TUNNELING IN ROCK MASS:
(NECESSITY, SYSTEMATIC APPROACH,
PLANNING AND CONSTRUCTION)
1
APPLIED MECHANICS DEPARTMENT
SVNIT,SURAT
GUIDED BY : SUBMITTED BY:
PROF S.KUMAR JOSHI AKSHAY
p16SM006
UNDERGROUND OR UNDERWATER
PASSAGE WAY, DUG THROUGH THE
SURROUNDING SOIL/EARTH/ROCK AND
ENCLOSED EXCEPT FOR ENTRANCE
AND EXIT,
TYPE BASED ON APPLICATION
2
VEHICULAR
TUNNEL
RAIL
TUNNEL
CANAL
TUNNEL
NECESSITY
3
To minimize land acquisition costsTo minimize land acquisition costs
To avoid steep grades and longerTo avoid steep grades and longer
routes.routes.
To avoid impact on
environmentally sensitive areas.
To avoid impact on cultural
heritage
SYSTEMATIC APPROACH & PLANNING
 STAGES OF PLANNING
4
PRE-PLANNING
DETAIL PLANNING
MONITARING AND
CONTROL
PRE-PLANNING
 Justification for taking up the project
 Objectives of the project
 Alignment Selection
 Investigation
 Examining alternatives
 Cost benefit analysis
 Financial planning
5
ALIGNMENTALIGNMENT SELECTIONSELECTION
 The Alignment of the Tunnel must be consistent with
the alignment of the roadway leading to it.
 The Alignment must consider factors like the sight
distances, minimum turning radius and design
speeds in its design.
 Except for maintenance reasons, two way roads
should be discouraged in a single tube of tunnel, for
safety reasons.
 Pedestrian and Cyclist use of tunnels should be
discouraged except a special passage is designed for
them.
6
INVESTIGATIONSINVESTIGATIONS
Several investigations are required at the preliminary,
design and construction phases of a tunnel project. The
processes are highlighted below:
Collection and Review of Available Information for a
general knowledge of the area (Existing Topographical,
hydrological, Geological, Geotechnical, Seismic,
Environmental, Zoning etc)
Topographic and Aerial Photographs
Preliminary Surveys
Water Well Logs
Hydrographic Surveys
7
 Identification of Underground Structures and
Obstacles
 Geologic Mapping
 Subsurface Investigations
 Test Borings and Sampling
 Soil and Rock Identification and Classification
 In - situ Tests •Geophysical Tests •Seismic Wave
Propagation •Laboratory Tests •Groundwater
Investigation •Pumping Tests
8
COSTRUCTION
9
10
11.. TUNNEL CONSTRUCTION SYSTEMSTUNNEL CONSTRUCTION SYSTEMS
(a)(a) Cut and Cover System.Cut and Cover System.
(b)(b) Pipe Jacking System (Micro Tunneling).Pipe Jacking System (Micro Tunneling).
(c)(c) Shield Tunneling (TBM).Shield Tunneling (TBM).
(d)(d) New Austrian Tunneling MethodNew Austrian Tunneling Method
(NATM).(NATM).
(e)(e) Immersed-Tube Tunneling System.Immersed-Tube Tunneling System.
Tunnel Construction
11
(a) Cut and Cover System(a) Cut and Cover System
Sequence of Construction (Stages 1 to 3Sequence of Construction (Stages 1 to 3 ))
Tunnel Construction
12
(a) Cut and Cover System(a) Cut and Cover System
Sequence of Construction (Stages 4 to 6)Sequence of Construction (Stages 4 to 6)
Tunnel Construction
13
Cut and Cover SystemCut and Cover System
AdvantagesAdvantages::
• Economy for shallow depths (4 - 10 m) and for
shorter applications.
• Un-sophisticated labor and equipment required.
• Adaptability to different conditions.
• Simple structural & geotechnical analyses
required.
• Safe environment (ventilation and fire hazard)
• DisadvantagesDisadvantages::
• Possible disturbances to existing facilities.
• Practical limitations of depth.
• Unsuitability under buildings or water.
Tunnel Construction
14
Soil Grouting TechniquesSoil Grouting Techniques
Jet Grouting: Soil Replacement ProcessJet Grouting: Soil Replacement Process
Tunnel Construction
15
Soil Grouting TechniquesSoil Grouting Techniques
Slurry Wall ConceptSlurry Wall Concept
Tunnel Construction
16
((bb) Pipe Jacking System (Micro Tunneling)) Pipe Jacking System (Micro Tunneling)
Schematic RepresentationSchematic Representation
Tunnel Construction
STAGES OF BORING
17
GUIDANCE AND POSITIONING USING
LASER-GUIDED STEERING SYSTEM
18
Laser Guide &Laser Guide &
ControlControl
MonitorMonitor
Screen CaptureScreen Capture
Tunnel Construction
MTBM - SHIELDS OF DIFFERENT
SIZES
DIA. RANGES FROM 0.5M TO 3M
19
Tunnel Construction
MTBM - DIFFERENT SHAPES OF
