•Durgesh Kumar Yadav
 Soil classification
 Soft soil classification
 Challenges in tunneling
 Methods of tunneling in soft soil
 Methods adopted for tunneling may vary with
soil present in the construction site.
 Soil present on site can be classified as :
1. Soft soil , which requires temporary support
during and after excavation.
2. Hard rocks or Fully self supporting soil
Soft soil
Running
Ground
Soft Ground Firm Ground
Self supporting
ground
•Needs instant
support during
excavation.
•Dry sand, gravel
,silt etc.
•Roof needs instant
support after
excavation.
•Walls can
withstand for few
minutes only
without support
•Soft earth, clay,
damp sand.
•Roof can withstand
without support for
few minutes.
•Walls can stand for 1
or 2 hours after
excavation.
•Dry earth, firm clay,
cemented sand etc.
•Ground can stand
unsupported while
excavation is done
for 1.5m to 5m.
•Sand stones, hard
clay etc.
 Preventing soil movement.
 Soil pressure.
 Water seepage
1. Which requires timbering.
2. Other methods.
 Which requires timbering :
i. Fore-poling method
ii. Needle beam method
iii. Belgian method
iv. Austrian method
v. American method
vi. English method
vii. Army method or Case method
viii. German method
ix. Italian method
• Ancient method, used for running ground
• Now replace by compressed air tunneling method
• Slow, tedious method but safe.
• Skilled labours and strict provision required.
Sequence of operations for 1.52x1.52 m.
• “A” frame prepared and placed near facing of tunnel.
• Poles are inserted at top which are supported by vertical posts.
 Bent is placed from the sheeting
 Now the excavation can be done under forepoles
 Fore pole consist of plank with wedge ends are entered one at a
time
 Driven through half length at 15 cm/m inclination
• Suitable for firm ground
• Needle beam consist of a stout timber beam from
main temporary support
 SEQENCE OF OPERATION :
 a drift of about 1m. is driven on working face
 roof of this drift is lagged with sheeting
 apply trench jack on it
 a needle beam of 5 to 6m. is inserted and one end
is carried on plank and other on stout post.
 with help of jacks , drift is widened side ways
MERITS :
 economical
 works all right on brick lining
DEMERITS :
 heavy beam pushed foreward by hand
 no. of trench jacks required
 difficulties in concrete lining with machine
 It is used for moderately firm or hard soils.
SEQUENCE OF OPERATION :
• A top heading abcd for the full rise of the arch is
driven & supported.
• Heading is widened sideways , and supported by
additional crown bars on sill.
• Lining the arch
• Inserted the shore at side and excavate the mnop.
• Shoring is removed and space is filled with
masonary.
 It is also known as “sequential excavation
method”.
 A center cut is taken for full height .
 Cut is widened to full face.
 Permit short section of masonry to be
completed.
• It is used for railway or highway tunneling.
SEQUENCE OF OPERATION :
 A top drift is driven and supported by
laggings,cap timber and parts
 Side are widened
 Walls plates are introduced at the springing
supporting the arch set
 Vertical posts are driven
 Sides and benching are clared & tunnel lining is
started
• The main characteristic of this method is
excavation of full section of the tunnel at once
using longitudinal strutting and alternate of
masonry work and excavation
SEQUENCE OF OPERATION :
