), “Labourproductivity-analysisand ranking”, International Research Journal of Engineering and Technology, Vol. 02, No. 03. [7] Benviolent Chigara_ and Tirivavi Moyo, (2014), “Factors Affecting Labour Productivity on Building Projects in Zimbabwe”, International Journal of Architecture, Engineering and Construction Vol. 3, No. 1, pp. 58-65. [8] Hasan Hamouda, Nadine Abu-Shaaban, (2015), “Enhancing Labour Productivity within Construction Industry throughAnalytical Hierarchy Process, the Case of Gaza Strip”,Universal Journal of Management, Vol. 3, No. 8, pp. 329-336. [9] Mahamid Ibrahim,(2013), “Contractorsperspective toward factors affecting labour productivity in building construction”, Engineering, Construction and Architectural Management, Vol. 20, No. 5, pp. 446 – 460. [10] Mostafa E. Shehata A and Khaled M. El-Gohary, (2012), “Towards improving construction labour productivity and projects” performance”, Alexandria Engineering Journal, Vol. 50, pp. 321– 330. [11] Nurulzatushima Abdul Karim, SitiHafizan Hassan, (2013), “Factors Influence Labour Productivity and the Impacts on Construction Industry”, Caspian Journal of Applied Sciences Research, Vol. 2, pp. 349-354. [12] Osama Moselhi and Zafar Khan, (2012), “Significance ranking of parameters impacting construction labour productivity”, International Journal of Productivity and Performance Management, Vol. 12, No. 3, pp. 282 – 296. [13] S. Sharmila and K.Nirmalkumar, (2016), “Study on the Critical Factors Influencing Labour Productivity in Construction Industry”, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 5, No. 3. [14] Soekiman, K. S. Pribadi, B.W. Soemardi and R.D. Wirahadikusumah, (2011), “Factors relating To labour productivity affecting the project schedule performance in Indonesia”, International Journal of Project Management, pp. 865–883. [15] Thiyagu.C and Dheenadhayalan.M, (2015), “Construction Labour Productivity and its Improvement”, International Research Journal of Engineering and Technology, Vol 2, No. 8. [16] Vicente Roca Puig, Inmaculada Beltran Martin and Mercedes Segarra Cipres, (2012), ‘Commitment to Employees, Labour Intensity and Labour Productivity inSmall Firms’,International Journal of Manpower, Vol. 33, No. 8, pp. 938 – 954. [17] William Ibbs, Long D Nguyen and Seulkee Lee, (2007), ‘Quantified Impacts of Project Change’, Journal of Professional Issues in Engineering Education and Practice, Vol. 4, No. 3, pp. 258 – 262. [18] Xiaodong Li and Kwan Hang Chow, (2016), ‘Evaluating the Impacts of High-Temperature Outdoor Working Environments on Construction Labour Productivity in China’, Building and Environment, pp. 42-52.