CUTTING HEADS
20
Dirt cutter headDirt cutter head
(clay and silty(clay and silty
sand)sand)
Sand shelvesSand shelves
Carbide cutter headCarbide cutter head
(soft to medium hard(soft to medium hard
rockrock))
Tunnel Construction
21
Pipe Jacking System (Micro TunnelingPipe Jacking System (Micro Tunneling
AdvantagesAdvantages::
• Suitability for almost all types of soil.
• Large depths with unlimited lengths of drive.
• High levels of accuracy and safety.
• Wide choice of pipe and joint materials.
• High construction rates.
• Reduced manpower requirements.
• Reduced environmental disturbance.
• DisadvantagesDisadvantages::
• Sophisticated equipment and highly skilled
labor.
• Inability to make rapid changes in line or level.
• Very expensive corrective actions, if required
Tunnel Construction
22
(c) Shield Tunneling (TBM)(c) Shield Tunneling (TBM)
Cutter Head Tunnel Tube
Tunnel Construction
CONSTRUCTION SEQUENCE
23
Tunnel Construction
24
Shield Tunneling (TBM)Shield Tunneling (TBM)
AdvantagesAdvantages::
• Suitability for almost all types of soil.
• Suitability for wide tunnels (highway, railway,
etc.).
• Large depths ( > 10 m), with unlimited lengths
of drive.
• Reducing environmental disturbance and
utilities diversions.
Tunnel Construction
DisadvantagesDisadvantages::
• Sophisticated equipment and highly
skilled labor.
• Inability to make rapid changes in line or
level.
• Very expensive corrective actions, if
required.
• Difficult structural and geotechnical
analyses reqd..
25
26
(d)(d) New Austrian Tunneling Method (New Austrian Tunneling Method (NATM)NATM)
Tunnel Construction
27
NATMNATM
AdvantagesAdvantages::
• Best alternative for non-circular roadway
tunnels.
• Suitability for almost all stable to strong
ground types, including rock.
• Suitability for a variety of soil conditions.
• Small thickness of tunnel lining, reducing the
amount of excavation.
• Economy and speed of construction.
Tunnel Construction
DisadvantagesDisadvantages::
• Highly skilled workers and expert
engineers.
• Safety measures for shotcrete
application.
• Ground water freezing and/or soil
strengthening (in case of water-bearing
cohesionless soil).
28
29
(e) Immersed-Tube Tunneling System(e) Immersed-Tube Tunneling System
Tunnel Construction
30
(E) Immersed-Tube Tunneling System(E) Immersed-Tube Tunneling System
Construction SequenceConstruction Sequence::
1. Dredging the trench in river or sea bottom.
2. Prefabrication of tunnel sections, and sealing
ends with bulkheads.
3. Floating the sections to the tunnel trench.
4. Lowering the sections to seabed.
5. Joining the sections together underwater.
6. Removing the temporary bulkheads.
7. Backfilling the trench.
Tunnel Construction
31
Immersed-Tube Tunneling SystemImmersed-Tube Tunneling System
AdvantagesAdvantages::
• Economy (most economical alternative for any
type of underwater tunnel crossing).
• High construction rates (particularly for steel
tube tunnels).
• Wide variety of different conditions.
DisadvantagesDisadvantages::
• Highly skilled and experienced workers.
• Safety measures for underwater construction..
Tunnel Construction
32
DEVELOPMENTS & FUTURE TRENDSDEVELOPMENTS & FUTURE TRENDS
IN TUNNEL CONSTRUCTIONIN TUNNEL CONSTRUCTION
Conventional TunnelingConventional Tunneling::
Areas Developments
Blast Tunneling
• Drilling techniques.
• Blasting technology.
• Re-use of excavated material.
Tunneling in Loose
Sand
• Injection.
• High-pressure injection.
• Soil freezing.
Shotcrete Safety
Measures
• Special shotcretes without accelerators
that reduce concrete solidity.
General Equipment
Developments
• Advances in diesel motor technology
(less pollutants in exhausted gases).
Handling of
Groundwater
• Two-layer plastic sealing tracks
(double water-pressure resistance).
Final Lining in
Concrete
• Measures for protecting inner concrete
linings (to prevent tears).
Tunnel Construction
REFERANCES
 http://terratec.co/files/TERRATEC-Microtunnelling-Brochur
 http://www.railsystem.net/natm/
 http://www.dr-sauer.com/technical-info/906
 https://en.wikipedia.org/wiki/Tunnel
33
Thank youThank you
34
Tunnel Construction