 Top head is driven up to 5 m.
 It is supported on crown bars
 Then widening of the heading is then done by
digging away the earth at each side.
 Then started excavation of part -2 and put the sill
 Part -3 in same manor and started masonry
• It is derived by USA army for constructing small
tunnels at shallow depth.
SEQUENCE OF OPERATION :
 A common gallery of wood 1.1x1.8x0.05 mtr. Of
wood is used.
 A top braced is removed and ground is excavated
for a short distance.
 The box is moved ahead and set next cap.
 After that remove the breast one by one and
excavate .
MERITS :
 Simple,economic
 Unskilled labour can driven
DEMERITS :
 Only for short tunnel
• In this method 3 drifts are used to support the
roof and side .
• One at the crown and rest two are at bottom
along the wall.
 Other methods :
i. Linear plate method
ii. Shield method
iii. Compressed air method
• It is presented steel plates ,plain or corrugated
are used to support the soil during excavation.
• The size of plates are 0.91 x 0.41m with flange
of .05 m.
• The plates are bolted to each other through
holes in flange.
SEQUENCE OF OPERATION :
 a hole of 0.4 m depth is cut at crown and liner
plate “ a” is inserted.
Excavated sides and place “b” and “c” plates
Now two wooden wall plates of size about 20
cm. x 5 cm. And placed on each side of the bench
Jacks are removed
The bench is then cleared and the wall plates are
under pinned at bottom.
 LINEAR PLATE WITH STIFFNERES :
• For strenthen the plate “I” or “T” section rib is
used as stiffners.
MERITES :
 Lighter, economical
 Erected with unskilled labour
 Fire proof
 Require less number of joints
• It is used for driving a tunnel through water
bearing strata.
• It is an equipment which acts as a bridge with
roof for workers.
• A shield is a movable frame and it is used to
support the face of the tunnel.
• The excavation & lining of tunnel can be
carried out under protection of shield.
COMPONENTES OF SHIELD :
1.The skin
2.Cutting edge
3.Propelling jack
4.The hood
5.The tail
6. Port holes
SEQUENCE OF OPERATION :
•The ground is excavated ahead of the shield of .45 to .75
meter.
•The shield is jacked forward.
PRIMARY LINING :
•It is the name given to the heavy cast iron lining used in
conjunction with the shield.
SECONDARY LINING :
•5 to 7 cm. Concrete is placed over the flange of iron.
MERITS :
•Full dimension available
•Speedy
•Moving with constant support to the advanced tunnel.
• Most modern method used for tunneling in soft
grounds having water bearing strata.
• Timber support is not required.
• Support is provided by compressed air into
enclosed space to prevent the collapse of roof
and sides of tunnel.
• Usually air is used in conjunction with a shield
and air-tight locks.
• Air pressure adopted is approximately
1kg/cm^2.
• If pressure will be more than working hour will
reduce which will increase the cost of labours and the
construction cost as well.
 Challenges occurs in maintaining air pressure :
I. Earth pressure varies from top to bottom in a
tunnel.
II. Pressure in floor depends upon the nature of
soil strata.
III. Value of pressure varies with moisture content
of soil strata.
IV. Compressed air will escape continuously
through the pores of soil , thus air pressure
will have vary time to time to get balanced.
Tunnelling methods
Tunnelling methods
Tunnelling methods
Tunnelling methods

