Analysis of stability of rock column between cut & cover Metro Station
and NATM Tunnels
Swarup Maiti1, Prof. Dr. Sandeep Potnis2
1PG student, MIT World Peace University, Pune, India
2Head, School of Tunnel Engineering, MIT world Peace University, Pune
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract: Planning and accommodation of underground metro stations in available land areas is an important aspect of any
metro project. Designer has to adopt the innovative solution for station design due to limited space. To accommodate the station
box within the available area, station may have to be constructed with the combined construction approach of NATMandcutand
cover. In this approach main station box is constructed with a cut and cover method and platform tunnel is constructed with a
NATM method. The sequence of construction can be simultaneous or opening of tunnel is carried out from the cut & cover shaft or
TBM tunnel excavation is done before station excavation. Any underground excavation has a major influence on the nearby
existing structures. This paper covers the various aspects of ground response to the interaction between strutted excavation and
NATM tunnel excavation. Study of integrated excavation is carried out with varying the width of rock column between station
excavation and NATM platform tunnel. The variations in the geological stratification and impact of different construction
sequences are investigated.
Key words- Earth Retaining System (ERS), secant pile, Platform NATM tunnel, Surface settlement, Underground metro, Rock
column, cut and cover structures, deep excavations.
1. INTRODUCTION
India has seen a huge development in the metro rail projects in the last 3 decades. Several Underground Metro projects have
been constructed and many are in the under-construction and planning phase. Planning and design of theundergroundmetro
station is a challenging job. As most of the underground stations are planned in a densely populated area to gain more public
ridership. Underground metro stationsareusuallyplannedunderroads,emptyground.Planningofundergroundstationunder
existing road has major issue i.e., protection of buildings adjacent to the metro station. One of the underground metrostations
were planned in a densely populated area in Mumbai, on narrow roads,andinthestationvicinity,several dilapidatedbuildings
were present. Hence few stations were planned to construct with a mixed method of cut and cover for station box and NATM
method for Platform tunnel. Owing to the presence of buildings in the vicinity of the station footprint the possibility of a
complete cut and cover station was not feasible. Hence the innovative idea ofintegratedNATMplatformtunnel andcut&cover
station excavation is adopted in many stations. This study inspires by the same case wherethestationboxisbeing executed by
adopting the methodology of cut and cover method and the platform is being constructed by the NATM tunneling method [1].
Connection with station box and NATM platform is made with the intermediate cross passages at regular intervals. Research
study emphasis on the behavior of integrated cut and cover excavation and excavation of NATM tunnel using predictable
element of soil-structure interaction analysis. The results response of ground under differentparametersarepresentedinthis
paper.
Alignment of the underground metro is generally planned through a heavily built-up urban area. Many times, important
Landmarks and Heritage structures are located nearby or directly above the tunnel alignment. Owing to land availability
constraints, cost of private properties, inadequate available road width, and the veryimportantpresenceofHeritage buildings
planning, and design of metro alignment is important part of any underground metro project.
The alignment of an underground metro project is constructed with twin tunnelsbyTunnel BoringMachine(TBM) connecting
two stations. The underground stations or shaft are generally proposed to be constructed by adopting the cut & cover
construction methodology, and NATM method of construction and ground settlements are to be limited to protect existing
buildings.
Due presence of a high-water table, high rise building imposes a higher surcharge load which leads to higher settlements;
however, the designer has to control it well within the acceptable limit. In high water table areas generally, excavation is done
with a water-tight retaining system to prevent ground settlements due to seepage during excavations. To maintain the water
table in the non-excavated area proposal of the recharge well may be required.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 604
The purpose of this study is to carry out the assessment of rock column between cut & cover station and NATM tunnels of one
Underground Metro project in Mumbai. This paper provides an analysis for safety of rock column.
 In Preliminary stage, the rock column width was 2.6m based on tender stage GIR.
 During construction stage, after preparing actual GIR, Geotechnical parameters were revised, and rock quality is
considered to be poor w.r.t Tender GIR. Rock column width needed to increase for stability of supporting system
during excavation.
 Following analyses are performed –
a) Rock Column width 4m between cut & cover Station and NATM Tunnel
b) Rock Column width 5m between cut & cover Station and NATM Tunnel
2. Literature review
The settlement data from TBM tunneling in varying ground condition which are representative of the Mumbai geology are
analyzed and presented in this section.
In the year 1958, Martos has examinedthesettlementtroughshapeonminingexcavations,whichwasrepresentedbyaGaussian
or Normal distribution curve.
On the later stage, Schimdt, and Peck in the year 1969 has shown that surface settlement in the abovetunnelswereexperienced
in a similar form. O’Reilly and New has developed the Gaussian mode in the year 1982, by assuming that the ground loss could
be represented by a radial flow of material towards the tunnel and that the trough could be related to the ground conditions
through an empirical “trough width parameter” (K). The model was guided by an analysis of case history data.
Due to the above assumptions, it was possibletodevelopequationsforverticalandhorizontalgroundmovementsthatwerealso