More Related Content

What's hot

Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
Sathish Kumar
 
Construction dewatering
Construction dewateringConstruction dewatering
Construction dewatering
Shubham Parab
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
MAHAVIR MEENA
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
Vinay Vb
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
Surat Construction PVT LTD
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
MaddelaSiddhardha
 
Compaction equipment
Compaction equipmentCompaction equipment
Compaction equipment
chavan Aniruddha
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design PresentationKeith Kong
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
Tulsi Makwana
 
Box culverts
Box culvertsBox culverts
Box culverts
sunil choudhary
 
Construction equipment (earth work)
Construction equipment (earth work)Construction equipment (earth work)
Construction equipment (earth work)
Suhaa Chine
 
Pile foundation
Pile foundationPile foundation
Pile foundation
Parth Desani
 
Well foundation
Well foundationWell foundation
Lining of tunnel
Lining of tunnelLining of tunnel
Lining of tunnel
Giri Guru
 
Geotechnical investigation
Geotechnical investigationGeotechnical investigation
Geotechnical investigation
Abdul Mutakaber Tareen
 
Well foundations
Well foundationsWell foundations
Well foundations
ganesh6561
 
GI For Tunnel Projects
GI For Tunnel ProjectsGI For Tunnel Projects
GI For Tunnel Projects
Keith Kong
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
An Up K
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
vikasravekar
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
AbhishekM45
 

What's hot (20)

Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Construction dewatering
Construction dewateringConstruction dewatering
Construction dewatering
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Compaction equipment
Compaction equipmentCompaction equipment
Compaction equipment
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
Box culverts
Box culvertsBox culverts
Box culverts
 
Construction equipment (earth work)
Construction equipment (earth work)Construction equipment (earth work)
Construction equipment (earth work)
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Well foundation
Well foundationWell foundation
Well foundation
 
Lining of tunnel
Lining of tunnelLining of tunnel
Lining of tunnel
 
Geotechnical investigation
Geotechnical investigationGeotechnical investigation
Geotechnical investigation
 
Well foundations
Well foundationsWell foundations
Well foundations
 
GI For Tunnel Projects
GI For Tunnel ProjectsGI For Tunnel Projects
GI For Tunnel Projects
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 

Viewers also liked

Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
Strukturas
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringJunaida Wally
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
AltosMarketing
 