More Related Content

What's hot

Well foundations
Well foundationsWell foundations
Well foundationsganesh6561
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of explorationjagadish108
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
Lining of tunnel
Lining of tunnelLining of tunnel
Lining of tunnelGiri Guru
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rockkamariya keyur
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repairKartikSuryawanshi2
 
types of coffer dam
types of coffer dam types of coffer dam
types of coffer dam VINAY PATEL
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 
Canal alignment
Canal alignmentCanal alignment
Canal alignmentNaveenaa
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floorDivya Vishnoi
 

What's hot (20)

Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Well foundations
Well foundationsWell foundations
Well foundations
 
Pile load test
Pile load testPile load test
Pile load test
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Wash boring
Wash boringWash boring
Wash boring
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
Lining of tunnel
Lining of tunnelLining of tunnel
Lining of tunnel
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Tunneling
TunnelingTunneling
Tunneling
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repair
 
types of coffer dam
types of coffer dam types of coffer dam
types of coffer dam
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
 

Viewers also liked

NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingHamed Zarei
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessonscoen_van_der_vliet
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014richardbieniawski
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Hamed Zarei
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)Austrian Standards
 
Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATMluisaam
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingIEI GSC
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationCommunications Branding
 

Viewers also liked (20)

Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessons
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
Tunneling
Tunneling Tunneling
Tunneling
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Casting yard
Casting yardCasting yard
Casting yard
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATM
 
Dam PPT
Dam PPTDam PPT
Dam PPT
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 

Similar to Tunnelling methods

ABC 1st Week(2hrs
ABC 1st Week(2hrsABC 1st Week(2hrs
ABC 1st Week(2hrspal892241
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdfBalpreetSingh47890
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Mayur Rahangdale
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & ExcavationShivananda Roy
 
soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpointLawin Langat
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxNisthaPathak2
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsAkash Tilokani
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall constructionABHISHEK THAKKAE
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building ConstructionEr.Karan Chauhan
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxChinnuNinan
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 

Similar to Tunnelling methods (20)

ABC 1st Week(2hrs
ABC 1st Week(2hrsABC 1st Week(2hrs
ABC 1st Week(2hrs
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)Tunnel Construction (VJTI MUMBAI)
Tunnel Construction (VJTI MUMBAI)
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
pire and well.pptx
pire and  well.pptxpire and  well.pptx
pire and well.pptx
 
soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpoint
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptx
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm Walls
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Micropile
MicropileMicropile
Micropile
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Tunnelling methods