presented in terms of ground strain, slope,and curvature(both at,and below, the ground surface).Fromthereon,theequations
are being widely used to access the potential impact of tunneling works during the design stage. The base equation is as
mentioned below.
Where S = ground settlement at a point; Smax = maximumgroundsettlement;A=cross-sectionalareaoftunnel;V=%ofground
loss assuming the ground is incompressible i.e., V = Vs/A, where Vs is the volume loss; k = empirical constant also called as
trough width parameter; and Z = depth of tunnel axis.
For an example, to determine /predict the ground movement only the following parameters were adopted /considered.
 Clough, O’Rourke and Peck adopted the excavation depth to determine ground movement as it is the only parameter.
 To predict the ground movement wherein the excavation depth is the main parameter in the formula, Bowles
considered the area covered by lateral wall movement as a parameter.
 To predict the concave type and spandrel typeofsettlementprofiles,HsiesandOuusedtheexcavationdepthastheonly
parameter.
 Osman and Bolton adopted the plastic zone, which is completely related to the excavation depth and was the only
parameter used in the prediction.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 605
3. DESIGN OF TEMPORARY SUPPORT SYSTEM AND GEOLOGY
In combination of cut & coverand NATM underground metro station construction, thereis access Tunnelat regular intervalfor
connection between them. During excavation for access tunnel and Platform tunnel high stresses around the opening are to be
checked and controlled. Therefore,rockcolumnstabilitycheckisveryimportant.ThisstudyhasbeenperformedusingPLAXIS2-
D finite element analysis program.
As per requirement of Employer, all the tunnel sections shall be complied with Schedule of Dimension (SOD). The profile of
Tunnel may be circular, D-Shape or horseshoe and it depends on the ground conditions. Here horse-shoe shape tunnel is
considered. Cross sectional area of Tunnel is around 90.4 sqm., width is 11.2m and height is 10m. Overburden (soil mixed with
rock) of 18m is considered above tunnel crown in this analysis.Actualgeotechnicalprofileandinformationiscollectedfrom GIR
of project. Class IV and V rock are identified at final excavation level which is 28m below ground. For parallel construction and
stability of the system, all the secant pile are terminated 4m below the final excavation level.
For stability analysis, following parameters have been considered in the model –
 Co-efficient of lateral earth pressure=0.5
 The soil is modeled by using Mohr-Coulomb material model
 Using Mohr-Coulomb material model, Rock mass is modelled where the strength and deformation properties are
derived using Hoek and Brown criterion based on Hoek and Torres (2002).
 Water table at ground level
 Secant pile (combination of M40 - RCC and M10 - PCC) of 1m dia, 32m depth and 170mm overlap.
 All piles are 32m depth i.e., 4m below from final excavation level.
 5 level struts are used for supporting of secant pile, horizontal spacing 10m c/c and vertical spacing 4.5m c/c.
Table -1: Properties of Structural Element
Structural elements Grade of Concrete EA
(kN/m)
EI
(kN-m2/m)
RCC Secant Pile (1m diameter) M40 22.14E+06 645780
Sprayed concrete for primary Tunnel
lining 200mm thick
M35 5.19E+06 19720
Table 2: Geotechnical Parameters
Following construction stages are considered in the model:
1. In-situ stage
2. Installation of Secant Piles
3. Lowering of water table inside the cut & cover box 1m below – 1st level of strut
4. Excavation of soil up to 1m below 1st level strut
5. Installation of 1st level strut
6. Repeat the stage 3, 4, 5 till the last design strut is installed
7. Excavation of NATM tunnel profile
Material Type
Unit wt
(kN/m3)
Cohesion c
(kPa)
Friction angle Young’s modulus E
(MPa)
Poisson’s
Ratio
Soil 18 1 30 12 0.3
Completely weathered
rock
20 27 29 423 0.3
Moderately weathered
rock
25 148 55 685 0.3
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 606
8. Installation of Primary support
9. Installation of full-strength primary tunnel lining along with wire mesh.
Fig -1: Road level plan of Station Box
Fig -2: Undercroft level Plan of Station Box
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 607
Fig -3: L- Section of Geotechnical Profile of Station Box
Fig -4: Rock Column width
4. METHODOLOGY
Analysis of the stability of rock column, properties of temporary support system and construction sequencearediscussedhere.
The geotechnical software PLAXIS 2D was used to study the soil-structure interaction between the cut & cover structure and
NATM tunnel and its impact on rock column stability. The software was used to provide the factor of safety of rock and soil for
the proposed construction sequence.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 608
Fig -5: Construction stage PLAXIS 2-D model
5. ANALYSIS AND RESULTS
Initially rock column of 2.66m width is analyzed. Theanalysiswascarriedoutforthiscolumnwidth,anditwasobservedthatthe
rock collapses in this scenario. Hence, the width between the cut & cover station box and NATM tunnel was increased to have
lower concentration of stresses in the rock column.
Following analysis were performed –
a) Rock column width of 4m between station and NATM Tunnel
PLAXIS output for Rock column stability (4m wide) considering 30% Relaxation –
Fig -6: Total displacement after final excavation of cut & cover Box: 43mm
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 609
Maximum value = 1822 kPa
Minimum value = -9982 kPa
Maximum value = 1895 kPa
Minimum value = -10.10*10^3 kPa
Fig -9: Total stress after construction of NATM lining
Fig -7: Maximum Total displacement near ground surface after NATM Construction: 50mm
Fig -8: Total stress after final excavation of cut & cover Box
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 610
Fig -10: The factor of safety with column width 4m between station and NATM Tunnel
a) Rock column width of 5m between station and NATM Tunnel
PLAXIS output for Rock column stability (5m wide) considering 30% Relaxation –
Fig -11: Maximum Total displacement near ground surface after final level excavation of cut & cover Box: 32mm
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 611
Fig -12: Maximum Total displacement near ground surface after NATM construction: 39mm