Bridge
BridgeBridge
Bridges precast
Bridges precastBridges precast
Bridges precast
Dr Fereidoun Dejahang
 
Guidelines
GuidelinesGuidelines
Guidelines
Šumadin Šumić
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
Mahesh Raj Bhatt
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Mohit Shukla
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineFilipe Mello
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
Palmer Consulting Services, LLC
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
ADIL BIN AYOUB
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
Communications Branding
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
SHUBHAM DABHADE
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
Umer Farooq
 
Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
HERITAGE INFRASPACE INDIA PRIVATE LIMITED
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Let's Tute
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
VISHAL KUMAR SINGH
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
Naquiakhter
 

Viewers also liked (20)

Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
Tunneling
Tunneling  Tunneling
Tunneling
 
Bridge
BridgeBridge
Bridge
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Guidelines
GuidelinesGuidelines
Guidelines
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
 

Similar to tunnelling scope, construction techniques and necessity

Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
Rajesh Prasad
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
Loay Ghazaleh MBA, BSc Civil Eng.
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015ILIAS MICHALIS
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
Sahl Buhary
 
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.pptunit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
Pranaysandeepjadhav
 
Lecture 6 p
Lecture 6 pLecture 6 p
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
Sukhdarshan Singh
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
Yatiraj Battul
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...
IRJET Journal
 
Presentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergencyPresentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergency
Super Arc Consultant
 
MEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptxMEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptx
TebonLionel
 
Advanced tunnel borring machine.ppt
Advanced tunnel borring machine.pptAdvanced tunnel borring machine.ppt
Advanced tunnel borring machine.ppt
abhishek kulkarni
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
Dr Mazin Alhamrany
 
Tunneling
TunnelingTunneling
Tunneling
Safdar Ali
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
Narayan Gupta
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
AlexASquare1
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
AlexASquare1
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Abner Silva
 

Similar to tunnelling scope, construction techniques and necessity (20)

Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.pptunit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
unit-vi-tunnels-alignments-tunneling-methods-highway-tunnels-r-bhagat-2020.ppt
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...
 
Presentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergencyPresentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergency
 
MEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptxMEMOIR-Optimization of Tunnel reconstruction.pptx
MEMOIR-Optimization of Tunnel reconstruction.pptx
 
Advanced tunnel borring machine.ppt
Advanced tunnel borring machine.pptAdvanced tunnel borring machine.ppt
Advanced tunnel borring machine.ppt
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
 
Tunneling
TunnelingTunneling
Tunneling
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