  • 2.  Soil classification  Soft soil classification  Challenges in tunneling  Methods of tunneling in soft soil
  • 3.  Methods adopted for tunneling may vary with soil present in the construction site.  Soil present on site can be classified as : 1. Soft soil , which requires temporary support during and after excavation. 2. Hard rocks or Fully self supporting soil
  • 4. Soft soil Running Ground Soft Ground Firm Ground Self supporting ground •Needs instant support during excavation. •Dry sand, gravel ,silt etc. •Roof needs instant support after excavation. •Walls can withstand for few minutes only without support •Soft earth, clay, damp sand. •Roof can withstand without support for few minutes. •Walls can stand for 1 or 2 hours after excavation. •Dry earth, firm clay, cemented sand etc. •Ground can stand unsupported while excavation is done for 1.5m to 5m. •Sand stones, hard clay etc.
  • 5.  Preventing soil movement.  Soil pressure.  Water seepage
  • 6. 1. Which requires timbering. 2. Other methods.  Which requires timbering : i. Fore-poling method ii. Needle beam method iii. Belgian method iv. Austrian method v. American method vi. English method vii. Army method or Case method viii. German method ix. Italian method
  • 7. • Ancient method, used for running ground • Now replace by compressed air tunneling method • Slow, tedious method but safe. • Skilled labours and strict provision required. Sequence of operations for 1.52x1.52 m. • “A” frame prepared and placed near facing of tunnel. • Poles are inserted at top which are supported by vertical posts.  Bent is placed from the sheeting  Now the excavation can be done under forepoles  Fore pole consist of plank with wedge ends are entered one at a time  Driven through half length at 15 cm/m inclination
  • 8.
  • 9. • Suitable for firm ground • Needle beam consist of a stout timber beam from main temporary support  SEQENCE OF OPERATION :  a drift of about 1m. is driven on working face  roof of this drift is lagged with sheeting  apply trench jack on it  a needle beam of 5 to 6m. is inserted and one end is carried on plank and other on stout post.  with help of jacks , drift is widened side ways
  • 10.
  • 11. MERITS :  economical  works all right on brick lining DEMERITS :  heavy beam pushed foreward by hand  no. of trench jacks required  difficulties in concrete lining with machine
  • 12.  It is used for moderately firm or hard soils. SEQUENCE OF OPERATION : • A top heading abcd for the full rise of the arch is driven & supported. • Heading is widened sideways , and supported by additional crown bars on sill. • Lining the arch • Inserted the shore at side and excavate the mnop. • Shoring is removed and space is filled with masonary.
  • 13.
  • 14.
  • 15.  It is also known as “sequential excavation method”.  A center cut is taken for full height .  Cut is widened to full face.  Permit short section of masonry to be completed.
  • 16.
  • 17. • It is used for railway or highway tunneling. SEQUENCE OF OPERATION :  A top drift is driven and supported by laggings,cap timber and parts  Side are widened  Walls plates are introduced at the springing supporting the arch set  Vertical posts are driven  Sides and benching are clared & tunnel lining is started
  • 18.
  • 19. • The main characteristic of this method is excavation of full section of the tunnel at once using longitudinal strutting and alternate of masonry work and excavation SEQUENCE OF OPERATION :  Top head is driven up to 5 m.  It is supported on crown bars  Then widening of the heading is then done by digging away the earth at each side.  Then started excavation of part -2 and put the sill  Part -3 in same manor and started masonry
  • 20.
  • 21. • It is derived by USA army for constructing small tunnels at shallow depth. SEQUENCE OF OPERATION :  A common gallery of wood 1.1x1.8x0.05 mtr. Of wood is used.  A top braced is removed and ground is excavated for a short distance.  The box is moved ahead and set next cap.  After that remove the breast one by one and excavate .
  • 22.
  • 23. MERITS :  Simple,economic  Unskilled labour can driven DEMERITS :  Only for short tunnel
  • 24. • In this method 3 drifts are used to support the roof and side . • One at the crown and rest two are at bottom along the wall.
  • 25.  Other methods : i. Linear plate method ii. Shield method iii. Compressed air method
  • 26. • It is presented steel plates ,plain or corrugated are used to support the soil during excavation. • The size of plates are 0.91 x 0.41m with flange of .05 m. • The plates are bolted to each other through holes in flange. SEQUENCE OF OPERATION :  a hole of 0.4 m depth is cut at crown and liner plate “ a” is inserted.
  • 27. Excavated sides and place “b” and “c” plates Now two wooden wall plates of size about 20 cm. x 5 cm. And placed on each side of the bench Jacks are removed The bench is then cleared and the wall plates are under pinned at bottom.
  • 28.
  • 29.  LINEAR PLATE WITH STIFFNERES : • For strenthen the plate “I” or “T” section rib is used as stiffners. MERITES :  Lighter, economical  Erected with unskilled labour  Fire proof  Require less number of joints
  • 30. • It is used for driving a tunnel through water bearing strata. • It is an equipment which acts as a bridge with roof for workers. • A shield is a movable frame and it is used to support the face of the tunnel. • The excavation & lining of tunnel can be carried out under protection of shield.
  • 31.
  • 32. COMPONENTES OF SHIELD : 1.The skin 2.Cutting edge 3.Propelling jack 4.The hood 5.The tail 6. Port holes
  • 33. SEQUENCE OF OPERATION : •The ground is excavated ahead of the shield of .45 to .75 meter. •The shield is jacked forward. PRIMARY LINING : •It is the name given to the heavy cast iron lining used in conjunction with the shield. SECONDARY LINING : •5 to 7 cm. Concrete is placed over the flange of iron. MERITS : •Full dimension available •Speedy •Moving with constant support to the advanced tunnel.
  • 34.
  • 35. • Most modern method used for tunneling in soft grounds having water bearing strata. • Timber support is not required. • Support is provided by compressed air into enclosed space to prevent the collapse of roof and sides of tunnel. • Usually air is used in conjunction with a shield and air-tight locks. • Air pressure adopted is approximately 1kg/cm^2.
  • 36. • If pressure will be more than working hour will reduce which will increase the cost of labours and the construction cost as well.  Challenges occurs in maintaining air pressure : I. Earth pressure varies from top to bottom in a tunnel. II. Pressure in floor depends upon the nature of soil strata. III. Value of pressure varies with moisture content of soil strata. IV. Compressed air will escape continuously through the pores of soil , thus air pressure will have vary time to time to get balanced.