Maximum value = 1787 kPa
Minimum value = -9067 kPa
Maximum value = 1673 kPa
Minimum value = -8157 kPa
Fig -14: Total stress after construction of NATM lining
Fig -13: Total stress after final excavation of cut & cover Box
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 612
Fig -15: The factor of safety with column width 5m between station and NATM Tunnel
Rock Column
width
Total
displacement
after final
excavation of
cut & cover Box
Maximum Total
displacement
near ground
surface after
NATM
Construction
Total stress
after final
excavation of
cut & cover Box
Total stress after
construction of
NATM lining
FOS
4m Rock
Column width
43mm 50mm
Maximumvalue=
1822 kPa
Minimum value =
-9982 kPa 2
Maximum
value = 1895 kPa
Minimum value = -
10100 kPa
2.2
5m Rock
Column width 32mm 39mm
Maximu
m value = 1673
kPa
Minimum value =
-8157 kPa
Maximum value =
1787 kPa
Minimum value = -
9067 kPa
2.8
Rock Column
width
Total
displacementafter
near ground
surface final
excavation of cut
& cover Box
Total
displacement
near ground
surface after
NATM
Construction
Total stress
after final
excavation of
cut & cover Box
Total stressafterconstruction
of NATM lining
5m Rock
Column width 18 mm 21 mm
Maximum value=
903 kPa
Minimum value =
-5272 kPa
Maximum value = 988 kPa
Minimum value = -5887 kPa
Table 3: Comparison of result of different rock column
Table 4: During construction actual displacement and stress for 5m rock column
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 613
6. DISCUSSION AND CONCLUSION
To understand the complex soil-structure interaction Two-dimensional FEM modelling is used, involving cut & cover
excavation with an adjacent NATM Tunnel. It is observed that the excavation of Tunnel adjacent to the cut & cover box
excavation influences the ground behavior along with the behavior of earth retaining system.
Geological stratification has major impact ontunnel design.Increasein rock columnwidth,thereisreduceofgroundsettlement
and reduce of total stress.
Excavation of tunnel will cause a short-term loss of ground water due to which the unbalanced load path is imposed on earth
retaining system of supporting cut & cover excavation. Theunbalancedloadingconditionsincreasesthedisplacementofsecant
pile on the fair side of tunnel excavation. The loss of ground water can be controlled by installing a grout curtain around the
tunnel profile before the start of excavation along with recharge wells.
It is observed that the tunnel excavation induces additional stressontherock column andcausestherock columndeformation.
After excavation of tunnel, surface settlements increase immediately. The maximum surface settlements are observed
immediately behind the secant pile. The width of rock column appears to have no major effect on the magnitude of maximum
surface settlements. The slope of settlement trough is influence by the rock column width.
Adjacent cut & cover excavation has an influence on the behavior of tunnel excavation. Tunnel lining was subjected to higher
deformation at the face wall adjacent to the open excavation and deformation increased with reduction in width of the rock
column.
From the analysis, it is concluded that the minimum width of rock column between station and NATM tunnel shall be 5m to
achieve FOS of 2.8. A sensitivity analysis was carried out for 4m wide rock column, and the analysis was not successful (i.e.,
FOS<2.5), confirming that the minimum width of rock column shall be 5m for these geological conditions.
REFERENCES
[1] Mechanized Tunnelling in Urban Areas – Design methodology and constructioncontrol byVittorioGulielmetti, Piergiorgio
Grasso, Ashraf Mahtab & Shulin Xu
[2] Martos, F. 1958. Concerning an approximate equation of the subsidence trough and its time factors. International Strata
Control Congress, Leipzig, (Berlin: Deutsche Akademie der Wissenschaften zu Berlin, Section fur Bergbau), 191-205
[3] Peck, R. B. 1969. Deep excavation and tunneling in soft ground. 7th International Conference on Soil Mechanics and
Foundation Engineering, Mexico City State-of-the-Art volume, 225-290
[4] O’Reilly, M. P. and New, B. M., 1982. Settlements above tunnels in the United Kingdom – their magnitude and prediction.
Tunneling’82, London, 173-181.
[5] Clough GW, O’Rourke TD. Construction-induced movements of in situ walls. Proceeding of the design and performance of
earth retaining structures, ASCE special conference, Ithaca, New York: 1990, 439-70.
[6] Bowles JE. Foundation analysis and design. 4th ed. New York: McGraw-Hill: 1986
[7] Hsieh PG, Ou CY. Analysis of nonlinear stress and strain in clay under the undrained condition.JMech2011;27(2):201-13
[8] Osman AS, Bolton MD. Ground movement predictions for braced excavationsinundrainedclay.JGeotechGeoenvironEngg
2006; 132(4):465-77.
[9] Chakeri H, Hasanpour R., Hindistan M., Unver B. (2010). Analysis of interaction between tunnels in
[10] the soft ground by 3D numerical modeling. Bulletin of Engineering Geology and the Environment, 70: 439-448.
[11] Hoek E., Carranza – Torres C. (2002). Hoek – Brown failure criterion, Edition 1, In: Proc.NARMS-TACConference,Toronto,
1, 267-273.
[12] Kim S. H., Burd H. J., Milligan G.W.E. (1998). Model testing of closely spaced tunnels in clay. Geotechnique. 48(3), 375-388.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 614
[13] Liu H. Y., Small J. C., Carter J. P., Williams D. J. (2009). Effects of tunneling on existing support system of perpendicularly
crossing tunnels, Comput Geotech. 36(5), 880-894.
[14] Perri G. (1994), Analysis of the effects of the new twin-tunnels excavation very close to a big diameter tunnel of Caracas
Subway. In: Salam A (ed) Tunneling and ground conditions, Balkema, Rotterdam, 83-90.
[15] Shahrour I., Mroueh H. (1997). Three-dimensional nonlinear analysis of a closely twin tunnels. In: Sixth international
symposium on numerical models in geomechanics (NUMOG VI), Montreal, QC, Canada, 2, 481-487.
BIOGRAPHIES
Mr. Swarup has completed B. E.
(Civil Engineering) from IIEST,
Shibpore, Howrah in 2004. After
that continuous more than 19
years working in Design and
Construction of underground &
elevated Metro Rail ProjectinIndia
as Engineering Manager. Mr.
Swarup is Final year M. Tech –
Tunnel Engineering student of
MIT, Pune. He is pursuing Post
Graduate project management
from NICMAR, Hyderabad.