tunnelling scope, construction techniques and necessity

  • 1. TUNNELING IN ROCK MASS: (NECESSITY, SYSTEMATIC APPROACH, PLANNING AND CONSTRUCTION) 1 APPLIED MECHANICS DEPARTMENT SVNIT,SURAT GUIDED BY : SUBMITTED BY: PROF S.KUMAR JOSHI AKSHAY p16SM006
  • 2. UNDERGROUND OR UNDERWATER PASSAGE WAY, DUG THROUGH THE SURROUNDING SOIL/EARTH/ROCK AND ENCLOSED EXCEPT FOR ENTRANCE AND EXIT, TYPE BASED ON APPLICATION 2 VEHICULAR TUNNEL RAIL TUNNEL CANAL TUNNEL
  • 3. NECESSITY 3 To minimize land acquisition costsTo minimize land acquisition costs To avoid steep grades and longerTo avoid steep grades and longer routes.routes. To avoid impact on environmentally sensitive areas. To avoid impact on cultural heritage
  • 4. SYSTEMATIC APPROACH & PLANNING  STAGES OF PLANNING 4 PRE-PLANNING DETAIL PLANNING MONITARING AND CONTROL
  • 5. PRE-PLANNING  Justification for taking up the project  Objectives of the project  Alignment Selection  Investigation  Examining alternatives  Cost benefit analysis  Financial planning 5
  • 6. ALIGNMENTALIGNMENT SELECTIONSELECTION  The Alignment of the Tunnel must be consistent with the alignment of the roadway leading to it.  The Alignment must consider factors like the sight distances, minimum turning radius and design speeds in its design.  Except for maintenance reasons, two way roads should be discouraged in a single tube of tunnel, for safety reasons.  Pedestrian and Cyclist use of tunnels should be discouraged except a special passage is designed for them. 6
  • 7. INVESTIGATIONSINVESTIGATIONS Several investigations are required at the preliminary, design and construction phases of a tunnel project. The processes are highlighted below: Collection and Review of Available Information for a general knowledge of the area (Existing Topographical, hydrological, Geological, Geotechnical, Seismic, Environmental, Zoning etc) Topographic and Aerial Photographs Preliminary Surveys Water Well Logs Hydrographic Surveys 7
  • 8.  Identification of Underground Structures and Obstacles  Geologic Mapping  Subsurface Investigations  Test Borings and Sampling  Soil and Rock Identification and Classification  In - situ Tests •Geophysical Tests •Seismic Wave Propagation •Laboratory Tests •Groundwater Investigation •Pumping Tests 8
  • 10. 10 11.. TUNNEL CONSTRUCTION SYSTEMSTUNNEL CONSTRUCTION SYSTEMS (a)(a) Cut and Cover System.Cut and Cover System. (b)(b) Pipe Jacking System (Micro Tunneling).Pipe Jacking System (Micro Tunneling). (c)(c) Shield Tunneling (TBM).Shield Tunneling (TBM). (d)(d) New Austrian Tunneling MethodNew Austrian Tunneling Method (NATM).(NATM). (e)(e) Immersed-Tube Tunneling System.Immersed-Tube Tunneling System. Tunnel Construction
  • 11. 11 (a) Cut and Cover System(a) Cut and Cover System Sequence of Construction (Stages 1 to 3Sequence of Construction (Stages 1 to 3 )) Tunnel Construction
  • 12. 12 (a) Cut and Cover System(a) Cut and Cover System Sequence of Construction (Stages 4 to 6)Sequence of Construction (Stages 4 to 6) Tunnel Construction
  • 13. 13 Cut and Cover SystemCut and Cover System AdvantagesAdvantages:: • Economy for shallow depths (4 - 10 m) and for shorter applications. • Un-sophisticated labor and equipment required. • Adaptability to different conditions. • Simple structural & geotechnical analyses required. • Safe environment (ventilation and fire hazard) • DisadvantagesDisadvantages:: • Possible disturbances to existing facilities. • Practical limitations of depth. • Unsuitability under buildings or water. Tunnel Construction
  • 14. 14 Soil Grouting TechniquesSoil Grouting Techniques Jet Grouting: Soil Replacement ProcessJet Grouting: Soil Replacement Process Tunnel Construction
  • 15. 15 Soil Grouting TechniquesSoil Grouting Techniques Slurry Wall ConceptSlurry Wall Concept Tunnel Construction
  • 16. 16 ((bb) Pipe Jacking System (Micro Tunneling)) Pipe Jacking System (Micro Tunneling) Schematic RepresentationSchematic Representation Tunnel Construction
  • 18. GUIDANCE AND POSITIONING USING LASER-GUIDED STEERING SYSTEM 18 Laser Guide &Laser Guide & ControlControl MonitorMonitor Screen CaptureScreen Capture Tunnel Construction
  • 19. MTBM - SHIELDS OF DIFFERENT SIZES DIA. RANGES FROM 0.5M TO 3M 19 Tunnel Construction
  • 20. MTBM - DIFFERENT SHAPES OF CUTTING HEADS 20 Dirt cutter headDirt cutter head (clay and silty(clay and silty sand)sand) Sand shelvesSand shelves Carbide cutter headCarbide cutter head (soft to medium hard(soft to medium hard rockrock)) Tunnel Construction
  • 21. 21 Pipe Jacking System (Micro TunnelingPipe Jacking System (Micro Tunneling AdvantagesAdvantages:: • Suitability for almost all types of soil. • Large depths with unlimited lengths of drive. • High levels of accuracy and safety. • Wide choice of pipe and joint materials. • High construction rates. • Reduced manpower requirements. • Reduced environmental disturbance. • DisadvantagesDisadvantages:: • Sophisticated equipment and highly skilled labor. • Inability to make rapid changes in line or level. • Very expensive corrective actions, if required Tunnel Construction
  • 22. 22 (c) Shield Tunneling (TBM)(c) Shield Tunneling (TBM) Cutter Head Tunnel Tube Tunnel Construction
  • 24. 24 Shield Tunneling (TBM)Shield Tunneling (TBM) AdvantagesAdvantages:: • Suitability for almost all types of soil. • Suitability for wide tunnels (highway, railway, etc.). • Large depths ( > 10 m), with unlimited lengths of drive. • Reducing environmental disturbance and utilities diversions. Tunnel Construction
  • 25. DisadvantagesDisadvantages:: • Sophisticated equipment and highly skilled labor. • Inability to make rapid changes in line or level. • Very expensive corrective actions, if required. • Difficult structural and geotechnical analyses reqd.. 25
  • 26. 26 (d)(d) New Austrian Tunneling Method (New Austrian Tunneling Method (NATM)NATM) Tunnel Construction
  • 27. 27 NATMNATM AdvantagesAdvantages:: • Best alternative for non-circular roadway tunnels. • Suitability for almost all stable to strong ground types, including rock. • Suitability for a variety of soil conditions. • Small thickness of tunnel lining, reducing the amount of excavation. • Economy and speed of construction. Tunnel Construction
  • 28. DisadvantagesDisadvantages:: • Highly skilled workers and expert engineers. • Safety measures for shotcrete application. • Ground water freezing and/or soil strengthening (in case of water-bearing cohesionless soil). 28
  • 29. 29 (e) Immersed-Tube Tunneling System(e) Immersed-Tube Tunneling System Tunnel Construction
  • 30. 30 (E) Immersed-Tube Tunneling System(E) Immersed-Tube Tunneling System Construction SequenceConstruction Sequence:: 1. Dredging the trench in river or sea bottom. 2. Prefabrication of tunnel sections, and sealing ends with bulkheads. 3. Floating the sections to the tunnel trench. 4. Lowering the sections to seabed. 5. Joining the sections together underwater. 6. Removing the temporary bulkheads. 7. Backfilling the trench. Tunnel Construction
  • 31. 31 Immersed-Tube Tunneling SystemImmersed-Tube Tunneling System AdvantagesAdvantages:: • Economy (most economical alternative for any type of underwater tunnel crossing). • High construction rates (particularly for steel tube tunnels). • Wide variety of different conditions. DisadvantagesDisadvantages:: • Highly skilled and experienced workers. • Safety measures for underwater construction.. Tunnel Construction
  • 32. 32 DEVELOPMENTS & FUTURE TRENDSDEVELOPMENTS & FUTURE TRENDS IN TUNNEL CONSTRUCTIONIN TUNNEL CONSTRUCTION Conventional TunnelingConventional Tunneling:: Areas Developments Blast Tunneling • Drilling techniques. • Blasting technology. • Re-use of excavated material. Tunneling in Loose Sand • Injection. • High-pressure injection. • Soil freezing. Shotcrete Safety Measures • Special shotcretes without accelerators that reduce concrete solidity. General Equipment Developments • Advances in diesel motor technology (less pollutants in exhausted gases). Handling of Groundwater • Two-layer plastic sealing tracks (double water-pressure resistance). Final Lining in Concrete • Measures for protecting inner concrete linings (to prevent tears). Tunnel Construction
  • 33. REFERANCES  http://terratec.co/files/TERRATEC-Microtunnelling-Brochur  http://www.railsystem.net/natm/  http://www.dr-sauer.com/technical-info/906  https://en.wikipedia.org/wiki/Tunnel 33