More Related Content

Similar to Analysis of stability of rock column between cut & cover Metro Station and NATM Tunnels

Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresIJAEMSJORNAL
 
Analytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactionAnalytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactioneSAT Publishing House
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 
Study of Dynamic Analysis for Immersed Tube Tunnel
Study of Dynamic Analysis for Immersed Tube TunnelStudy of Dynamic Analysis for Immersed Tube Tunnel
Study of Dynamic Analysis for Immersed Tube Tunnelijceronline
 
NSL General HdW.update nov09
NSL General HdW.update nov09NSL General HdW.update nov09
NSL General HdW.update nov09Hans De Wit
 
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...IRJET Journal
 
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeAnalysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeIRJET Journal
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...CrimsonPublishersAMMS
 
IJARE151191422736200
IJARE151191422736200IJARE151191422736200
IJARE151191422736200Hassan Abbasi
 
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...IJERA Editor
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Prudhvi Thota
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011ILIAS MICHALIS
 
IRJET- Study of Response of Wall Type Pier for Varying Width of Superstru...
IRJET-  	  Study of Response of Wall Type Pier for Varying Width of Superstru...IRJET-  	  Study of Response of Wall Type Pier for Varying Width of Superstru...
IRJET- Study of Response of Wall Type Pier for Varying Width of Superstru...IRJET Journal
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignDr Mazin Alhamrany
 
Abutment pile-soil interaction of a psc bridge under seismic loading
Abutment pile-soil interaction of a psc bridge under seismic loadingAbutment pile-soil interaction of a psc bridge under seismic loading
Abutment pile-soil interaction of a psc bridge under seismic loadingeSAT Publishing House
 
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...IOSR Journals
 

Similar to Analysis of stability of rock column between cut & cover Metro Station and NATM Tunnels (20)

Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
 
Analytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interactionAnalytical study of abutment and pile behaviour of iab with soil interaction
Analytical study of abutment and pile behaviour of iab with soil interaction
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Study of Dynamic Analysis for Immersed Tube Tunnel
Study of Dynamic Analysis for Immersed Tube TunnelStudy of Dynamic Analysis for Immersed Tube Tunnel
Study of Dynamic Analysis for Immersed Tube Tunnel
 
NSL General HdW.update nov09
NSL General HdW.update nov09NSL General HdW.update nov09
NSL General HdW.update nov09
 
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
 
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment BridgeAnalysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
Analysis of Soil-Structure Interaction Mechanisms on Integral Abutment Bridge
 
Mumbai-Nagpur.pdf
Mumbai-Nagpur.pdfMumbai-Nagpur.pdf
Mumbai-Nagpur.pdf
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
 
IJARE151191422736200
IJARE151191422736200IJARE151191422736200
IJARE151191422736200
 
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...
Rock Mass Characteristics Modification Using Back Analysis Method for Isfahan...
 
Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.Case studies of surveys involved in Railway Tunnel constructed under sea.
Case studies of surveys involved in Railway Tunnel constructed under sea.
 
Mihalis presentation final 10092011
Mihalis presentation final 10092011Mihalis presentation final 10092011
Mihalis presentation final 10092011
 
IRJET- Study of Response of Wall Type Pier for Varying Width of Superstru...
IRJET-  	  Study of Response of Wall Type Pier for Varying Width of Superstru...IRJET-  	  Study of Response of Wall Type Pier for Varying Width of Superstru...
IRJET- Study of Response of Wall Type Pier for Varying Width of Superstru...
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
 
Abutment pile-soil interaction of a psc bridge under seismic loading
Abutment pile-soil interaction of a psc bridge under seismic loadingAbutment pile-soil interaction of a psc bridge under seismic loading
Abutment pile-soil interaction of a psc bridge under seismic loading
 
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...
Modelling of Permanent Deformation on Flexible Pavement Using Accelerated Pav...
 

More from IRJET Journal

STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsIRJET Journal
 

More from IRJET Journal (20)

STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant Coefficients
 

Recently uploaded

microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 

Recently uploaded (20)

microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 

Analysis of stability of rock column between cut & cover Metro Station and NATM Tunnels

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 603 Analysis of stability of rock column between cut & cover Metro Station and NATM Tunnels Swarup Maiti1, Prof. Dr. Sandeep Potnis2 1PG student, MIT World Peace University, Pune, India 2Head, School of Tunnel Engineering, MIT world Peace University, Pune ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract: Planning and accommodation of underground metro stations in available land areas is an important aspect of any metro project. Designer has to adopt the innovative solution for station design due to limited space. To accommodate the station box within the available area, station may have to be constructed with the combined construction approach of NATMandcutand cover. In this approach main station box is constructed with a cut and cover method and platform tunnel is constructed with a NATM method. The sequence of construction can be simultaneous or opening of tunnel is carried out from the cut & cover shaft or TBM tunnel excavation is done before station excavation. Any underground excavation has a major influence on the nearby existing structures. This paper covers the various aspects of ground response to the interaction between strutted excavation and NATM tunnel excavation. Study of integrated excavation is carried out with varying the width of rock column between station excavation and NATM platform tunnel. The variations in the geological stratification and impact of different construction sequences are investigated. Key words- Earth Retaining System (ERS), secant pile, Platform NATM tunnel, Surface settlement, Underground metro, Rock column, cut and cover structures, deep excavations. 1. INTRODUCTION India has seen a huge development in the metro rail projects in the last 3 decades. Several Underground Metro projects have been constructed and many are in the under-construction and planning phase. Planning and design of theundergroundmetro station is a challenging job. As most of the underground stations are planned in a densely populated area to gain more public ridership. Underground metro stationsareusuallyplannedunderroads,emptyground.Planningofundergroundstationunder existing road has major issue i.e., protection of buildings adjacent to the metro station. One of the underground metrostations were planned in a densely populated area in Mumbai, on narrow roads,andinthestationvicinity,several dilapidatedbuildings were present. Hence few stations were planned to construct with a mixed method of cut and cover for station box and NATM method for Platform tunnel. Owing to the presence of buildings in the vicinity of the station footprint the possibility of a complete cut and cover station was not feasible. Hence the innovative idea ofintegratedNATMplatformtunnel andcut&cover station excavation is adopted in many stations. This study inspires by the same case wherethestationboxisbeing executed by adopting the methodology of cut and cover method and the platform is being constructed by the NATM tunneling method [1]. Connection with station box and NATM platform is made with the intermediate cross passages at regular intervals. Research study emphasis on the behavior of integrated cut and cover excavation and excavation of NATM tunnel using predictable element of soil-structure interaction analysis. The results response of ground under differentparametersarepresentedinthis paper. Alignment of the underground metro is generally planned through a heavily built-up urban area. Many times, important Landmarks and Heritage structures are located nearby or directly above the tunnel alignment. Owing to land availability constraints, cost of private properties, inadequate available road width, and the veryimportantpresenceofHeritage buildings planning, and design of metro alignment is important part of any underground metro project. The alignment of an underground metro project is constructed with twin tunnelsbyTunnel BoringMachine(TBM) connecting two stations. The underground stations or shaft are generally proposed to be constructed by adopting the cut & cover construction methodology, and NATM method of construction and ground settlements are to be limited to protect existing buildings. Due presence of a high-water table, high rise building imposes a higher surcharge load which leads to higher settlements; however, the designer has to control it well within the acceptable limit. In high water table areas generally, excavation is done with a water-tight retaining system to prevent ground settlements due to seepage during excavations. To maintain the water table in the non-excavated area proposal of the recharge well may be required.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 604 The purpose of this study is to carry out the assessment of rock column between cut & cover station and NATM tunnels of one Underground Metro project in Mumbai. This paper provides an analysis for safety of rock column.  In Preliminary stage, the rock column width was 2.6m based on tender stage GIR.  During construction stage, after preparing actual GIR, Geotechnical parameters were revised, and rock quality is considered to be poor w.r.t Tender GIR. Rock column width needed to increase for stability of supporting system during excavation.  Following analyses are performed – a) Rock Column width 4m between cut & cover Station and NATM Tunnel b) Rock Column width 5m between cut & cover Station and NATM Tunnel 2. Literature review The settlement data from TBM tunneling in varying ground condition which are representative of the Mumbai geology are analyzed and presented in this section. In the year 1958, Martos has examinedthesettlementtroughshapeonminingexcavations,whichwasrepresentedbyaGaussian or Normal distribution curve. On the later stage, Schimdt, and Peck in the year 1969 has shown that surface settlement in the abovetunnelswereexperienced in a similar form. O’Reilly and New has developed the Gaussian mode in the year 1982, by assuming that the ground loss could be represented by a radial flow of material towards the tunnel and that the trough could be related to the ground conditions through an empirical “trough width parameter” (K). The model was guided by an analysis of case history data. Due to the above assumptions, it was possibletodevelopequationsforverticalandhorizontalgroundmovementsthatwerealso presented in terms of ground strain, slope,and curvature(both at,and below, the ground surface).Fromthereon,theequations are being widely used to access the potential impact of tunneling works during the design stage. The base equation is as mentioned below. Where S = ground settlement at a point; Smax = maximumgroundsettlement;A=cross-sectionalareaoftunnel;V=%ofground loss assuming the ground is incompressible i.e., V = Vs/A, where Vs is the volume loss; k = empirical constant also called as trough width parameter; and Z = depth of tunnel axis. For an example, to determine /predict the ground movement only the following parameters were adopted /considered.  Clough, O’Rourke and Peck adopted the excavation depth to determine ground movement as it is the only parameter.  To predict the ground movement wherein the excavation depth is the main parameter in the formula, Bowles considered the area covered by lateral wall movement as a parameter.  To predict the concave type and spandrel typeofsettlementprofiles,HsiesandOuusedtheexcavationdepthastheonly parameter.  Osman and Bolton adopted the plastic zone, which is completely related to the excavation depth and was the only parameter used in the prediction.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 605 3. DESIGN OF TEMPORARY SUPPORT SYSTEM AND GEOLOGY In combination of cut & coverand NATM underground metro station construction, thereis access Tunnelat regular intervalfor connection between them. During excavation for access tunnel and Platform tunnel high stresses around the opening are to be checked and controlled. Therefore,rockcolumnstabilitycheckisveryimportant.ThisstudyhasbeenperformedusingPLAXIS2- D finite element analysis program. As per requirement of Employer, all the tunnel sections shall be complied with Schedule of Dimension (SOD). The profile of Tunnel may be circular, D-Shape or horseshoe and it depends on the ground conditions. Here horse-shoe shape tunnel is considered. Cross sectional area of Tunnel is around 90.4 sqm., width is 11.2m and height is 10m. Overburden (soil mixed with rock) of 18m is considered above tunnel crown in this analysis.Actualgeotechnicalprofileandinformationiscollectedfrom GIR of project. Class IV and V rock are identified at final excavation level which is 28m below ground. For parallel construction and stability of the system, all the secant pile are terminated 4m below the final excavation level. For stability analysis, following parameters have been considered in the model –  Co-efficient of lateral earth pressure=0.5  The soil is modeled by using Mohr-Coulomb material model  Using Mohr-Coulomb material model, Rock mass is modelled where the strength and deformation properties are derived using Hoek and Brown criterion based on Hoek and Torres (2002).  Water table at ground level  Secant pile (combination of M40 - RCC and M10 - PCC) of 1m dia, 32m depth and 170mm overlap.  All piles are 32m depth i.e., 4m below from final excavation level.  5 level struts are used for supporting of secant pile, horizontal spacing 10m c/c and vertical spacing 4.5m c/c. Table -1: Properties of Structural Element Structural elements Grade of Concrete EA (kN/m) EI (kN-m2/m) RCC Secant Pile (1m diameter) M40 22.14E+06 645780 Sprayed concrete for primary Tunnel lining 200mm thick M35 5.19E+06 19720 Table 2: Geotechnical Parameters Following construction stages are considered in the model: 1. In-situ stage 2. Installation of Secant Piles 3. Lowering of water table inside the cut & cover box 1m below – 1st level of strut 4. Excavation of soil up to 1m below 1st level strut 5. Installation of 1st level strut 6. Repeat the stage 3, 4, 5 till the last design strut is installed 7. Excavation of NATM tunnel profile Material Type Unit wt (kN/m3) Cohesion c (kPa) Friction angle Young’s modulus E (MPa) Poisson’s Ratio Soil 18 1 30 12 0.3 Completely weathered rock 20 27 29 423 0.3 Moderately weathered rock 25 148 55 685 0.3
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 606 8. Installation of Primary support 9. Installation of full-strength primary tunnel lining along with wire mesh. Fig -1: Road level plan of Station Box Fig -2: Undercroft level Plan of Station Box
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 607 Fig -3: L- Section of Geotechnical Profile of Station Box Fig -4: Rock Column width 4. METHODOLOGY Analysis of the stability of rock column, properties of temporary support system and construction sequencearediscussedhere. The geotechnical software PLAXIS 2D was used to study the soil-structure interaction between the cut & cover structure and NATM tunnel and its impact on rock column stability. The software was used to provide the factor of safety of rock and soil for the proposed construction sequence.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 608 Fig -5: Construction stage PLAXIS 2-D model 5. ANALYSIS AND RESULTS Initially rock column of 2.66m width is analyzed. Theanalysiswascarriedoutforthiscolumnwidth,anditwasobservedthatthe rock collapses in this scenario. Hence, the width between the cut & cover station box and NATM tunnel was increased to have lower concentration of stresses in the rock column. Following analysis were performed – a) Rock column width of 4m between station and NATM Tunnel PLAXIS output for Rock column stability (4m wide) considering 30% Relaxation – Fig -6: Total displacement after final excavation of cut & cover Box: 43mm
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 609 Maximum value = 1822 kPa Minimum value = -9982 kPa Maximum value = 1895 kPa Minimum value = -10.10*10^3 kPa Fig -9: Total stress after construction of NATM lining Fig -7: Maximum Total displacement near ground surface after NATM Construction: 50mm Fig -8: Total stress after final excavation of cut & cover Box
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 610 Fig -10: The factor of safety with column width 4m between station and NATM Tunnel a) Rock column width of 5m between station and NATM Tunnel PLAXIS output for Rock column stability (5m wide) considering 30% Relaxation – Fig -11: Maximum Total displacement near ground surface after final level excavation of cut & cover Box: 32mm
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 611 Fig -12: Maximum Total displacement near ground surface after NATM construction: 39mm Maximum value = 1787 kPa Minimum value = -9067 kPa Maximum value = 1673 kPa Minimum value = -8157 kPa Fig -14: Total stress after construction of NATM lining Fig -13: Total stress after final excavation of cut & cover Box
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 612 Fig -15: The factor of safety with column width 5m between station and NATM Tunnel Rock Column width Total displacement after final excavation of cut & cover Box Maximum Total displacement near ground surface after NATM Construction Total stress after final excavation of cut & cover Box Total stress after construction of NATM lining FOS 4m Rock Column width 43mm 50mm Maximumvalue= 1822 kPa Minimum value = -9982 kPa 2 Maximum value = 1895 kPa Minimum value = - 10100 kPa 2.2 5m Rock Column width 32mm 39mm Maximu m value = 1673 kPa Minimum value = -8157 kPa Maximum value = 1787 kPa Minimum value = - 9067 kPa 2.8 Rock Column width Total displacementafter near ground surface final excavation of cut & cover Box Total displacement near ground surface after NATM Construction Total stress after final excavation of cut & cover Box Total stressafterconstruction of NATM lining 5m Rock Column width 18 mm 21 mm Maximum value= 903 kPa Minimum value = -5272 kPa Maximum value = 988 kPa Minimum value = -5887 kPa Table 3: Comparison of result of different rock column Table 4: During construction actual displacement and stress for 5m rock column
  • 11. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 613 6. DISCUSSION AND CONCLUSION To understand the complex soil-structure interaction Two-dimensional FEM modelling is used, involving cut & cover excavation with an adjacent NATM Tunnel. It is observed that the excavation of Tunnel adjacent to the cut & cover box excavation influences the ground behavior along with the behavior of earth retaining system. Geological stratification has major impact ontunnel design.Increasein rock columnwidth,thereisreduceofgroundsettlement and reduce of total stress. Excavation of tunnel will cause a short-term loss of ground water due to which the unbalanced load path is imposed on earth retaining system of supporting cut & cover excavation. Theunbalancedloadingconditionsincreasesthedisplacementofsecant pile on the fair side of tunnel excavation. The loss of ground water can be controlled by installing a grout curtain around the tunnel profile before the start of excavation along with recharge wells. It is observed that the tunnel excavation induces additional stressontherock column andcausestherock columndeformation. After excavation of tunnel, surface settlements increase immediately. The maximum surface settlements are observed immediately behind the secant pile. The width of rock column appears to have no major effect on the magnitude of maximum surface settlements. The slope of settlement trough is influence by the rock column width. Adjacent cut & cover excavation has an influence on the behavior of tunnel excavation. Tunnel lining was subjected to higher deformation at the face wall adjacent to the open excavation and deformation increased with reduction in width of the rock column. From the analysis, it is concluded that the minimum width of rock column between station and NATM tunnel shall be 5m to achieve FOS of 2.8. A sensitivity analysis was carried out for 4m wide rock column, and the analysis was not successful (i.e., FOS<2.5), confirming that the minimum width of rock column shall be 5m for these geological conditions. REFERENCES [1] Mechanized Tunnelling in Urban Areas – Design methodology and constructioncontrol byVittorioGulielmetti, Piergiorgio Grasso, Ashraf Mahtab & Shulin Xu [2] Martos, F. 1958. Concerning an approximate equation of the subsidence trough and its time factors. International Strata Control Congress, Leipzig, (Berlin: Deutsche Akademie der Wissenschaften zu Berlin, Section fur Bergbau), 191-205 [3] Peck, R. B. 1969. Deep excavation and tunneling in soft ground. 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico City State-of-the-Art volume, 225-290 [4] O’Reilly, M. P. and New, B. M., 1982. Settlements above tunnels in the United Kingdom – their magnitude and prediction. Tunneling’82, London, 173-181. [5] Clough GW, O’Rourke TD. Construction-induced movements of in situ walls. Proceeding of the design and performance of earth retaining structures, ASCE special conference, Ithaca, New York: 1990, 439-70. [6] Bowles JE. Foundation analysis and design. 4th ed. New York: McGraw-Hill: 1986 [7] Hsieh PG, Ou CY. Analysis of nonlinear stress and strain in clay under the undrained condition.JMech2011;27(2):201-13 [8] Osman AS, Bolton MD. Ground movement predictions for braced excavationsinundrainedclay.JGeotechGeoenvironEngg 2006; 132(4):465-77. [9] Chakeri H, Hasanpour R., Hindistan M., Unver B. (2010). Analysis of interaction between tunnels in [10] the soft ground by 3D numerical modeling. Bulletin of Engineering Geology and the Environment, 70: 439-448. [11] Hoek E., Carranza – Torres C. (2002). Hoek – Brown failure criterion, Edition 1, In: Proc.NARMS-TACConference,Toronto, 1, 267-273. [12] Kim S. H., Burd H. J., Milligan G.W.E. (1998). Model testing of closely spaced tunnels in clay. Geotechnique. 48(3), 375-388.
  • 12. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 07 | Jul 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 614 [13] Liu H. Y., Small J. C., Carter J. P., Williams D. J. (2009). Effects of tunneling on existing support system of perpendicularly crossing tunnels, Comput Geotech. 36(5), 880-894. [14] Perri G. (1994), Analysis of the effects of the new twin-tunnels excavation very close to a big diameter tunnel of Caracas Subway. In: Salam A (ed) Tunneling and ground conditions, Balkema, Rotterdam, 83-90. [15] Shahrour I., Mroueh H. (1997). Three-dimensional nonlinear analysis of a closely twin tunnels. In: Sixth international symposium on numerical models in geomechanics (NUMOG VI), Montreal, QC, Canada, 2, 481-487. BIOGRAPHIES Mr. Swarup has completed B. E. (Civil Engineering) from IIEST, Shibpore, Howrah in 2004. After that continuous more than 19 years working in Design and Construction of underground & elevated Metro Rail ProjectinIndia as Engineering Manager. Mr. Swarup is Final year M. Tech – Tunnel Engineering student of MIT, Pune. He is pursuing Post Graduate project management from NICMAR, Hyderabad.